This file is a Project Manual for the Elk River Trail New Headquarters Building for the West Virginia Division of Natural Resources (WV DNR), located at 12 Buffalo Creek, Clay, WV 25043. The project manual, identified as Architect Project No. 22010 and dated July 25, 2024, is Volume II covering Division 22 (Plumbing) through Division 33 (Utilities). The project involves comprehensive building systems specifications including plumbing, HVAC, electrical, telecommunications, earthwork, exterior improvements, and utilities. The architectural firm is WYK Associates, Inc. (Clarksburg, WV), with consulting engineers including Civil & Environmental Consultants, Inc., Studio on Stony Run PLLC, CAS Structural Engineering Inc., and Miller Engineering Inc. The specifications establish detailed requirements for all plumbing materials and methods, requiring conformance with the current International Mechanical Code and International Plumbing Code (2018 edition), applicable building codes, and industry best practices. Contractors must thoroughly review all documents and site conditions prior to bidding, with all substitute material requests submitted and approved before bidding through formal addendum procedures only.
The specifications detail extensive technical requirements for piping materials including copper tube for domestic water systems, PVC pipe for sanitary waste, cast iron for above-grade drainage, and cross-linked polyethylene for water distribution. All potable water components must comply with NSF 61 and NSF 372 standards for health effects and lead content limitations. Valve requirements include bronze ball valves for shut-off service, swing check valves, pressure reducing valves operating at 5 to 50 psi, and temperature and pressure relief valves certified to ASME standards. Installation specifications mandate piping support every 6.5 to 10 feet depending on pipe size, with proper hangers, unions, and dielectric connections for dissimilar metals. Insulation requirements specify flexible elastomeric cellular rubber materials with specific thicknesses ranging from 3/4 inch to 1-1/2 inches depending on pipe size and service temperature. The project requires identification of all piping systems using ASME A13.1 color-coded markers, pressure gauges with 4-1/2 inch diameter dials, vibration isolation mounts for equipment, and comprehensive field testing of all systems including pressure tests and disinfection of domestic water piping before service initiation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
ELK RIVER TRAIL NEW HQ BUILDING
for the WV Division of Natural Resources (WV DNR) f
,,,,,, .. 11., EST ,,,,,, ,,,, "" ,,,,
...q ........... , .. ... ,,,,,,,,,,,�CHI�,,,,,,, .. , .. ,,,,,,; ...... ,,,,, 12 Buffalo Creek, Clay, WV 25043
ARCHITECT PROJECT NO: 22010
July 25, 2024
I WYK ASSOCIATES, INC.
VI ARCHITECTURE•PLANNING
Civil & Environmental
Consultants, Inc.
CAS
STRUCTURAL
Ui6JKEERIOO,IIIC.
ENGINEER/NU, INC.
W'c proviclc Solutions. You c:m c.""pccr Excellence.
ARCHITECT:
WYK Associates, Inc.
205 Washington Ave.
Clarksburg, WV 26301 304-624-6326 james@wykarchitects.com stephen@wykarchitects.com
CONSULTING ENGINEERS:
Civil & Environmental Consultants, Inc. (CEC) - Civil / Landscaping 120 Genesis Blvd
Bridgeport, WV 26330 304-933-3119 jrobinson@cecinc.com bstutler@cecinc.com
Studio on Stony Run, PLLC - Landscaping 2922 Stony Run Road Independence, WV 26374 304-864-4019 sa ra@studioonstonyrun.com
CAS Structural Engineering, Inc. - Structural PO Box 469 Alum Creek, WV 25003 304-756-2564 calalane@aol.com
Miller Engineering, Inc. - Mechanical/Electrical/Plumbing 54 West Run Road
Morgantown, WV 26508 304-2912234 cmiller@millereng.net ttaylor@millereng.net
VOLUME II (Div 22 - Div 33)
TABLE OF CONTENTS
VOLUME I
DRAWING SHEET INDEX
DIVISION 01 - GENERAL REQUIREMENTS
011000 Summary 012300 Alternates 013100 Project Management and Coordination 013300 Submittal Procedures 014000 Quality Requirements 014200 References 015000 Temporary Facilities and Controls 016000 Product Requirements 017000 Execution Requirements 017310 Cutting and Patching 017700 Closeout Procedures 017823 Operation and Maintenance Data 017839 Project Record Documents 017900 Demonstration and Training
DIVISION 02 – EXISTING CONDITIONS (NOT USED)
DIVISION 03 – CONCRETE
030516 Underslab Vapor Barrier 033000 Cast-in-Place Concrete
DIVISION 04 – MASONRY
042200 Concrete Unit Masonry
DIVISION 05 – METAL (NOT USED)
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
061000 Rough Carpentry 061600 Sheathing 061753 Shop-Fabricated Wood Trusses
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
071113 Bituminous Damproofing 072100 Thermal Insulation 072500 Weather Barriers 073113 Asphalt Shingles 074646 Fiber-Cement Siding 076200 Sheet Metal Flashing and Trim 077123 Manufacturing Gutters and Downspouts 078400 Firestopping 079200 Joint Sealants
DIVISION 08 – OPENINGS
081416 Flush Wood Doors 085200 Wood Windows
087100 Door Hardware 088000 Glazing
DIVISION 09 – FINISHES
092116 Gypsum Board Assemblies 093000 Tiling 099113 Exterior Painting 099123 Interior Painting
DIVISION 10 – SPECIALTIES
102800 Toilet Bath and Laundry Accessories 104400 Fire Protection Specialties 107500 Flagpoles
DIVISION 11 - EQUIPMENT (NOT USED)
DIVISION 12 – FURNISHINGS
121316 Manufactured Plastic-Laminate-Faced Casework
123661.16 Solid Surfacing Countertops
DIVISION 13 – SPECIAL CONSTRUCTION (NOT USED)
VOLUME II
DIVISION 22 – PLUMBING
220519 Meters and Gauges for Plumbing Piping 220523 General-Duty Valves for Plumbing Piping 220548 Vibration and Seismic Controls for Plumbing Piping and Equipment 220553 Identification for Plumbing Piping and Equipment 220719 Plumbing Piping Insulation 221005 Pumping Piping 221006 Plumbing Piping Specialties 223000 Plumbing Equipment 224000 Plumbing Fixtures
DIVISION 23 – HEATING VENTILATION AND AIR CONDITIONING
230548 Vibration and Seismic Controls for HVAC 230553 Identification for HVAC Piping and Equipment 230593 Testing, Adjusting and Balancing for HVAC 230713 Duct Insulation 232300 Refrigerant Piping 233100 HVAC Ducts and Casings 233300 Air Duct Accessories 233423 HVAC Power Ventilators 233700 Air Outlets and Inlets 235400 Furnaces 236213 Packaged Air-Cooled Refrigerant Compressor and Condenser Units 238216 Air Colts
DIVISION 26 – ELECTRICAL
260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems
260533.13 Conduit for Electrical Systems
260533.16 Boxes for Electrical Systems
260553 Identification for Electrical Systems 260583 Wiring Connections 260923 Lighting Control Devices 262100 Low-Voltage Electrical Service Entrance 262416 Panelboards 262726 Wiring Devices 262813 Fuses
262816.16 Enclosed Switches
265100 Interior Lighting 265600 Exterior Lighting
DIVISION 27 – TELECOMMUNICATIONS
271000 Structured Cabling
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED)
DIVISION 31 – EARTHWORK
311000 Site Clearing 312000 Earth Moving 321216 Asphalt Paving 321313 Concrete Paving 321373 Concrete Paving Joint Sealants
DIVISION 32 – EXTERIOR IMPROVEMENTS
321216 Asphalt Paving 321313 Concrete Paving 321373 Concrete Paving Joint Sealants
DIVISION 33 – UTILITIES
330500 Common Work Results for Utilities 331100 Water Utility Distribution Piping 333100 Sanitary Utility Sewerage Piping 334200 Stormwater Conveyance
APPENDIX
GEOTECHNICAL REPORT – Civil & Environmental Consultants, Inc. (CEC) |July 2024
BASIC PLUMBING MATERIALS
AND METHODS
22 0001 - 1
SECTION 22 0001
BASIC PLUMBING MATERIALS AND METHODS
GENERAL REQUIREMENTS
1.01 CONFORM TO THE CURRENT REQUIRMENTS OF THE IMC AND IPC - 2018
1.02 PERFORM ALL WORK UNDER THIS SECTION IN ACCORDANCE WITH APPLICABLE CODES &
STANDARDS AND BEST INDUSTRY AND TRADE PRACTICES.
1.03 COORDINATE ALL WITH WITH OTHER TRADES PRIOR TO BIDDING. THIS IS A RENOVATION
PROJECT.
1.04 BY SUBMISSION OF A BID, THE CONTRACTOR REPRESENTS THAT THEY HAVE THOROUGHLY
REVIEWED THE DOCUMENTS, THESE SPECIFICATIONS, AND THE PROJECT SITE IN SUFFICIENT
DETAIL AND THAT THE BID REPRESENTS THE WORK NECESSARY FOR A FULLY OPERATIONAL
SYSTEM. THE BID SUBMISSION ALSO REPRESENTS THAT THE CONTRACT HAS BEEN AFFORDED
REASONABLE OPPORTUNITY TO ASK QUESTIONS AND RECEIVED ANSWERS IN WRITING; SHARED
WITH ALL BIDDERS.
1.05 REQUESTS FOR SUBSTITUTIONS WILL BE MADE PRIOR TO BIDDING. NO SUBSTITUTION REQUEST WILL BE CONSIDERED AFTER BIDDING. A REQUEST FOR SUBSTITUTIION WILL FOLLOW ANY AND
ALL REQUIREMENTS SET FORTH IN THE PROJECT DOCUMENTS. THE REQUESTING CONTRACTOR
MUST SUBMIT THE REQUEST FOR SUBSTITUTION, NO REQUESTS DIRECTLY FROM VENDORS WILL BE
REVIEWED OR CONSIDERED. ALL REQUESTS MUST BE TIMELY IN ACCORDANCE WITH
INSTRUCTIONS AND PROJECT DOCUMENTS, IN WRITING, AND BE OF SUFFICIENT DETAIL TO
DEMONSTRATE COMPLIANCE WITH ALL ASPECTS OF THE PROJECT DOCUMENTS. RECEIPT OF A
REQUEST DOES NOT IMPLY ACCEPTANCE. ALL ACCEPTANCES OF SUBSTITUTION REQUEST WILL
BE BY ADDENDUM TO THE PROJECT SPECIFICATIONS ONLY.
1.06 THE APPROVED SCHEDULE WILL NOT BE MODIFIED EXCEPT BY APPROVAL OF THE ENGINEER.
WITH EACH PAY APPLICATION, THE SCHEDULE WILL BE HAND MARKED TO INDICATE PROGRESS
DEVIATIONS FROM THE SCHEDULE. THE DEVIATIONS WILL BE REVIEWED BY THE ENGINEER AND
OWNER AND THE CONTRACTOR WILL DEVELOP A PLAN TO REUTRN TO THE SCHEDULED WORK
FLOW AT NO ADDITIONAL COST TO THE PROJECT. FAILURE TO MAINTAIN PROGRESS WITH THE
SCHEDULE MAY AFFECT RETAINAGE WITHHELD BY THE OWNER ON THE PAY APPLICATION.
MATERIALS & METHODS
2.01 BUILDING SERVICES PIPING
A. Information for Specific Systems:
1. System Pressures: Specified in other Sections.
2. Pipe and Fitting Applications: Indicated on drawings; materials specified in 22
1005.
3. Valve Types and Applications: Indicated on drawings; general requirements specified in 22 1005.
4. Specialties: Indicated on drawings; general requirements specified in 22 1006.
5. Sections Where Other Requirements are Specified:
a. Domestic Water: Section 22 1005.
b. Sanitary Sewer and Vent: Section 22 1005.
B. Field Testing: Visually inspect connections for leaks at frequent intervals over entire duration of test.
1. Domestic Water:
a. Hydraulic (air over water) pressure test maintained at 25 psi (172 kPa) above system operating pressure for minimum of 1 hour.
2. Gravity Drainage Inside Building:
AND METHODS
22 0001 - 2
a. Water pressure test, by filling with water and maintaining minimum of 10 feet (3 m) water head for 15 minutes.
b. Air pressure test, by maintaining minimum of 5 psi (34.5 kPa) air pressure using air compressor for minimum of 15 minutes.
3. Gravity Drainage Outside Building:
a. Water pressure test, before backfilling, by filling with water and maintaining minimum of 10 feet (3 m) water head until backfilling is complete.
2.02 PIPES AND TUBES
A. ABS/PVC Composite Pipe: ASTM D 2680, with matching fittings and solvent welded joints.
B. Copper Pipe: ASTM B 42, light drawn, with ASME B16.18 or ASME B16.22 fittings and soldered joints, or ANSI/ASME B16.26 fittings and flared joints.
C. PVC Pipe: Solvent welded joints, unless otherwise indicated.
1. Water Piping, Not Buried: ASTM D 1785 or ASTM D 2241, with ASTM D 2665 PVC fittings.
2.03 VALVES
A. Ball Valves: Bronze two piece body, bronze stem, and Class 125; threaded or soldered ends; MSS SP-110.
B. Drain Valves: Bronze body, screwed bonnet, rising stem, composition disc, 3/4 inch (19
mm) outlet connection, Class 125; threaded or solder ends.
C. Temperature and Pressure Relief Valves: Cast iron, bronze or steel body, stainless steel or bronze trim, direct spring loaded, lifting level, and ASME Unfired Pressure Vessel Code stamp.
2.04 PIPING SPECIALTIES
A. Unions: Screwed type for pipes 2-1/2 inches (63 mm) and smaller; flanged type for pipes 3 inches (75 mm) and larger.
B. Bladder Type Expansion Tanks: ASME stamped steel shell with removable bladder, flanged connection for insertion of bladder, and lifting rings; factory primed and enamel finished.
1. Drain: Minimum 3/4 inch (19 mm) NPT, with plug.
2. Air valve for pumping air into the bladder.
C. Reduced Pressure Backflow Preventers: double check w/ air gap on discharge of booster pump.
D. Water Hammer Arrestors and Air Chambers: Stainless steel casing with flexible bellow, pressurized inert gas chamber; DI WH-201 Certified; precharged for operation in the temperature range and pressure intended.
E. Traps: Self-scouring with no internal divisions; liquid seal of at least 2 inches (50 mm) but less than 4 inches (100 mm); brass or bronze with chrome-plating where exposed to view.
F. Floor Drains: Cast iron, ASME A112.6.3.
1. Strainer: Round nickel-bronze flat grating, 2 times area of connecting pipe.
2. Configuration as required to make watertight connection to waterproofing system or finish flooring, as applicable.
3. All floor drain are to be properly trapped.
AND METHODS
22 0001 - 3
2.05 PLUMBING FIXTURES AND EQUIPMENT
A. Hydrants and Hose Bibbs: Bronze or brass, hose thread spout, integral vacuum breaker complying with ANSI/ASSE 1011; handwheel operated; at interior spaces, chrome plated; on exterior, cast bronze, vandal proof, freeze-resistant self-draining type.
B. Temperature and Pressure Relief Valves: Bronze body, direct pressure actuated;
manual test lever, and factory pressure and temperature setting; ASME certified for capacity.
C. When piping vents are located within 40 feet of outside air piping or AHUs, install a sewer vent filter on vent piping.
1. Manufacturer:
a. Odor Expert; Odor Expert Eliminator Sewer Vent Filter w/ Media:
www.odorexpert.com.
END OF SECTION
METERS AND GAUGES FOR
PLUMBING PIPING
22 0519 - 1
SECTION 22 0519
METERS AND GAUGES FOR PLUMBING PIPING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Pressure gauges.
B. Pressure gauges and pressure gauge taps.
1.02 RELATED REQUIREMENTS
A. Section 23 2113 - Hydronic Piping.
B. Section 23 0993 - Sequence of Operations for HVAC Controls.
1.03 REFERENCE STANDARDS
A. ASME B40.100 - Pressure Gauges and Gauge Attachments; 2013.
B. ASME MFC-3M - Measurement of Fluid Flow in Pipes Using Orifice, Nozzle and Venturi;
2007.
C. ASTM E1 - Standard Specification for ASTM Liquid-in-Glass Thermometers; 2014.
D. UL 393 - Indicating Pressure Gauges for Fire-Protection Service; Current Edition, Including All Revisions.
E. UL 404 - Gauges, Indicating Pressure, for Compressed Gas Service; Current Edition, Including All Revisions.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
B. Product Data: Provide red-marked product data sheets for each furnished item with associated components and accessories.
C. Project Record Documents: Record actual locations of components and instrumentation.
D. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.
1. See Section 01 6000 - Product Requirements. for additional provisions.
2. Extra Pressure Gauges: One of each type and size.
1.05 FIELD CONDITIONS
A. Do not install instrumentation when areas are under construction, except for required rough-in, taps, supports and test plugs.
PART 2 PRODUCTS
2.01 PRESSURE GAUGES
A. Manufacturers:
1. Dwyer Instruments, Inc: www.dwyer-inst.com/#sle.
2. Moeller Instrument Company, Inc: www.moellerinstrument.com/#sle.
3. Weksler Glass Thermometer Corp: www.wekslerglass.com/#sle.
4. Substitutions: See Section 01 6000 - Product Requirements.
B. Bourdon Tube for Liquids and Gases:
1. Dial Size and Cover: 4-1/2 inch diameter scale with polycarbonate window.
2. Dial Text and Markings: Black color on white background with scaled kPa and psi units.
3. Accuracy: ASME B40.100, adjustable commercial grade (D) with 5 percent of span.
METERS AND GAUGES FOR
PLUMBING PIPING
22 0519 - 2
4. Process Connection: Lower-back, 1/4 inch NPT male except where noted.
5. Gauge Wetted Materials: Painted steel case and brass socket rated to match process pressure and temperature range.
2.02 PRESSURE GAUGE TAPPINGS
A. Gauge Cock: Tee or lever handle, brass for maximum 150 psi.
B. Needle Valve: Brass, 1/4 inch NPT for minimum 150 psi.
2.03 TEST PLUGS
A. Test Plug: 1/4 inch or 1/2 inch brass fitting and cap for receiving 1/8 inch outside diameter pressure or temperature probe with neoprene core for temperatures up to 200 degrees F.
PART 3 EXECUTION
3.01 INSTALLATION
A. Install metering products in accordance with manufacturer's instructions for intended fluid type and service.
B. Install gauges and thermometers in locations where they are easily read from normal operating level. Install vertical to 45 degrees off vertical.
C. Adjust gauges and thermometers to final angle, clean windows and lenses, and calibrate to zero.
3.02 SCHEDULES
A. Pressure Gauge Tappings, Location:
1. Water service entracne - see detail on plans for location.
GENERAL-DUTY VALVES FOR
PLUMBING PIPING
22 0523 - 1
SECTION 22 0523
GENERAL-DUTY VALVES FOR PLUMBING PIPING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Applications.
B. General requirements.
C. Ball valves.
D. Check valves.
1.02 RELATED REQUIREMENTS
1.03 ABBREVIATIONS AND ACRONYMS
A. CWP: Cold working pressure.
B. EPDM: Ethylene propylene copolymer rubber.
C. NBR: Acrylonitrile-butadiene, Buna-N, or nitrile rubber.
D. NRS: Non-rising stem.
E. OS&Y: Outside screw and yoke.
F. PTFE: Polytetrafluoroethylene.
G. RS: Rising stem.
H. TFE: Tetrafluoroethylene.
I. WOG: Water, oil, and gas.
1.04 REFERENCE STANDARDS
A. ASME B1.20.1 - Pipe Threads, General Purpose (Inch); 2013.
B. ASME B16.5 - Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch
Standard; 2013.
C. ASME B16.10 - Face-to-Face and End-to-End Dimensions of Valves; 2017.
D. ASME B16.18 - Cast Copper Alloy Solder Joint Pressure Fittings; 2012.
E. ASME B16.34 - Valves - Flanged, Threaded and Welding End; 2017.
F. ASME B31.9 - Building Services Piping; 2014.
G. ASME BPVC-IX - Boiler and Pressure Vessel Code, Section IX - Welding, Brazing, and
Fusing Qualifications; 2015.
H. ASTM A126 - Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe
Fittings; 2004 (Reapproved 2014).
I. ASTM B62 - Standard Specification for Composition Bronze or Ounce Metal Castings;
2015.
J. MSS SP-71 - Cast Iron Swing Check Valves, Flanged and Threaded Ends; 2011.
K. MSS SP-80 - Bronze Gate, Globe, Angle and Check Valves; 2013.
L. MSS SP-110 - Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared
Ends; 2010.
M. NSF 61 - Drinking Water System Components - Health Effects; 2014 (Errata 2015).
N. NSF 372 - Drinking Water System Components - Lead Content; 2011.
1.05 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
PLUMBING PIPING
22 0523 - 2
B. Product Data: Provide data on valves including manufacturers catalog information.
Submit performance ratings, rough-in details, weights, support requirements, and piping connections.
C. Operation and Maintenance Data: Include manufacturer's descriptive literature, operating instructions, maintenance and repair data, and parts listings.
D. Maintenance Materials: Furnish Owner with one wrench for every five plug valves, in each size of square plug valve head.
1. See Section 01 6000 - Product Requirements for additional provisions.
1.06 QUALITY ASSURANCE
A. Manufacturer:
1. Obtain valves for each valve type from single manufacturer.
2. Company must specialize in manufacturing products specified in this section, with not less than three years of documented experience.
B. Welding Materials and Procedures: Comply with ASME BPVC-IX.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Prepare valves for shipping as follows:
1. Minimize exposure of operable surfaces by setting plug and ball valves to open position.
2. Protect valve parts exposed to piped medium against rust and corrosion.
3. Protect valve piping connections such as grooves, weld ends, threads, and flange faces.
4. Adjust globe, gate, and angle valves to the closed position to avoid clattering.
5. Secure check valves in either the closed position or open position.
6. Adjust butterfly valves to closed or partially closed position.
1.08 EXERCISE THE FOLLOWING PRECAUTIONS FOR HANDLING:
A. Handle large valves with sling, modified to avoid damage to exposed parts.
B. Avoid the use of operating handles or stems as rigging or lifting points.
PART 2 PRODUCTS
2.01 APPLICATIONS
A. See drawings for specific valve locations.
B. Listed pipe sizes shown using nominal pipe sizes (NPS) and nominal diameter (DN).
C. Provide the following valves for the applications if not indicated on drawings:
1. Sutoff: Ball
2. Throttling: Provide ball.
D. Substitutions of valves with higher CWP classes or WSP ratings for same valve types are permitted when specified CWP ratings or WSP classes are not available.
E. Domestic, Hot and Cold Water Valves:
1. 2 inch and Smaller:
a. Bronze: Provide with solder-joint or threaded ends.
b. Ball: One piece, full port, brass or bronze with stainless-steel trim.
F. Sanitary Waste and Storm Drainage Water Valves:
1. 2 inch and Smaller:
a. Bronze Swing Check: Class 125, bronze disc.
2. 2-1/2 inch and Larger:
a. Iron Swing Check: Class 125, metal seats.
PLUMBING PIPING
22 0523 - 3
2.02 GENERAL REQUIREMENTS
A. Valve Pressure and Temperature Ratings: No less than rating indicated; as required for system pressures and temperatures.
B. Valve Sizes: Match upstream piping unless otherwise indicated.
C. Valve Actuator Types:
1. Gear Actuator: Quarter-turn valves 8 inch and larger.
D. Insulated Piping Valves: With 2 inch stem extensions and the following features:
1. Gate Valves: Rising stem.
2. Ball Valves: Extended operating handle of non-thermal-conductive material, and protective sleeve that allows operation of valve without breaking the vapor seal or disturbing insulation.
3. Butterfly Valves: Extended neck.
4. Memory Stops: Fully adjustable after insulation is installed.
E. Valve-End Connections:
1. Threaded End Valves: ASME B1.20.1.
2. Pipe Flanges and Flanged Fittings 1/2 inch through 24 inch: ASME B16.5.
3. Solder Joint Connections: ASME B16.18.
F. General ASME Compliance:
1. Ferrous Valve Dimensions and Design Criteria: ASME B16.10 and ASME B16.34.
2. Solder-joint Connections: ASME B16.18.
3. Building Services Piping Valves: ASME B31.9.
G. Potable Water Use:
1. Certified: Approved for use in compliance with NSF 61 and NSF 372.
2. Lead-Free Certified: Wetted surface material includes less than 0.25 percent lead content.
H. Bronze Valves:
1. Fabricate from dezincification resistant material.
2. Copper alloys containing more than 15 percent zinc are not permitted.
I. Source Limitations: Obtain each valve type from a single manufacturer.
2.03 BRASS, BALL VALVES
A. One Piece, Full Port with Brass Trim and Push-to-fit or Threaded Connections:
1. Comply with MSS SP-110.
2. CWP Rating: 200 psi.
3. CWP Rating: 400 psig.
4. Body: Forged brass.
5. Ends: Threaded.
6. Seats: PTFE or TFE.
7. Stem: Brass.
8. Ball: Chrome-plated brass.
9. Operator: Handle.
2.04 BRONZE, BALL VALVES
A. General:
1. Fabricate from dezincification resistant material.
2. Copper alloys containing more than 15 percent zinc are not permitted.
B. One Piece, Reduced Port with Bronze Trim:
1. Comply with MSS SP-110.
PLUMBING PIPING
22 0523 - 4
2. WSP Rating: 400 psi.
3. CWP Rating: 600 psi.
4. Body: Bronze.
5. End Connections: Pipe press.
6. Seats: PTFE or TFE.
7. Stem: Bronze.
8. Ball: Chrome plated brass.
2.05 BRONZE, SWING CHECK VALVES
A. General:
1. Fabricate from dezincification resistant material.
2. Copper alloys containing more than 15 percent zinc are not permitted.
B. Class 125: CWP Rating: 200 psig (1380 kPa).
1. Pressure and Temperature Rating: MSS SP-80, Type 3.
2. Design: Y-pattern, horizontal or vertical flow.
3. Body: Bronze, ASTM B62.
4. End Connections: Threaded.
5. Disc: Bronze.
2.06 IRON, HORIZONTAL SWING CHECK VALVES
A. Class 125:
1. Pressure and Temperature Rating: MSS SP-71, Type I.
2. Design: T-body style for clear or full waterways.
3. WOG Rating: 200 psi.
4. Design: Clear or full waterway.
5. Body: ASTM A126, gray cast iron with bolted bonnet.
6. Ends: Flanged or threaded as indicated.
7. Trim: Composition.
8. Seat Ring and Disc Holder: Bronze.
9. Disc: PTFE or TFE.
10. Gasket: Asbestos free.
PART 3 EXECUTION
3.01 EXAMINATION
A. Discard all packing materials and verify that valve interior, including threads and flanges are completely clean without signs of damage or degradation that could result in leakage.
B. Verify valve parts to be fully operational in all positions from closed to fully open.
C. Confirm gasket material to be suitable for the service, to be of correct size, and without defects that could compromise effectiveness.
D. Should valve is determined to be defective, replace with new valve.
3.02 INSTALLATION
A. Provide unions or flanges with valves to facilitate equipment removal and maintenance while maintaining system operation and full accessibility for servicing.
B. Provide separate valve support as required and locate valve with stem at or above center of piping, maintaining unimpeded stem movement.
VIBRATION AND SEISMIC
CONTROLS FOR PLUMBING
PIPING AND EQUIPMENT
22 0548 - 1
SECTION 22 0548
VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Vibration-isolated equipment support bases.
B. Vibration isolators.
1.02 REFERENCE STANDARDS
A. ASHRAE (HVACA) - ASHRAE Handbook - HVAC Applications; 2015.
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
B. Product Data:
1. Provide manufacturer's product literature documenting compliance with PART 2
PRODUCTS.
2. Include seismic rating documentation for each isolator and restraint component accounting for horizontal, vertical, and combined loads.
1.04 QUALITY ASSURANCE
A. Comply with applicable building code.
B. Perform design and installation in accordance with applicable codes.
C. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section, with not less than three years of documented experience.
PART 2 PRODUCTS
2.01 PERFORMANCE REQUIREMENTS
A. General:
1. All vibration isolators, base frames and inertia bases to conform to all uniform deflection and stability requirements under all operating loads.
2. Steel springs to function without undue stress or overloading.
3. Steel springs to operate in the linear portion of the load versus deflection curve over deflection range of not less than 50 percent above specified deflection.
4. Lateral to vertical stiffness ratio to not exceed 0.08 with spring deflection at minimum 75 percent of specified deflection.
5. All equipment mounted on vibration isolated bases to have minimum operating clearance of 2 inches between the base and floor or support beneath unless noted otherwise.
2.02 VIBRATION ISOLATORS
A. General Requirements:
1. Resilient Materials for Vibration Isolators: Oil, ozone, and oxidant resistant.
2. Spring Elements for Spring Isolators:
a. Color code or otherwise identify springs to indicate load capacity.
b. Lateral Stability: Minimum lateral stiffness to vertical stiffness ratio of 0.8.
c. Designed to operate in the linear portion of their load versus deflection curve over deflection range of not less than 50 percent above specified deflection.
d. Designed to provide additional travel to solid of not less than 50 percent of rated deflection at rated load.
e. Selected to provide designed deflection of not less than 75 percent of specified deflection.
f. Selected to function without undue stress or overloading.
CONTROLS FOR PLUMBING
PIPING AND EQUIPMENT
22 0548 - 2
B. Vibration Isolators for Nonseismic Applications:
1. Resilient Material Isolator Mounts, Nonseismic:
a. Description: Mounting assemblies for bolting equipment to supporting structure utilizing elastomeric (e.g., neoprene, rubber) or fiberglass isolator material; fail-safe type.
2. Resilient Material Isolator Hangers, Nonseismic:
a. Description: Isolator assembly designed for installation in hanger rod suspension system utilizing elastomeric (e.g., neoprene, rubber) or fiberglass isolator material for the lower hanger rod connection.
C. Non-Seismic Type:
1. Elastomeric Mounts:
a. Material: Oil, ozone, and oxidant resistant compounds.
b. Assembly: Encapsulated load transfer plate bolted to equipment and base plate with anchor hole bolted to supporting structure.
2. Elastomeric Hangers:
a. Housing: Steel construction containing elastomeric isolation element to prevent rod contact with housing and short-circuiting of isolating function.
b. Incorporate steel load distribution plate sandwiching elastomeric element to housing.
