210824_FFE_Alternate_Form.docx

DOCX document 28 KB Posted

Attached to
Office Furniture for MCC Buildings 2 & 3
Solicitation number
RFQ - 03A - 21100100000000000072
Issued by
York County, Maine

About this file

This is an alternate form document for a furniture procurement initiative in Maine, specifically supporting the Office Furniture for MCC Buildings 2 & 3 contract opportunity. The document provides an alternative submittal format for bidders responding to the office furniture requirements for the two Maine Community College buildings. The form is designed to accommodate vendors who may prefer or need to submit their proposals using this alternate structure rather than the standard format, ensuring flexibility in the bidding process while maintaining the ability to evaluate all submissions against consistent criteria.

The alternate form maintains alignment with the original solicitation requirements and evaluation standards, allowing bidders to present pricing, product specifications, and delivery terms through this alternative template. This approach facilitates broader participation from potential vendors while preserving the integrity and comparability of all bid submissions for the procurement evaluation committee's review and award determination.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Maine Correctional Center Invitation to Bid August 4, 2016 Furniture, Fixtures & Equipment Building 2 and 3 Windham, Maine

ALTERNATE FORM

PROVIDE ITEM IMAGE HERE

Item Designation (Tag):

Basis of Design Manufacturer/Model:

Proposed Alternate Manufacturer:

Proposed Alternate Model Name and Number:

Item Dimensions:

Description:

Sustainable Attributes:

Finishes as Priced:

Vendor Name:

Submitted by (Individual):

*Initial:

*Initials indicate that the above person has investigated the proposed product and determined that it meets or exceeds the quality level of the specified product* **Attach/Include any additional drawings, specifications or cut sheets required to adequately evaluate substitution, and as outlined in Instructions to Bidders and Product Requirements**

Alternate Form

File details come from the government source that posted it. Updated .