This addendum document pertains to the DNR Rose Lake Facility Upgrade Project in East Lansing, Michigan, issued by Kendra C. Thompson Architects on July 17, 2026. The project encompasses facility improvements at 8903 E. Stoll Road, including demolition, construction of administrative and equipment buildings, site grading, septic system installation, and mechanical and electrical systems upgrades. A mandatory pre-bid conference was held on July 16, 2026, at 10:00 a.m. The addendum addresses 13 significant items including clarifications, revisions, and substitutions to the original specifications and drawings. Key project modifications include revisions to roof drainage systems, lawn restoration specifications, septic system and grading design, demolition scope, equipment area bracing, and plumbing, mechanical, and electrical system details. The construction schedule anticipates commencement in October 2026 with substantial completion targeted for July 2027. Substitution approvals include Mesker hollow metal frames (when meeting all specification requirements) and Hager hinges, seals, and kickplates, though Hager closers were not approved and LCN closers must be provided as specified.
The addendum clarifies that the owner (DTMB) will provide a hazardous material testing report upon availability, with any specialized abatement costs to be handled through work change modifications. The owner will vacate the building to allow the contractor full access throughout the project duration. Significant design clarifications address heat pump location coordination with the installation manual and owner, compressed air loop specifications at 1-1/4" line size with inlet and outlet pressure to be coordinated with owner equipment, and electrical heat pump location revisions requiring verification with the mechanical contractor. Drawing sheets C0.1, C1.0, A201, A202, A300, P201, M201, M202, M300, and E201P contain the revised details and must be acknowledged in the bid proposal to avoid disqualification. The project documentation includes comprehensive site plans, grading plans, foundation plans, mechanical and plumbing fixture schedules, and electrical power distribution plans for the administrative and equipment building components.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
803 cherry street manistee, mi 49660 ■ t: 231.723.4195 ■ thompson.kendra@sbcglobal.net ■ www.kendrathompson-architects.com kendra c.
THOMPSON
architects, p.c.
ADDENDUM NO. 1
DNR ROSE LAKE – FACILITY UPGRADE PROJECT DATE: 7/17/2026
8903 E. Stoll Road SOM: File #751/24215.JLM East Lansing, MI KTA: Job #22025001
The following items are changes, additions, deletions and/or clarifications of the drawings and specifications, and shall be included in the Bid Proposal. All of items will be a part of the Construction Documents. Acknowledge receipt of this Addendum in the appropriate space on the Bid Proposal form. Failure to do so may result in disqualification of the bid.
Item No. 1: Pre-Bid Meeting:
A mandatory Pre-Bid Conference was held on July 16, 2026, at 10:00 a.m. Refer to attached Meeting
Agenda.
Item No. 2: Clarification: Hazardous Material Testing Report
Clarification: DTMB has contracted for hazardous material testing and will provide report once available. It is not anticipated that the report to be available prior to bid due date. Should any hazardous materials be discovered requiring specialized abatement, costs will be handled through a work change modification.
Item No. 3: Clarification: Use of Project Site
Clarification: Owner will be vacating building allowing Contractor to have full access to project area for duration of project.
Item No. 4: Clarification and Revision: Specification Section 07 71 00 Roof Specialties Clarification and Revision: Project to include new roof edge drainage system (gutters and downspouts) as outlined in specification Section 07 71 00, 2.03. Revise Section 07 71 00, 3.04.C.2 to indicate downspouts directed away from building approximately 18-inches onto polymer downspout splashblocks (no below grade drainage system to be provided).
Item No. 5: Revise: Specification Section 32 92 18 Lawn Restoration Revise: Revise Specification Section 32 92 18, 1.03, A Definitions: Weeds: “Include…and other species not identified on the approved seed mix”.
Item No. 6: Substitution: Section 08 11 13 HM Doors and Frames Substitution: Request for substitution of Mesker hollow metal frames is acceptable when meeting all requirements of original specification. Refer to attached substitution request review.
Item No. 7: Substitution: Section 08 71 00 Door Hardware Substitution: Request for substitution of Hager for hinges, door seals and kickplates is acceptable when meeting all requirements of original specification. Request for substitution of Hager closers has not been approved, and products shall be provided as specified. Refer to attached substitution request review.
Item No. 8: Revise: On-Site Septic System – Reference Drawing Sheets C0.1 and C1.0 Revise: On-site septic system and grading has been revised as outlined on attached drawing Sheets
C0.1 and C1.0.
803 cherry street manistee, mi 49660 ■ t: 231.723.4195 ■ thompson.kendra@sbcglobal.net ■ www.kendrathompson-architects.com
Addendum No. 1 DNR Rose Lake 7/17/2026
Item No. 9: Revise and Add: Demolition – Reference Drawing Sheet A201 and A202 Revise and Add: Revise demolition to include removal of existing limited area deteriorated concrete slab as indicated on Drawing Sheet A201. Add installation of new concrete slab to match existing at area removed as indicated on Drawing Sheet A202.
Item No. 10: Add: Bracing at Equipment Area Addition – Reference Drawing Sheet A300 Add: Add lateral bracing members at Equipment Area addition as indicated on Drawing Sheet A300.
Item No. 11: Revise: Plumbing – Refer to Drawing Sheet P201
Revise and Add: The following items have been revised and/or added to plumbing drawings:
1. Electric water cooler (EWC-1) has been tagged and added to plumbing fixture schedule.
2. Overall floor plan has been revised showing plumbing venting and (2) two sanitary wall cleanouts.
3. Water softener detail was revised showing additional water treatment by Owner, installed by
Contractor.
Item No. 12: Revise: Mechanical – Refer to Drawing Sheets M201, M202 and M300 Revise and add: The following items have been revised and/or added to mechanical drawings:
1. Clarification: Location of heat pump shall be coordinated with heat pump installation manual and Owner prior to locating unit and concrete pad.
2. Clarification: Compressed air loop shows 1-1/4” line size. Coordinate inlet and outlet pressure with Owner equipment.
3. Heat pump stand detail added for clarification. Stand shall be structurally supported to pad in an approved manner by manufacturer’s installation manual.
Item No. 13: Revise: Electrical – Refer to Drawing Sheets E201P Revise: The following items have been revised and/or added to mechanical drawings:
1. Revise location of heat pump (HP-1) as shown. Verify final location with mechanical contractor.
END OF ADDENDUM NO. 1
Attachment: Pre-Bid Meeting Agenda
Substitution Request: 081113 and 087100 Drawing Sheets C0.1, C1.0, A201, A202, A300, P201, M201, M202, M300 and E201P fullm Typewritten Text Full Mortise LLC fullm Typewritten Text suite 208 6650 highland rd , waterford MI 48327 fullm Typewritten Text 248-472-0365 fullm Typewritten Text Mike Rodriguez fullm Typewritten Text A101 door schedule fullm Typewritten Text 08 11 13 hollow metal 08 71 00 door hardware fullm Typewritten Text
2.01 manufacturers , 07 71 00 applicable mfg fullm Typewritten Text ceco , steel craft , allegion fullm Typewritten Text Mesker Door inc - Hollow metal frames and hollow metal doors fullm Typewritten Text Hager Companies and or Best- Hinges, continuous hinges , Closers , seal , kick plates fullm Typewritten Text Pulls and architectural trim - Keying to remain the same fullm Typewritten Text x fullm Typewritten Text x
Mesker HM frames are acceptable when meeting all spec requirements.
There are no HM doors for this project.
Hager & Best door hardware hinges, seals and kick pltaes are acceptable when meeting all spec requirements.
Hager closers are not accepted and will need to provide LCN closers as specified.
Kendra Thompson, PSC
7/17/2026 fullm Typewritten Text None fullm Typewritten Text fullm Typewritten Text x fullm Typewritten Text Same or greater warranty coverage will be provided, fullm Image fullm Typewritten Text owner fullm Date fullm Typewritten Text Mike Rodriguez fullm Typewritten Text No adverse effect the substitution is requested and will Provide competitive lead times.
864 865
2 863
INDICATES EXISTING
TREE LINE TO REMAIN
APPROXIMATE
MOW LINE
6EXIST'G.
BUILDING
FF=865.5
ADDITION
FF=865.5
865.0
864.6
865.0
864.6
865.5
865.3 865.3
865.0865.0
.0
CONCRETE APRON
NEW 8" 22A AGGREGATE
DRIVE COMPACTED TO
95% MOD. PROCTOR
DENSITY ON UNDIST. SOIL
(ENLARGE EXIST'G. DRIVE
TO 20 FT MIN WIDTH)
NEW 8" 22A AGGREGATE
PARKING AREA
ACCESS AISLE
8 FT X 20FT EACH)
(MAX. 2% SLOPE)
CONCRETE APRON
C O
N C
R
ET
E A
PR
O N
NEW 8" 22A AGGREGATE
DRIVE COMPACTED TO
95% MOD. PROCTOR
DENSITY ON UNDIST. SOIL
W/ 12 FT MIN. WIDE NEW
DRIVE TO EXIST'G.)
PR
O
PA
N E
TA
N K
PR
O
PA
N E
TA
N K
INDICATES EXIST'G.
