This is a Geotechnical Report prepared for the Harris County Flood Control District in support of the Greens Bayou Mid-Reach Channel Conveyance Improvements (Segment 1) project at John F. Kennedy Boulevard in Texas. The report documents subsurface soil and geological conditions at the project site through field investigations and laboratory testing. The geotechnical assessment provides engineering data necessary for design and construction planning of the channel improvement project, which is funded through Community Development Block Grant-Disaster Recovery (CDBG-DR) and General Land Office (GLO) sources. The report characterizes soil stratigraphy, bearing capacity, settlement potential, and other geotechnical parameters critical for foundation design and construction methodology selection for the conveyance improvements.

The geotechnical investigation informs bidding requirements and contractor planning for the project, as it establishes baseline subsurface conditions that contractors must account for in their proposals and construction approaches. The findings are essential for cost estimation, schedule development, and risk assessment related to soil conditions and construction logistics. This report serves as a supporting exhibit to the Invitation to Bid and provides technical documentation that qualified bidders must review to prepare accurate and competitive proposals for the channel conveyance improvement work.

View the file

Other files

File Type Posted
18-Attachment BB - MWBE Goal Participation Information Packet.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
20-Attachment P - Required Contract Provisions.pdf PDF
14-Attachment Q - Section 3 Bid Requirements.pdf PDF
23-Federal IFB General Conditions and Specifications - Construction.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
19-Attachment O - Davis Bacon Wage Decision.pdf PDF
16-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
13-Attachment G - Contractor Profile.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
6-Attachment K - Payment Bond.pdf PDF
25-Attachment S - Plans Drawings.pdf PDF
26-Attachment V - Project Signs Plaques.pdf PDF
15-Attachment A - Bid Addenda Acknowledgement.pdf PDF
9-Attachment W - GLO Compliance Package.pdf PDF
12-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
11-Attachment CC – MWBE Utilization Plan Commitment Form.pdf PDF
4-Attachment F - References.pdf PDF
10-Attachment FF - Heat Protection Safety Requirements.pdf PDF
24-Attachment U - Project Manual.pdf PDF
21-Attachment M - Minimum Insurance Requirements for Flood Control District.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .