21321.101 Stockton MoDOT Lagoon Closure Plan_SEALED_CERTIFIED.pdf
PDF Posted
- Solicitation number
- IFB605CO25000818
- Issued by
- Cass County, Missouri
About this file
This is a Lagoon Closure Plan document prepared by the Missouri Department of Transportation (MoDOT) for the SW Stockton Sanitary Sewer and Water Main Extension project in Stockton, Missouri. The project involves constructing a sanitary sewer main extension of approximately 2,400 linear feet of 8" PVC gravity main and a water main extension of approximately 3,610 linear feet of 6" PVC C900 pipe along State Highway 32 to connect the MoDOT maintenance facility to the City of Stockton's public utility systems. The project deliverables include directional boring, installation of casing pipes under roads, and decommissioning of the existing facility lagoon with associated site restoration. A mandatory pre-bid meeting is scheduled for November 12, 2024, at 1:00 PM, with bids due on November 22, 2024, at 2:00 PM CST. The project has a defined completion date of December 31, 2025, with liquidated damages of $700 per day assessed for late completion. Bids will be received electronically through MissouriBUYS, via mail, UPS, or FedEx, with notification to the buyer required five business days prior to bid closing for hard copy submissions.
Bidders must submit a lump sum project bid that includes 600 cubic yards of rock excavation, with additional excavation priced separately. The project encourages minority and women-owned business enterprise participation, with target goals of 10% for Minority Business Enterprises and 5% for Women Business Enterprises. Bidders must provide a 5% bid bond and, if awarded, a 100% performance and payment bond. Contractors are required to maintain specific insurance coverages including $4,000,000 in general and automobile liability and workers' compensation insurance. The project will be awarded to the lowest responsive and responsible bidder in accordance with Cedar County, Missouri prevailing wage requirements. All on-site personnel must provide proof of OSHA 10-hour construction safety training. Bidders must comply with the Domestic Products Procurement Act and provide various documentation including affidavits, E-Verify information, and insurance certificates upon contract award.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .