This Addendum No. 2, issued on July 27, 2026, by Kendra C. Thompson Architects (KTA) for the DNR Rose Lake Facility Upgrade Project in East Lansing, Michigan, clarifies and modifies the original bid documents through twelve Request for Information (RFI) responses and three substitution requests. The project, identified as File #751/24215.JLM and Job #22025001, involves facility improvements at 8903 E. Stoll Road. Key clarifications include confirmation that existing roofing will be demolished with new roofing installed; that owner-provided equipment such as safes, displays, appliances, and furniture are excluded from the bid scope; and detailed specifications for fluid-applied decorative resinous flooring with Sherwin-Williams' Decorative Mosaic Epoxy Coating System as the basis of design. The addendum provides comprehensive specifications for window selections (Andersen aluminum clad frames in Terratone and Dark Bronze with pine interior jambs), well water equipment relocation, sanitary plumbing demolition and abandonment, duct cleaning requirements prior to final completion, and specific piping requirements for LP gas and air compressor installations. Building signage design intent and corner guard installation locations are referenced in specification sections 10 14 01 and 10 26 01, respectively. The bid form requires only Bid Alternate No. 1, with bidders instructed to strike out non-applicable Alternates 2 and 3 on the Bid Summary. Regarding the septic system, elevations reflect the finish grade at approximately 864.5, with the system revised from pressurized to gravity-based design; the contractor is responsible for obtaining necessary permits from the Mid-Michigan District Health Department, with potential change directives issued for any required design adjustments.

The addendum denies Substitution Request #02 for Kommerling 76 window units, maintaining the requirement for aluminum clad wood window units consistent with previously completed DNR projects. Substitution Request #03 is accepted, allowing Overhead Door Corp Model #592 and Model #625 to replace the specified sectional and rolling doors, respectively, provided they meet or exceed all specified design intent requirements. The fluid-applied flooring specification (Section 09 67 00) establishes detailed substrate preparation requirements, including shot-blasting or grinding with dust containment, moisture-vapor emission testing per ASTM F 1869 (maximum 3 lb/1000 sq. ft. in 24 hours), and relative humidity testing per ASTM F 2170 (maximum 80 percent). The flooring system requires a manufacturer's authorized installer trained in the specific system, single-source procurement of primary materials, and pre-installation conference at the project site. The decorative mosaic epoxy system includes a primer coat (8-10 mils DFT), body coat with colored paint chip aggregates (10-12 mils DFT), clear grout coat (8-10 mils DFT), and finish coat of solvenated urethane (1.5-2 mils DFT), producing an overall system thickness of 26-34 mils. Yellow safety traffic striping (two 3-inch wide by 60-foot stripes at each overhead door) is required, with final placement coordinated between the contractor, design professional, and owner representative. Traffic is prohibited on the flooring for 48 hours after installation, with the area barricaded until fully cured.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

803 cherry street manistee, mi 49660 ■ t: 231.723.4195 ■ thompson.kendra@sbcglobal.net ■ www.kendrathompson-architects.com kendra c.

THOMPSON

architects, p.c.

ADDENDUM NO. 2

DNR ROSE LAKE – FACILITY UPGRADE PROJECT DATE: 7/27/2026

8903 E. Stoll Road SOM: File #751/24215.JLM East Lansing, MI KTA: Job #22025001

The following items are changes, additions, deletions and/or clarifications of the drawings and specifications, and shall be included in the Bid Proposal. All of items will be a part of the Construction Documents. Acknowledge receipt of this Addendum in the appropriate space on the Bid Proposal form. Failure to do so may result in disqualification of the bid.

Item No. 1: RFI #01: Roofing Demo Clarification: Design intent is for existing roofing to be demo’d and new roofing system installed.

Item No. 2: RFI #02: Owner Equipment Clarification: Drawing indication of safe, info displays, appliances and furniture are by others and not included in bid scope.

Item No. 3: RFI #03: Fluid-Applied Flooring Add: Specification Section 09 67 00 Fluid-Applied Flooring. Refer to attached specification.

Item No. 4: RFI #04: Building Signage

Clarification: Refer to Specification Section 10 14 01 for signage design intent and location schedule as outlined in 101401, 2.01A.

Item No. 5: RFI #05: Window Color and Product Clarification: Window color selections (based on Andersen) or approved equal by Pella:

1. Window frames, exterior: Aluminum clad "TERRATONE"

2. Window sashes, exterior: Aluminum clad "DARK BRONZE"

3. Window and extension jambs, interior: PINE, field stained/sealed

4. Window hardware: "TERRATONE"

Add: Andersen Windows meeting design specification requirements are an approved product.

Item No. 6: RFI #06: Well Water Equipment

Clarification: Existing well is intended to remain. Well water equipment is existing and shall be relocated by Contractor as outlined on drawings. Well water equipment includes buffer tank, pressure tank, iron detector, brine tank, water softener and other incidental well water system equipment. At this time, Contractor shall plan on all existing equipment being relocated, however, Owner may opt to acquire new water treatment equipment to be provided by others with Contractor providing necessary piping connections.

Item No. 7: RFI #07: Sanitary Demolition

Clarification: Contractor shall demo all existing plumbing fixtures and sanitary as required to accommodate new work as outlined. Design intent is to cap and abandon in place so as to remain flush with new finish floor. Any piping located in exposed walls shall be removed in its entirety.

803 cherry street manistee, mi 49660 ■ t: 231.723.4195 ■ thompson.kendra@sbcglobal.net ■ www.kendrathompson-architects.com

Addendum No. 2 DNR Rose Lake 7/27/2026

Item No. 8: RFI #08: Duct Cleaning

Clarification: Duct cleaning shall be provided as required to rid new work from construction debris and foreign matter prior to final completion in accordance with Specification Section 23 31 00, 3.02

Item No. 9: RFI #09: Bid Form – Alternates Clarification: Bid documents Section 00300, Article 6 Bid Schedule correctly identifies Bid Alternate No. 1 to be included with Bid Proposal (page 00300-5). Bidders shall strike out non-applicable Alternates 2 and 3 on Bid Summary (page 00300-1) when submitting Bid Proposal.

Item No. 10: RFI #10: Piping Specification Clarification: Piping for LP gas shall be as outlined in specification Section 23 11 26.

Installation and piping for air compressor shall be as follows:

A. Steel Pipe: ASTM A53/A53M, Schedule 40 black.

a. Fittings: ASME B16.3, malleable iron, or ASTM A234/A234M, wrought steel welding type.

b. Joints: Threaded or welded to ASME B31.1.

B. Air compressor shall be provided by Owner and installed by Contractor.

C. Quick connector/Speed Coupler:

a. Quick Connector: 3/8 inch or 1/2 inch brass, snap-on connector with self-closing valve.

b. Quick disconnect/speed coupler connection shown on drawing detail shall be coordinated so as to match the connection of equipment by Owner.

D. Unions:

a. Ferrous Pipe: 150 psi (1034 kPa) malleable iron threaded unions.

b. Dielectric Connections: Union with galvanized or plated steel threaded end, copper solder end, water impervious isolation barrier.

c. Flexible Connector: Neoprene with brass threaded connectors.

Item No. 11: RFI #11: Septic System Clarification:

A. Elevations are not intended to indicate a "berm" but are reflecting finish grade of installed system being approximate Elev.=864.5, with final adjustments made in field.

B. Addendum #1 revised the septic system from pressurized system to gravity system. Diverter valve was only needed with pressurized system.

C. Contractor is responsible for obtaining any permitting with government agency having jurisdiction.

PSC had a vacant land assessment conducted by officials from Mid-Michigan District Health Department with their input being the basis of the design outlined. Should any adjustments based on final MMDHD permitting be required, a change directive would be issued to adjust contract scope.

Item No. 12: RFI #12: Corner Guards Clarification: Corner guards are to be furnished and installed as outlined in Specification

Section 10 26 01, 3.02, A "...at all outside corners of interior wall partitions or where otherwise determined to require wall protection."

Item No. 13: Substitution Request #02: Windows Substitution request for Kommerling 76 window units has been denied.

Item No. 14: Substitution Request #03: OH Doors

Accepted: Sectional door as specified in Section 08 36 13 may be substituted with Overhead Door Corp Model #592 when meeting or exceeding all aspects of the specified design intent for product and accessories. Rolling door as specified in Section 08 35 00 may be substituted with Overhead Door Corp Model #625 when meeting or exceeding all aspects of the specified design intent for product and accessories.

END OF ADDENDUM NO. 2

Attachment: RFI #01 – RFI #12 Substitution Request #02 & 03 Specification Section 09 67 00

KTA-22025001 FLUID-APPLIED FLOORING

Copyright KTA 07272026 09 67 00 - Page 1

SECTION 09 67 00

FLUID-APPLIED RESINOUS FLOORING

PART 1 - GENERAL

1.1 SUMMARY

A. Decorative resinous fluid-applied flooring systems.

1.2 RELATED SECTIONS

A. Section 03 30 00 – Cast-in-place concrete.

1.3 ACTION SUBMITTALS

A. Refer to Section 011000 General Requirements for submittal process.

B. Product Data: For each type of product indicated.

C. Samples: For each type of exposed finish required.

1.4 INFORMATIONAL SUBMITTALS

A. Material certificates.

B. Material test reports.

1.5 CLOSEOUT SUBMITTALS

A. Maintenance data.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of flooring systems required for this Project.

B. Source Limitations: Obtain primary resinous flooring materials, including primers, resins, hardening agents, grouting coats, and topcoats, from single source from single manufacturer.

Provide secondary materials, including patching and fill material, joint sealant, and repair materials, of type and from source recommended by manufacturer of primary materials.

C. Mockups: Apply mockups to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.

1. Apply full-thickness mockups on 48-inch- (1200-mm-) square floor area selected by Design Professional.

2. Simulate finished lighting conditions for Design Professional's review of mockups.

3. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

D. Preinstallation Conference: Conduct conference at Project site with Design professional and Owner Representative in attendance prior to commencing Work.

1.7 PROJECT CONDITIONS

A. Environmental Limitations: Comply with resinous flooring manufacturer's written instructions for substrate temperature, ambient temperature, moisture, ventilation, and other conditions affecting resinous flooring application.

B. Lighting: Provide permanent lighting or, if permanent lighting is not in place, simulate permanent lighting conditions during resinous flooring application.

C. Close spaces to traffic during resinous flooring application and for not less than 24 hours after application unless manufacturer recommends a longer period.

Copyright KTA 07272026 09 67 00 - Page 2

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

B. BASISI OF DESIGN: Product: Subject to compliance with requirements, provide “Decorative Mosaic” Epoxy Coating System as manufactured by Sherwin-Williams.

C. Approved Equal: As determined by Design Professional.

2.2 MATERIALS

A. VOC Content of Liquid-Applied Flooring Components: Not more than 100 g/L when calculated according to 40 CFR 59, Subpart D (EPA Method 24):

2.3 SPECIALITY DECORATIVE RESINOUS FLOORING RF-1

A. Resinous Flooring: Abrasion-, impact- and chemical-resistant, decorative-aggregate-filled, epoxy-resin-based, monolithic floor surfacing designed to produce a seamless floor.

B. System Characteristics:

1. Color and Pattern: As selected by Design Professional from manufacturer's full range.

2. Broadcast: Color and Pattern: BASIS OF DESIGN: Medium coverage; red, grey, beige color range. Color and pattern as selection by Design Professional from manufacturer’s full range.

3. Wearing Surface: Textured for slip resistance and approved by Design Professional.

4. Overall System Thickness: 26-34 Mils DFT

C. Primer Coat:

1. Resin: Epoxy –3579

2. Formulation Description: High solids

3. Application Method: Self-leveling resin

a. Thickness of Coats: 8-10 mils DFT

b. Number of Coats: One

D. Body Coats:

1. Resin: Epoxy –3746

2. Formulation Description: 100% solids

3. Application Method: Self-leveling resin with broadcast decorative chips

a. Thickness of Coats: 10-12 mils DFT

b. Number of Coats: One

4. Aggregates: Colored Paint Chips

E. Grout Coat:

1. Resin: Epoxy –3746

2. Formulation Description: 100% solids

3. Type: Clear

4. Finish: Gloss

5. Thickness of Coats: 8-10 mils DFT

6. Number of Coats: One

F. Yellow Safety Traffic Striping:

1. Product as recommended by fluid applied flooring manufacturer.

2. Apply (2) 3-inch wide x 60-foot stripes at each overhead door.

3. Coordinate exact placement of stripes with Design Professional and Owner

Representative.

Copyright KTA 07272026 09 67 00 - Page 3

G. Finish Coat:

1. Resin: 4638

2. Formulation Description: Solvenated Urethane

3. Type: Clear

4. Finish: Gloss

5. Thickness of Coats: 1.5-2 mils DFT

6. Number of Coats: One

H. System Physical Properties: Provide resinous flooring system with the following minimum physical property requirements when tested according to test methods indicated:

1. Tensile Strength: 2,500 psi per ASTM C 307.

2. Flexural Modulus of Elasticity: 10,000 psi per ASTM C 580.

3. Impact Resistance: No chipping, cracking, or delamination and not more than 16 ft/lbs permanent indentation per MIL-D-3134.

4. Resistance to Elevated Temperature: No slip or flow of more than 1/16 inch (1.6 mm) per

MIL-D-3134.

5. Abrasion Resistance: 90-100 mg maximum weight loss per ASTM D 4060.

6. Flammability: Self-extinguishing per ASTM D 635.

7. Hardness: 80, Shore D per ASTM D 2240.

8. Bond Strength: 300 psi , 100 percent concrete failure per ACI 503R.

2.4 ACCESSORIES

A. Patching and Fill Material: Resinous product of or approved by resinous flooring manufacturer and recommended by manufacturer for application indicated: General Polymers 3513

B. Specialty Primer: General Polymers 5531

PART 3 - EXECUTION

3.1 PREPARATION

A. Concrete Substrates: Provide sound concrete surfaces free of laitance, glaze, efflorescence, curing compounds, form-release agents, dust, dirt, grease, oil, and other contaminants incompatible with resinous flooring.

1. Roughen tile substrates as follows:

a. Shot-blast or grind surfaces with an apparatus that abrades the concrete surface, contains the dust within the apparatus.

b. Comply with ASTM C 811 requirements unless manufacturer's written instructions are more stringent.

2. Repair damaged and deteriorated concrete according to resinous flooring manufacturer's written instructions.

3. Verify that concrete substrates are dry and moisture-vapor emissions are within acceptable levels according to manufacturer's written instructions.

a. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed with application of resinous flooring only after substrates have maximum moisture-vapor-emission rate of 3 lb of water/1000 sq. ft. of slab area in 24 hours.

b. Perform relative humidity test using in situ probes, ASTM F 2170. Proceed with installation only after substrates have a maximum 80 percent relative humidity level measurement.

c. Proceeding with Work is acceptance that conditions are acceptable and meet requirements of manufacturer’s installation specifications.

4. Alkalinity and Adhesion Testing: Verify that concrete substrates have pH within acceptable range. Perform tests recommended by manufacturer. Proceed with application only after substrates pass testing.

Copyright KTA 07272026 09 67 00 - Page 4

B. Resinous Materials: Mix components and prepare materials according to resinous flooring manufacturer's written instructions.

C. Use patching and fill material to fill holes and depressions in substrates according to manufacturer's written instructions.

D. Treat control joints and other nonmoving substrate cracks to prevent cracks from reflecting through resinous flooring according to manufacturer's written instructions.

3.2 APPLICATION

A. General: Apply components of resinous flooring system according to manufacturer's written instructions to produce a uniform, monolithic wearing surface of thickness indicated.

1. Coordinate application of components to provide optimum adhesion of resinous flooring system to substrate, and optimum intercoat adhesion.

2. Cure resinous flooring components according to manufacturer's written instructions.

Prevent contamination during application and curing processes.

3. At substrate expansion and isolation joints, comply with resinous flooring manufacturer's written instructions.

B. Apply specialty primer over prepared substrate at manufacturer's recommended spreading rate.

C. Apply two coats patch and fill materials over tile to fill in grout lines. The material should be used only to fill in grout lines. Abrade second coat to remove any trowel lines.