DRIVE TO REMAIN
MAX. 2" SLOPE @
NEW WALKWAYS
.0
INDICATES
TREE LINE
TO REMAIN
INDICATES
EXIST'G.
STORAGE
NEW
LEAN-TO
FT TH
IS
AREA
12'-0"
NEW SEPTIC SYSTEM:
REFER TO SHEET C1.0
FOR SEPTIC SYSTEM
DESIGN CRITERIA
(PER MID-MICHIGAN DHD)
RESERVE AREA
F
T W
EL
L
IS
O
LA
TI
O N
REMOVE
CONC.
REMOVE
COOLER/SLAB
INDICATES EXIST'G.
AGGREGATE DRIVE
6" CONC. PARK'G &
HC VAN-ACCESSIBLE
ADA SIGNAGE
NEW DRAIN FIELD
NEW
GENERATOR
SESC SILT FENCE -
REFER TO DET. 1/C0.1
MACHINE POINTED
POST, MAX. 6 FT
SPACING
ATTACH GEOTEXTILE
FABRIC TO POSTS
USING LATH
DIG TRENCH, PLACE
GEOTEXTILE FABRIC
& REPLACE SOIL
AREAS PER STATE
OF MICHIGAN SESC
DESIGN REQ'MTS.
INSTALL SESC
CONTROL @ WORK
1 SEEDING WHEN BARE SOIL IS EXPOSED
2 MULCH & MULCH BLANKET AREAS SUBJECT TO RAIN OR EROSION
3 STORM DRAIN INLET DRAINS SUBJECT TO RUNOFF
PROTECTION FROM EARTH ACTIVITIES
4 SILT FENCE TEMPORARY MEASURE AROUND
WORK AREA OF EARTH ACTIVITY
5 STABILIZE CONSTRUCTION WHERE EQUIPMENT MAY TRACK SOIL
ACCESS
SESC CONTROL MEASURES
ITEM SESC MEASURE WHERE USED
S.E.S.C GENERAL NOTES:
1. SESC measures to comply with Michigan Association of County Drain Commissioners SESC Specifications.
2. Additional erosion measures to be completed as required by SESC governing jurisdiction.
3. Contractor responsible for all measures necessary to prevent off-site sedimentation.
4. Geotextile silt fence and all catch basin protection measures shall be properly placed as needed to retain soils onsite.
5. Stabilize site as soon as possible after work activity.
6. Anticipated Schedule:
Construction Commencement: October 2026 Substantial Completion: July 2027
JAN 2026
KT-220230024
C op yr ig ht
Ke nd ra C
. T ho m ps on A rc hi te ct s, P
.C
GRADING PLAN
kt@kendrathompson-architects.com www.kendrathompson-architects.com
SITE PLAN &
SCALE: 1" = 15'-0"
GRADING PLAN
N kendra c.
architects, p.c.
THOMPSON
803 Cherry Street Manistee, MI 49660 tel: 231.723.4195
C0.1
DRAWING TITLE
KCT PROJECT NO.DRAWN
KCT
REVIEWED
KCT
DATE
SCALE
AS NOTED
DRAWING NO.
SEAL
SHEET NO.
NO. REVISIONS / SUBMISSIONS DATE
PROJECT NAME
SITE PLAN &
ROSE LAKE
EAST LANSING, MICHIGAN
8903 STOLL ROAD
DNR SGA
FILE #751/24215.JLM
FACILITY IMPROVEMENTS FOR:
NO SCALE
REQ'MTS
S.E.S.C.
C0.1
1 SCHEMATIC DESIGN 2/13/2026
2 SCHEMATIC DESIGN REV #01 2/14/2026
3 SCHEMATIC DESIGN REV #02 3/13/2026
4 DD 50% REVIEW SET 4/20/2026
5 CD 50% SET 6/05/2026
6 CD 90% SET 6/26/2026
7 BID/PLAN REVIEW SET 7/1/2026
8 ADDENDUM NO. 1 7/17/2026
2.0'
30.0'
20.0'MOW
LINE
TREE
LINE
TREE
LINE
BUILDING
PROPANE
PROPANE
GRAVEL
10.0'
10.0'
10.0'
R75.0' WELL ISOLATION DISTANCE
C1.0
NORTH
SE
PT
IC
P
LA
N
PLOT SCALE
SCALE
DRAWING
PROJECT
For protection of underground utilities, the CONTRACTOR shall dial 1-800-482-7171 OR 811 a minimum of three working days, excluding Saturdays, Sundays and holidays, prior to excavation in the vicinity of utility lines.
All "MISS DIG" participating members will thus be routinely notified. This does not relieve the CONTRACTOR of the responsibility of notifying the utility owners who may not be part of the "MISS DIG" alert system.
EA
ST
L
AN
SI
N
G C
LI
N
TO
N
C O
U N
TY
, M
IC
H
IG
AN
S
TO
LL
R
O
AD
4,517 SFT
BUILDING
FFE = 865.51'
M D
N R
LA
N
SI
N
G , M
IC
H
IG
AN
Know what's below.
before you dig.Call
R
PO
B
O X
C al le n
E ng in ee ri ng
, I nc
Ea st S av id ge S tre et
Sp rin g La ke , M
I 4
T.
6.
4.
w w w .c al le ne ng in ee rin g.
co m
BRUCE
A
CALLEN
ST
ATE OF MICHIGAN
LICENSED PROFES SIONAL ENGI
NE
ER
License No.
6201047392
DATE OF PLAN: 07-17-26
PLACE:
1 EA. - 1,500 GALLON SEPTIC TANK
INLET INV = 860.90'±
OUTLET INV = 860.90'±
PLACE:
10 LFT. - 6" SAN LAT @ 1.00% MIN.
6" INV @ BLDG. = 861.01
6" INV @ TANK = 860.90
D N
R S
G A
R O
SE
L
AK
E
PROPOSED SEPTIC DRAINFIELD
NO SCALE
SEPTIC SYSTEM DISTRIBUTION CELL SECTION X-SECTION
12" SCREENED SANDY LOAM
TOPSOIL WITH GRASS COVER.
12" TILE BED
(MDOT 6A STONE)
MAX 1:4 SLOPE
ELEV 857.70 FT
ELEV 864.50 - 863.50 FT
ELEV 858.70 FT
GEOTEXTILE (2 OZ. / SYD)
GENERAL NOTES
1) PROJECT INCLUDES THE CONSTRUCTION OF AN ON-SITE SEWAGE DISPOSAL FACILITY SERVING
ONE COMMERCIAL BUILDING FACILITY TO SERVE A MAXIMUM OF 5 PERSONS PER DAY.
· ONE (1) EA.- 1500 GAL SEPTIC TANK.
· 600 SFT (20'x30') GRAVITY DISTRIBUTION CELL WITH 8 LATERALS (4 PER ZONE @ 12-FT LENGTH
AT 4-FT SPACING). LATERALS SHALL BE 1 12" DIAMETER WITH 14" HOLES AT 5-FT SPACING.
CLEANOUTS SHALL BE PLACED AT ALL CHANGES IN PIPE DIRECTION, AND AT ENDS OF LATERALS
2) PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE MID
MICHIGAN DISTRICT HEALTH DEPARTMENT (MMHD), ENVIRONMENTAL HEALTH DIVISION
3) TANKS SHALL BE TESTED FOR WATER TIGHTNESS PER ASTM C1227 BY A CERTIFIED INSTALLER.
PRESSURE TEST TO BE WITNESSED BY ENGINEER AND/OR QUALIFIED THIRD PARTY.
SEPTIC SYSTEM DISTRIBUTION CELL PLAN VIEWNORTH
RESERVE SEPTIC
DRAINFIELD
RESERVE
AREA
EX. SUBSURFACE
SOILS
SUBSURFACE CONDITIONS
Soils generally consist of Boyer Sandy Loam (USDA NRCS Classification) consisting of Sandy Loam, Loamy Sand to a depth of 60 inches.
Soil borings and MMHD Land Evaluation are pending.
PRELIMINARY - NOT FOR CONSTRUCTION
DIRECTION OF FLOW45°
SANITARY LATERAL CLEAN-OUT
NO SCALE
1/8 BEND OR
COMBINATION WYE
CLEANOUT W/ THREADED CAP
2'x2' CONCRETE SURROUND
3" MIN. 8" MAX.
1" MIN.
CLEANOUT (TYP.)
PLACE:
17 LFT. - 6" SAN LAT @ 1.00% MIN.
6" INV @ TANK = 860.90
6" INV @ EDGE OF FIELD = 860.73
AutoCAD SHX Text
GM
AutoCAD SHX Text
GM
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text B.A.C.
AutoCAD SHX Text
EDIT
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text J.W.C.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISED IN ACCORDANCE WITH CONSTRUCTION RECORDS
AutoCAD SHX Text 1:1
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
026 KT ARCH - DNR
AutoCAD SHX Text
JUL '26
AutoCAD SHX Text Plan Prepared By: Bruce A. Callen, PE Callen Engineering, Inc. 108 E. Savidge St. Spring Lake, Michigan 49456 Tel: 616-414-5260 email: bcallen@callenengineering.com
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUANCE / REVISION
AutoCAD SHX Text
BY
AutoCAD SHX Text
JUL '26
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EX. WELL
AutoCAD SHX Text 1.
