224003 Chipley REVAMP ADDENDUM #1.pdf
PDF 2 MB Posted
- Attached to
- 224003 Chipley REVAMP
- Solicitation number
- ITB-17297
- Issued by
- St. Johns County, Florida
About this file
This Addendum #1, issued by the Florida Department of Military Affairs, Construction and Facility Management Office on November 19, 2026, modifies the original bidding documents for Invitation to Bid 224003 for the Chipley REVAMP project. The project encompasses full facility sustainment of the 17,208-square-foot Chipley Readiness Center located at 749 7th Street, Chipley, Florida, addressing maintenance, repairs, and lifecycle replacement of buildings, equipment, systems, and utilities without constructing new square footage. Scope items include roof repairs and replacements, building envelope sealing, exterior and interior maintenance and repairs, latrine and shower repairs and replacements, electrical and water system repairs and replacements, HVAC system repairs and replacements, fire alarm and mass notification system repairs and replacements, communications system repairs and replacements, window and fencing replacements, interior and exterior lighting repairs and replacements, parking area sealing and re-striping, Anti-Terrorism-Force Protection measures, site drainage and grading work, and signage repairs and replacements. The bid opening is scheduled for December 10, 2026 at 2:00 p.m. Eastern Time at the RFE Armory in St. Augustine, Florida. Addendum #1 includes five attachments: two bid addenda, a revised scope of work workbook, a revised schedule, a unit price bid form, and answers to bidders' questions. Substantial completion is required within 300 calendar days after Notice to Proceed, with liquidated damages of $182.54 per calendar day for delays.
Bidders must acknowledge Addendum #1 in the Proposal and Subcontractor List. Level 5 bids exceeding $500,000 require prequalification documentation including a Florida State Contractor License, corporate charter number, proof of an active office within 300 road miles of the project, resumes for the Project Manager and Project Superintendent meeting Florida Administrative Code requirements, a 36-month project status history, proof of completing at least two similar projects within the previous five years, MyFloridaMarketplace registration, and a bonding company letter of intent. Bidders must list all subcontractors by discipline with license numbers, and unverified licensing may render a bid nonresponsive. Bid security equal to at least 5 percent of the total bid is required, with a bid bond required on bids over $100,000. Performance and labor and material payment bonds equal to 100 percent of the contract sum are required on projects over $100,000. The contractor must establish a local office and maintain general liability coverage with a minimum of $1 million per occurrence. All employees, agents, and subcontractors must pass criminal history background checks. Davis-Bacon and related federal labor standards apply if determined applicable. The award goes to the lowest responsive and qualified bidder, with the state reserving the right to reject any or all bids if the low qualified bid exceeds the construction budget. Proposals remain valid for 60 calendar days from bid opening, and the successful bidder must execute the formal agreement within 10 calendar days. CPH Consulting of Sanford, Florida serves as the Architect/Engineer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Army National Guard Construction & Facility Management Office
ISSUED ADDENDUM
Rev. 11/2018
Date November 19, 2026
ADDENDUM Number 1
Project Number and Name 224003 Chipley REVAMP
Invitation to Bid Date October 21, 2026
Number of Attachments 5
Bid Opening Date and Time December 10, 2026, 2:00 p.m. Eastern (RFE Armory, St. Augustine, FL)
From: Department of Military Affairs, CFMO Contracting Office
This addendum and the listed attachments forms a part of the contract documents and modifies the original bidding documents. Acknowledgement of this addendum in the Proposal& Subcontractor List is required.
Concerns with this addendum should be addressed to:
ng.fl.flarng.list.cfmo-contracting@army.mil
Attachment List
CPH BID ADDENDUM #1
CPH BID ADDENDUM #2
SCOPE OF WORK WORKBOOK SCHEDULE-REVISED
UNIT PRICE BID FORM
BID RFI WORKBOOK-Answers to Bidder’s Questions
END OF ADDENDUM #1
File details come from the government source that posted it. Updated .