2024-04-11_Final_Specifications_(Invitation_for_Bids)_141_Archer_.pdf

PDF 1 MB Posted

Attached to
EWP Project 5228 - 141 Archer Dr.
Solicitation number
IFB No. PW-0124
Issued by
Santa Cruz County, San Francisco City, California

About this file

The document is an Invitation for Bids issued by the City of Santa Cruz Public Works Department for EWP Project 5228 located at 141 Archer Drive. The project involves removing a damaged retaining wall and debris, constructing a new soldier pier retaining wall with associated drainage facilities, and performing slope stabilization and site work. The contract requires completion within 45 working days, with a bid opening scheduled for May 7, 2024, at 2:00 PM Pacific Standard Time. Bidders must submit sealed bids to the Public Works Department, and the project is funded through the federal Emergency Watershed Protection (EWP) Program.

The project has a total estimated contract cost that will be paid through a lump sum contract, with various line items including mobilization, water pollution control, traffic control, excavation, engineered fill, steel soldier piles, timber lagging, tieback anchors, guard rail, masonry wall, geocomposite drains, and storm drain installation. Contractors must possess a valid Class A Contractor License and be registered with the California Department of Industrial Relations. The bidding process requires compliance with federal regulations, including domestic preference for procurements, disadvantaged business enterprise requirements, and prevailing wage standards. Bid security of 10% of the total bid amount is required, and the City reserves the right to reject any or all bids.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUBLIC WORKS DEPARTMENT

INVITATION FOR BIDS,

SPECIFICATIONS, AND CONTRACT DOCUMENTS

FOR

EWP Project 5228 for 141 Archer Dr.

CITY PROJECT NO. g402402 UEI No. NNFLE88HHW48 / DUNS No. 050515881

SANTA CRUZ CITY COUNCIL

Fred Keeley, Mayor Renee Golder, Vice Mayor

Sandy Brown Sonja Brunner

Shebreh Kalantari-Johnson Scott Newsome Martine Watkins

Matt Huffaker, City Manager

Bonnie Bush, City Clerk Administrator

Anthony P. Condotti, City Attorney

Nathan Nguyen, Public Works Department Director

Kevin Crossley, Assistant Public Works Department Director

BID OPENING MAY 7 , 2024 @ 2:00 PM PACIFIC STANDARD TIME

Closing time to receive bids will be verified by the on-line clock maintained by the

US Naval Observatory, found at:

https://www.usno.navy.mil/USNO/time/display-clocks/simpletime https://www.usno.navy.mil/USNO/time/display-clocks/simpletime

Project Name: 141 Archer Dr.

Project Number: g402402

NOTICE INVITING SEALED PROPOSALS OR BIDS

NOTICE IS HEREBY GIVEN that the City of Santa Cruz, California (the “City”), invites sealed Bids for the following “Project”:

“EWP Project 5228 – 141 Archer Dr."

1. Date and Place of Opening Bids. Sealed bids for the construction of the Project will be received at the Public Works Department, 809 Center Street, Room 201, Santa Cruz, California 95060, until May 7, 2024, at 2:00 PM local time in a sealed envelope plainly endorsed with the Project Name and Number, listed above. At that time, the Bids received will be publicly opened and read. Attendees will be required to wear face masks, social distance, and follow any other safety measures currently recommended by the County Public Health Officer. Bids received after the date and time stated above will be rejected as nonresponsive.

2. Location of Project. The Project is to be performed at the following location: 141 Archer Dr.

and on city property adjacent to 141 Archer Dr.

3. Description of Work. The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: Remove damaged retaining wall and debris, construct new soldier pier retaining wall and associated drainage facilities, slope stabilization and site work (the “Work”). For additional information, please contact the individual listed in Paragraph 17, below.

4. Time for Completion. The Project shall be completed in 45 working days. All time limits stated herein are of the essence.

5. Bidding Documents. The “Bidding Documents” shall include this Notice Inviting Bids, the Bid Form including all attachments included herein, General Requirements, Technical Specifications (including all plans, drawings, and reports), Addenda, draft Agreement, the City’s Standard Specifications (dated 2002), as amended1, the State of California’s Department of Transportation Standard Specifications (dated 2022), as amended, and all other documents identified herein.

6. Obtaining the Bidding Documents. Bidding Documents may be downloaded, without charge, from the following designated website:

https://procurement.opengov.com/portal/santacruzca?status=all.

Paper Bidding Documents may be examined from the office of the Public Works Department, 809 Center Street, Room 201, Santa Cruz, California 95060.

Prospective bidders are urged to register with the designated website as a Bidding Documents holder, even if Bidding Documents are obtained from a source other than the

1 The City’s Standard Specifications (dated 2002) are located via the City Website at:

https://www.cityofsantacruz.com/home/showpublisheddocument?id=2467.

https://www.cityofsantacruz.com/home/showpublisheddocument?id=2467 designated website or City in either electronic or paper format. The designated website will be updated periodically with Addenda, reports, and other information relevant to submitting a bid for the Project. All official notifications, Addenda, and other Bidding Documents will be offered only through the designated website. Neither City nor any City official, employee, or agent will be responsible for Bidding Documents, including Addenda, if any, obtained from sources other than the designated website or the City.

7. Submitted Bid. Each sealed Bid shall comply with the Bidding Documents and be submitted on the Bid Form, including all attachments. Contractor must clearly and legibly set forth all information requested in the manner and form indicated.

By submitting a Bid, the Bidder represents that it has carefully examined and investigated the Project site and all Bidding Documents.

Each Bid shall include a bid security in the form of a certified check, cashier's check, or bidder's bond made payable to the order of the City of Santa Cruz, California, for an amount not less than (10) percent of the amount of the Proposal. The bid security shall be given as a guarantee that the successful bidder will enter into the contract, and will be declared forfeited if the successful bidder refuses or fails to enter into said contract.

All bidders shall submit with its Bid the included sworn statement of its financial responsibility, technical ability, and experience.

8. Addenda. All submitted Bids shall verify if the City has issued any addenda for this Project.

It is the bidder’s sole responsibility to ensure that all addenda requirements are included in the submitted Bid. All addenda shall be posted on the City’s designated website.

9. Pre-Bid Conference. A non-mandatory pre-bid conference will be held at the Project address, listed in Section 2, above, on April 23 , 2024, at 3:00 PM local time.

10. Withdrawing Submitted Bid. A bidder may withdraw a submitted Bid at any time prior to the time of bid opening only by written request to the City. Unless otherwise required by law, no bidder may withdraw its Bid for a period of sixty (60) days after the bid opening.

11. Award of Contract. The City will award the Project to the lowest responsible and responsive bidder. The City reserves the right to reject any and all Bids, including but not limited to for any minor irregularities, or waive any informalities or minor defects in proposals received.

The City may reject a Bid if it determines that any of the bid prices are materially unbalanced to the potential detriment of the City.

Within ten (10) calendar days after receiving written notice that the contract has been awarded, the successful bidder shall return to the City the signed agreement, together with the completed Labor and Material Bond and Faithful Performance Bond each in an amount equal to one hundred percent (100%) of the contract price (issued by a corporate surety company approved by the City Attorney), insurance certificates, and all other documents as required by the Bidding Documents.

12. Department of Industrial Relations Monitoring. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR). Prevailing wages as published by the DIR are required for all workers, including those employed by subcontractors, for all non-federally funded projects.

No contractor or subcontractor may be listed on a Bid or awarded the contract for the Project unless registered with the DIR pursuant to Labor Code section 1725.5 and 1771.1.

Refer to the DIR website, http://www.dir.ca.gov, to register and to find the correct wage rates and answers to questions related to prevailing wage requirements.

13. Federal Monitoring. This Project is funded by the federal Emergency Watershed Protection (EWP) Program. The Project is subject to, but not limited to, federal domestic preferences for procurements (2 CFR Section 200.322), the Disadvantaged Business Enterprise good faith efforts, California prevailing wage rates, American Iron and Steel requirements, the Contract Work Hours and Safety Standards Act, the Clean Air Act (42 U.S.C. 7401-7671) and the Federal Water Pollution Control Act (33 U.S.C. 1251-1387), as amended, and the Byrd Anti-Lobbying Amendment. The Davis-Bacon Act does not apply under this Federal program legislation.

14. Licenses. Bidders and their proposed subcontractors shall hold such licenses as may be required by the laws of the State of California for the performance of the Work. The Contractor is required to ensure that all subcontractors listed in the Bid Form and working on this Project hold valid licenses and certifications suitable for their trade. Bidder is required to provide with its Bid satisfactory proof of licensure to the City.

Bidders bidding as the Prime Contractor shall possess a valid California Contractor’s General A license at the time of Contract award, and all listed subcontractors shall hold valid licenses suitable for their trade at the time of bid submittal. Failure to possess required licenses shall act as a bar to award of the contract to the bidder.

Bidder and all subcontractors shall maintain the required licenses throughout the entire Project until the City issues a Notice of Completion.

15. Retention. Progress payments are subject to 5% retention withholding until thirty-five (35) calendar days after recording the notice of completion. Pursuant to California Public Contract Code Section 22300, for monies earned by the General Contractor and withheld by the City to ensure the performance of the Contract. The General Contractor, may, at its option, choose to substitute securities meeting the requirements of California Public Contract Code Section 22300, or have the retained, earned monies deposited in an escrow account at a federal or state-chartered bank.

16. Business License. All Contractors and subcontractors working in the City must have a valid

City of Santa Cruz business license at the time the contract is awarded, pursuant to Santa Cruz Municipal Code (SCMC) Chapter 5.04.

17. Questions for City. All questions relative to this Project prior to the opening of Bids shall be in writing and received a minimum of five (5) working days prior to the above-stated Bid opening date and shall be directed to:

City of Santa Cruz, Public Works Department

809 Center Street, Room 201, Santa Cruz, California 95060

Chris Schneiter Management Professional and Technical Assistant Email: cschneiter@santacruzca.gov Tel.: 831-212-6051 Fax: 831-420-5161

This Advertisement is issued by the City of Santa Cruz, California.

Dated: April 11, 2024 Kevin Crossley Assistant Director/City Engineer Public Works Department 809 Center Street, Rm. 201 Santa Cruz, CA 95060

BID FORM

For

EWP Project 5228 for 141 Archer Dr.

TO: The Council of the City of Santa Cruz

PROPOSAL OF:

Business Address:

Business Telephone:

The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement, in the form specified in the Contract Documents, with the City of Santa Cruz (“City”) to perform all work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the Bidding Documents.

The undersigned Bidder understands that any or all quantities of work shown herein are approximate only and are subject to increase or decrease, and offers to do the work whether the quantities are increased or decreased at the unit prices as stated in the following tabulation. The undersigned Bidder agrees to take in full payment for the work, including all applicable state and local taxes, the amount shown on the bid sheet.

Please note closing time to receive bids will be verified according to local telephone company time.

IT IS UNDERSTOOD THAT THIS BID IS BASED UPON COMPLETION OF THE

WORK AS SPECIFIED IN THE SPECIAL PROVISIONS WITHIN 45 WORKING DAYS,

AND THE PRICES INCLUDE ALL STATE, FEDERAL, AND OTHER TAXES

APPLICABLE TO THE PROJECT.

The undersigned Bidder agrees to do any extra work, not covered by the above schedule of price, which may be ordered by the City, and to accept as full compensation therefore, such prices as may be agreed upon in writing by the City and the Contractor in accordance with the “Measurement and Payment” Section of the Standard Specifications.

If awarded the contract, the undersigned Bidder hereby agrees to submit the following documents to the City within ten (10) business days of the Notice of Award: a signed Agreement, executed bonds (including Faithful Performance Bond and Payment Bond), proper evidence of insurance, and any other forms or documents identified in the Bidding Documents and Notice of Award. The undersigned Bidder further agrees to begin work within ten (10) days after receiving the Notice to Proceed.

The undersigned Bidder has carefully examined the form of the Agreement, the Standard Specifications, the Plans and Special Provisions for the project hereinbefore described and referred to in the “Invitation to Bidders” inviting proposals for 141 Archer Drive and also the site of the work and will provide all necessary machinery, tools apparatus and other means of construction, and do all the work and furnish all materials required by said Specifications and Plans and Special Provisions in the manner described therein.

No bid will be considered for less than all items of this schedule and one contract will be awarded for the entire Project.

The undersigned has carefully checked the bid prices, and all computations involved in the preparation of this bid, and understands that the City of Santa Cruz will not be responsible for any errors or omissions on the part of the undersigned in making up this bid.

This Bid is made with a full knowledge of the kind, quantities, and quality of the work and of materials, equipment, and plans required. This proposal is also made after a complete, careful, and independent examination and investigation of the site of the work, local conditions affecting the same, and materials to be encountered.

The undersigned Bidder hereby acknowledges receipt of the following Addenda:

Addendum Number Addendum Date

The Bidder furthermore agrees that in case of its default in executing said Agreement with necessary bonds, the check or bond accompanying this Bid and money payable will become and remain the property of the City of Santa Cruz.

Enclosed is Bidder’s bond, certified check, or cashier’s check no. of the Bank for $ which is not less than 10 percent of the Bid submitted by the undersigned, payable to the City of Santa Cruz, California, and which is given as a guarantee that the undersigned will enter into the contract if awarded the work.

It is understood and agreed that the City may reject any or all proposals, or waive any informalities or minor defects in proposals received.

It is agreed that this bid may not be withdrawn over a period of sixty (60) days from the opening thereof.

Bidder submits the following complete and executed documents herewith to form a complete Bid:

1. Bid Form

2. Basis of Bid

3. Bid Bond (if used as security)

4. List of Subcontractors Form

5. DIR Compliance Affidavit

6. Contractor Reference Information

7. Non-Collusion Declaration

8. Bidder’s Financial Qualification Form

9. Certification Regarding Lobbying and Disclosure of Lobbying Activities

10. Exhibit 12-B: Bidder’s List of Subcontractors (DBE) Part 1

11. Exhibit 12-B: Bidder’s List of Subcontractors (DBE) Part 2

12. Contractor Qualification Questionnaire

13. Equal Employment Opportunity Certification

14. Public Contract Code

15. Debarment and Suspension Certification

Note: Bidders should not add any conditions or qualifying statement to this bid as otherwise the bid may be declared irregular as being not responsive to the Advertisement for Bids.