AutoCAD SHX Text 07-01-26
AutoCAD SHX Text
FOR BIDS
AutoCAD SHX Text A.J.B.
AutoCAD SHX Text 2.
AutoCAD SHX Text 07-17-26
AutoCAD SHX Text
ADDENDUM #1
AutoCAD SHX Text A.J.B.
REMOVE EXIST'G.
WALKING COOLER W/
CONCRETE SLAB &
FOOTINGS (V.I.F.)
REMOVE EXIST.
WALL AS REQ'D.
FOR NEW WORK
(V.I.F.)
REMOVE EXIST.
WALL AS REQ'D.
FOR NEW WORK
(V.I.F.)
REMOVE EXIST.
WALL AS REQ'D.
FOR NEW WORK
(V.I.F.)
REMOVE EXIST.
WALL AS REQ'D.
FOR NEW WORK
(V.I.F.)
REMOVE EXIST.
WALL AS REQ'D.
FOR NEW WORK
(V.I.F.)
REMOVE EXIST.
WALL & ROOF FRAMING
AS REQ'D. FOR NEW
WORK (V.I.F.)
REMOVE EXIST.
OVERHEAD DOOR,
TRACK & SLAB PIPE
REMOVE EXIST.
WALL & WINDOW
AS REQ'D. FOR
NEW WORK (V.I.F.)
REMOVE EXIST.
WALL & DOOR
AS REQ'D. FOR
NEW WORK (V.I.F.)
REMOVE EXIST.
OVERHEAD DOOR,
TRACK & SLAB PIPE
REMOVE EXIST.
OVERHEAD DOOR,
TRACK & SLAB PIPE
REMOVE EXIST.
WALL & WINDOW
AS REQ'D. FOR
NEW WORK (V.I.F.)
REMOVE EXIST.
WALL & WINDOW
AS REQ'D. FOR
NEW WORK (V.I.F.)
REMOVE EXIST.
WINDOW
REMOVE EXIST.
WINDOW
REMOVE EXIST.
WINDOW
REMOVE EXIST.
DOOR & FRAME
REMOVE EXIST.
WALLS & DOORS
AS REQ'D. FOR
NEW WORK (V.I.F.)
REMOVE EXIST.
DOOR & FRAME
REMOVE EXIST.
WALLS & DOORS
AS REQ'D. FOR
NEW WORK (V.I.F.)
REMOVE EXIST.
DOOR & FRAME
REMOVE EXIST.
CONC. SLABS
(V.I.F.)
REMOVE EXIST.
COUNTER - SAVE
MARBLE TOP FOR
RE-USE (V.I.F.)
REMOVE EXIST.
PLUMBING FIXTURES -
CAP PLUMBING
@ FLOOR LINE
DEMOLITION NOTES:
1) REMOVE ALL EXTERIOR SIDING
DOWN TO SHEATHING - PATCH &
REPAIR EXIST. SHEATHING AS
REQ'D. FOR NEW WORK (V.I.F.)
2) EXIST. ROOF SYSTEM TO BE
REMOVED DOWN TO SHEATHING
- PATCH & REPAIR SHEATHING AS
REQ'D. FOR NEW WORK (V.I.F.)
3) ALL EXIST. INTERIOR FLOOR
FINISHES TO BE REMOVED
DOWN TO CONC. SLAB - PATCH
& REPAIR EXIST. SLAB AS REQ'D.
(V.I.F.)
4) ALL EXIST. INTERIOR FINISHES TO
BE REMOVED TO STUDS OR
CEILING FRAMING (V.I.F.)
5) CONTRACTOR TO PROVIDE
SHORING OF EXIST. STRUCTURE
AS REQ'D. UNTIL INSTALLATION
OF NEW WORK IS COMPLETED
(V.I.F.)
6) REFER TO MEP DRAWINGS FOR
FURTHER DEMO WORK SCOPE
REMOVE EXIST.
CONC. SLAB
THIS AREA
(V.I.F.)
REMOVE CONCRETE SLAB
THIS AREA WHERE CRACKED
(V.I.F. EXTENT REQ'D.)
OVERALL PLAN
kt@kendrathompson-architects.com www.kendrathompson-architects.com
SCALE: 1/4 = 1'-0"
DEMOLITION PLAN
N kendra c.
architects, p.c.
THOMPSON
803 Cherry Street Manistee, MI 49660 tel: 231.723.4195
A201
DRAWING TITLE
KCT PROJECT NO.DRAWN
KCT
REVIEWED
KCT
DATE
SCALE
AS NOTED
DRAWING NO.
SEAL
SHEET NO.
NO. REVISIONS / SUBMISSIONS DATE
PROJECT NAME
ADMIN/EQUIP'T:
ROSE LAKE
EAST LANSING, MICHIGAN
8903 STOLL ROAD
DNR SGA
FILE #751/24215.JLM
FACILITY IMPROVEMENTS FOR:
C op yr ig ht
Ke nd ra C
. T ho m ps on A rc hi te ct s, P
.C
JAN 2026
KT-220230024
1 SCHEMATIC DESIGN 2/13/2026
2 SCHEMATIC DESIGN REV #01 2/14/2026
3 SCHEMATIC DESIGN REV #02 3/13/2026
4 DD 50% REVIEW SET 4/20/2026
5 CD 50% SET 6/05/2026
6 CD 90% SET 6/26/2026
7 BID/PLAN REVIEW SET 7/1/2026
8 ADDENDUM NO. 1 7/17/2026
NOTE:
UNEXCAVATED
'-0
'-0
'-0
'-0
'-8
3" 32'-2" 3"
6'-8" 18'-10" 6'-8"
'-2
'-0
'-0
'-0
'-0
'-7
'-7
'-8
'-4
'-0
3"32'-2"3"7'-11"
6'-8"18'-10"6'-8"
'-0
'-0
'-0
'-6
'-0
2'-0" 6'-0"
'-4
6'-8"8"
EXIST. FOUNDATION
SYSTEM (V.I.F.)
16" x 16" CMU PIER
FOR COLUMN SUPPORT
ON 24" x 24" POURED CONC.
FOOTING W/ BOTTOM OF
FOOTING MIN. 42" BELOW
FIN. GRADE (TYP.)
8" POURED CONC.
TRENCH FOOTING W/
(1) #5 BAR CONT. TOP &
BOTTOM - BOTT. OF
FOOTING MIN. 42" BELOW
FIN. GRADE (TYP.)
36" DIA. x 12" THICK
CONCRETE PAD FOOTING
W/ (3) #5 BARS EA. WAY -
TYPICAL @ POLE STRUCTURE
FOOTINGS
8" POURED CONC.
TRENCH FOOTING W/
(1) #5 BAR CONT. TOP &
BOTTOM - BOTT. OF
FOOTING MIN. 42" BELOW
FIN. GRADE (TYP.)
16" x 16" CMU PIER
FOR COLUMN SUPPORT
ON 24" x 24" POURED CONC.
FOOTING W/ BOTTOM OF
FOOTING MIN. 42" BELOW
FIN. GRADE (TYP.)
8" POURED CONC.
TRENCH FOOTING W/
(1) #5 BAR CONT. TOP &
BOTTOM - BOTT. OF
FOOTING MIN. 42" BELOW
FIN. GRADE (TYP.)
CONT. 2" RIGID INSULATION
UNDER SLAB ENTIRE PERIMETER
OF NEW ADDITION - VERTICAL &
48" HORIZ. (TYP.)
NOTE:
6" CONCRETE SLAB W/
6x6 - 2.9/2.9 WWF ON
10 MIL VAPOR BARRIER ON
MIN. 8" COMPACTED
GRANULAR FILL ON
UNDISTURBED SOIL
(OR ENGINEERED FILL) -
TYPICAL @ EQUIP. AREA
EXIST. FOUNDATION
SYSTEM (V.I.F.)
NOTE:
PIN POURED CONC. TRENCH FT'G. TO
EXIST. FND. WALL W/ #5 - 12" LONG
DOWELS @ 24" O.C. VERT. -
EPOXY INTO EXIST. WALL (TYP.)
NOTE:
PIN POURED CONC. TRENCH FT'G. TO
EXIST. FND. WALL W/ #5 - 12" LONG
DOWELS @ 24" O.C. VERT. -
EPOXY INTO EXIST. WALL (TYP.)
'-3
5'-4" 22'-0"
'-0
6'-3"
5'-4"
5'-4"
'-6
'-0
'-4
'-4
'-3
NOTE:
8" CONCRETE SLAB W/
6x6 - 2.9/2.9 WWF ON
MIN. 8" COMPACTED
GRANULAR FILL ON
UNDISTURBED SOIL
(OR ENGINEERED FILL) -
TYPICAL @ EXTERIOR APRONS
NOTE:
8" CONCRETE SLAB W/
6x6 - 2.9/2.9 WWF ON
MIN. 8" COMPACTED
GRANULAR FILL ON
UNDISTURBED SOIL
(OR ENGINEERED FILL) -
TYPICAL @ EXTERIOR APRONS
8" 26'-0"8"7'-3"8"
NOTE:
4" CONCRETE SLAB W/
6x6 - 1.3/1.3 WWF ON
MIN. 6" COMPACTED
GRANULAR FILL ON
UNDISTURBED SOIL
(OR ENGINEERED FILL) -
TYPICAL @ EXTERIOR ENTRY
NOTE:
4" CONCRETE SLAB W/
6x6 - 1.3/1.3 WWF ON
MIN. 6" COMPACTED
GRANULAR FILL ON
UNDISTURBED SOIL
(OR ENGINEERED FILL) -
TYPICAL @ EXTERIOR ENTRY
THICKENED CONCRETE SLAB @
EXIST'G. FOUNDATION - PIN TO
EXIST'G W/ #5 X 12" LONG DOWELS
@ 32" O.C. (V.I.F.)
NEW 4" CONC. SLAB W/
6X6-1.3/1.3 WWF ON MIN.
6" COMPACTED GRANULAR
FILL ON UDIST. SOIL - DOWEL
TO EXIST'G. W/ #5 X 8" @
32" O.C. @ PERIMETER
TYPICAL SLAB REPLACEMENT
(@ AREA TO BE REPAIRED):
OVERALL PLAN
kt@kendrathompson-architects.com www.kendrathompson-architects.com
EQUIPMENT BLDG:
SCALE: 3/16 = 1'-0"
FOUNDATION PLAN
N kendra c.
architects, p.c.
THOMPSON
803 Cherry Street Manistee, MI 49660 tel: 231.723.4195
A202
DRAWING TITLE
KCT PROJECT NO.DRAWN
KCT
REVIEWED
KCT
DATE
SCALE
AS NOTED
DRAWING NO.
SEAL
SHEET NO.
NO. REVISIONS / SUBMISSIONS DATE
PROJECT NAME
ADMIN/SHOP:
ROSE LAKE
EAST LANSING, MICHIGAN
8903 STOLL ROAD
DNR SGA
FILE #751/24215.JLM
FACILITY IMPROVEMENTS FOR:
ADMINISTRATION/
JAN 2026
KT-220230024
C op yr ig ht
Ke nd ra C
. T ho m ps on A rc hi te ct s, P
.C
1 SCHEMATIC DESIGN 2/13/2026
2 SCHEMATIC DESIGN REV #01 2/14/2026
3 SCHEMATIC DESIGN REV #02 3/13/2026
4 DD 50% REVIEW SET 4/20/2026
5 CD 50% SET 6/05/2026
6 CD 90% SET 6/26/2026
7 BID/PLAN REVIEW SET 7/1/2026
8 ADDENDUM NO. 1 7/17/2026
CEILING
EL. = 109'-0"
FIN. FLOOR
EL. = 100'-0"
GRADE
EL. = 99'-4" +/-
TOP OF WALL (EXIST. V.I.F.)
EL. = 110'-8"
T.O.W. @ ENTRY
EL. = 108'-0"
TOP OF WALL
EL. = 116'-0"
FIN. FLOOR
EL. = 100'-0"
FIN. FLOOR
EL. = 100'-0"
GRADE
EL. = 99'-4" +/-
TOP OF WALL
EL. = 116'-0"
CEILING
EL. = 109'-0"
FIN. FLOOR
EL. = 100'-0"
GRADE
EL. = 99'-4" +/-
TOP OF WALL (EXIST. V.I.F.)
EL. = 110'-8"
DOOR HEAD
EL. = 114'-0"
DOOR HEAD
EL. = 114'-0"
B B AB
B AAAA
'-6
'-0
'-8
'-0
'-6
'-0
'-2
'-8
'-6
CONT. RIDGE VENT
SHINGLE OVER STYLE
METAL DRIP EDGE
METAL WRAPPED
CONT. 2x6 WOOD FASCIA
ARCHITECTURAL PROFILE
ASPHALT SHINGLES
METAL CORNER TRIM
VERT. BOARD & BATT
METAL SIDING
METAL DRIP EDGE
METAL WRAPPED
CONT. 2x6 WOOD FASCIA
VERT. BOARD & BATT
METAL SIDING
ARCHITECTURAL PROFILE
ASPHALT SHINGLES
METAL CORNER TRIM
6x6 TREATED
WOOD POSTS (TYP.)
CONC. PAD FOOTING
STEEL BOLLARD
EXIST. FOUNDATION
SYSTEM (V.I.F.)
EXIST. FOUNDATION
SYSTEM (V.I.F.)
12" x 12" CEDAR CLAD
COLUMN & BEAM
STONE VENEER ON
16 x 16 CMU BASE
CONT. RIDGE VENT
SHINGLE OVER STYLE
METAL DRIP EDGE
METAL WRAPPED
CONT. 2x6 WOOD FASCIA
ARCHITECTURAL PROFILE
ASPHALT SHINGLES
METAL DRIP EDGE
METAL WRAPPED
CONT. 2x6 WOOD FASCIA
VERT. BOARD & BATT
METAL SIDING
ARCHITECTURAL PROFILE
ASPHALT SHINGLES
METAL CORNER TRIM
6x6 TREATED
WOOD POSTS (TYP.)
CONC. PAD FOOTING
STEEL BOLLARD
NOTE:
EXIST. WALL OPENINGS TO BE
PATCHED & REPAIRED TO MATCH
EXIST. CONSTR. - VERIFY EXACT
NUMBER OF OPENINGS IN FIELD.
MIN. 4-OPENINGS
MET. CLAD WOOD WINDOW W/
LOW-E INSUL'G. GLASS (TYPICAL)
LOW-E INSUL'G GLASS IN
FRP FRAME - THIS UNIT ONLY
POLYMER COVER ON
POLYMER COVER ON
METAL CLAD WOOD WINDOW
W/LOW-E INSUL'G. GLASS (TYP.)
INDICATES 2X6 "X"
BRACING (TYPICAL)
INDICATES 2X6 "X"
BRACING (TYPICAL)
CEILING
EL. = 109'-0"
FIN. FLOOR
EL. = 100'-0"
GRADE
EL. = 99'-4" +/-
TOP OF WALL (EXIST. V.I.F.)
EL. = 110'-8"
FIN. FLOOR
EL. = 100'-0"
GRADE
EL. = 99'-4" +/-
TOP OF WALL
EL. = 116'-0"
DOOR HEAD
EL. = 110'-0"
6 VERIFY
TOP OF WALL
EL. = 116'-0"
FIN. FLOOR
EL. = 100'-0"
TOP OF WALL
EL. = 116'-0"
TOP OF WALL
EL. = 116'-0"
CONT. RIDGE VENT
SHINGLE OVER STYLE
METAL DRIP EDGE
METAL WRAPPED
CONT. 2x6 WOOD FASCIA
VERT. BOARD & BATT
METAL SIDING
ARCHITECTURAL PROFILE
ASPHALT SHINGLES
12" x 12" CEDAR CLAD
COLUMN & BEAM
STONE VENEER ON
16 x 16 CMU BASE
POURED CONC.
TRENCH FOOTING
'-6
'-0
'-8
'-4
'-0
'-2
CONT. RIDGE VENT
SHINGLE OVER STYLE
METAL DRIP EDGE
METAL WRAPPED
CONT. 2x6 WOOD FASCIA
ARCHITECTURAL PROFILE
ASPHALT SHINGLES
METAL CORNER TRIM
6x6 TREATED
WOOD POSTS (TYP.)
CONC. PAD FOOTING
STEEL BOLLARD
VERT. BOARD & BATT
METAL SIDING
STEEL BOLLARD
FIN. FLOOR
EL. = 100'-0"
METAL CORNER TRIM
'-0
'-2
'-0
'-2
MECH. EXHAUST FANS
REFER TO MECH.
DRAWINGS
FRP DOOR &
FRAME
POLYMER COVER ON
FRP DOOR & FR. W/
LOW-E INSUL'G GLASS
INDICATES 2X6 "X"
BRACING (TYPICAL)
INDICATES 2X6 "X"
BRACING (TYPICAL) BLDG. ELEV'N.
kt@kendrathompson-architects.com www.kendrathompson-architects.com kendra c.
architects, p.c.
THOMPSON
803 Cherry Street Manistee, MI 49660 tel: 231.723.4195
A300
DRAWING TITLE
KCT PROJECT NO.DRAWN
KCT
REVIEWED
KCT
DATE
SCALE
AS NOTED
DRAWING NO.
SEAL
SHEET NO.
NO. REVISIONS / SUBMISSIONS DATE
PROJECT NAME
ADMIN. BLDG.
ROSE LAKE
EAST LANSING, MICHIGAN
8903 STOLL ROAD
DNR SGA
FILE #751/24215.JLM
FACILITY IMPROVEMENTS FOR:
C op yr ig ht
Ke nd ra C
. T ho m ps on A rc hi te ct s, P
.C
1 SCHEMATIC DESIGN 2/13/2026
2 SCHEMATIC DESIGN REV #01 2/14/2026
3 SCHEMATIC DESIGN REV #02 3/13/2026
4 DD 50% REVIEW SET 4/20/2026
5 CD 50% SET 6/05/2026
6 CD 90% SET 6/26/2026
7 BID/PLAN REVIEW SET 7/1/2026
8 ADDENDUM NO. 1 7/17/2026
JAN 2026
KT-220230024
SCALE: 3/16 = 1'-0"
NORTH VIEW
SCALE: 3/16 = 1'-0"
SOUTH VIEW
SCALE: 3/16 = 1'-0"
WEST VIEW
SCALE: 3/16 = 1'-0"
EAST VIEW
MECH/
ELECT.
