This is a Scope of Work document for the Chipley Readiness Center facility sustainment project, a National Guard Bureau initiative located in Chipley, Florida. The project (No. 12224003) involves comprehensive maintenance, repairs, and lifecycle replacement work for a 17,208 square foot Readiness Center and supporting assets, with no new construction intended. The scope encompasses a broad range of sustainment activities including roof repairs and replacements, exterior building maintenance, building envelope sealing, interior maintenance such as painting and flooring replacement, repair and replacement of latrines and showers with associated fixtures and finishes, electrical systems and components, water systems (potable and non-potable), sewage and irrigation systems, HVAC systems, fire alarm and suppression systems, communications systems, windows, fencing and gates for facility security, interior and exterior lighting, parking area sealing and re-striping, Anti-Terrorism-Force Protection measures, site drainage and stormwater management work, and signage repairs or replacement. The project also includes other sustainment work deemed necessary to maintain the facility in proper operating condition.

No specific pricing terms, set-asides, response dates, due dates, site visit requirements, bidders' conference information, award dates, contract term details, or funding source information is provided in this Scope of Work document. The document functions as a project description extracted from NGB Form 420-R and references NG PAM 415-12 for additional details regarding functional areas within the Readiness Center and support buildings. Bidders are directed to consult the complete bid documents for comprehensive project specifications and requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHIPLEY REVITALIZATION MANAGEMENT PROGRAM - REVAMP

Extracted from NGB Form 420-R, Section 9

Project Description

Project No. 12224003 | Chipley Readiness Center | Chipley, Florida

9. Project Description SUSTAINMENT (Maintenance & Repair) - This is a full facility sustainment project that will address maintenance, repairs, and lifecycle replacement for buildings, building equipment and systems, utilities, and components of the 17,208 square foot Readiness Center and supporting assets to keep them in good working order.

The intent is not to construct any new square footage, buildings, structures, etc.; rather, the intent is to sustain the overall asset inventory and maintain the asset inventory in good working order. See Project Description Extended.

9. Project Description (Continued) The project will include sustainment maintenance and repair of items that are at, nearing, or at the end of their useful life, failing or failed, including complete replacement of items as necessary, which is a function of the Sustainment Work Classification.

Work may include, but is not limited to, the following:

• Roof repairs/roof replacements for buildings and structures.

• General maintenance/repair activities to exterior of buildings and structures to keep them in good working order.

• Seal building envelope(s) from the elements.

• General maintenance/repair activities in the Readiness Center and support building(s) functional areas outlined in NG PAM 415-12 (e.g. painting, flooring replacement, replace ceiling tiles as necessary, etc.).

• Repair/replacement of latrines/showers, fixtures, tile, flooring, lockers, etc.

• Repair/replacement of electrical systems/components.

• Repair/replacement of water systems and components (potable/non-potable, sewage, irrigation, fire suppression, etc.).

• Repair/replacement of HVAC systems/components.

• Repair/replacement of fire alarm system/components (alarm, mass notification system, fire suppression system, etc.).

• Repair/replacement of communications system/components as necessary.

• Repair/replace windows as necessary.

• Repair/replace fencing/gates as necessary, in order to maintain a secure facility.

• Repair/replace interior and exterior lighting as necessary.

• Parking Areas (MOV & POV) sealing/re-coating with asphalt (or similar) and re-striping parking spaces.

• Repair/replace Anti-Terrorism-Force Protection (ATFP) measures as necessary.

• Draining/grading work to address any site drainage/stormwater requirements as necessary.

• Repair/replace signage as necessary.

• Other sustainment work that is found to be necessary to keep the facility in good working order.