The undersigned declares under penalty of perjury that the information contained in this Bid and all accompanying documents are true and correct. A notary acknowledgment is required.

Dated: Firm Name:

Official Address: Phone:

Email Address:

By: Title:

State Contractor’s License No.:

DIR Registration No.:

Signature of Bidder:

Basis of Bid

Name of Bidder:

Project Name/Number:

Item No. Item Description Unit

Estimated Quantity

Unit Price

Unit Price Extension ($)

1 Mobilization LS 1 2 Water Pollution and Erosion Control LS 1 3 Traffic Control LS 1 4 Clearing and Grubbing LS 1 5 Excavation and Grading LS 1 6 Engineered Fill – Native Soil CY 10 7 Engineered Fill – Imported Soil (Revocable) CY 5 8 Steel Soldier Piles W10x39 (24” Dia) LF 96 9 Steel Soldier Piles W10x45 (24” Dia) LF 280 10 Treated Timber Lagging 4”x12” SF 400 11 Treated Timber Lagging 6”x12” SF 460 12 Grouted Tieback Anchor Assembly EA 9 13 Guard Rail LF 30 14 Masonry Wall LF 27 15 Geocomposite Drain – Soldier Pile Wall LF 80 16 Geocomposite Drain – Masonry Wall LF 24 17 6 “ Diameter Residential Storm Drain LF 325 18 6 “ Diameter Slope Storm Drain LF 110 19 Fence LF 70 20 Slope Restoration LS 1 21 Special Inspections Allow. $12,000 $12,000

SUBTOTAL

10% CONTINGENCY

TOTAL

Total Basis of Bid Plus Contingency in Words:

Bid Bond (If Bond Posted as Security)

KNOW ALL PERSONS BY THESE PRESENT:

THAT WE, , AS PRINCIPAL,

AND , AS SURETY, are held and firmly bound unto the City of Santa Cruz in the penal sum of 10 PERCENT OF THE TOTAL AMOUNT OF THE BID of the Principal above named, submitted by said Principal to the City of Santa Cruz for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made to the City of Santa Cruz to which said bid was submitted, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. In no case shall the liability of the surety hereunder exceed the sum of

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, WHEREAS, the Principal has submitted the above-mentioned bid to the City of Santa Cruz, aforesaid, for certain construction specifically described as follows

For:

EWP Project 5228 for 141 Archer

NOW, THEREFORE, if the aforesaid Principal is awarded the contract and, within the time and manner required under the specifications, after the prescribed forms are presented to him/her for signature enters into a written contract, in the prescribed form, in accordance with the bid, and files the certificate of insurance and two bonds with the City, one to guarantee faithful performance, and the other to guarantee payment for labor and materials as required by law, then this obligation shall be null and void; otherwise, it shall be and remain in full force and virtue.

IN WITNESS WHEREOF, we have hereunto set our hands and seals on this _________day of____________, 20 ___.

PRINCIPAL SURETY

__________________________________ (Seal) (Seal)

Signature Signature

Title Title

Address Address (Note: Signatures of those executing for the surety as an Attorney-in-Fact must include a Notary Acknowledgement.)

List of Subcontractors Form

Project Name/Number: _____________________________

Bidder will use Subcontractors for the Work: □ YES □ NO

For each subcontractor to whom the Bidder proposes to subcontract portions of the work in an amount in excess of one-half of one percent, Bidder shall indicate on this form each proposed subcontractor’s legal/contracting entity name, business address and phone number, the Contractor’s State Licensing Board license number, the public works contractor registration number issued pursuant to California Labor Code Section 1725.5, the dollar amount and proportion (in percent) of the Work of each Subcontractor (of any tier) to whom a portion of the Work will be awarded via one or more subcontracts, and the work to be performed by the subcontractor.

Subcontractor’s

Legal Name Business

Address and Phone

Number

CSLB

License Number

Public Works

Contractor

DIR

Number

Subcontract Amount and Proportion of Total Bid

Price

Work to Be Performed

(Attach additional sheets, if necessary)

DIR COMPLIANCE AFFIDAVIT

California Labor Code requires private contractors, and their subcontractors, to pay prevailing wages to their workers when working on a project funded by a public entity. Prevailing wages are due if the project costs more than $1,000, and involves the following construction work: new construction, alteration, demolition, installation, repair and maintenance. Contractors must also make an attempt to hire apprentices when the total project costs exceed $30,000.

Prior to commencement of the Contract, all Contractors and subcontractors are required to register, and maintain active registration throughout the duration of the contract with the California Department of Industrial Relations (DIR). For information regarding registration, please go to https://www.dir.ca.gov/Public-Works/PublicWorks.html.

• No contractor or subcontractor may be listed on a bid proposal for a public works project (effective March 1, 2015) unless registered with the DIR pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

• No contractor or subcontractor may be awarded a contract for public work on a public works project (effective April 1, 2015) unless registered with the DIR pursuant to Labor Code section 1725.5.

• DIR registration is required each fiscal year (July 1 – June 30).

I, the Bidder, certify that:

I acknowledge that this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. I am aware of the provisions of Senate Bill SB 854 and Labor Code sections 1725.5, 1771.1(a), 1774-1776, 1777.5, 1813, and 1815 which require Contractors to comply with all labor compliance requirements, including but not limited to, prevailing wage requirements, Public Works Contractor Registration Program, Electronic Certified Payroll Reporting, and other requirements described in the DIR website. I will comply with such provisions before commencing the performance of the work of this contract, and maintain compliance throughout the completion of said contract.

Signature Date

Print Name Title https://www.dir.ca.gov/Public-Works/PublicWorks.html

Contractor Reference Information

Project Name/Number:

Failure to provide this information may constitute grounds for rejection of the bid.

The Bidder has been engaged in the contracting business under State License No.(s) for a period of years.

The following are five owners for whom the Bidder has constructed projects of similar scope to the Project. Such projects will have been completed within the past five years.

1. Name, Address, Phone No:

Project Description:

Date Completed:

2. Name, Address, Phone No:

3. Name, Address, Phone No:

4. Name, Address, Phone No:

5. Name, Address, Phone No:

Non-Collusion Declaration (Pursuant to Section 7106 of the Public Contract Code)

The undersigned declares:

I am the of , the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham.

The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true.

The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on , 20__, at [City], , [State].

(Signature)

Bidder’s Financial Qualification

Reference is hereby made to the following bank or banks as to the financial responsibility of the Bidder:

Name of Bank Address/Phone Number/Contact Name & Title

Reference is hereby made to the following surety companies as to the financial responsibility and general reliability of the Bidder:

Company:

Address:

Company:

Address:

I certify that Bidder is financially and technically capable of performing and has the necessary experience to perform the work of the contract.

I declare under penalty of perjury that the foregoing is true and correct. This certificate is executed on ______________[date], at ______________[city], ______________[state].

BIDDER

Name:

Title:

Certificate Regarding Lobbying 31 U.S. Code § 1352

The undersigned certifies, to the best of his or her knowledge and belief that:

(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federally-funded contract, grant loan, or cooperative agreement, it will complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions.

(3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, grants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31 U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this certificate is executed on ______________[date], at ______________[city], ______________[state].

BIDDER:

Exhibit 12-B: Bidder’s List of Subcontractors (DBE and Non-DBE) Part 1

Form Attached

Exhibit 12-B: Bidder’s List of Subcontractors (DBE and Non-DBE) Part 2

Form Attached

CONTRACTOR QUALIFICATION QUESTIONNAIRE

The Bidder agrees to complete, sign, and return this Contractor Qualification Questionnaire, including all required supporting documentation, with the Bid. If Bidder fails or refuses to fully complete the Contractor Qualification Questionnaire, furnish all required attachments, sign the Contractor Qualification Questionnaire, and return it to the City with the Bid, the Bid will be considered incomplete and the City reserves the right to reject the Bid as nonresponsive. The Bid will not be considered for award of the contract.

Bidder shall fully and completely answer each question set forth below. If necessary, Bidder shall attach additional sheets. Please print or type each response. If your response to any question is “no” or “none,” you must state “no” or “none.” “Not applicable” or other similar responses will not be accepted.

1. State the full legal name of the Bidder.

2. State the nature of the Bidder’s business entity (i.e. sole proprietorship, joint venture, partnership, corporation, or other [describe]).

3. State the name and address of each person or other legal entity which has a legal or equitable ownership interest of ten percent (10%) or more of the Bidder. For each such person or legal entity, state that person or entity’s ownership interest, title, and responsibilities, if any.

4. Has any person or legal entity holding a legal or equitable ownership of ten percent (10%) or more of the Bidder ever been accused of a civil violation of California Government Code Section 12650 et seq. (False Claims Act)? If so, describe in detail all facts, circumstances, and the outcome.

5. Has any person or legal entity holding a legal or equitable ownership of ten percent (10%) or more of the Bidder ever been determined by a public agency to not be a responsible bidder? If so, state the name, address, and telephone number of the public agency, including the name of the agency’s contact person.

6. State the Bidder’s contractor’s license number(s).

7. State the date Bidder first began business.

8. State any other names that Bidder has used or done business under in the past five (5) years.

9. Describe, in general, Bidder’s construction experience.

10. Has Bidder ever failed to complete a construction project? If so, describe in detail all facts, circumstances, and the outcome.

11. Has Bidder’s control over a work of improvement ever been terminated? If so, describe in detail all facts, circumstances, and the outcome.

12. For every public work of improvement upon which Bidder has furnished labor, services, materials, or equipment in the past five years, whether completed or not, for which the Bidder’s original contract was greater than $250,000 but not more than $1,000,000, state the name, address, and telephone number of the owner and principal designer (architect or engineer), original and final cost (if greater than 10% of original), and year.

13. For every lawsuit or arbitration between Bidder and the owner of any work of improvement initiated within the past five (5) years, state the name and address of the tribunal, the matter number, the parties, a general description of the nature of the dispute, and the outcome, if any.

14. Has Bidder ever been charged with a felony? If so, describe all facts, circumstances, and the outcome, furnishing the name and address of the court in which the charge(s) were filed, including the matter name and case number.

15. Has Bidder ever been accused of a civil violation of California Government Code Section 12650 et seq. (False Claims Act)? If so, describe in detail all facts, circumstances, and the outcome.

16. Has Bidder ever been accused of presenting false claims to a public agency or public owner, as such claims are defined in California Government Code Section 12650 et seq., or 31 United States Code Section 3729 et seq.? If so, describe in detail all facts, circumstances, and the outcome.

17. Has any public agency ever determined or ruled that Bidder is not a responsible bidder? If so, state the name, address, and telephone number of the public agency, including the name of the agency’s contact person.

18. Within the past five (5) years, has Bidder ever failed to complete a public works construction project, within the time allowed by the contract, plus any written agreed upon contract time extensions? If so, state the name, address, and telephone number of the owner of such public works construction project including the name of the agencies’ contact person, and further, describe in detail the nature of the work of improvement.

19. Has any surety of Bidder ever paid or satisfied any claim on behalf of Bidder? If so, state all facts and circumstances, including the name, address, and telephone number of surety and all claimants.

20. Has any surety of Bidder ever been called upon to complete a project of Bidder? If so, state all facts and circumstances, including the name, address, and telephone number of surety and all claimants.

21. For each project or work of improvement that Bidder is either (a) currently furnishing labor, services, materials, or goods, or (b) under contract to furnish labor, services, materials, or goods state a general description of the project; the current status of the project and Bidder’s work thereon; the owner’s name, address, and telephone number; and the amount of Bidder’s contract on such project.

22. State Bidder’s annual gross sales for each of the last five (5) fiscal years.

23. Have Bidder’s accounts receivable or rights to payment been assigned to a third party? If so, state the name of the third party and whether the third party has a secured or unsecured interest. Attach a copy of the assignment agreement to this Questionnaire.

The following certification must be signed by an owner, general partner, or officer of Bidder.

I declare under penalty of perjury under the laws of the State of California, and do personally certify and attest that: I have thoroughly reviewed the attached contractor qualification questionnaire and attachments, if any, and know its contents, and said contractor qualification questionnaire and attachments, if any, are truthful, complete and accurate; and that city of Santa Cruz may reasonably rely upon the contents as being complete and accurate; and further, that I am familiar with California Penal Code Section 72 and California Government Code Section 12650 et seq., pertaining to false claims, and further know and understand that submission or certification of a false claim may lead to fines, imprisonment, and/or other severe legal consequences.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this certificate is executed on ______________[date], at ______________[city], ______________[state].

BIDDER:

EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION

The Bidder’s Execution on the signature portion of this Bid shall also constitute an endorsement and execution of those certifications which are a part of this Bid.

The Bidder/Proposed Subcontractor, , hereby certifies that it □ has / □ has not (check one) participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, it has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the Committee on Equal Employment Opportunity all reports due under the applicable filing requirements.

BIDDER

Date:

NOTE: The Bidder must place a check mark before “has” or “has not” in one of the boxes provided.

The above Certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b)(1)), and must be submitted by Bidders and Proposed Subcontractors only in connection with contracts and subcontracts, which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.)

Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.

Proposed prime contractors or subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports, should note that 41 CFR 60-1.7(b)(1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period of such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, and U.S. Department of Labor.

PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT

In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the Bidder hereby declares under penalty of perjury under the laws of the State of California that the Bidder

□ has / □ has not (check one) been convicted, within the preceding three (3) years of any offenses referred to in that Section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any State or Federal antitrust law in connection with the bidding upon, award of, or performance of any public works contract (as defined in Public Contract Code Section 1101) with any public entity (as defined in Public Contract Code Section 1100). The term “Bidder” is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1.

NOTE: The Bidder must place a check mark before “has” or “has not” in one of the boxes provided.

The above statement is part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Statement.

Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE

In conformance with Public Contract Code Section 10162, the Bidder shall complete under penalty of perjury the following Questionnaire:

1. Has the Bidder or any officer or employee of Bidder, who has a proprietary interest in the Bidder, ever been disqualified, removed, or otherwise prevented from bidding on or completing a federal, state, or local government project because of a violation of law or a safety regulation? Please check one of the below:

□ YES □ NO

If the answer is “yes”, explain the circumstance.

PUBLIC CONTRACT CODE SECTION 10232 STATEMENT

In conformance with Public Contract Code Section 10232, the Bidder hereby states under penalty of perjury that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractor’s failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board.

Note: The above Questionnaire and Statement are part of the Proposal. Signing the Proposal on the signature portion thereof shall also constitute signature of this Questionnaire and Statement.

Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

DEBARMENT AND SUSPENSION CERTIFICATE

Title 49, Code of Federal Regulations, Part 29

The Bidder, under penalty of perjury, certifies that except as noted below, it or any other person associated therewith in the capacity of owner, partner, director, officer, or manager:

1. Is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;

2. Has not been suspended, debarred, voluntarily excluded, or determined ineligible by any Federal agency within the past 3 years;

3. Does not have a proposed debarment pending; and

4. Has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past three (3) years.

If there are any exceptions to this Certification, state the exceptions, including as to whom it applies, the initiating agency, and dates of action.

Exceptions will not necessarily result in denial of award, but will be considered by City in determining Bidder responsibility.

Note: Providing false information may result in criminal prosecution or administrative sanctions.

The above Certification is part of the Proposal. Signing the Proposal on the signature portion thereof shall also constitute signature of this Certification.

AGREEMENT

THIS AGREEMENT, made and entered into this ________day of ______________, 20___ (“Effective Date”), by and between the CITY OF SANTA CRUZ, a municipal corporation, hereinafter called “City,” and _________________________________, hereinafter called “Contractor;”

WITNESSETH, that the parties hereto do mutually agree as follows:

ARTICLE I

That for and in consideration of the covenants and agreements herein contained and the payments at the prices stated in the bid proposal attached hereto, and by this reference made a part hereof, the Contractor hereby covenants and agrees to furnish any and all required supervision, labor, equipment, material, services, and transportation, as set forth in the Contract Documents as hereinafter defined, and will bear any and all other expense necessary or incidental to the performance of certain work hereinafter specified, and to build, construct, reconstruct, pave or repave and complete improvements for:

EWP Project 5228 for 141 Archer

(the “Project”) in strict conformity and compliance with the Contract Documents, and to do everything required by this Agreement, and by said Contract Documents as hereinafter defined (the “Work”).

ARTICLE II

It is expressly agreed and understood by each and every party to this Agreement that the following documents are hereby incorporated and made a part of this Agreement (hereinafter the “Contract Documents”):

1. All applicable Laws and Regulations

2. Duly issued Agreement modifications, and allowance authorization(s) signed by the City, in chronological order by effective date of each.

3. This Agreement, including:

a. Exhibit A – Contractor’s Bid Proposal, including all attachments

4. Labor and Material Bond (Payment Bond)

5. Performance Bond

6. Insurance Certificates, including Contractor’s Certificate Relating to Worker’s Compensation

7. Invitation For Bids for EWP Project 5228 for 141 Archer, g402402, including the Project

Specifications, drawings, plans, reports, all Exhibits, and all Addenda in the reverse order of date of issuance

8. General Conditions

9. Standard Specifications, including the City Specifications and all applicable State

Specifications and/or Drawings

The parties to this Agreement do hereby expressly acknowledge that they have read, understand, and promise to comply with each and every provision of Contract Documents. There are no Contract Documents other than those indicated above. In the event inconsistencies, conflicts, or ambiguities between and among the Contract Documents are discovered, the parties shall attempt to resolve any ambiguity, conflict, or inconsistency informally, recognizing that the Contract Documents shall take precedence in the order in which they are listed above. Inclusion of an order of precedence herein does not in any way negate or reduce Contractor’s obligation to report conflicts, discrepancies, apparent omissions, and similar matters to the City.

ARTICLE III

It is expressly agreed and understood by the Contractor that the “Standard Specifications” consists of the documents on file at the Public Works Department of the City of Santa Cruz, entitled:

1. City of Santa Cruz Department of Public Works, Department of Parks and Recreation, and Water Department 2002 Standard Specifications (“City Specifications”);

2. Standard Specifications of the State of California, Department of Transportation, dated 2022 (“State Specifications”); and

3. State of California /Caltrans: California Manual on Uniform Traffic Control Devices (CA MUTCD) (2014 Revision 6).

4. California Building Code 2022

Where conflicts arise between the City’s Standard Specifications and the State Specifications, the City’s Standard Specifications shall control and apply.

ARTICLE IV

Contractor shall conform to all laws and regulations of the United States and the State of California, as well as laws of Santa Cruz, as may be applicable to the Project. In addition, the City Council of the City of Santa Cruz endorses the MacBride Principles and the Peace Charter and encourages all companies doing business in Northern Ireland to abide by the MacBride Principles.

ARTICLE V

The City hereby contracts to pay said Contractor the prices provided for in the Bid Proposal in the manner, to the extent, and at the times set forth in the Contract Documents.

ARTICLE VI

It is agreed by the parties hereto that the acceptance of the Contractor's performance will be made only by an affirmative action of the City of Santa Cruz City Council in session, evidenced by resolution, and upon the filing by the Contractor of a Release of all Claims of every nature on account of work done under this Agreement, together with an affidavit that all claims have been fully paid.

The acceptance by the Contractor of said final payment shall constitute a waiver of all claims against the City arising out of or in connection with this Agreement.

ARTICLE VII

To the fullest extent permitted by law, Contractor shall defend, indemnify, and hold harmless the City and its respective officials, officers, directors, partners, employees, and authorized agents (“Indemnitees”) from and against any and all claims, suits, actions, judgments, demands, liabilities, losses, damages, expenses, including attorneys’ fees and costs of litigation (collectively, “Losses”), arising from personal or bodily injuries, death, property damage, or otherwise in any way related to, connected with, or resulting from the obligations or performance of the Work under this Agreement by Contractor, subcontractors, and their respective officers, directors, employees, agents, or other third parties directly or indirectly employed by or under the authority or control of Contractor or subcontractors. This provision shall not be deemed to require the Contractor to indemnify or hold harmless an Indemnitee for any Loss proximately caused by the sole or active negligence or willful misconduct of the Indemnitee, as determined by a court or other adjudicatory body of competent jurisdiction.

Contractor acknowledges and agrees that Contractor’s obligation to defend the City and the other Indemnitees arises at the time such Losses is tendered to Contractor by the Indemnitees and continues at all times until finally resolved, and/or decided by an adjudicatory body or a court of competent jurisdiction. This provision shall survive the termination of the Agreement or the completion of the Work.

This indemnification clause supersedes any other indemnification clauses contained in any other Contract Documents.

ARTICLE VIII

General Terms

1. Complete Agreement. This Agreement, along with the terms and conditions in the Contract

Documents and any attachments, is the full and complete integration of the Parties’ agreement with respect to the matters addressed herein, and that this Agreement supersedes any previous written or oral agreements between the Parties with respect to the matters addressed herein. Unless otherwise stated, to the extent there is any conflict between this Agreement and any other agreement (written or oral), the terms of this Agreement shall control.

2. Severability. The unenforceability, invalidity or illegality of any provision(s) of this Agreement shall not render the other provisions unenforceable, invalid or illegal.

3. Waiver. Waiver by any party of any portion of this Agreement shall not constitute a waiver of the same or any other portion hereof.

4. Governing Law. This Agreement shall be governed by and interpreted in accordance with California law.

5. Contract Interpretation. Each party acknowledges that it has reviewed this Agreement and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this Agreement.

6. Counterparts. The Parties may execute this Agreement in two or more counterparts, which shall, in the aggregate, be deemed an original but all of which, together, shall constitute one and the same instrument. A scanned, electronic, facsimile or other copy of a party’s signature shall be accepted and valid as an original.

7. Warranty of Authority. The signatories to this Agreement warrant and represent that each is authorized to execute this Agreement and that their respective signatures serve to legally obligate their respective representatives, agents, successors and assigns to comply with the provisions of this Agreement.

Signature Page to Follow

IN WITNESS WHEREOF, this Agreement is executed by the City Manager of the City of Santa Cruz, under and pursuant to a resolution of the City Council authorizing such execution, and the Contractor has affixed his/her signature hereto the day and year first hereinabove written.

Technical Review by:

Kevin Crossley, Assistant Director/City Engineer

Approved as to Form by:

Anthony P. Condotti, City Attorney

For Contractor Name:

Signature: Date:

(Name, Title)

For CITY OF SANTA CRUZ, a municipal corporation

Matt Huffaker, City Manager

LABOR AND MATERIAL BOND

WHEREAS, as the City Council of the City of Santa Cruz, a municipal corporation in the County of Santa Cruz, State of California (the “City”), has awarded to hereinafter designated as the “Principal”, a contract for constructing the work or improvement described in the contract documents entitled: 141 Archer Drive, adopted by the City Council of the City , 20___ and

WHEREAS, said Principal is required under the terms of said contract to furnish a Labor and Material Bond, the surety of this bond will pay the same to the extent hereinafter set forth; and

WHEREAS, the said Principal is about to enter into the annexed contract with the City to complete the work or improvement referred to above for the City, all as more particularly and in detail shown upon the Contract Documents filed in the Office of the City Clerk of the City:

NOW, THEREFORE, we, the Principal, and , a corporation organized and existing under and by virtue of the laws of the State of as “Surety”, are held and firmly bound unto the City of Santa Cruz in the sum of dollars ($ ), such sum being not less than one hundred percent (100%) of the estimated contract cost of the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .