224109 Part 1-General Terms & Conditions.pdf

PDF 155 KB Posted

Attached to
Wauchula Mold Remediation
Solicitation number
ITB-09381
Issued by
Hardee County, Florida

About this file

This document is a Construction Contract Project Manual for a mold remediation project at the Wauchula National Guard Facility in Wauchula, Florida. The project is being managed by the Florida Department of Military Affairs (DMA), and the contract will be administered by the DMA's Construction and Facility Management Office. The work covered by this contract includes furnishing all labor, services, tools, materials, equipment, transportation, supervision, and other requirements needed to perform mold abatement and remediation at the facility. The project is to be substantially complete within 60 calendar days after the Notice to Proceed, with liquidated damages assessed for late completion. The contractor is required to provide an on-site office for the Architect/Engineer, as well as utilities, security, and project signage.

The bid proposal must include a bid bond if the bid exceeds $100,000. Bidders must comply with all applicable laws, including Davis-Bacon requirements if applicable. Interested contractors must attend a pre-bid site visit on June 20th and submit any questions to the DMA Contracting Office. The project will be awarded to the successful bidder, and the contract term and any renewal options are not specified in the provided documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Contract Project Manual for the

NON-TECHNICAL SPECIFICATION

SECTIONS OF DIVISION ONE

LEVEL 3

($65,000 - $200,000)

Revised FEBRUARY 2023 (All previous revisions are obsolete)

STATE OF FLORIDA

DEPARTMENT OF MILITARY AFFAIRS

2305 STATE ROAD 207

St. Augustine, Florida 32086

224109

WAUCHULA MOLD REMEDIATION

Wauchula National Guard Facility

450 Rodeo Drive, Wauchula, Florida 33873

TO BE CONSTRUCTED FOR:

Department of Military Affairs

82 Marine Street

St. Augustine, FL 32084

CONTRACT ADMINISTERED BY

Construction and Facility Management Office

2305 State Road 207

St. Augustine, Florida, 32086

ARCHITECT / ENGINEER

SUPPLEMENTARY TERMS AND CONDITIONS

June 12, 2024

224109

Wauchula Mold Remediation

OWNER: Department of Military Affairs

ARCHITECT/ENGINEER: Department of Military Affairs

This document forms an integral part of the Request for Proposal Documents and the Contract Documents. The receipt of this document must be acknowledged in the space provided on your Proposal. This General Terms and Conditions are hereby modified as follows:

1. SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES: Section C-7 is amended in part as follows: This Project is to be substantially complete within 60 calendar days after the date of the Notice to Proceed. This date may be extended only in accordance with the Contract Documents. If the project is not substantially completed by the required date, liquidated damages shall be assessed at the rate of $0 per calendar day. (PM determines the daily rate in coordination with A/E, Contracting, and Deputy CFMO, or use $0)

2. ARCHITECT/ENGINEER'S FIELD OFFICE. The Contractor shall provide and maintain a watertight office at the Project for the exclusive use of the Architect/Engineer and his representatives, not less than 12' x 12' in size, one room with at least one window in each exterior wall and an independent outside entrance door fitted with hardware and lock, artificial light, a bench with one drawer, a blueprint rack, a heater and a window air conditioner. This office and equipment shall become the property of the Contractor upon completion of the contract.

3. TELEPHONE. A telephone shall be installed in the Architect/Engineer's office and it shall remain until the full completion of the project. Charges for long distance calls shall be paid by the person making the calls. All other telephone charges shall be paid by the Contractor.

4. WATER. Water necessary for construction of the building and testing its plumbing and mechanical systems shall be furnished by the Contractor. He shall make all connections, install a meter, take out and pay for all permits necessary, do all piping and clear away all evidence of same after the job is completed.

5. ELECTRICITY. All electricity for light and power necessary for the construction of the building and testing of its electrical and mechanical systems shall be paid for by the Contractor. The Contractor shall make all necessary arrangements for this service and perform the work required.

6. PROJECT SIGN. A sign shall be erected at the site by the Contractor and shall be 3/4"- 4' X 8' exterior grade plywood mounted on 4 x 4 wood posts (p.t.), located in a prominent location approved by the Architect/Engineer and Owner. Sign shall conform to the size, colors and design specifications provided by Architect/Engineer or owner.

7. INITIAL CONSTRUCTION CONFERENCE. Immediately prior to starting construction or as soon as possible after the construction has started, the Owner will arrange a meeting with the project stakeholders. The purpose of this meeting shall be to discuss requirements and responsibilities of the various parties involved with the objective of expeditious handling of the construction contract. The Owner's Contract Manager and Project Manager will chair this meeting.

8. SITE SECURITY. The Contractor shall pay for and be responsible to secure the site and the project against theft, vandalism, fire and for public safety at all times (24 hours per day) from Notice to Proceed until Substantial Completion.

9. DAVIS-BACON REQUIREMENTS. If Davis-Bacon and related laws apply, they will be addressed in Section D of the General Terms and Conditions. If applicable, then all applicable federal labor standards clauses are incorporated into the Contract Documents. The Contractor agrees to familiarize itself with “Making Davis-Bacon Work – A Contractor’s Guide to Prevailing Wage Requirements for Federally-Assisted Construction Projects” and to comply with all applicable regulations.

EXCEPT AS SPECIFICALLY PROVIDED HEREIN, ALL OTHER TERMS AND CONDITIONS OF THE

BIDDING DOCUMENTS AND CONTRACT DOCUMENTS REMAIN UNCHANGED.

[END]

Date Issued:____________

A/I Initials:____________

NOTICE TO BIDDERS

The following General Terms and Conditions and the Supplemental Terms and Conditions are part of the bidding and contract process for construction projects in excess of $200,000. These non-technical documents are designed to (i) ensure compliance with applicable laws, (ii) protect the

State’s interests, and (iii) make the contracting process easier for all parties. Please review carefully all sections in the non-technical specifications including the following items:

1. All Bidders must submit a bid bond with their bid proposal if the bid exceeds $100,000.00.

For details please refer to Section B-11 of the General Terms and Conditions.

2. All Bidders must submit bids in accordance with the publicized Invitation to Bid (ITB). If prequalification to bid is required, it will be stated within the ITB along with instructions.

3. Criminal History Background Checks, if included in the General Terms and Conditions, must be obtained for all employees and agents of the Contractor and its subcontractors, their agents and employees, and all other persons performing any of the work under a contract to the Contractor working within buildings or facilities either owned or managed by the Department of Military Affairs. Details of this responsibility are outlined in Article

C-38 of the General Terms and Conditions.

4. All Bidders are responsible for the cost of insurance and bonds. Please refer to Sections

C-1 through C-3 of the General Terms and Conditions for required types of insurance and

Exhibits 2 and 3 to review the requirements on the bond forms.

5. Proposal Form may be obtained with the ITB or as instructed in the ITB.

6. Samples of some Forms required by the Department of Military Affairs (DMA) are shown in the General Terms and Conditions. Forms for use during contract performance will be provided by DMA after contract award.

File details come from the government source that posted it. Updated .