21321.101 Stockton MoDOT Lagoon Closure Plan_SEALED_CERTIFIED.pdf

PDF Posted

Attached to
SW Stockton Sanitary Sewer and Water Main Extension
Solicitation number
IFB605CO25000818
Issued by
Cass County, Missouri

About this file

This is a Lagoon Closure Plan document prepared by the Missouri Department of Transportation (MoDOT) for the SW Stockton Sanitary Sewer and Water Main Extension project in Stockton, Missouri. The project involves constructing a sanitary sewer main extension of approximately 2,400 linear feet of 8" PVC gravity main and a water main extension of approximately 3,610 linear feet of 6" PVC C900 pipe along State Highway 32 to connect the MoDOT maintenance facility to the City of Stockton's public utility systems. The project deliverables include directional boring, installation of casing pipes under roads, and decommissioning of the existing facility lagoon with associated site restoration. A mandatory pre-bid meeting is scheduled for November 12, 2024, at 1:00 PM, with bids due on November 22, 2024, at 2:00 PM CST. The project has a defined completion date of December 31, 2025, with liquidated damages of $700 per day assessed for late completion. Bids will be received electronically through MissouriBUYS, via mail, UPS, or FedEx, with notification to the buyer required five business days prior to bid closing for hard copy submissions.

Bidders must submit a lump sum project bid that includes 600 cubic yards of rock excavation, with additional excavation priced separately. The project encourages minority and women-owned business enterprise participation, with target goals of 10% for Minority Business Enterprises and 5% for Women Business Enterprises. Bidders must provide a 5% bid bond and, if awarded, a 100% performance and payment bond. Contractors are required to maintain specific insurance coverages including $4,000,000 in general and automobile liability and workers' compensation insurance. The project will be awarded to the lowest responsive and responsible bidder in accordance with Cedar County, Missouri prevailing wage requirements. All on-site personnel must provide proof of OSHA 10-hour construction safety training. Bidders must comply with the Domestic Products Procurement Act and provide various documentation including affidavits, E-Verify information, and insurance certificates upon contract award.

View the file

Other files

File Type Posted
IFB605CO25000818_Nov_18_24_solicitation_doc.pdf PDF
IFB605CO25000818_Feb_17_25_solicitation_doc.pdf PDF
MoDOT - Stockton - Addendum 1 Drawings.pdf.crdownload CRDOWNLOAD file
IFB605CO25000818_May_5_25_solicitation_doc.pdf PDF
IFB605CO25000818_Nov_25_24_solicitation_doc.pdf PDF
IFB605CO25000818_Jun_2_25_solicitation_doc.pdf PDF
VendorChangeDetailsReport_IFB605CO25000818_v1_Nov_21_24.pdf PDF
IFB605CO25000818_Jan_13_25_solicitation_doc.pdf PDF
IFB605CO25000818_Jun_9_25_solicitation_doc.pdf PDF
IFB605CO25000818_Jan_27_25_solicitation_doc.pdf PDF
IFB605CO25000818_Feb_24_25_solicitation_doc.pdf PDF
IFB605CO25000818_Mar_24_25_solicitation_doc.pdf PDF
IFB605CO25000818_Dec_2_24_solicitation_doc.pdf PDF
21321.101 Stockton MoDOT Lagoon Closure Plan_SEALED_CERTIFIED.pdf.crdownload CRDOWNLOAD file
Exhibit M - ANTI-DISCRIMINATION AGAINST ISRAEL.pdf PDF
IFB605CO25000818_Dec_16_24_solicitation_doc.pdf PDF
IFB605CO25000818_Dec_9_24_solicitation_doc.pdf PDF
IFB605CO25000818_May_19_25_solicitation_doc.pdf PDF
IFB605CO25000818_Jan_6_25_solicitation_doc.pdf PDF
21321.101 CASCO Civil Lagoon Closure Technical Specifications_SEALED.pdf PDF
IFB605CO25000818_Feb_10_25_solicitation_doc.pdf PDF
21321.101C_Lagoon Grading Plan_SEALED_CERTIFIED.pdf PDF
IFB605CO25000818_May_12_25_solicitation_doc.pdf PDF
Bid Form.pdf PDF
IFB605CO25000818_Jul_3_26_solicitation_doc.pdf PDF
IFB605CO25000818_Dec_23_24_solicitation_doc.pdf PDF
IFB605CO25000818_Mar_10_25_solicitation_doc.pdf PDF
IFB605CO25000818_Nov_11_24_solicitation_doc.pdf PDF
CedarAWO31.pdf PDF
IFB605CO25000818_Mar_17_25_solicitation_doc.pdf PDF
IFB605CO25000818_Apr_3_26_solicitation_doc.pdf PDF
IFB605CO25000818_Feb_3_25_solicitation_doc.pdf PDF
IFB605CO25000818_Jan_20_25_solicitation_doc.pdf PDF
Affidavits - Exhibit A and B.pdf PDF
MoDOT Stockton Sanitary Sewer and Water Main Extension Plans.pdf PDF
IFB605CO25000818_Nov_4_24_solicitation_doc.pdf PDF
IFB605CO25000818_Mar_31_25_solicitation_doc.pdf PDF
IFB605CO25000818_Dec_30_24_solicitation_doc.pdf PDF
IFB605CO25000818_Apr_14_25_solicitation_doc.pdf PDF
IFB605CO25000818_Jun_23_25_solicitation_doc.pdf PDF
IFB605CO25000818_Apr_7_25_solicitation_doc.pdf PDF
IFB605CO25000818_Apr_21_25_solicitation_doc.pdf PDF
IFB605CO25000818_Mar_3_25_solicitation_doc.pdf PDF
IFB605CO25000818_Apr_28_25_solicitation_doc.pdf PDF
IFB605CO25000818_Nov_2_24_solicitation_doc.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .