N0042126Q0005 Amendment 0001.pdf

PDF 142 KB Posted

Attached to
Provide electrical service connections for new furniture
Solicitation number
22721217
Issued by

About this file

This is a Standard Form 30 Amendment of Solicitation/Modification of Contract for an electrical service connections project at Building 2272, issued by NAWCAD Procurement Group. The amendment includes a comprehensive list of 17 Requests for Information (RFIs) and responses related to electrical work for new furniture installations, covering details such as wiring methods, panel capacity, working hours, and installation logistics. Key technical clarifications include confirmation that metallic cable (MC) is an acceptable wiring method, subpanels can be added for spare circuits, and as-built circuit routing diagrams will be sufficient for the project.

The amendment also adds two attachments: an electrical solicitation sign-in sheet dated 23-DEC-2025 and attachments 1-8 dated 11-DEC-2025. The solicitation (N00421226Q0005) involves electrical reconnections that will require multiple phased return visits, with work to be performed during normal business hours and scheduled in advance with the government. Contractors are advised that electrical re-connections will be coordinated with the furniture installation schedule to minimize disruption to existing workstations.

View the file

Other files

File Type Posted
Electrical Solicitation sign in sheet.jpg JPG image
N0042126Q0005.pdf PDF
Attachments 1 - 8.pdf PDF
Infill_Electric_SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add the Requests for Information and the Site visit Attendance list

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Dec-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0042126Q0005

X 9B. DATED (SEE ITEM 11)

29-Dec-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Dec-2025

CODE

NAWCAD PROCUREMENT GROUP

21983 BUNDY ROAD, BLDG 441

PATUXENT RIVER MD 20670

N00421 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

joseph.w.perry63.civ@us.navy.milEMAIL:240-317-5192TEL:

JOSEPH W. PERRY / CONTRACT SPECIALIST

N0042126Q0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION H - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

REQUESTS FOR INFORMATION

ELECTRICAL SERVICE CONNECTIONS TO NEW FURNITURE IN OFFICE AND CUBICAL SPACES

WITHIN BUILDING 2272 Solicitation: N00421226Q0005 RFI Questions Government Response 1 Would the Government please provide a copy of the site visit sign-in sheet Yes, a copy of the sign in sheet will be provided.

2 The Statement of Work 1.4 states “Time of Completion: Work shall be prosecuted diligently and shall be completed for use within the time indicated in the award document. Duration time is calendar days not workdays.”

Please provide the number of calendar days from NTP to project completion, as the project schedule directly affects pricing. This electrical work is time-sensitive and would be great if it could be started and completed quickly.

3 Please confirm that MC (metallic cable) is an approved and acceptable wiring method for this project.

Yes, metallic cable (MC) is an acceptable wiring method for this project.

4 Please advise if any new panel(s) are required for the additional electrical circuits for any of the electrical scope. Access was give to company representatives during the walkthrough for this solicitation to make an assessment. It is each company's responsibility to confirm if additional sub-panels are required as part of their proposal.

5 Please confirm the interior and exterior wall depths for running new wiring. Typical suite interior wall depths are 2.5” metal studs and exterior fire rated wall depths are 3-5/8” metal studs.

6 Can you verify with the furniture contractors if their power poles are 3 or 4 wire? I believe it was 4 but just wanted to be sure. Confirming 4-wire power poles.

7 Most of the panels in the electric rooms did not have space for spare circuits. Can we add subpanels in order to add more circuits? Yes, the addition of subpanel(s) for spare circuits is/are acceptable.

8 What are the expected working hours/days for these projects? Normal business hours, but work must be scheduled in advance with the govermnet prior to any portion that may cause power disruptions.

9 Do we have to submit a quote for all 8 attachments? Please itemize each CLIN as a separate price. Please refer to SOW.

10 Are copies of 1 line diagrams or panel schedules available? No, 1-line diagrams or panel schedules are not available.

11 Is the designated SSHO for the job allowed to work or are they restricted only to supervision? The designated SSHO for this project will be allowed to work.

12 Will core drilling through the existing slab be permitted for power feeds to furniture systems, and if so, are there any restrictions (locations, hours, firestopping requirements, or structural review approvals)? No, core drilling will not be permitted for power feeds to systems furniture. Please propose an alternate solution.

13 Can the Government confirm that existing electrical panels serving Building 2272 have sufficient spare capacity for all new circuits shown, or will panel upgrades / new breakers be required? Access was give to company representatives during the walkthrough for this solicitation to make an assessment. It is each bidders responsibility to verify existing panel capacity and design to code requirements based on your assesment during the site visit. Any assumptions should be noted in your proposal.

14 For areas shown with power poles on the furniture plans, will under-carpet surface raceway systems be approved as an equal alternative where they reduce cost, and who is the final approval authority (COR or NAVFAC)? For locations with base feeds under-carpet surface raceway systems are approved as an equal alternative as the exception suite 536 workstation N1 which could be powered via under-carpet surface raceway.

However, all power to power poles will be supplied via overhead plenum above the drop ceiling.

15 Will the Government provide a finalized furniture installation schedule for each suite, and will electrical re-connections occur in a single mobilization or require multiple phased return visits? Yes, a furniture schedule

N0042126Q0005 will be provided. However, furniture installation schedule will be coordinated based on the electrical disconnections schedule for existing workstations as to not disrupt use of those workstations that currently have existing power. Electrical re-connections will require multiple phased return visits.

16 Does the Government require a stamped electrical riser diagram and load calculations as part of the electrical design services, or will as-builts and simple circuit routing diagrams be sufficient? As-builts and simple circuit routing diagrams are sufficient.

17 Will the Government please provide the site visit sign-in sheet? Yes, a copy of the sign in sheet will be provided.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The below Table of Contents has been added

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Electrical Solicitation sign in sheet

1 23-DEC-2025

Attachment 2 Attachments 1-8 8 11-DEC-2025

(End of Summary of Changes)