MEETING
ROOM
LOBBY
AREA
UNISEX
TOIL. RM.
OFFICE #1 OFFICE #2 OFFICE #3 OFFICE #4
SERVICE
AREA
WORK/
STAFF
WELLNESS
ROOM
COVERED
ENTRY
STAFF
TOIL. RM.
STAFF
ENTRY
BREAK
ROOM
NEW EQUIPMENT
AREA
COVERED
ENTRY
STORAGE
105 106 107 108
111 112 113
E/W-1
FS-1
1-HR FIRE BARRIER
EWH-1
1- 1/
4" H
W
AH-1
1-1/2" CW
RP-1
3/ 4"
H W
1" CW
3/4" HWR
3" SAN
3" SAN
LT-1
AAV
4" SAN TO
SEPTIC
VB-1
HB-1
36" AFF
HB-3
CW/HW
36" AFF
S-1
AAVCONTRACTOR
WELL TANK BY WELL
WATER SERVICE &
4" Y.C.O.
1- 1/
4" C
W
3/ 4"
H W
R LAV-1
1-1/2" V3/4"
CW
3" SAN
WC-1
1" HW
LAV-1
SH-1 WC-1
3" SAN
3/4" HW
3/4" CW
1" HW
3" SAN
HB-2
HW/CW
36" AFF
SS-1
1-1/2" V
HB-1
36" AFF
PROEPRLY SUPPORT HB-3
PIPING AND FIXTURE TO
STRUCTURE.
PANEL
#A
ATS
#A
ELEC.
METER
DISC.
#A
EWC-1
W.C.O.
3" VTR
1-1/2" V
2" V4" S
AN
W.C.O.
1-1/2" V
2" V
1-1/2" V
2" V
3" VTR
A1
WCO
CO
TYP
V
VTR
VSANITARY VENT PIPING
BELOW GRADE
SANITARY PIPE
HOT WATER PIPE
COLD WATER PIPE
HOT WATER RETURN
PLUMBING LEGEND
BALL VALVE
WALL CLEANOUT
TYPICAL
VENT
FLOOR CLEANOUT
VENT THRU ROOF
TIE TO EXISTING
PIPE DOWN
PIPE UP
PIPE BREAK
(FOR CLARITY)
PIPE CONTINUATION
WITH WATER HEATER.
HOSE BIBB FURNISHED
ASME TEMPERATURE AND
PRESSURE RELIEF VALVE
EWH-1
FLOOR
DISCHARGE AT 6" MAX
ABOVE FLOOR OR DRAIN
PAN WITHOUT PIPE THREADS
METAL DRAIN PAN W/
3/4" DRAIN PIPED
INDIRECT TO FD
REFERENCE UNIT PLANS
FOR SPECIFIC WATER HEATER
1-1/4" HW
1-1/4" CW
AMTROL ST-12
EXPANSION TANK
ELECTRIC WATER HEATER DETAIL
Scale: None
RECIRC PUMP
3/4" HWR
RP-1
CIRC. SETTER
2 GPM (TYP.)
FRONT VIEW
NOTE: Panel not required to be centered
Working Space
SIDE VIEW
Working Space
Structural Ceiling
Finished Floor
Piping Permitted
Panel
ELECTRICAL CLEAR SPACE NOTES
3 3 in the 30" Working Space.
30" or Panel Width (whichever is greater)
Piping NOT Permitted Over Panel(s)
Piping Permitted
Piping NOT Permitted Over Panel(s)
Clear Space Clear Space
4 5
ELECTRICAL CLEAR SPACE DETAIL
Scale: None
36"
78" 78"
42" (480V)
THE ELECTRICAL CLEAR SPACE OR WORK SPACE IS
REQUIRED TO PROVIDE AN ADEQUATE AND SAFE
WORK AREA FOR ELECTRICAL SERVICE.
ANY COMBINATION OF HIGH VOLTAGE ELECTRICAL
EQUIPMENT, SUCH AS MULTIPLE PANELS, A PANEL
AND A DISCONNECT, ETC., SHALL COMBINE TO
FORM THE OVERALL CLEAR SPACE WIDTH
(MINIMUM OF 30").
THE OVERALL CLEAR SPACE VOLUME SHALL BE
DETERMINED BY THE SINGLE OR COMBINED PANEL
WIDTH (MIN. OF 30"), AND SHALL EXTEND 3'-0" OUT
FROM THE FRONT OF THE DEEPEST PANEL, AND
SHALL BE 6'-6" TALL ABOVE THE FINISHED FLOOR.
THE ELECTRICAL CLEAR SPACE SHALL ALSO
EXTEND BELOW AND DIRECTLY ABOVE THE
PANEL(S) TO THE FINISHED CEILING ASSEMBLY
ABOVE.
DO NOT INSTALL ANY PLUMBING, MECHANICAL
PIPING, AND/OR MECHANICAL DUCTWORK IN THE
FLOOR DIRECTLY BELOW THE PANEL. COORDINATE
WTIH THE ELECTRICAL CONTRACTOR
1-1/2" WATER
DIELECTRIC UNION (TYP.)
FINISH FLOOR
BYPASS
TO SYSTEM
1-1/2" CW
1-1/2" CW FROM WELL
SUPPLY
TANK
BRINE
CAP (TYP.)
5' -0
WATER SOFTENER AND IRON DEFENDER
WATER TREATMENT DETAIL
Scale: None
SHUT-OFF VALVE (TYP.)
WATER SOFTENER BY OWNER,
INSTALLED BY CONTRACTOR
IRON DEFENDER AND OTHER
WATER TREATMENT BY OWNER,
INSTALLED BY CONTRACTOR
A1
PLUMBING FIXTURE SCHEDULE
TAG DESCRIPTION MANUFACTURER
/ MODEL MODEL
ROUGH-IN SIZE
(INCHES) TRIM REMARKS
CW HW WASTE VENT
EW-1 PEDESTAL MOUNTED EYEWASH GUARDIAN G1896 TEPID 3/4" 2" 1-1/2" FURNISH WITH THERMOSTATIC MIXING VALVE G6020 -
SS-1 MOP SERVICE BASIN MUSTEE 63M 1/2" 1/2" 2" 1-1/2"
CHICAGO 897-RCF WALL MOUNT FAUCET, VACUUM BREAKER,
HOSE THREADED END, BACKSPLASH WALL GUARDS, BUMPER
GUARDS, OPTIONAL SEAL
HOSE AND HOSE CARRIER
S.S. MOP HANGER; ②
LT-1 LAUNDRY/ UTILITY TUB MUSTEE 14CP 1/2" 1/2" 1-1/2" 1-1/2"
FAUCET: 6" SWING SPOUT FAUCE WITH AERATOR AND HOSE
END,
DRAIN STOPPER
SUPPLY LINES, PVC P-TRAP W/ 12"
TAILPIECE
WC-1
FLOOR MOUNTED, ELONGATED
WATER CLOSET, TANK-TYPE
1.28 GPF; ADA
AMERICAN
STANDARD CADET 1/2" - 3" 2" SEAT: BEMIS #2155SSCT, SELF-SUSTAINING` CHROME STOP 1/4 TURN, SUPPLY
LAV-1 DROP-IN LAV,
VITREOUS CHINA, 4" CENTERS; ADA
AMERICAN
STANDARD AQUALYN 1/2" 1/2" 1-1/2" 1-1/2"
FAUCET: AMERICAN STANDARD 7075.004, BRUSHED NICKEL,
SINGLE LEVER FAUCET W/ FIXED STRAINER ; ①
CHROME STOP 1/4 TURN, SUPPLY;
ESCUTCHEON,
INSUL SUPPLIES & TRAP PER ADA
EWH-1 ELECTRIC WATER HEATER
50 GAL., 4500 WATT LOCHINVAR LEM-50 2" 2" - - 21 GPH @ 90°F RISE, 4500 W
NON-SIMULTANEOUS, 0.92 UEF 208V, 1-PH, 60Hz
SH-1
30" x 34" x 76-3/4"ACRYLIC ROLL-IN
SHOWER CENTER DRAIN, INTEGRAL
FRONT TRENCH DRAIN; ADA
AQUATIC 16034TRCOL 1/2" 1/2" 2" 1-1/2"
FURNISH W/ STAINLESS SIDE AND BACK GRAB BARS, L-SHAPE
SEAT, PRESSURE BALANCING MIXING VALVE, HAND-HELD
SHOWER ASSEMBLY, STAINLESS GRATE, MIXING VALVE
60” SS CURTAIN ROD AND
ANTIBACTERIAL, FLAME-RETARDANT
WHITE VINYL SHOWER CURTAIN
EWC-1 ELECTRIC WATER COOLER
BOTTLE FILL, TWO LEVEL - ADA MURDOCK A172108F-UG-VR 1/2" - 1-1/2" 1-1/2"
FLEXIBLE BUBBLER
BOTTLE FILLER WITH SENSOR OPERATION WITH BOTTLE
COUNTER DISPLAY (-BF12-BCD)
INCLUDE 3000-GALLON EZ DOOR PFAS
FILTER
(-WF3EZ)
FS-1 8" INDIRECT WASTE DRAIN, SQUARE ZURN Z1910 - - 4" - HALF GRATE ②
VB-1 ICE MAKER VALVE BOX GUY GRAY W9700 1/2" - - - 1/4" TURN BALL VALVES INCLUDE BACKFLOW PREVENTER
HB-1 HOSE BIBB, FREEZELESS, REMOVABLE
HANDLE, BOX COVER WOODFORD MODEL 67 3/4" - - - INTEGRAL VACUUM BREAKER, DUAL CHECK VALVE
REMOVABLE TEE HANDLE FURNISH TEE TO OWNER
HB-2 HOSE BIBB, FREEZELESS, REMOVABLE
HANDLE, BOX COVER, HOT AND COLD WOODFORD MODEL B22 3/4" 3/4" - - INTEGRAL VACUUM BREAKER, DUAL CHECK VALVE
REMOVABLE TEE HANDLE FURNISH TEE TO OWNER
HB-3 HOSE BIBB, FREEZELESS, REMOVABLE
HANDLE, BOX COVER, HOT AND COLD WOODFORD MODEL C22 3/4" 3/4" - - INTEGRAL VACUUM BREAKER, DUAL CHECK VALVE
REMOVABLE TEE HANDLE FURNISH TEE TO OWNER
① -- PROVIDE MIXING VALVE TO MEET ADA REQUIREMENTS. EQUAL TO CASH ACME 135 SERIES, MOUNT UNDER LAV.
