This document contains a request for proposals for the time charter of a Jones Act compliant tanker vessel. The solicitation requests a U.S. flagged, double hull tanker capable of carrying a minimum of 310,000 barrels of clean petroleum products within designated cargo tanks and with double valve isolation. The contract would be firm-fixed-price with pass-through expenses for port charges and fuel. The base period is one year with three one-year options and one final 11-month option. Pricing tables are provided to input daily rates for crew wages, vessel costs, insurance, fuel consumption and total evaluated prices for the base and option periods. The Department of the Navy Military Sealift Command is the contracting agency.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic Pricing Data

Attachment IX(D)Vessel:
Basic Pricing DataRFP: N3220522R0010
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Base Period
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 1

Attachment IX(D)Vessel:
Basic Pricing DataRFP: N3220522R0010
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 366-day year
Option Period One
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 366 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 2

Attachment IX(D)Vessel:
Basic Pricing DataRFP: N3220522R0010
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Two
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 3

Attachment IX(D)Vessel:
Basic Pricing DataRFP: N3220522R0010
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Three
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 4

Attachment IX(D)Vessel:
Basic Pricing DataRFP: N3220522R0010
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 334-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 334 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Fuel Consumption Data

Attachment IX(D)Vessel:
Fuel Consumption DataRFP: GULF COAST TANKER LONG-TERM TIME CHARTER

Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Select "Fuel Type" from the drop down menu in the list below. If more than one fuel type is burned either underway or in-port please use extra rows provided.

Box #Description# DaysMetric Tons/dayFuel TypePrice per Metric TonTotal
89Fuel Underway (laden)807
Other Fuel Type (if necessary)
90Fuel Underway (ballast)320
Other Fuel Type (if necessary)
92In-Port Loading575
Other Fuel Type (if necessary)
92In-Port Discharging276
Other Fuel Type (if necessary)
1978TOTAL:$ - 0
Notes:
Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and
appropriate fuel conversion factors(Letter dated 12 April 2022). The rates to be used are as follows:
MGO/MDO:per metric ton$ 1,428.31
IFO-180:per metric ton$ 918.20
IFO-380:per metric ton$ 910.03

MGO/MDO: 7.507 barrels per metric ton

TOTAL EVALUATED PRICE

TOTAL EVALUATED PRICE
PER DIEM
DAILY CHARTER HIRE RATE# OF DAYSTOTAL PER DIEM/PERIOD
BASE PERIOD365$ - 0
OPTION 1366$ - 0
OPTION 2365$ - 0
OPTION 3365$ - 0
OPTION 4334$ - 0
FAR 52.217-8183$ - 0
1978
TOTAL EVALUATED FUEL$ - 0

PORT CHARGES DIFFERENTIAL

DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR

REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR

TOTAL EVALUATED PRICE