D. Apply primer over prepared substrate at manufacturer's recommended spreading rate.

E. Apply grout coat, of type recommended by resinous flooring manufacturer, to fill voids in surface of final body coat and to produce wearing surface indicated.

F. Apply topcoats in number indicated for flooring system and at spreading rates recommended in writing by manufacturer.

G. Protect resinous flooring from damage and wear during the remainder of construction period.

3.3 FIELD QUALITY CONTROL

A. Record temperature of the following during application:

1. Air temperature.

2. Substrate temperature.

3. Relative humidity.

3.4 CLEANING AND PROTECTION

A. Properly remove and dispose of excess materials, application devices, rags and solvents.

B. Clean off splashed material from adjacent surfaces.

C. Prohibit traffic on floor finish for 48 hours after installation.

D. Barricade area to protect flooring until cured.

END OF SECTION

Drawing notes on Sheet A201 accurrately reflect the design intent to provide new roof shingle system at all areas. Roof Plan illustrated on Sheet A207 is intended to reflect the roof slopes, valleys, etc.

and is not intended to reflect new vs. existing roofing materials.

Kendra Thompson, PSC Kendra C. Thompson Architects

7/22/2026

KTA RFI-01

thomp Highlight

These items are by others and not part of the construction bid scope.

Kendra Thompson, PSC Kendra C. Thompson Architects

7/22/2026

KTA RFI-02

Kendra C. Thompson Architects

7/22/2026

Specification Section 09 67 23 Resinous Flooring will be added in an addendum.

KTA RFI-03

Kendra Thompson Architects

7/22/2026

Specification Section 10 14 01 provides the design intent of signage. Section 101401, 2.01A provides the sign schedule.

Interior room identification signage is limited to UNISEX TOILET ROOM and STAFF TOILET ROOM and is standard, universal signage.

Wall identification signage is clearly specified and to be installed at fire/smoke partitions above ceiling areas.

Vinyl graphics specifies the contractor to carry an allowance for design layout at entry doors to be developed at a later time.

KTA RFI-04

Kendra C. Thompson Architects, PC

7/22/2026

Colors (based on Andersen) or approved equal by Pella:

Window frames, exterior: Aluminum clad "TERRATONE" Window sashes, exterior: Aluminum clad "DARK BRONZE" Window and extension jambs, interior: PINE, field stained/sealed Window hardware: "TERRATONE"

NOTE: Andersen windows will be identified as an approved equal in an addendum.

KTA RFI-05

Existing well is intended to remain. Well water equipment is existing and shall be relocated by Contractor as outlined on drawings. Well water equipment includes buffer tank, pressure tank, iron detector, brine tank, water softener and other incidental well water system equipment. At this time, Contractor shall plan on all existing equipment being relocated, however, Owner may opt to aquire new water treatment equipment to be provided by others with Contractor providing necessary piping connections.

7/24/2026Kendra Thompson, PSC Kendra C. Thompson Architects, PC

KTA RFI-06

Contractor to demo all existing plumbing fixtures and sanitary as required to accommodate new work as outlined. Design intent is to cap and abandon in place so as to remain flush with new finish floor. Any piping located in exposed walls shall be removed in its entirety.

For site visit, as outline in Bid Manual, contact DNR Chad Krumnauer at (517)512-0427 or krumnauerc@michigan.gov.

7/23/2026

KTA RFI-07

thompson.kendra@sbcglobal.net

From: Jonathan Dzido <jonathan@wmfloyd.net> Sent: Friday, July 24, 2026 2:04 PM To: thompson.kendra@sbcglobal.net Subject: DNR Rose Lake RFI

Hello Kendra, In 23 31 00-2 3.02 of the specs it calls for duct cleaning. Is this required considering that all new duct is being installed and will be capped throughout construction.

Best Regards, Jonathan Dzido Estimator Wm. Floyd Company Cell: 517.428.3922 www.wmfloyd.net

RESPONSE:

Duct cleaning shall be provided as required to rid new work from construction debris and foreign matter prior to final completion.

Kendra Thompson, PSC 7/24/2026 kendra C. Thompson Architects

KTA RFI-08

Sorensen Gross

Flint, MI 48502

111 E Court St Ste 1S

(810) 767-4821

While reviewing the Bid Form I noticed that the form calls out for Alternate 1,2,3 while this project only has one alternate. Can you please confirm that this project has 1 alternate and do i leave the other alternates in the form empty when submitting?

snasr@sgcompany.com

Simon Nasr

07/24/2026

(315) 886-0045

Bid documents Section 00300, Article 6 Bid Schedule correctly identifies Bid Alternate No. 1 to be included with Bid Proposal (page 00300-5). Bidders shall strike out non-applicable Alternates 2 and 3 on Bid Summary (page 00300-1) when submitting Bid Proposal.

Kendra Thompson, PSC Kendra C. Thompson Architects, PC

7/24/2026

KTA RFI-09

Piping for LP gar shall be as outlined in Specification Section 23 11 26.

Installation and piping for air compressor shall be as follows:

A. Steel Pipe ASTM A53/A53M, Schedule 40, black.

a. Fittings: ASME B16.3, malleable iron, or ASTM A234/A234M, wrought steel welding type.

b. Joints: Threaded or welded to ASME B31.1.

B. Air compressor shall be provided by Owner and isntalled by Contractor.

C. Quick connector/Speed Coupler:

a. Quick Connector: 3/8-inch or 1/2-inch brass, snap-on connector with self-closing valve.

b. Quick disconnect/speed coupler connection show on drawing detail shall be coordinated so as to match connection of equipment by Owner.

D. Unions:

a. Ferrous Pipe: 150 psi (1034 kPa) malleable iron threaded unions.

b. Dielectric Connections: Union with galvanized or plated steel threaded end, copper solder end, water impervious isolation barrier.

c. Flexible Connector: Neoprene with brass threaded connectors.

7/27/2027Kendra Thompson, PSC Kendra C. Thompson Architects, PC

KTA RFI-10

thomp Highlight thomp Highlight

1. Elevations are not intended to indicate a "berm" but are reflecting finish grade of installed system being approximate Elev.=864.5, with final adjustments made in field.

2. Addendum #1 revised the septic system from pressurized to gravity system. Diverter valve was only needed with pressurized system.

3. The Contractor is responsible for obtaining any permitting with government agency having jurisdiction. We have already had a vacant land assessment conducted by officials from Mid-Michigan District Health Department with their input being the basis of the design outlined. Should any adjustments based on final MMDHD requirements be necessary, we would adjust by issuing a change directive, including any costing modifications that may be necessary.

Kendra Thompson, PSC Kendra C. Thompson Architects

7/27/2026

KTA RFI-11

Corner guards are to be furnished and installed as outlined in Specification Section 10 26 01, 3.02, A "...at all outside corners of interior wall partitions or where otherwise determined to require wall protection."

7/24/2026Kendra Thompson, PSC Kendra C. Thompson Architects, PC

KTA RFI-12

KTA SR-02

7/22/2026

This product is rejected. Design intent is for aluminum clad wood window units matching previously completed DNR projects.

2.99" 1.89"

2.99"

.5 7"

.9 1"

1.

0.

1.

2.

.9

0"

KTA SR-03

Overhead Door Corp Model #592 is acceptable when meeting or exceeding all aspects of specified product and accessories.

7/24/2026

Kendra Thompson, PSC Kendra C. Thompson Architects

Overhead Doors Corp Model #625 is acceptable when meeting or exceeding all aspects of specified product and accessories.

Kendra Thompson, PSC Kendra C. Thompson Architects

7/24/2026

Page 2 of 2
22025001 DNR Rose Lake - SUBSTITUTION REQUEST 02 windows 22july2026 RESPONSE.pdf
22025001 DNR Rose Lake - SUBSTITUTION REQUEST 02 windows product brochure.pdf
76 Ali.Clad central seal.pdf
76 MD + AluClip - Tech.pdf
096700 fluid applied flooring.pdf
PART 1 - GENERAL
1.1 SUMMARY
A. Decorative resinous fluid-applied flooring systems.
1.2 RELATED SECTIONS
A. Section 03 30 00 – Cast-in-place concrete.
1.3 ACTION SUBMITTALS
A. Refer to Section 011000 General Requirements for submittal process.
B. Product Data: For each type of product indicated.
C. Samples: For each type of exposed finish required.
1.4 INFORMATIONAL SUBMITTALS
A. Material certificates.
B. Material test reports.
1.5 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of flooring systems required for this Project.
B. Source Limitations: Obtain primary resinous flooring materials, including primers, resins, hardening agents, grouting coats, and topcoats, from single source from single manufacturer. Provide secondary materials, including patching and fill materia...
C. Mockups: Apply mockups to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.
1. Apply full-thickness mockups on 48-inch- (1200-mm-) square floor area selected by Design Professional.
2. Simulate finished lighting conditions for Design Professional's review of mockups.
3. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

D. Preinstallation Conference: Conduct conference at Project site with Design professional and Owner Representative in attendance prior to commencing Work.

1.7 PROJECT CONDITIONS
A. Environmental Limitations: Comply with resinous flooring manufacturer's written instructions for substrate temperature, ambient temperature, moisture, ventilation, and other conditions affecting resinous flooring application.
B. Lighting: Provide permanent lighting or, if permanent lighting is not in place, simulate permanent lighting conditions during resinous flooring application.
C. Close spaces to traffic during resinous flooring application and for not less than 24 hours after application unless manufacturer recommends a longer period.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. BASISI OF DESIGN: Product: Subject to compliance with requirements, provide “Decorative Mosaic” Epoxy Coating System as manufactured by Sherwin-Williams.
C. Approved Equal: As determined by Design Professional.
2.2 MATERIALS
A. VOC Content of Liquid-Applied Flooring Components: Not more than 100 g/L when calculated according to 40 CFR 59, Subpart D (EPA Method 24):
2.3 SPECIALITY DECORATIVE RESINOUS FLOORING RF-1
A. Resinous Flooring: Abrasion-, impact- and chemical-resistant, decorative-aggregate-filled, epoxy-resin-based, monolithic floor surfacing designed to produce a seamless floor.
B. System Characteristics:
1. Color and Pattern: As selected by Design Professional from manufacturer's full range.
2. Broadcast: Color and Pattern: BASIS OF DESIGN: Medium coverage; red, grey, beige color range. Color and pattern as selection by Design Professional from manufacturer’s full range.
3. Wearing Surface: Textured for slip resistance and approved by Design Professional.
4. Overall System Thickness: 26-34 Mils DFT
C. Primer Coat:
1. Resin: Epoxy –3579
2. Formulation Description: High solids
3. Application Method: Self-leveling resin
a. Thickness of Coats: 8-10 mils DFT
b. Number of Coats: One
D. Body Coats:
1. Resin: Epoxy –3746
2. Formulation Description: 100% solids
3. Application Method: Self-leveling resin with broadcast decorative chips
a. Thickness of Coats: 10-12 mils DFT
b. Number of Coats: One

4. Aggregates: Colored Paint Chips

E. Grout Coat:
1. Resin: Epoxy –3746
2. Formulation Description: 100% solids
3. Type: Clear
4. Finish: Gloss
5. Thickness of Coats: 8-10 mils DFT
6. Number of Coats: One
F. Yellow Safety Traffic Striping:
1. Product as recommended by fluid applied flooring manufacturer.
2. Apply (2) 3-inch wide x 60-foot stripes at each overhead door.
3. Coordinate exact placement of stripes with Design Professional and Owner Representative.
G. Finish Coat:
1. Resin: 4638
2. Formulation Description: Solvenated Urethane
3. Type: Clear
4. Finish: Gloss
5. Thickness of Coats: 1.5-2 mils DFT
6. Number of Coats: One
H. System Physical Properties: Provide resinous flooring system with the following minimum physical property requirements when tested according to test methods indicated:
1. Tensile Strength: 2,500 psi per ASTM C 307.
2. Flexural Modulus of Elasticity: 10,000 psi per ASTM C 580.
3. Impact Resistance: No chipping, cracking, or delamination and not more than 16 ft/lbs permanent indentation per MIL-D-3134.
4. Resistance to Elevated Temperature: No slip or flow of more than 1/16 inch (1.6 mm) per MIL-D-3134.
5. Abrasion Resistance: 90-100 mg maximum weight loss per ASTM D 4060.
6. Flammability: Self-extinguishing per ASTM D 635.
7. Hardness: 80, Shore D per ASTM D 2240.
8. Bond Strength: 300 psi , 100 percent concrete failure per ACI 503R.
2.4 ACCESSORIES
A. Patching and Fill Material: Resinous product of or approved by resinous flooring manufacturer and recommended by manufacturer for application indicated: General Polymers 3513
B. Specialty Primer: General Polymers 5531
PART 3 - EXECUTION
3.1 PREPARATION
A. Concrete Substrates: Provide sound concrete surfaces free of laitance, glaze, efflorescence, curing compounds, form-release agents, dust, dirt, grease, oil, and other contaminants incompatible with resinous flooring.
1. Roughen tile substrates as follows:
a. Shot-blast or grind surfaces with an apparatus that abrades the concrete surface, contains the dust within the apparatus.
b. Comply with ASTM C 811 requirements unless manufacturer's written instructions are more stringent.
2. Repair damaged and deteriorated concrete according to resinous flooring manufacturer's written instructions.
3. Verify that concrete substrates are dry and moisture-vapor emissions are within acceptable levels according to manufacturer's written instructions.
a. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed with application of resinous flooring only after substrates have maximum moisture-vapor-emission rate of 3 lb of water/1000 sq. ft. of slab area in 24 hours.
b. Perform relative humidity test using in situ probes, ASTM F 2170. Proceed with installation only after substrates have a maximum 80 percent relative humidity level measurement.
c. Proceeding with Work is acceptance that conditions are acceptable and meet requirements of manufacturer’s installation specifications.

4. Alkalinity and Adhesion Testing: Verify that concrete substrates have pH within acceptable range. Perform tests recommended by manufacturer. Proceed with application only after substrates pass testing.

B. Resinous Materials: Mix components and prepare materials according to resinous flooring manufacturer's written instructions.
C. Use patching and fill material to fill holes and depressions in substrates according to manufacturer's written instructions.
D. Treat control joints and other nonmoving substrate cracks to prevent cracks from reflecting through resinous flooring according to manufacturer's written instructions.
3.2 APPLICATION
A. General: Apply components of resinous flooring system according to manufacturer's written instructions to produce a uniform, monolithic wearing surface of thickness indicated.
1. Coordinate application of components to provide optimum adhesion of resinous flooring system to substrate, and optimum intercoat adhesion.
2. Cure resinous flooring components according to manufacturer's written instructions. Prevent contamination during application and curing processes.
3. At substrate expansion and isolation joints, comply with resinous flooring manufacturer's written instructions.
B. Apply specialty primer over prepared substrate at manufacturer's recommended spreading rate.
C. Apply two coats patch and fill materials over tile to fill in grout lines. The material should be used only to fill in grout lines. Abrade second coat to remove any trowel lines.
D. Apply primer over prepared substrate at manufacturer's recommended spreading rate.
E. Apply grout coat, of type recommended by resinous flooring manufacturer, to fill voids in surface of final body coat and to produce wearing surface indicated.
F. Apply topcoats in number indicated for flooring system and at spreading rates recommended in writing by manufacturer.
G. Protect resinous flooring from damage and wear during the remainder of construction period.
3.3 FIELD QUALITY CONTROL
A. Record temperature of the following during application:
1. Air temperature.
2. Substrate temperature.
3. Relative humidity.
22025001 DNR Rose Lake - SUBSTITUTION REQUEST 02 windows 22july2026 RESPONSE.pdf
22025001 DNR Rose Lake - SUBSTITUTION REQUEST 02 windows product brochure.pdf
76 Ali.Clad central seal.pdf
76 MD + AluClip - Tech.pdf

File details come from the government source that posted it. Updated .