3. Thrust Restraints:
a. Housing: Steel construction containing stable steel spring and integral elastomeric element installed in pairs to resist air pressure thrusts.
b. Bottom Openings: Sized to allow plus/minus 15 degrees rod misalignment.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that field measurements are as shown on the drawings.
B. Verify that mounting surfaces are ready to receive vibration isolation and/or seismic control components and associated attachments.
C. Verify that conditions are satisfactory for installation prior to starting work.
3.02 INSTALLATION
A. Install products in accordance with manufacturer's instructions.
B. Install anchors and fasteners in accordance with ICC Evaluation Services, LLC (ICC-ES) evaluation report conditions of use where applicable.
C. Secure fasteners according to manufacturer's recommended torque settings.
D. Install flexible piping connections to provide sufficient slack for vibration isolation and/or seismic relative displacements as indicated or as required.
E. Vibration Isolation Systems:
1. Isolator Hangers:
a. Use precompressed isolator hangers where required to facilitate installation and prevent damage to equipment utility connection provisions.
b. Locate isolator hangers at top of hanger rods in accordance with manufacturer's instructions.
2. Clean debris from beneath vibration-isolated equipment that could cause short-circuiting of isolation.
3. Use elastomeric grommets for attachments where required to prevent short-circuiting of isolation.
4. Adjust isolators to be free of isolation short circuits during normal operation.
CONTROLS FOR PLUMBING
PIPING AND EQUIPMENT
22 0548 - 3
5. Do not overtighten fasteners such that resilient material isolator pads are compressed beyond manufacturer's maximum recommended deflection.
3.03 INSTALLATION - GENERAL
A. Install in accordance with manufacturer's instructions.
B. Bases:
1. Adjust equipment level.
C. Prior to making piping connections to equipment with operating weights substantially different from installed weights, block up equipment with temporary shims to final height. When full load is applied, adjust isolators to load to allow shim removal.
D. Support piping connections to equipment mounted on isolators using isolators or resilient hangers for scheduled distance.
1. Up to 4 Inches Pipe Size: First three points of support.
2. 5 to 8 Inches Pipe Size: First four points of support.
3.04 FIELD QUALITY CONTROL
A. See Section 01 4000 - Quality Requirements, for additional requirements.
B. Inspect vibration isolation and/or seismic control components for damage and defects.
C. Correct deficiencies and replace damaged or defective vibration isolation and/or seismic control components.
D. Inspect isolated equipment after installation and submit report. Include static deflections.
3.05 SCHEDULES
A. Pipe Isolation Schedule.
1. 1 Inch Pipe Size: Isolate 120 diameters from equipment.
2. 2 Inch Pipe Size: Isolate 90 diameters from equipment.
IDENTIFICATION FOR PLUMBING
PIPING AND EQUIPMENT
22 0553 - 1
SECTION 22 0553
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Nameplates.
B. Tags.
C. Pipe markers.
D. Underground warning tape.
E. Ceiling tacks.
1.02 RELATED REQUIREMENTS
A. Section 09 9123 - Interior Painting: Identification painting.
1.03 REFERENCE STANDARDS
A. ASME A13.1 - Scheme for the Identification of Piping Systems; 2007.
B. ASME A13.1 - Scheme for the Identification of Piping Systems; The American Society of
Mechanical Engineers; 2007 (ANSI/ASME A13.1).
C. ASTM D709 - Standard Specification for Laminated Thermosetting Materials; 2013.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
B. Schedules:
1. Submit plumbing component identification schedule listing equipment, piping, and valves.
2. Detail proposed component identification data in terms of of wording, symbols, letter size, and color coding to be applied to corresponding product.
3. Valve Data Format: Include id-number, location, function, and model number.
C. Product Data: Provide manufacturers catalog literature for each product required.
PART 2 PRODUCTS
2.01 PLUMBING COMPONENT IDENTIFICATION GUIDELINE
A. Pipe Markers: 3/4 inch diameter and higher.
2.02 IDENTIFICATION APPLICATIONS
A. Piping: Pipe markers.
B. Tanks: Nameplates.
C. Valves: Tags and ceiling tacks where located above lay-in ceiling.
2.03 NAMEPLATES
A. Description: Laminated piece with up to three lines of text.
1. Letter Color: White.
2. Letter Height: 1/4 inch.
3. Background Color: Black.
4. Plastic: Comply with ASTM D709.
2.04 TAGS
A. Flexible: Vinyl with engraved black letters on light contrasting background color with up to three lines of text. Minimum tag size 1-1/2 inch in diameter.
PIPING AND EQUIPMENT
22 0553 - 2
B. Metal: Brass, 19 gauge 1-1/2 inch in diameter with smooth edges, blank, smooth edges, and corrosion-resistant ball chain. Up to three lines of text.
C. Valve Tag Chart: Typewritten 12-point letter size list in anodized aluminum frame.
2.05 PIPE MARKERS
A. Comply with ASME A13.1.
B. Flexible Marker: Factory fabricated, semi-rigid, preformed to fit around pipe or pipe covering; minimum information indicating flow direction arrow and identification of fluid conveyed.
C. Flexible Tape Marker: Flexible, vinyl film tape with pressure-sensitive adhesive backing and printed markings.
D. Underground Flexible Marker: Bright-colored continuously printed ribbon tape, minimum 6 inches wide by 4 mil, 0.004 inch thick, manufactured for direct burial service.
E. Identification Scheme, ASME A13.1:
1. Primary: External Pipe Diameter, Uninsulated or Insulated.
2. Secondary: Color scheme per fluid service.
a. Water; Potable, Cooling, Boiler Feed, and Other: White text on green background.
F. Color code as follows:
1. Potable, Cooling, Boiler, Feed, Other Water: Green with white letters.
2.06 UNDERGROUND WARNING TAPE
A. Materials: Use foil-backed detectable type polyethylene tape suitable for direct burial, unless otherwise indicated.
B. Foil-backed Detectable Type Tape: 3 inches wide, with minimum thickness of 5 mil,
0.005 inch, unless otherwise required for proper detection.
C. Legend: Type of service, continuously repeated over full length of tape.
D. Color:
2.07 CEILING TACKS
A. Description: Steel with 3/4 inch diameter color coded head.
B. Color code as follows:
1. Plumbing Valves: Green.
PART 3 EXECUTION
3.01 PREPARATION
A. Degrease and clean surfaces to receive identification products.
B. Prepare surfaces for stencil painting, see Section 09 9123.
3.02 INSTALLATION
A. Install flexible nameplates with corrosive-resistant mechanical fasteners, or adhesive.
Apply with sufficient adhesive to ensure permanent adhesion and seal with clear lacquer.
B. Install tags in clear view and align with axis of piping C. Install plastic pipe markers in accordance with manufacturer's instructions.
D. Install plastic tape pipe marker around pipe in accordance with manufacturer's instructions.
PIPING AND EQUIPMENT
22 0553 - 3
E. Install underground plastic pipe markers 6 to 8 inches below finished grade, directly above buried pipe.
F. Use tags on piping 3/4 inch diameter and smaller.
1. Identify service, flow direction, and pressure.
2. Install in clear view and align with axis of piping.
3. Locate identification not to exceed 20 feet on straight runs including risers and drops, adjacent to each valve and Tee, at each side of penetration of structure or enclosure, and at each obstruction.
G. Locate ceiling tacks to locate valves or dampers above lay-in panel ceilings. Locate in corner of panel closest to equipment.
PLUMBING PIPING INSULATION 22 0719 - 1
SECTION 22 0719
PLUMBING PIPING INSULATION
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Flexible elastomeric cellular insulation.
B. Piping insulation.
C. Jacketing and accessories.
1.02 RELATED REQUIREMENTS
A. Section 07 8400 - Firestopping.
B. Section 22 1005 - Plumbing Piping: Placement of hangers and hanger inserts.
1.03 REFERENCE STANDARDS
A. ASTM C534/C534M - Standard Specification for Preformed Flexible Elastomeric Cellular
Thermal Insulation in Sheet and Tubular Form; 2014.
B. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building
Materials; 2015a.
C. ASTM E96/E96M - Standard Test Methods for Water Vapor Transmission of Materials;
2014.
D. UL 723 - Standard for Test for Surface Burning Characteristics of Building Materials;
Current Edition, Including All Revisions.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
B. Product Data: Provide product description, thermal characteristics, list of materials and thickness for each service, and locations.
1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing the Products specified in this section with not less than three years of documented experience.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Accept materials on site, labeled with manufacturer's identification, product density, and thickness.
1.07 FIELD CONDITIONS
A. Maintain ambient conditions required by manufacturers of each product.
B. Maintain temperature before, during, and after installation for minimum of 24 hours.
PART 2 PRODUCTS
2.01 REGULATORY REQUIREMENTS
A. Surface Burning Characteristics: Flame spread index/Smoke developed index of 25/50, maximum, when tested in accordance with ASTM E84 or UL 723.
2.02 FLEXIBLE ELASTOMERIC CELLULAR INSULATION
A. Manufacturers:
1. Aeroflex USA, Inc; AEROFLEX Self-Seal: www.aeroflexusa.com/#sle.
2. Armacell LLC; AP Armaflex: www.armacell.us/#sle.
3. K-Flex USA LLC; Insul-Tube: www.kflexusa.com/#sle.
4. Substitutions: See Section 01 6000 - Product Requirements.
PLUMBING PIPING INSULATION 22 0719 - 2
B. Insulation: Preformed flexible elastomeric cellular rubber insulation complying with ASTM C534/C534M Grade 1; use molded tubular material wherever possible.
1. Minimum Service Temperature: Minus 40 degrees F.
2. Maximum Service Temperature: 220 degrees F.
3. Connection: Waterproof vapor barrier adhesive.
C. Elastomeric Foam Adhesive: Air dried, contact adhesive, compatible with insulation.
2.03 JACKETING AND ACCESSORIES
A. PVC Plastic Jacket:
1. Jacket: One piece molded type fitting covers and sheet material, off-white color.
a. Minimum Service Temperature: 0 degrees F.
b. Maximum Service Temperature: 150 degrees F.
c. Moisture Vapor Permeability: 0.002 perm inch, maximum, when tested in accordance with ASTM E96/E96M.
d. Thickness: 10 mil, 0.010 inch.
e. Connections: Brush on welding adhesive.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that piping has been tested before applying insulation materials.
B. Verify that surfaces are clean and dry, with foreign material removed.
3.02 INSTALLATION
A. Install in accordance with manufacturer's instructions.
B. Install in accordance with North American Insulation Manufacturers Association
(NAIMA) National Insulation Standards.
C. Exposed Piping: Locate insulation and cover seams in least visible locations.
D. Insulated pipes conveying fluids below ambient temperature: Insulate entire system including fittings, valves, unions, flanges, strainers, flexible connections, pump bodies, and expansion joints.
E. Glass fiber insulated pipes conveying fluids below ambient temperature:
1. Provide vapor barrier jackets, factory-applied or field-applied. Secure with self-sealing longitudinal laps and butt strips with pressure-sensitive adhesive.
Secure with outward clinch expanding staples and vapor barrier mastic.
2. Insulate fittings, joints, and valves with molded insulation of like material and thickness as adjacent pipe. Finish with glass cloth and vapor barrier adhesive or PVC fitting covers.
F. For hot piping conveying fluids 140 degrees F or less, do not insulate flanges and unions at equipment, but bevel and seal ends of insulation.
G. For hot piping conveying fluids over 140 degrees F, insulate flanges and unions at equipment.
H. Glass fiber insulated pipes conveying fluids above ambient temperature:
1. Provide standard jackets, with or without vapor barrier, factory-applied or field-applied. Secure with self-sealing longitudinal laps and butt strips with pressure-sensitive adhesive. Secure with outward clinch expanding staples.
2. Insulate fittings, joints, and valves with insulation of like material and thickness as adjoining pipe. Finish with glass cloth and adhesive or PVC fitting covers.
I. Inserts and Shields:
1. Application: Piping 1-1/2 inches diameter or larger.
http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M
PLUMBING PIPING INSULATION 22 0719 - 3
2. Shields: Galvanized steel between pipe hangers or pipe hanger rolls and inserts.
3. Insert Location: Between support shield and piping and under the finish jacket.
4. Insert Configuration: Minimum 6 inches long, of same thickness and contour as adjoining insulation; may be factory fabricated.
5. Insert Material: Hydrous calcium silicate insulation or other heavy density insulating material suitable for the planned temperature range.
J. Continue insulation through walls, sleeves, pipe hangers, and other pipe penetrations.
Finish at supports, protrusions, and interruptions. At fire separations, see Section 07 8400.
K. Pipe Exposed in Mechanical Equipment Rooms or Finished Spaces (less than 10 feet above finished floor): Finish with canvas jacket sized for finish painting.
3.03 SCHEDULES
A. All piping to be insulated in accordance with the 2015 IECC.
B. Insulate hot water and hot water recirculating piping with the following type and thickness of insulaton for circulating mains and runouts:
1. Pipe Size Hot Water
2. Up to 2" 1"
3. 2-1/2" and up 1-1/2"
C. Insulate domestic and chilled cold water piping with the following type and thickness of insulation for circulating mains and runouts"
1. Pipe Size Cold Water
2. Up to 1-1/4" 3/4"
3. 1-1/2" to 2" 1"
4. 2" and up 1-1/2"
END OF SECTION
http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C534/C534M
PLUMBING PIPING 22 1005 - 1
SECTION 22 1005
PLUMBING PIPING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Sanitary waste piping, buried within 5 feet of building.
B. Sanitary waste piping, above grade.
C. Domestic water piping, buried within 5 feet of building.
D. Domestic water piping, above grade.
E. Pipe flanges, unions, and couplings.
F. Pipe hangers and supports.
G. Pressure reducing valves.
H. Pressure relief valves.
I. Strainers.
1.02 RELATED REQUIREMENTS
A. Section 22 0548 - Vibration and Seismic Controls for Plumbing Piping and Equipment.
B. Section 22 0553 - Identification for Plumbing Piping and Equipment.
C. Section 22 0719 - Plumbing Piping Insulation.
1.03 REFERENCE STANDARDS
A. ANSI Z21.22 - American National Standard for Relief Valves and Automatic Gas Shutoff
Devices for Hot Water Supply Systems; 1999, and addenda A&B (R2004).
B. ASME B16.18 - Cast Copper Alloy Solder Joint Pressure Fittings; 2012.
C. ASME B16.22 - Wrought Copper and Copper Alloy Solder-Joint Pressure Fittings; 2013.
D. ASME B31.9 - Building Services Piping; 2014.
E. ASME BPVC-IV - Boiler and Pressure Vessel Code, Section IV - Rules for Construction of
Heating Boilers; 2015.
F. ASME BPVC-IX - Boiler and Pressure Vessel Code, Section IX - Welding, Brazing, and
Fusing Qualifications; 2015.
G. ASSE 1003 - Performance Requirements for Water Pressure Reducing Valves for
Domestic Water Distribution Systems; 2009.
H. ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on
Iron and Steel Products; 2015.
I. ASTM B32 - Standard Specification for Solder Metal; 2008 (Reapproved 2014).
J. ASTM B42 - Standard Specification for Seamless Copper Pipe, Standard Sizes; 2015a.
K. ASTM B88 - Standard Specification for Seamless Copper Water Tube; 2014.
L. ASTM B88M - Standard Specification for Seamless Copper Water Tube (Metric); 2013.
M. ASTM B813 - Standard Specification for Liquid and Paste Fluxes for Soldering of Copper and Copper Alloy Tube; 2010.
N. ASTM B828 - Standard Practice for Making Capillary Joints by Soldering of Copper and
Copper Alloy Tube and Fittings; 2002 (Reapproved 2010).
O. ASTM D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120; 2015.
PLUMBING PIPING 22 1005 - 2
P. ASTM D2241 - Standard Specification for Poly (Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series); 2015.
Q. ASTM D2466 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40; 2013.
R. ASTM D2564 - Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems; 2012.
S. ASTM D2665 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings; 2014.
T. ASTM D2855 - Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings; 1996 (Reapproved 2010).
U. ASTM D3034 - Standard Specification for Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings; 2015.
V. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials; 2015a.
W. ASTM F876 - Standard Specification for Crosslinked Polyethylene (PEX) Tubing; 2013a.
X. ASTM F877 - Standard Specification for Crosslinked Polyethylene (PEX) Plastic Hot- and
Cold-Water Distribution Systems; 2011.
Y. ASTM F1960 - Standard Specification for Cold Expansion Fittings with PEX Reinforcing
Rings for Use with Cross-linked Polyethylene (PEX) Tubing; 2015.
Z. AWS A5.8M/A5.8 - Specification for Filler Metals for Brazing and Braze Welding;
2011-AMD 1.
AA. CISPI 301 - Standard Specification for Hubless Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste and Vent Piping Applications; 2009.
AB. CISPI 310 - Specification for Coupling for Use in Connection with Hubless Cast Iron Soil
Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping Applications;
2011.
AC. ICC-ES AC106 - Acceptance Criteria for Predrilled Fasteners (Screw Anchors) in Masonry Elements; 2012.
AD. ICC-ES AC193 - Acceptance Criteria for Mechanical Anchors in Concrete Elements;
2013.
AE. MSS SP-58 - Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation; 2009.
AF. NSF 61 - Drinking Water System Components - Health Effects; 2014 (Errata 2015).
AG. NSF 372 - Drinking Water System Components - Lead Content; 2011.
AH. PPI TR-4 - PPI Listing of Hydrostatic Design Basis (HDB), Hydrostatic Design Stress (HDS), Strength Design Basis (SDB), Pressure Design Basis (PDB), and Minimum Required Strength (MRS) Ratings For Thermoplastic Piping Materials or Pipe; 2013.
AI. UL 723 - Standard for Test for Surface Burning Characteristics of Building Materials;
Current Edition, Including All Revisions.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
B. Product Data: Provide data on pipe materials, pipe fittings, valves, and accessories.
Provide manufacturers catalog information. Indicate valve data and ratings.
C. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.
PLUMBING PIPING 22 1005 - 3
1. See Section 01 6000 - Product Requirements for additional provisions.
2. Valve Repacking Kits: One for each type and size of valve.
1.05 QUALITY ASSURANCE
A. Perform work in accordance with applicable codes.
B. Valves: Manufacturer's name and pressure rating marked on valve body.
C. Welding Materials and Procedures: Comply with ASME BPVC-IX and applicable state labor regulations.
D. Identify pipe with marking including size, ASTM material classification,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .