210040_ATT3_Submittal_Register.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Repair Roof Sections 7, 8, 9, 10, 19, & 20, B3102
Solicitation number
WWYK210040
Issued by

About this file

The Submittal Register is a comprehensive document for a design-build roofing repair project at Tinker Air Force Base (AFB), specifically for repairing roof sections 7, 8, 9, 10, 19, and 20 of Building 3102. The document details 96 required submittals across multiple specification sections, including preconstruction submittals, certificates, product data, manufacturer's instructions, design data, test reports, and closeout documents. Key submittal requirements include a Health and Safety Plan, Storm Water Pollution Prevention Plan, Construction Phasing Plan, baseline construction and design schedules, quality control plans, air sampling results, waste disposal receipts, and as-built drawings.

The project is valued between $1,000,000 - $5,000,000 and is exclusively for Tinker AFB - MAC BOA Holders. A mandatory site visit is scheduled for August 5, 2025, at 0930, with an RSVP deadline of August 1, 2025, at 1500 CST. Contractor responsibilities include site investigation, verifying existing conditions, identifying logistical and structural work elements, and completing FOD awareness training. Contractors will work on flight lines, runways, taxiways, parking ramps, and in aircraft hangars or maintenance areas. The solicitation is currently in the draft stage and not yet funded, with the specific Request for Proposal (RFP) to be posted later.

View the file

Other files

File Type Posted
Solicitation - FA813725R0042.pdf PDF
210040_Hangar-3102 Drawing.pdf PDF
Site Visit Sign In Sheet.pdf PDF
210040 Government Response.pdf PDF
Solicitation - FA813725R0042.pdf PDF
Roof Shop Pages 3102.pdf PDF
03102A-FP02.pdf PDF
210040_ATT1_MACB_Design_Build_SOW_v3.pdf PDF
210040_ATT2_Design_Narrative_Final.pdf PDF
EAL List ATT 5 - BLANK to Contractors.xlsx XLSX spreadsheet
3102 Original.pdf PDF
83 Repair Roof Joints and Drains 3102.pdf PDF
03102A-FP01.pdf PDF
01 Emergency Roof Repair 3102.pdf PDF
3102 Roof W Sections.pdf PDF
3102 Aerial.pdf PDF
210040_ATT11_Drawings_Final.pdf PDF
88 Roof Repair 3102.pdf PDF
97 Renovate Flight Test 3102.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register_General (2

TITLE:Tinker AFB General Requirements Specification (Div 00-01)SUBMITTAL REGISTER
JOB NAME:WWYK 210040 Repair Roof Sections 7, 8, 9, 10, 19, & 20, B3102
LOCATION:Tinker AFB, OK
CONTRACT NO:TBD
CONTRACTOR:TBD
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(r)
LineActivity #Transmittal #Specification SectionSD #SDSubmittal DescriptionItem SubmittedParagraph #Classification: GOVT or A/E ReviewerSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth Date RCD From CONTRRemarks
100 70 00066Test ReportsPre-Construction Testing Record1.3.10G
200 70 00077CertificatesWelding, Cutting and Brazing Permit1.4G
300 71 00011Preconstruction SubmittalsHealth and Safety Plan1.3G
400 71 00011Preconstruction SubmittalsEntry Authority List1.5.2
500 71 00011Preconstruction SubmittalsVehicle Entry Authority List1.5.2G
600 71 00011Preconstruction SubmittalsEquipment and Material Storage1.5G
700 71 00011Preconstruction SubmittalsContractor Offices and Plants1.5G
800 71 00011Preconstruction SubmittalsDesignated Waste and Disposal Areas1.5G
900 71 00011Preconstruction SubmittalsConstruction Phasing Plan1.5G
1000 71 00011Preconstruction SubmittalsAirfield Construction Waiver1.5GMust be turned in by the 5th day of the month to make that month Waiver Package. Provide editable form to the CO to be forwarded to Community Planning. Allow 45 days for processing.
1100 71 00011Preconstruction SubmittalsFAA Form 7460-11.5.3G
1200 71 00077CertificatesSafety Meetings1.3
1300 71 00077CertificatesFOD Awareness and Prevention Training1.4
1400 72 00011Preconstruction SubmittalsStorm Water Pollution Prevention Plan1.3.3.2G
1500 72 00011Preconstruction SubmittalsAF Form 3952 Chemical/Hazardous Material Request/Authorization1.4G
1600 72 00011Preconstruction SubmittalsEnvironmental Management System Awareness Training1.10
1700 72 00033Product DataAffirmative Procurement Documentation or Green Statement1.3.9GProvide only one. Reference specification for additional information
1800 72 00077CerificatesMonthly Hazardous Material Usage Report1.4GProvide 1st week of each month during construction
1900 72 00088Manufacturer's InstructionsSafety Data Sheets/Material Safety Data Sheets1.4
2000 72 001111Closeout SubmittalsNotice of Termination
(ODEQ Form 640-572)1.3.3.2G
2100 72 00 - Attch 2011Preconstruction SubmittalsDocumentation of Training/ ExperienceC.2

C.13 22 00 72 00 - Attch 2 01 1 Preconstruction Submittals Employee Physicals C.2 C.13

2300 72 00 - Attch 2011Preconstruction SubmittalsRegulatory Agency NotificationC.3
2400 72 00 - Attch 2011Preconstruction SubmittalsSecurity DocumentationC.4
2500 72 00 - Attch 2011Preconstruction SubmittalsCommunicationsC.5
2600 72 00 - Attch 2011Preconstruction SubmittalsStep-by-Step Abatement ProceduresC.6G
2700 72 00 - Attch 2011Preconstruction SubmittalsGlovebag ProceduresC.7G
2800 72 00 - Attch 2011Preconstruction SubmittalsNegative Pressure Enclosure Construction ProceduresC.8G
2900 72 00 - Attch 2011Preconstruction SubmittalsRespirator Protection ProgramC.9
3000 72 00 - Attch 2011Preconstruction SubmittalsEncapsulation ProceduresC.11G
3100 72 00 - Attch 2011Preconstruction SubmittalsLandfill QualificationsC.14
3200 72 00 - Attch 2011Preconstruction SubmittalsWork ScheduleC.16
3300 72 00 - Attch 2011Preconstruction SubmittalsEmergency Plans and Fire Prevention PlansC.17G
3400 72 00 - Attch 2011Preconstruction SubmittalsWritten Hazardous Communication ProgramC.18
3500 72 00 - Attch 2011Preconstruction SubmittalsRental EquipmentC.19
3600 72 00 - Attch 2077CerificatesManufacturer’s CertificationsC.10
3700 72 00 - Attch 2077CerificatesLaboratory and Monitoring Qualifications/CertificationsC.12
3800 72 00 - Attch 2077CerificatesAsbestos Waste Transporter Certification of InsuranceC.13
3900 72 00 - Attch 2088Manufacturer's InstructionsSafety Data Sheets/Material Safety Data SheetsC.15
4000 72 00 - Attch 21111Closeout SubmittalsWaste Disposal ReceiptM.1(1)G
4100 72 00 - Attch 21111Closeout SubmittalsAir Sampling ResultsM.1(2)G
4200 72 00 - Attch 3011Preconstruction SubmittalsDocumentation of Training/ ExperienceC.1
4300 72 00 - Attch 3011Preconstruction SubmittalsEmployee PhysicalsC.2
4400 72 00 - Attch 3011Preconstruction SubmittalsSecurity DocumentationC.3
4500 72 00 - Attch 3011Preconstruction SubmittalsStep-by-Step Abatement Procedures PlanC.4G
4600 72 00 - Attch 3011Preconstruction SubmittalsFull Containment Construction Procedures/DrawingsC.5G
4700 72 00 - Attch 3011Preconstruction SubmittalsRespirator Protection ProgramC.6
4800 72 00 - Attch 3011Preconstruction SubmittalsWork ScheduleC.11G
4900 72 00 - Attch 3033Product DataMaterials ListC.10
5000 72 00 - Attch 3077CerificatesManufacturer’s CertificationsC.7
5100 72 00 - Attch 3077CerificatesLaboratory and Monitoring QualificationsC.8
5200 72 00 - Attch 3077CerificatesLead Based Paint Waste Transporter’s QualificationsC.9
5300 72 00 - Attch 31111Closeout SubmittalsWaste Disposal ReceiptM.1.1G
5400 72 00 - Attch 31111Closeout SubmittalsAir Sampling ResultsM.1.2G
5500 72 00 - Attch 31111Closeout SubmittalsVerification of Decontamination of Rental EquipmentM.1.3
5600 72 00 - Attch 3a011Preconstruction SubmittalsRemoval ProceduresB.1G
5700 72 00 - Attch 3a033Product DataList of MaterialB.2
5800 72 00 - Attch 3a088Manufacturer's InstructionsMaterial Data SheetsB.3
5900 72 00 - Attch 5011Preconstruction SubmittalsConstruction Debris Analysis Plan1.2.3G
6000 72 00 - Attch 5077CertificatesMonthly Debris Management Report2GProvide 1st week of each month during construction
6101 32 16.00 20011Preconstruction SubmittalsBaseline Construction Schedule1.2GProvide within 10 days of NTP.
6201 32 16.00 20011Preconstruction SubmittalsBaseline Design Schedule1.2GProvide within 10 days of NTP.
6301 32 16.00 20077CertificatesMonthly Updates1.4Provide 1st week of each month during construction, or as directed by CO
6401 32 16.00 20077Certificates3-Week Look Ahead Schedule1.6Provide weekly with the Contract Progress Report
6501 33 00011Preconstruction SubmittalsSubmittal Register1.8G
6601 33 16.00 10011Preconstruction SubmittalsDesign Quality Control Plan1.5.1G
6701 33 16.00 10011Preconstruction SubmittalsInitial Design Conference1.5.2.2
6801 33 16.00 10011Preconstruction SubmittalsPreconstruction Conference1.5.2.3
6901 33 16.00 10011Preconstruction SubmittalsDCM Procedures3.5.1G
7001 33 16.00 10011Preconstruction SubmittalsSubmittal Register3.8.4G
7101 33 16.00 10055Design DataDesign and Code Checklists1.7.1C
7201 33 16.00 10055Design DataInterim Design Submittals3.2.1R
7301 33 16.00 10055Design DataInterior And Exterior Building Finishes Scheme3.6.5.1.1G
7401 33 16.00 10055Design DataConference Documentation3.7.3
7501 33 16.00 10055Design DataFinal Design Submittals3.8R
7601 33 16.00 10055Design DataDesign Complete Documents3.9C
7701 33 16.00 101111Closeout SubmittalsDD Form 13543.8.5A
7801 45 00.00 10011Preconstruction SubmittalsQuality Control (QC) Plan3.2G
7901 45 00.00 10011Preconstruction SubmittalsAdditional Requirements for Design Quality Control (DQC) Plan3.2.2G
8001 45 00.00 10055Design DataDiscipline-Specific Checklists3.2.2
8101 45 00.00 10055Design DataDesign Quality Control3.9.1
8201 45 00.00 10066Test ReportsQC Documentation3.9Provide weekly with the Contract Progress Report
8301 50 00011Preconstruction SubmittalsRequest for Contractor Staging Area1.1G
8401 50 00011Preconstruction SubmittalsPhotographic Record1.3
8501 78 00033Product DataWarranty Letter1.7.1
8601 78 00088Manufacturer's InstructionsInstructions1.7.1
8701 78 001010Operation and Maintenance DataOperation and Maintenance Manuals3.4G
8801 78 001111Closeout SubmittalsWorking As-Built Drawings3.1GProvide (2) electronic sets (optical media) and (2) hard copies
8901 78 001111Closeout SubmittalsRecord Drawings3.3GProvide (2) electronic sets (optical media) and (1) hard copy
9001 78 001111Closeout SubmittalsCertification of EPA Designated Items2.3G
9101 78 001111Closeout SubmittalsCertification Of USDA Designated Items2.4G
9201 78 001111Closeout SubmittalsDD FORM 13543.6G
9301 78 001111Closeout SubmittalsChecklist for DD FORM 13543.6G
94SOW077CertificatesContract Progress Report(s)2.4GProvide weekly throughout life of contract. Utilize AF Form 3065, Contract Progress Report (or equal)
95SOWCertify LPS functionalityLPS Recertification2.6.10.3G
96SOWPreconstruction SubmittalsRoofing Products3.2.1GAdded to the Example
97SOWPreconstruction SubmittalsStructural Analysis Calculations3.4.1.3GAdded to the Example

&8Submittal Register_v3_03/07/22