2206 Helical Pile Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- 2206
- Issued by
- Kenosha County, Wisconsin
About this file
This document is a construction bid set of helical pile drawings prepared by Associated Engineers, Inc. for the UW Parkside Trail Bridges project located in Kenosha County, Wisconsin. The project encompasses the design and installation of helical piles at five distinct bridge sites along the trail system. The drawings include comprehensive construction documentation comprising a cover sheet, general notes and quantities, alignment details for each site, typical sections, bridge-specific details for Sites 2 through 5, and subsurface exploration data. The bid package was solicited by Kenosha County with a sealed bid deadline of February 17, 2022, at 3:00 PM, CT, with submissions directed to the Kenosha County Division of Parks. A virtual pre-bid vendor conference was scheduled for February 3, 2022, at 10:00 AM via Microsoft Teams. The project utilizes Wisconsin County Coordinate System (WCCS) references for Kenosha County, with specific elevation and coordinate data provided for control points and benchmarks at each of the four primary station locations (10+00 to 10+77, 20+00 to 20+97, 30+00 to 30+78, and 40+00 to 40+40).
The bid documents establish that Kenosha County reserves the right to reject any and all bids, to select the most advantageous vendor, and to award contracts for partial scope of work. The county retains authority to request additional information, clarify responses, waive minor irregularities, and does not guarantee that a contract award will result from this request for bid. Vendors were required to register with the State of Wisconsin's eSupplier portal to receive notifications of addenda and future solicitations, with no registration fee assessed. Complete bid and proposal packages were made available through Wisconsin's VendorNet website at vendornet.wi.gov, with the Kenosha County Purchasing Division providing coordination through PurchasingDivision@KenoshaCounty.org.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2206 Bid Tabulation FINAL.pdf | ||
| 2206 Bid Tabulation.pdf | ||
| 2206 Addendum One.pdf | ||
| Vendor Responsibility Form.pdf | ||
| 2206 Helical Pile Specs.pdf | ||
| 2206 Helical Pile Bid Doc.pdf | ||
| 2206 Rev Bid Offer Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Associated Engineers, Inc.
WESTBROOK
UW PARKSIDE
TRAIL BRIDGES
PROJECT
LOCATION
UW PARKSIDE
TRAIL BRIDGES
C-101
COVER SHEET
CONSTRUCTION
BID SET
NOTE:
COORDINATES ON THIS PLAN ARE REFERENCED TO
THE WISCONSIN COUNTY COORDINATE SYSTEM
(WCCS), KENOSHA COUNTY.
DIGGERS HOTLINE
Dial or (800)242-8511 www.DiggersHotline.com
Associated Engineers, Inc.
WESTBROOK
C-201
UW PARKSIDE
TRAIL BRIDGES
GENERAL NOTES &
QUANTITIES
CONSTRUCTION
BID SET
10+00
10+77
BP
: 1
0+
.0
EP
: 1
0+
.2
N42°40'03"E
77.23'
N
4.
E
.9
N
1.
E
.3
CP1
N = 157 489.79 E = 619 600.27
ELEV = 632.46
4" REBAR
CP2
N = 157 615.10 E = 619 679.44
ELEV = 633.44
4" REBAR
BM1
N = 157 587.41 E = 619 644.81
ELEV = 633.03
NAIL IN TREE
30+00
30+78
BP
: 3
0+
.0
PI
: 3
0+
.0
PI
: 3
0+
.9
EP
: 3
0+
.3
N
0.
E
.8
N
3.
E
.6
N
5.
E
.8
N
9.
E
.9
N82°30'51"E
20.00' S78°38'24"E
37.94' N80°37'33"E
20.37'
CP3
N = 158 643.19 E = 620 736.54
ELEV = 621.76
4" REBAR
CP4
N = 158 708.78 E = 620 701.15
ELEV = 624.52
4" REBAR
BM2
N = 158 656.49 E = 620 742.33
ELEV = 622.87
NAIL IN TREE
20+00
20+97
BP
: 2
0+
.0
PI
: 2
0+
.5
EP
: 2
0+
.5 6N
9.
E
.5
N
5.
E
.3
N
.3
E
.6
N0°05'51"W
66.59' N18°35'26"E29.97'
CP5
N = 158 739.19 E = 619 749.58
ELEV = 631.29
4" REBAR
BM3
N = 158 849.38 E = 619 702.35
ELEV = 634.00
NAIL IN TREE
CP6
N = 158 807.61 E = 619 718.77
ELEV = 632.86
4" REBAR
CP7
N = 158 816.07 E = 619 740.72
ELEV = 633.35
4" REBAR
40+00
40+40
BP
: 4
0+
.0
PI
: 4
0+
.0
EP
: 4
0+
.0
N79°37'00"E
31.00'
N88°58'51"E 9.01'
N
7.
E
.9
N
2.
E
.4
N
3.
E
.4
CP8
N = 159 314.24 E = 620 075.16
ELEV = 638.54
4" REBAR
CP9
N = 159 321.63 E = 620 190.42
ELEV = 641.99
4" REBAR
BM4
N = 159 329.90 E = 620 187.08
ELEV = 642.66
NAIL IN TREE
Associated Engineers, Inc.
WESTBROOK
ALIGNMENT
DETAILS
UW PARKSIDE
TRAIL BRIDGES
CONSTRUCTION
BID SET
C-202
SITE 2 SITE 3
SITE 4 SITE 5
WESTBROOK
CONSTRUCTION
BID SET
UW PARKSIDE
TRAIL BRIDGES
C-801
TYPICAL SECTION &
GENERAL NOTES
CONSTRUCTION
BID SET
UW PARKSIDE
TRAIL BRIDGES
C-802
BRIDGE SITE 2
DETAILS
CONSTRUCTION
BID SET
UW PARKSIDE
TRAIL BRIDGES
C-803
BRIDGE SITE 3
CONSTRUCTION
BID SET
UW PARKSIDE
TRAIL BRIDGES
C-804
BRIDGE SITE 4
CONSTRUCTION
BID SET
UW PARKSIDE
TRAIL BRIDGES
C-805
BRIDGE SITE 5
CONSTRUCTION
BID SET
UW PARKSIDE
TRAIL BRIDGES
C-806
SUBSURFACE
EXPLORATION
| C-101 |
| Sheets and Views |
| 010101_ti |
| C-201 |
| Sheets and Views |
| 11x17 |
| C-202 |
| Sheets and Views |
| Alignment Details |
| C-801 |
| Sheets and Views |
| fsh |
| C-802 |
| Sheets and Views |
| site 2 |
| C-803 |
| Sheets and Views |
| site 3 |
| C-804 |
| Sheets and Views |
| site 4 |
| C-805 |
| Sheets and Views |
| site 5 |
| C-806 |
| Sheets and Views |
| bor |
File details come from the government source that posted it. Updated .