23-0032 SOW.pdf

PDF 41 KB Posted

Attached to
AS211 Generator Replacement
Solicitation number
N4008525R2504
Issued by

About this file

This document appears to be a Statement of Work (SOW) for a federal contract opportunity to replace a generator at Marine Corps Base Air Station, New River in North Carolina.

The SOW details the required work, which includes removing the existing generator, concrete pad, Automatic Transfer Switch (ATS), and associated wiring and conduits. It also requires removing the existing medium voltage conduit riser, fuse cutouts, surge arresters, conductors, conduits, duct-bank, and distribution transformer. The contractor must then install a properly sized generator with a supplemental load-bank breaker and Cam-Lok connectors, a new concrete pad, working platform, and ATS. The sub-base fuel tank must be sized to provide 96 hours of run time. Additionally, the contractor must provide and install new medium voltage fuse cutouts, surge arresters, conductors, conduits, duct-bank, transformer, and service disconnect.

The related federal contract opportunity solicitation number is N4008525R2504, with the project name "AS211 Generator Replacement". The contracting agency is the Department of the Navy Naval Facilities Engineering Command. Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this project.

View the file

Other files

File Type Posted
RFP 23-0032.pdf PDF
23-0032 DM.pdf PDF
N4008523B0032 Specs.pdf PDF
N4008523B0032 Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DESCRIPTION

The work includes - Remove the existing generator, concrete pad, ATS, all associated wirings and conduits. Remove existing medium voltage conduit riser, fuse cutouts, surge arresters, mounting hardware, conductors, conduits, duct-bank, and distribution transformer. Install properly sized generator with supplemental load-bank breaker and Cam-Lok connectors, concrete pad, working platform, and ATS. The sub-base fuel tank shall be sized to provide 96 hours of run time. Provide and install medium voltage fuse cutouts, surge arresters, conductors, conduits, duct-bank, transformer, service disconnect, and incidental related work.

The work shall be located at:

Marine Corps Base Air Station, New River, North Carolina

SUPERVISION

One person may fill the roles of Superintendent, Quality Control Manager, and

Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.

File details come from the government source that posted it. Updated .