② -- FLOOR DRAIN TRAP SEALER WITH RUBBER DIAPHRAGM ASSE 1072 LISTED, EQUAL TO SURE SEAL
A1
ADMIN./EQPM.
OVERALL FLOOR PLAN
SCALE: 1/8 = 1'-0" N
P201
DRAWING TITLE
KCT PROJECT NO.DRAWN
HT
REVIEWED
DAR
DATE
SCALE
AS NOTED
DRAWING NO.
SEAL
SHEET NO.
NO. REVISIONS / SUBMISSIONS DATE
PROJECT NAME
PLUMBING
ROSE LAKE
EAST LANSING, MICHIGAN
CONCEPTS FOR:
8903 STOLL ROAD
DNR SGA
FILE #751/24215.JLM
FACILITY IMPROVEMENT
ADMINISTRATION/EQUIPMENT BLDG:
C op yr ig ht
Ke nd ra C
. T ho m ps on A rc hi te ct s, P
.C
1 50% DDs 04.20.2026
2 CD 50% REVIEW SET 06.05.2026
3 CD 90% SET 06.26.2026
4 BID/PLAN REVIEW SET 07.01.2026
5 ADDENDUM #1 07.17.2026
JULY 2026
KT-220230024
OVERALL PLAN
PLUMBING
kendra c.
architects, p.c.
THOMPSON
803 Cherry Street Manistee, MI 49660 tel: 231.723.4195 thompson.kendra@sbcglobal.net www.kendrathompson-architects.com
STAFF
ENTRY
NEW SHOP
AREA
COVERED
ENTRY
GM1
GM2
EF-1
EF-2
GAS MON. SYSTEM
MTD ON COL. (TYP.)
L-1
CA DROP
CA DROP
CAP
4"Ø
EF-1
30X26"
BOT. OF UNIT
@ 12'-6" AFF
20X20"
EF-2
20X17"
BOT. OF UNIT
@ 12'-6" AFF
SD-1
6"Ø
75 CFM
SD-1
6"Ø
75 CFM
CAP
CA DROP
CA DROP
AIR COMP BY OTHERS,
INSTALLED BY
CONTRACTOR
6"Ø 4"Ø
4"Ø
4"Ø
LP GAS FROM TANK. COORDINATE
WITH LP GAS CONTRACTOR FOR
ROUTING OF LINE. SEE
ARCHITECTURAL DRAWINGS FOR
MORE INFORMATION
1-1/2" CA
1- 1/
2" C
A 1-
1/ 2"
C A
1- 1/
2" C
A 1-
1/ 2"
C A
1-1/2" CA
1" GAS
3/ 4"
G
AS
IR-1
MTD 6" FROM TOP
OF CEILING PER
ALLOWED MFG'R
CLEARANCE.
IR-2
MTD 6" FROM TOP
OF CEILING PER
ALLOWED MFG'R
CLEARANCE.
WALL CAP
INTAKE
WALL CAP
INTAKE
3/4" GAS
COORD. EXH/ INTAKE VENTS
WITH LIGHTING, FANS, ROLL
OVER DOORS, LOUVERS, ETC.
SO AS NOT TO OBSTRUCT ANY
OTHER DISCIPLINES
ROUTE COMPRESSED AIR HIGH OVER
ROLL OVER DOORS. COORD. WITH
ARCHITECTURAL DRAWINGS.
ROUTE COMPRESSED AIR HIGH
OVER ROLL OVER DOORS. COORD.
WITH ARCHITECTURAL DRAWINGS.
ROUTE HIGH OVER ROLL OVER
DOORS AND COORD. W/ LIGHTING
FIXT. CONFIRM ROUTING CAN
OCCUR PRIOR TO INSTALLATION.
(TYP.)
ROUTE COMPRESSED AIR HIGH
OVER ROLL OVER DOORS. COORD.
WITH ARCHITECTURAL DRAWINGS.
T
T
T-STAT
IR-2
T-STAT
IR-1
COORD. IR EXH/
INTAKE WITH
CEILING FANS
R LP REG
100 MBH
GC-1
PANEL
#B
COMBUSTION
BURNER
6-7/8"
BURNER10-1/4"
TUBE COUPLING
ASSEMBLY
20-1/2" ASSEMBLY
10-3/4"
TURNBUCKLE
ASSEMBLY
OF BUILDING
ANCHOR TO BEAM
LOCKNUT
10-3/4"
3/8" HANGER ROD
END VENT
ASSEMBLY
RADIANT PIPE
17-5/8"
GAS LINE
TUBING
12"
GAS VALVE
15"
GAS MAIN, SEE
COMBUSTION BURNER
1/2"
REFLECTOR
PLAN FOR SIZE
AS REQUIRED
REDUCER
INFRA-RED HEATER INSTALLATION DETAIL
19' AFF
0R CHAIN
NO SCALE
C A
BRONZE AIR COCK
1/2"
FLOOR
DIRT LEG
1- 1/
2" C
A
INTAKE
VIBRATION
BY OWNER
AIR COMPRESSOR
DRAIN VALVE
FLEX. CONNECTION
ISOLATION
FILTER/MUFFLER
AIR COMPRESSOR
PIPING DIAGRAM
Scale: None
COMPRESSED AIR DROP
OUTLET DETAIL (TYP.)
Scale: None
SPEED COUPLER, COORD.
WITH OWNER: 1/2" OR 3/8",
SEE PLANS FOR C.A. DROPS
MOUNT AT 36"
A.F.F., COORD. W.
OWNER
PRV
COORDINATE INLET AND
OUTLET PRESSURE TO
OWNER REQUIREMENTS
1-1/2" CA LOOP
A1
OPENING AS REQUIRED
PROVIDE WALL
ANGLE ON INSIDE
PROVIDE RETAINING
MOTOR
DAMPER
MOTORIZED
DISCHARGE
DAMPER
1/2" MESH
INLET SCREEN
METAL WALL
BOX
CHAULK ALL
AROUND
MOTOR
WALL STRUCTURE
90° WEATHERHOOD
EXHAUST FAN DETAIL
Scale: None
EXTENDED SILL
CAULK
FRAME WALL
LINKAGE
DUCT
DAMPER MOTOR
SCREW (2 PER CLIP)
#10-16 X 1" 1" LG. HWH SELF DRILL
ALUMINUM OR STEEL X
FASTENERS
LOUVER
OUTSIDE
CAULK
FRAME WALL
DAMPER
CLIP ANGLE
INSIDE
FRESH AIR LOUVER
& DAMPER DETAIL
Scale: None
EQPM. BLDG.
SCALE: 1/4 = 1'-0" N M202
DRAWING TITLE
KCT PROJECT NO.DRAWN
HT
REVIEWED
DAR
DATE
SCALE
AS NOTED
DRAWING NO.
SEAL
SHEET NO.
NO. REVISIONS / SUBMISSIONS DATE
PROJECT NAME
MECHANICAL
ROSE LAKE
EAST LANSING, MICHIGAN
CONCEPTS FOR:
8903 STOLL ROAD
DNR SGA
FILE #751/24215.JLM
FACILITY IMPROVEMENT
ENLARGED FLOOR PLAN
C op yr ig ht
Ke nd ra C
. T ho m ps on A rc hi te ct s, P
.C
1 50% DDs 04.20.2026
2 CD 50% REVIEW SET 06.05.2026
3 CD 90% SET 06.26.2026
4 BID/PLAN REVIEW SET 07.01.2026
5 ADDENDUM #1 07.17.2026
JULY 2026
KT-220230024
ENLGD.FLOOR PLAN
kendra c.
architects, p.c.
THOMPSON
803 Cherry Street Manistee, MI 49660 tel: 231.723.4195 thompson.kendra@sbcglobal.net www.kendrathompson-architects.com
KEY PLAN
NO SCALE
MECHANICAL ENLARGED
EQUIPMENT BLDG:
FRONT VIEW
NOTE: Panel not required to be centered
Working Space
SIDE VIEW
Working Space
Structural Ceiling
Finished Floor
Piping Permitted
Panel
ELECTRICAL CLEAR SPACE NOTES
3 3 in the 30" Working Space.
30" or Panel Width (whichever is greater)
Piping NOT Permitted Over Panel(s)
Piping Permitted
Piping NOT Permitted Over Panel(s)
Clear Space Clear Space
4 5
ELECTRICAL CLEAR SPACE DETAIL
Scale: None
36"
78" 78"
42" (480V)
THE ELECTRICAL CLEAR SPACE OR WORK SPACE IS
REQUIRED TO PROVIDE AN ADEQUATE AND SAFE
WORK AREA FOR ELECTRICAL SERVICE.
ANY COMBINATION OF HIGH VOLTAGE ELECTRICAL
EQUIPMENT, SUCH AS MULTIPLE PANELS, A PANEL
AND A DISCONNECT, ETC., SHALL COMBINE TO
FORM THE OVERALL CLEAR SPACE WIDTH
(MINIMUM OF 30").
THE OVERALL CLEAR SPACE VOLUME SHALL BE
DETERMINED BY THE SINGLE OR COMBINED PANEL
WIDTH (MIN. OF 30"), AND SHALL EXTEND 3'-0" OUT
FROM THE FRONT OF THE DEEPEST PANEL, AND
SHALL BE 6'-6" TALL ABOVE THE FINISHED FLOOR.
THE ELECTRICAL CLEAR SPACE SHALL ALSO
EXTEND BELOW AND DIRECTLY ABOVE THE
PANEL(S) TO THE FINISHED CEILING ASSEMBLY
ABOVE.
DO NOT INSTALL ANY PLUMBING, MECHANICAL
PIPING, AND/OR MECHANICAL DUCTWORK IN THE
FLOOR DIRECTLY BELOW THE PANEL. COORDINATE
WTIH THE ELECTRICAL CONTRACTOR
INFRARED TUBE HEATER SCHEDULE
TAG LOCATION MANUFACTURER
& MODEL NO.
MBH
INPUT
LENGTH
(FT)
FLUE DIA
(IN)
WEIGHT
(LBS)
ELECTRICAL CONTROL
DATA ACCESSORIES - REMARKS
VOLTAGE MCA MFS
IR-1
IR-2
NEW EQUIPMENT
AREA
RE-VERBER-RAY
DX3L-20-50 50 21' 9" 4" 120 120/60/1 4.8 15 THERMOSTAT WALL CAP AND ROOF/SIDE WALL
CAP; MOUNT REFLECTOR AT 0°
FURNISH WITH HANGER AND STRUCTURAL SUPPORTS, SEE MECHANICAL DETAILS FOR MORE INFORMATION
AIR HANDLER SCHEDULE
TAG LOCATION MANUFACTURER
& MODEL NO. CONFIG.
TOTAL
AIRFLOW
(CFM)
OUTDOOR
AIRFLOW
(CFM)
TOTAL
E.S.P.
(IN H20)
ELECTRIC HEATING ELEMENT DATA ELECTRICAL DATA
HEATING
ELEMENT
(kW)
HEATER
AMPS MCA MOP VOLTAGE MCA MOCP HP
AH-1 MECH/ELECT. 102 MITSUBISHI
SVZ-AP48NL
VERTICAL
UPFLOW 1600 280 0.8 17.5;
208/240V 36.5 45.6 50 208/230/1/60 5.63 15 430 W
FURNISH WITH: ELECTRIC HEAT LOCKOUT, REMOTE SENSOR,
HEAT PUMP SCHEDULE
TAG LOCATION MATCHING AIR
HANDLER
MANUFACTURER
& MODEL NO.
REFRIGERANT
TYPE
COOLING
CAPACITY
(MBH)
REFRIGERANT LINE SIZES ELECTRICAL
SEER ACCESSORIES/
REMARKSSUCTION
LINES LIQUID LINES VOLT/
PHASE M.C.A. MAX.
FUSE
HP-1 OUTSIDE AH-1 MITSUBISHI
SUZ-AK48NLHZ R454B 48 5/8" 3/8" 208/230/1/60 35 60 18.1 TXV KIT, CRANKCASE HEATER
FURNISH WITH: 12" OUTDOOR STAND (QSM*1202*)
DIFFUSER AND GRILLE SCHEDULE
TAG DESCRIPTION MANUFACTURER
& MODEL
SIZE
(INCHES)
VOLUME DAMPER
(TYPE, LOCATION) MATERIAL COLOR & FINISH
SD-1
SUPPLY AIR DIFFUSER
4-WAY THROW, PLAQUE STYLE
LAY-IN FRAME
TITUS
OMNI
24X24
NECK SIZE
ON PLANS
EXTERNAL STEEL #26 WHITE
SD-2
SUPPLY AIR DIFFUSER
4-WAY THROW, PLAQUE STYLE
SUFACE MOUNT FRAME
TITUS
OMNI
12X12
4" NECK EXTERNAL STEEL #26 WHITE
RG-1
RETURN AIR GRILLE
EGGCRATE STYLE, 1"x1"x1" CORE SIZE
LAY-IN FRAME
TITUS
50F 24x24" EXTERNAL ALUMINUM #26 WHITE
RG-2
RETURN AIR GRILLE
PERFORATED CEILING RETURN GRILLE
LAY-IN FRAME
TITUS
PAR
24x24" 10"x10" Neck EXTERNAL ALUMINUM #26 WHITE
TG-1
EXHAUST AIR GRILLE
PERFORATED
LAY-IN FRAME
TITUS
50F 24"x12" EXTERNAL STEEL #26 WHITE
EXHAUST FAN SCHEDULE
TAG MANUFACTURER
& MODEL NO. LOCATION
AIRFLOW
(CFM)
E.S.P.
(IN W.G.)
SOUND
LEVEL
(SONES)
ELECTRICAL
CONTROL DATA OPTIONS
VOLTAGE HP FLA
EF-1 GREENHECK
SE1-14-432-VG
NEW EQUIPMENT
AREA 1575 0.25 7.9 120/60/1Ø 0.15 3.8
GAS MONITORING
SYSTEM + MANUAL
OVERRIDE
BACKDRAFT DAMPER
(MOTORIZED), 90° WEATHERHOOD,
WALL HOUSING & BIRD SCREEN
EF-2 GREENHECK
SE1-8-440-D
NEW EQUIPMENT
AREA 105 0.28 5.1 120/60/1Ø 0.03 - ON CONTINUOUS 90° WEATHERHOOD, WALL
HOUSING & BIRD SCREEN
EF-3 DELTA
SLM50
UNISEX TOIL. RM.
103; STAFF TOIL.
RM. 112
50 0.25 1.5 120/60/1Ø - - INTERLOCK WITH
LIGHTS BACKDRAFT DAMPER
GAS MONITORING SYSTEM
TAG DESCRIPTION MANUFACTURER & MODEL
NO. ACTIVATION MOUNTING
HEIGHT
ELECTRICAL
NOTES:
VOLTAGE MFS
GC-1 GAS DETECTION SYSTEM
CONTROLLER
ARMSTRONG GAS DETECTION
MONITOR MODEL AMC-1AD
MULTI-DROP GAS MONITOR
RELAYS (1) CONTROL DAMPERS
AND (1) EXHAUST FANS
AND PROVIDES VISUAL ALARM
48" AFF 120/60/1Ø 15 GAS MONITORING SYSTEM COMPRISED
OF (1) GAS MONITOR CONTROLLER
AND (2) WIRELESS GAS MONITORS.
CONTRACTOR SHALL INCLUDE ALL
NECESSARY EQUIPMENT, WIRING, ETC.
FOR COMPLETE INSTALLATION AND
OPERATION.
GM-1,2,
ZONE 1
CARBON MONOXIDE AND
NITROGEN DIOXIDE GAS
SENSOR
ARMSTRONG MULTI-DROP GAS
SENSOR MODULE MODEL
AMC-1222 CARBON MONOXIDE
AND NITROGEN DIOXIDE
BOTH NO2 AND CO DETECTION
CO SENSOR RELAYS:
GC-1 WHEN CO EXCEEDS 25.0 PPM
NO2 SENSOR RELAYS GC-1 WHEN
NO2 LEVELS EXCEED 3.0 PPM
60" AFF 120/60/1Ø
LOUVER SCHEDULE
TAG DESCRIPTION MANUFACTURER
& MODEL NO. LOCATION
SIZE
(IN)
AIRFLOW
(CFM)
FREE AREA
(SF)
Velocity
(FPM)
APD
(IN W.G.) MATERIAL COLOR &
FINISH FRAME
L-1
STATIONARY EXTRUDED
LOUVER WITH DRAINABLE
BLADES AND 1/4" BIRD SCREEN
GREENHECK
ESD-635
NEW
EQUIPMENT
AREA
24x24 1,575 1.77 900 0.13 ALUMIN BY ARCH FLANGED
LOUVER OPTIONS:
1. INCLUDE LOW-LEAKAGE MOTORIZED DAMPER (VCD-33) W/ TRANSFORMER, INTERLOCKED WITH EF-1.
ELECTRIC HEATER SCHEDULE
TAG DUTY MANUFACTURER
& MODEL NO. WATTS
CABINET SIZE ELECTRICAL
CONTROL DATA ACCESSORIES/
NOTES:W L H VOLTAGE F.L.A
EH-1 STAFF TOIL.
RM. 112
MARKEL
E3313T2SRPW 750 4" 14-1/8" 19-1/2" 120V | 1Ф | 60Hz 6.25
SUMMER FAN
SWITCH; ① ②
COLOR: NORTHERN WHITE;
③ ④
EH-2 UNISEX TOIL.
RM. 103
MARKEL
E3313T2SRPW 750 4" 14-1/8" 19-1/2" 120V | 1Ф | 60Hz 6.3
SUMMER FAN
SWITCH; ① ②
COLOR: NORTHERN WHITE;
③ ④
① - INTEGRAL T-STAT ② - BUILT-IN MANUAL RESET THERMAL ③ - BACK BOX ROUGH-IN INSTALLATION IN WALL KIT ④ - DISCONNECT SWITCH
SECURE STAND TO
CONCRETE PAD IN AN
APPROVED MANNER AS
SUGGESTED BY THE
MANUFACTURER (TYP.)
HEAT PUMP STAND DETAIL
Scale: None
A1
SCHEDULES &
M300
DRAWING TITLE
KCT PROJECT NO.DRAWN
HT
REVIEWED
DAR
DATE
SCALE
AS NOTED
DRAWING NO.
SEAL
SHEET NO.
NO. REVISIONS / SUBMISSIONS DATE
PROJECT NAME
MECHANICAL
ROSE LAKE
EAST LANSING, MICHIGAN
CONCEPTS FOR:
8903 STOLL ROAD
DNR SGA
FILE #751/24215.JLM
FACILITY IMPROVEMENT
C op yr ig ht
Ke nd ra C
. T ho m ps on A rc hi te ct s, P
.C
1 50% DDs 04.20.2026
2 CD 50% REVIEW SET 06.05.2026
3 CD 90% SET 06.26.2026
4 BID/PLAN REVIEW SET 07.01.2026
5 ADDENDUM #1 07.17.2026
JULY 2026
KT-220230024
DETAILS
kendra c.
architects, p.c.
THOMPSON
803 Cherry Street Manistee, MI 49660 tel: 231.723.4195 thompson.kendra@sbcglobal.net www.kendrathompson-architects.com
MECH/
ELECT.
MEETING
ROOM
LOBBY
AREA
UNISEX
TOIL. RM.
OFFICE #1 OFFICE #2 OFFICE #3 OFFICE #4
SERVICE
AREA
WORK/
STAFF
WELLNESS
ROOMCOVERED
ENTRY
STAFF
TOIL. RM.
STAFF
ENTRY
BREAK
ROOM
NEW EQUIPMENT
AREA
COVERED
ENTRY
STORAGE
105 106 107 108
PANEL
#B
FRZR
44" AFF
B-27
240V OUTLET
44" AFF
B-14,16
AIR COMP.
B-10,12
C
C
CC
C
CC
C
CC
C
C
AC
AC
AC
AC
EWC
A-13
ACREF.
A-33
M/W A-29
AC
TV
TV FB
WP
AC
C
C
C C
AC
PRINTER
A-21 REF.
A-25
GENSET #A
70kW PROPANE
GENERATOR
120/240V-1Ø-3W
ELEC.
METER
DISC. #A
400A CB
SM
SM
SM
WP
WP
W P
A-11
A-11 A-11
A-11 A-11
A-11
A-13
A-13
A-15
A-17
A-17
A-15
A-15
A-17
A-19
A-19 A-23
A-23
A-23
A-23
A-27
A-27
A-27
A-27 A-27
A-31A-31A-2
A-2
A-2
A-2
A-4
A-4
A-4
A-4
A-6
A-6
A-6
A-6
A-8
A-8 A-8
A-8
AC
AC
SEE ENLARGED PLAN
ON THIS SHEET
L-1 B-4
SM
HP-1
A-18,20
SM
BLOCK
HEATER
A-51
BATT.
CHARGER
A-53
CONCRETE
PAD BY E.C.
1 1 1 1
POWER KEY NOTESx
1. CONNECT THE CONTROLLED RECEPTACLE IN EACH
YOKE TO THE OCCUPANCY SENSOR SWTICHPACK
LOCATED ABOVE THE CEILING. SEE LIGHTING PLAN
FOR CONTINUATION.
2. ALL FEEDER AND BRANCH CIRCUITS IN THE NEW
EQUIPMENT AREA SHALL BE RUN OVERHEAD. THIS
INCLUDES THE FEEDER TO PANEL #B.
UNDERGROUND CIRCUITS ARE NOT ALLOWED IN
THIS AREA. ALL CIRCUITS SHALL BE RUN IN SURFACE
MOUNTED EMT, AND ALL JUNCTION BOXES SHALL BE
SURFACE MOUNTED ON THE WALLS AND CEILING.
ALL BRANCH CIRCUIT RUNS SHALL BE INSTALLED IN
A WORKMANLIKE MANNER.
1" C
A-15
A-9
EH-1
A-26
EH-2
A-28
GC-1
B-8
44" AFF
B-19
44" AFF
B-19
44" AFF
B-21
44" AFF
B-21
44" AFF
B-23
44" AFF
B-23
44" AFF
B-23
44" AFF
B-25
44" AFF
B-25O/H DOOR #1
B-11
O/H DOOR #2
B-13
O/H DOOR #3
B-15
O/H DOOR #4
B-17
240V OUTLET
44" AFF
B-14,16
240V OUTLET
44" AFF
B-14,16
240V OUTLET
44" AFF
B-14,16
IR-2
B-2
IR-1
B-2
EF-2
B-29
B-29
B-29
EF-1
B-4
A1
MECH/
ELECT.
PANEL
#A
SM
ATS
#A
ELEC.
METER
DISC. #A
400A CB
RP-1
EWH-1 AH-1
A-10,12
AH-1
HEAT
A-14,16
44" AFF
A-9
44" AFF
A-9
44" AFF
A-9
44" AFF
A-9
44" AFF
A-9
ADMIN./EQPM. BLDG.
OVERALL FLOOR PLAN
SCALE: 1/8" = 1'-0" N E201P
DRAWING TITLE
KCT PROJECT NO.DRAWN
BSR
REVIEWED
BSR
DATE
SCALE
AS NOTED
DRAWING NO.
SEAL
SHEET NO.
NO. REVISIONS / SUBMISSIONS DATE
PROJECT NAME
ELECTRICAL POWER
ROSE LAKE
EAST LANSING, MICHIGAN
CONCEPTS FOR:
8903 STOLL ROAD
DNR SGA
FILE #751/24215.JLM
FACILITY IMPROVEMENT
ADMINISTRATION/EQUIPMENT BLDG:
C op yr ig ht
Ke nd ra C
. T ho m ps on A rc hi te ct s, P
.C
1 50% DDs 04.20.2026
2 CD 50% REVIEW SET 06.05.2026
3 CD 90% SET 06.26.2026
4 BID/PLAN REVIEW SET 07.01.2026
5 ADDENDUM #1 07.17.2026
JULY 2026
KT-220230024
FLOOR PLANELECTRICAL POWER
kendra c.
architects, p.c.
THOMPSON
803 Cherry Street Manistee, MI 49660 tel: 231.723.4195 thompson.kendra@sbcglobal.net www.kendrathompson-architects.com
FLOOR PLAN
SCALE: 1/4" = 1'-0" N
ENLARGED MECH/ELECT.
ELECTRICAL POWER
| 22025001 DNR Rose Lake CD ADDENDUM 01 17july2026-C0.1.pdf |
| Sheets and Views |
| C0.1 |
| 22025001 DNR Rose Lake CD ADDENDUM 01 17july2026-A201.pdf |
| Sheets and Views |
| A201 |
| 22025001 DNR Rose Lake CD ADDENDUM 01 17july2026-A202.pdf |
| Sheets and Views |
| A202 |
| 22025001 DNR Rose Lake CD ADDENDUM 01 17july2026-A300.pdf |
| Sheets and Views |
| A300 |
| 22025001 DNR Rose Lake-ADDENDUM 01-drawings civil 17july2026.pdf |
| Sheets and Views |
| SEPTIC PLAN |
File details come from the government source that posted it. Updated .