210040_ATT11_Drawings_Final.pdf
PDF 7 MB Posted
- Solicitation number
- WWYK210040
About this file
These are architectural design drawings for a roof repair project at Building 3102 on Tinker Air Force Base, Oklahoma. The documents include detailed aerial images and technical drawings for repairing roof sections 7, 8, 9, 10, 19, and 20, featuring a 35% design stage not yet ready for construction. The project involves removing the existing built-up roof system, installing a new single-ply EPDM roof, reinstalling roof drains and exhaust vents, replacing parapet coping caps and flashing, and addressing expansion joints. Key requirements include coordinating with base users, ensuring building functionality, complying with UFC roofing standards, and working with the Tinker AFB State Historical Preservation Office to address any historical concerns. The estimated project magnitude ranges from $1,000,000 to $5,000,000, with a site visit scheduled for August 5, 2025, and the solicitation currently in draft stage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA813725R0042.pdf | ||
| 210040_Hangar-3102 Drawing.pdf | ||
| Site Visit Sign In Sheet.pdf | ||
| 210040 Government Response.pdf | ||
| Solicitation - FA813725R0042.pdf | ||
| Roof Shop Pages 3102.pdf | ||
| 03102A-FP02.pdf | ||
| 210040_ATT1_MACB_Design_Build_SOW_v3.pdf | ||
| 210040_ATT2_Design_Narrative_Final.pdf | ||
| EAL List ATT 5 - BLANK to Contractors.xlsx | XLSX spreadsheet | |
| 3102 Original.pdf | ||
| 83 Repair Roof Joints and Drains 3102.pdf | ||
| 03102A-FP01.pdf | ||
| 01 Emergency Roof Repair 3102.pdf | ||
| 210040_ATT3_Submittal_Register.xlsx | XLSX spreadsheet | |
| 3102 Roof W Sections.pdf | ||
| 3102 Aerial.pdf | ||
| 88 Roof Repair 3102.pdf | ||
| 97 Renovate Flight Test 3102.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R U
N W
A Y
R
U
N
W
T A
X I W
G
T
A
X
I
W
H
TAXIWAY B
TAXIWAY C
T
A
X
I
W
M
A
X I W
K
A
X
IW
A Y
E
TAXIWAY A
T
A
X
I
W
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
T
A
X
I
W
J
A
X I W
G
A
X
IW
A Y
A
T
A
X
I
W
H
TAXIWAY C
TAXIWAY D
T
A
X
I
W
TAXIWAY F
C r u t c h o
C r e e k
K u h lm a n
C r e e k
K u h l m a n e e k
E l m e e k
E a s t u t c e e k
Elm Creek
E e e k
E e e k
E e e k
E e e k
E e e k
K u h l m e e k
E a u t c e e k
E e e k
West Crutcho Creek
W e s t
C r u t c h o
C r e e k
E e e k
E e e k
S o ld ie r
C r e e k
S o l d i e e e k
E a s t
C r u t c h o
C r e e k
E e e k
E a s t
C r u t c e e k
E a s t
C r u t c h o
C r e e k
S o l d i e e k
E a u t c e e k
S o l d i e r
C r e e k
S o l d i e e k
S o l d i e r
C r e e k
E a u t c e e k
E e e k
59475946
62540
61089
62509
62528
62523
62501X
43774
62512
62516
62525
35921
35916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
99999
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
99999
45134
96022
43120
41157
44045
45815
40592
40935
43610
62522
41163
15930
15930
11824
Arnold St.
E a s t
D r
SE 74th St
SE 59th St.
A i r
D e p o t
Patrol Rd.
S t a f f
D r
R e s e r v d
5th Ave
A
A v e
M u n i t i o
W a r e h o u
B
A v e
7th St.
H
A v e
M c N a r n e y
A v e
Mitchell Ave
A l e r t
R d
C o o k
A v e
W e s t
D r
E
A v e
Extender Dr.
Sentry Rd.
34th S t.
T w in in g D r
5th Ave.
J o n e s
Globemaster Dr.
T o w e r
R d
Vanaman Rd.
I n d u s t r i a l
B l v d
S o u
S
1st St.
D o o l i t t e
P i c n i c
R d
J a m e s
D r
W o l f
D
A i r
D e p o t
A i r
D e p o t
D
A v e
R a w l i n g s
A v e
P e r i m e t e r
R d
R a p c
R e s e r
L
A v e
Hercules /Mercury Rd.
F
A v e
1st St.
B r o w n
D r
P o n d
R d
O l d
A i r
D e p o t
A ir e y D r.
G e n e r
M t o
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
C
A v e
C
A v e
G arden P lot R d.
H i l l t p
D o r m i t o r y
R d
D o r m i t o y
M
A v e
C h e n n a u lt
D r
M i t c h e e
V a n d e n b u rg
S t.
E n g i n e
T e s t
D r
Doolittle Ave
W h i t e
D r
3rd Ave.
D
D r i v e
B a l l
P a r k
R d
Joint STARS Dr.
A i r
D e p o t
B l v d
Turbine Dr.
T u r b in e D r
Central Plant Dr.
6th St.6th St.
F a l c
B l a c k b i
W e y l a o p
Propulsion Dr.
T h u n d e r b o
M uniti ons R
d. E xt.
C o d d in g R d
Starlifter Dr.
Chidlaw Ct.
C o r s a i r
D r
R a p t
N i g h t
H a w k
C t
P h a n t o m
D r
F r a n k l i n
P o w e r h o u
S k y m a s t e r
D r
Spaatz Ct.
L a w r e n c e
M u n d e l l
Nabors Dr.
I n t r u d e r
D r
M c N i c k l e
M i l l e r
D r
T a i l
F e a t h
H o l d
A i r y i r
S m i
R a v
M i t c h e e
A i p o t
A i r
D e p o t
Vanaman Rd.
1st St.
1st St.
TINKER AFB, OK
VICINITY MAP
EAKER GATE
FIRE DEPARTMENT
B117
BASE OPERATIONS
B240
CONTRACTING
B3
VANCE
GATE
GOTT
GATE
TINKER GATE
PASS & ID
B6611
LIBERATOR
GATE
HOPE
GATE
LANCER
GATE
TRUCK
GATE
PIAZZA
GATE
HRUSKOCY
GATE
BASE CIVIL ENGINEER
B400
PEGASUS
GATE
TAXIWAY C
G E
N E
R A
L
S H
E E
T
I N
D E
X
A
N D
V I C
I N
I T
Y
M
A P
G-001
D S
S G
A O
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
KEY PLAN:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT: (CEFT)
PROJECT
LOCATION
PROJECT
LOCATION
WWYK210040
REPAIR ROOF SECTIONS
7,8,9,10,19, AND 20
B3102
PROJECT DRAWING INDEX
SHT. SHEET TITLE
G-001
SHEET INDEX AND VICINITY MAP
GENERAL
OF
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
T I N
K E
R
A
I
F
O R
B
S
E
O
K L
A H
O M
A
P R
O J E
N
F O
R M
A T
I O
N R
E V
I S
I O
N S
M A
R K
D E
S I G
N
G
R O
U P
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
D E
S C
R I P
T I O
N
2 3 4
E
D
C
B
A
M A
N A
G E
M E
F O
R M
A T
I O
N
1 2
E
D
C
B
A
I S
S U
E
D
A T
E
SHEET
SHEET NUMBER
S H
E E
T
T
I T
L E
D E
S I G
N
F
I L
C A
T I O
N
W W
Y K
R E
P A
O
F
S
E C
T O
I N
S
A
H D
R
35% DESIGN
NOT FOR
CONSTRUCTION
R-101
ARCHITECTURAL
RP101
DT101
RD101
AERIAL IMAGE OF B3102 SECTIONS 7,8,9,10,19, AND 20 - DEMOLITION
AERIAL IMAGE OF B3102 ROOF
AERIAL IMAGE OF B3102 SECTIONS 7,8,9,10,19, AND 20 - NEW WORK
B3102 SECTIONS 7,8,9,10,19, AND 20 - DETAILS
AE
IA
L
IM
AG
E O
F B3
R O
O F
R-101
AM
JS
R A
OF
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
W W
YK
R
EP
AI
R
R O
O F
SE
C
TO
IN
S 7, 8, 9, ,1
9, A
N D
B
/0
8/
H D
R
35% DESIGN
NOT FOR
CONSTRUCTION
KEY PLAN
BLDG 3102
PROJECT SITE
3 4
AERIAL IMAGE OF B3102 ROOF
SCALE: NTS
R-101
NIC
NIC
R I A
L
I M
A G
E
C
T I O
N S
A
D
E M
O L
I T
I O
N
RD101
A M
J S
R A
OF
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
T I N
K E
R
A
R
S
E
O
K L
A H
O M
A
P R
O J E
F O
R M
A T
I O
N R
E V
I S
I O
N S
M A
R K
D E
S I G
N
G
R O
U P
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
D E
S C
R I P
T I O
N
2 3 4
E
D
C
B
A
M A
N A
G E
M E
F O
R M
A T
I O
N
1 2
E
D
C
B
A
I S
S U
E
D
A T
E
SHEET
SHEET NUMBER
S H
E E
T
T
I T
L E
D E
S I G
N
F
I
C A
T I O
N
W W
Y K
R E
P A
O
F
S
E C
T O
I N
S
A
H D
R
35% DESIGN
NOT FOR
CONSTRUCTION
KEY PLAN
BLDG 3102
PROJECT SITE
AERIAL IMAGE OF B3102 ROOF
SECTIONS 7,8,9,10,19, AND 20 - DEMOLITION
SCALE: NTS
RD101
GENERAL NOTES:
1. DRAWINGS & SPECIFICATIONS ARE COMPONENTS OF
THE CONTRACT DOCUMENTS. REVIEW ALL DRAWINGS &
SPECIFICATIONS FOR THE COMPLETE SCOPE OF WORK.
NOTIFY CONTRACTING OFFICER IMMEDIATELY FOR
CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS,
OR OMISSIONS ARE DISCOVERED.
2. CONTRACTOR TO COORDINATE PHASING WITH USERS
AND CONTRACTING OFFICER TO PROVIDE ONGOING
FUNCTIONALITY OF BUILDING.
3. CONTRACTOR TO WALK ROOFS WITH GOVERNMENT /
USERS TO DETERMINE WHAT IS ABONDON AND WHAT IS
TO BE ROOFED OVER AND WHAT IS TO BE REPLACED.
4. CONTRACTOR IS TO DETERMINE BEST LOCATION /
SOLUTION FOR SECONDARY DRAINAGE AND TO ENSURE
TINKER AFB SHPO (STATE HISTORICAL PRESERVATION
OFFICE) IS IN AGREEMENT PRIOR TO DESIGN
SUBMISSION.
5. CONTRACTOR TO HAVE LEAD AND ASBESTOS TESTING
COMPLETED ON ROOF IN ITS ENTIRETY TO DETERMINE
WHAT MAY NEED REMOVED PRIOR TO GENERAL
DEMOLITION.
6. CONTRACTOR ROOFING DESIGN IS TO ACCOUNT FOR
INCREASED PARAPET HEIGHT IF NEEDED AND FLASHING
AGAINST ADJACENT MASONRY WALLS AND EJ'S. ROOF
MAY NEED ADDITIONAL/INCREASED SLOPE TO MEET
MINIMUM UFC-3-100-03 ROOFING SLOPE REQUIREMENTS.
7. CONTRACTOR TO REMOVE ALL LIGHTNING PROTECTION,
STORE FOR REINSTALLATION AFTER REROOFING.
8. ALL COMMUNICATION TO BE REMOVED BY GOVERNMENT
/USER AND REINSTALLED BY GOVERNMENT.
CONTRACTOR TO COORDINATE WITH USERS /
GOVERNMENT TO MAKE CONCESSIONS FOR REQUIRED
PENETRATIONS IN ROOFING AND CONCESSIONS FOR ALL
ROOF MOUNTED COMMUNICATIONS REQUIRED TO BE
SECURED.
REMOVE EXISTING BUILT UP ROOF SYSTEM PER
STATEMENT OF WORK.
REMOVE EXISTING ROOF DRAINS
REMOVE EXISTING ABANDONED CURBS, PENETRATIONS,
HATCHES AND OPENINGS. INFILL AS REQUIRED TO MATCH
ADJACENT CONSTRUCTION AND SYSTEM.
REMOVE EXISTING PERIMETER METAL FLASHING AND
COPING CAP.
REMOVE EXISTING MECHANICAL UNIT AND CURB. COVER
AND PROTECT MECHANICAL UNIT FOR RE-INSTALLATION.
PROVIDE NEW CURB AT LOCATIONS AND RE-INSTALL UNIT.
ASSESS ALL ROOF CURBS TO DETERMINE IF 12" OF ROOF
FLASHING IS ACHIEVABLE TO ENSURE ROOF WARRANTY.
CONTRACTOR TO COORDINATE WITH ROOFING MFR. TO
DETERMINE CURB REPLACEMENT REQUIREMENTS TO
ENSURE ROOF IS WARRANTABLE.
REMOVE EXISTING EXPANSION JOINT COVER.
GOVERNMENT / USERS TO REMOVE ALL
COMMUNICATIONS EQUIPMENT, STORE OR DEMOLISH AS
REQUIRED.
LIGHTNING PROTECTION TO BE REMOVED AND STORED.
DEMO KEY NOTES:
IMAGES OF B3102 ROOF
SECTIONS 7,8,9,10,19, AND 20 - DEMOLITION
SCALE: NTS
RD101
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
NIC
NIC
(TYP.)
(TYP.)
NIC
NIC
NIC NIC
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
R I A
L
I M
A G
E
C
T I O
N S
A
N
W
R
K
RP101
A M
J S
R A
OF
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
T I N
K E
R
A
R
S
E
O
K L
A H
O M
A
P R
O J E
F O
R M
A T
I O
N R
E V
I S
I O
N S
M A
R K
D E
S I G
N
G
R O
U P
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
D E
S C
R I P
T I O
N
2 3 4
E
D
C
B
A
M A
N A
G E
M E
F O
R M
A T
I O
N
1 2
E
D
C
B
A
I S
S U
E
D
A T
E
SHEET
SHEET NUMBER
S H
E E
T
T
I T
L E
D E
S I G
N
F
I
C A
T I O
N
W W
Y K
R E
P A
O
F
S
E C
T O
I N
S
A
H D
R
35% DESIGN
NOT FOR
CONSTRUCTION
KEY PLAN
BLDG 3102
PROJECT SITE
AERIAL IMAGE OF B3102 ROOF
SECTIONS 7,8,9,10,19, AND 20 - NEW WORK
SCALE: NTS
RP101
GENERAL NOTES:
1. DRAWINGS & SPECIFICATIONS ARE COMPONENTS OF
THE CONTRACT DOCUMENTS. REVIEW ALL DRAWINGS &
SPECIFICATIONS FOR THE COMPLETE SCOPE OF WORK.
NOTIFY CONTRACTING OFFICER IMMEDIATELY FOR
CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS,
OR OMISSIONS ARE DISCOVERED.
2. CONTRACTOR TO COORDINATE WITH USERS AND
CONTRACTING OFFICER TO PROVIDE ONGOING
FUNCTIONALITY OF BUILDING ENTRY AND SOUTH SIDE
WAREHOUSE AREA..
3. NEW SECONDARY SCUPPER DRAINAGE LOCATION IS TO
BE LOCATED PER CONTRACTOR'S DESIGN. SCUPPER
SIZE IS TO BE SIZED PER ASHRAE STANDARDS.
4. ROOF DESIGN IS TO COMPLY WITH UFC 3-100-03 ROOFING
AND OTHER APPLICABLE UFC, TINKER STANDARDS.
5. PARAPETS AND CURBS MAY NEED TO BE RAISED ONCE
INSULATION SLOPE HAS BEEN DETERMINED.
6. CONTRACTOR TO COORDINATE ALL MODIFICATIONS
WITH TINKER AFB SHPO OFFICE TO ENSURE ANY AND ALL
HISTORICAL CONCERNS ARE ADDRESSED PRIOR TO
CONSTRUCTION.
7. LIGHTING PROTECTION, LIGHTING AND ELECTRICAL IS TO
BE REPLACED AFTER ROOF INSTALLATION HAS
OCCURRED.
8. CONTRACTOR TO COORDINATE ANY COMMUNICATIONS
PENETRATIONS AND CURBS NEEDED TO SECURE
COMMUNICATIONS. GOVERNMENT TO REINSTALL
COMMUNICATION EQUIPMENT.
NEW SINGLE PLY EPDM ROOF SYSTEM AS INDICATED IN
SOW
NEW ROOF DRAINS
REINSTALLED EXHAUST VENT ON NEW CURB.
NEW PARAPET COPING CAP AND FLASHING.
NEW EXPANSION JOINT.
LIGHTING AND ASSOCIATED ELECTRICAL TO BE
REINSTALLED.
NEW WORK KEY NOTES:
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
NIC NIC
NIC
NIC NIC NIC
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MEMBRANE EXTENDED
BELOW NAILER AND
SECURED
FASTENERS APPROX. 12''
O.C.
90 MIL WHITE EPDM
ROOF MEMBRANE
24 GAUGE PVDF COATED
SHEET-METAL COPING
TREATED WOOD NAILER
ATTACHED TO SUBSTRATE
AND SLOPED TO THE INTERIOR
OF THE ROOF
M
I N
I M
U M
F L
A S
H I N
G
H
E I G
H T
S
L
O
P
E
BONDING ADHESIVE
MEMBRANE ATTACHMENT STRIP
WITH SEAM PLATES AND FASTENERS.
REFERENCE MANUFACTURERS
REQUIREMENTS TO ACHIEVE THE 30
YEAR NDL WARRANTY
24 GAUGE PVDF
COATED SHEET-METAL
GRAVEL STOP
2 X 6 MIN. TREATED WOOD NAILER
ATTACHED TO SUBSTRATE
OVERALL THICKNESS TO
MATCH INSULATION
SELF-ADHERING MEMBRANE
FLASHING PER THE
MANUFACTURER'S
WARRANTY REQUIREMENTS
APPROX. 2''
BONDING ADHESIVE
SEALANT
SEALANT
WATER BLOCK
FIELD SHEET
EXTENDED
BELOW
BLOCKING
22 GAUGE
CONTINUOUS
CLEAT
MEMBRANE SHEET CLOSURE
SECURED AND ADHERED TO WALL
FLEXIBLE LINER WITH
COMPRESSIBLE INSULATION
F L A
S H
I N
G
H
E I G
H T
M
I N
I M
U M
24 GAUGE PVDF CAOTED
SHEET-METAL EXPANSION JOINT
COVER WITH T-TYPE CLEAT
S
L
O
P
E
REINFORCED MEMBRANE
ATTACHMENT STRIP WITH
SEAM PLATES AND FASTENERS
BONDING ADHESIVE
90 MIL WHITE EPDM ADHERED
MEMBRANE FLASHING
2 X 6 MIN. TREATED WOOD NAILER
ATTACHED TO SUBSTRATE
OVERALL THICKNESS TO
MATCH INSULATION
2 x 6 MIN. TREATED WOOD NAILER
ATTACHED TO SUBSTRATE
OVERALL THICKNESS TO
MATCH INSULATION
COMPRESSIBLE
INSULATION
FLEXIBLE LINER TO SERVE
AS INSULATION RETAINER
(ATTACHED TO TOP OF CURB)
D
E
F L
A S
H I N
G
H
E I G
H T
M
I N
I M
U M
FASTENERS
8'' O.C.
BOTH SIDES
FLEXIBLE WEATHERPROOF
MEMBRANE CLOSURE
24 GAUGE FACTORY PVDF
COATED SHEET-METAL EXPANSION
JOINT COVER WITH T-TYPE CLEAT
S
L
O
P
E
90 MIL EPDM ADHERED
MEMBRANE FLASHING
SEALANT
SEAM PLATES
AND FASTENERS
BONDING ADHESIVE
TOP OF CURB TO
DRAIN TO ONE SIDE
SHEET-METAL SCUPPER
SECURED TO WALL AND
DECK AND/OR OPTIONAL
WOOD BLOCKING--SEE
NOTES 4 AND 5
TERMINATION OF
MEMBRANE FLASHING WILL
VARY
BONDING ADHESIVE
SEALANT (IF REQUIRED
FOR SPECIFIC SYSTEM)
BONDING ADHESIVE
SEALANT (IF REQUIRED
FOR SPECIFIC SYSTEM)
SEALANT WATER BLOCK
ADHERED MEMBRANE
FLASHING
OPTIONAL: TREATED WOOD
BLOCKING
TREATED WOOD
NAILER
PREFABRICATED METAL CURB
2 X 6 MIN. TREATED WOOD NAILER
ATTACHED TO SUBSTRATE
OVERALL THICKNESS TO
MATCH INSULATION
REINFORCED MEMBRANE
ATTACHMENT STRIP WITH
SEAM PLATES AND FASTENERS
ADHERED 90 MIL WHITE
EPDM MEMBRANE FLASHING
F L A
S H
I N
G
H
E I G
H T
M
I N
I M
U M
BONDING ADHESIVE
ROOFTOP EQUIPMENT FRAME
24 GAUGE REMOVABLE
SHEET-METALCOUNTERFLASHING
GASKETED FASTENER
MIN. TWO FASTENERS
PER SIDE
CORNER FLASHING PIECE
AT EACH CORNER
SEAL ALL EXPOSED EDGES
FASTENERS
APPROX. 8" O.C.
MIN. TWO PER SIDE
SEALANT
PRE-MANUFACTURED
MEMBRANE FLASHING
INSTALL SEALANT OR
SEALANT TAPE
BETWEEN PIPE AND
PRE-MANUFACTURED
MEMBRANE FLASHING
PLUMBING VENT STACK
DRAWBAND
SEALANT
F L A
S H
I N
G
H
E I G
H T
M
I N
I M
U M
CAST-IRON DRAIN BOWL
CLAMPING RING
ROOF DECK
PROPERLY SUPPORTED AT DRAINS
ROOF DRAIN HEIGHT FROM DECK
MAY VARY
DRAIN STRAINER
TAPERED INSULATION
SUMP
INSTALL COMPATIBLE SEALANT
BETWEEN DRAIN BOWL FLANGE
AND ROOF MEMBRANE
ROUND CUT IN MEMBRANE
EXTENDED APPROX. 1" PAST
CLAMPING RING. HOLE IN
MEMBRANE SHALL BE LARGER
THAN DRAIN PIPE DIAMETER
SEALANT WATER BLOCK
2 X 6 MIN. TREATED WOOD
NAILER ATTACHED TO
SUBSTRATE OVERALL
THICKNESS TO MATCH
INSULATION
SHEET-METAL GUTTER
THE FRONT OF THE GUTTER
SHOULD BE A MIN. 1'' LOWER
THAN THE BACK TO ALLOW
OVERFLOW
18 GAUGE GUTTER
BRACKET SUPPORT
SEALANT
ADHERED MEMBRANE FLASHING
PER THE MANUFACTURER'S
WARRANTY PER THE
MANUFACTURER'S
WARRANTY REQUIREMENTS
24 GAUGE PVDF
SHEET-METAL
EDGE FLASHING
18 GAUGE GUTTER SPACERS
INSTALLED 12" OC BETWEEN
GUTTER BRACKETS
BONDING
ADHESIVE
FIELD SHEET OR
SEPARATE MEMBRANE
SHEET EXTENDED BELOW
BLOCKING
24 GAUGE PVDF
COATED SHEET
METAL GUTTER
SEALANT (IF REQUIRED FOR
THE SPECIFIC SYSTEM)
WEATHERPROOF SHEET-METAL
PENETRATION POCKET--
SEE NOTES 3 AND 4
NONSHRINK
GROUT
ADHERED MEMBRANE FLASHING
EXTEND 1'' MIN. INTO
PENETRATION POCKET
ADHESIVE
OPTIONAL: SHEET-METAL
RAIN COLLAR OVERLAPPING
PENETRATION POCKET WITH
APPROPRIATE SEALANT
(E.G., POLYURETHANE) AND
DRAWBAND
2" APPROX.
POURABLE SEALANT
CORNER FLASHING PIECE AT
EACH CORNER--SEAL ALL
EXPOSED EDGES
B
S E
C T
I O
A
E T
A I L
S
DT101
A M
J S
R A
OF
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
T I N
K E
R
A
R
S
E
O
K L
A H
O M
A
P R
O J E
F O
R M
A T
I O
N R
E V
I S
I O
N S
M A
R K
D E
S I G
N
G
R O
U P
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
D E
S C
R I P
T I O
N
2 3 4
E
D
C
B
A
M A
N A
G E
M E
F O
R M
A T
I O
N
1 2
E
D
C
B
A
I S
S U
E
D
A T
E
SHEET
SHEET NUMBER
S H
E E
T
T
I T
L E
D E
S I G
N
F
I
C A
T I O
N
W W
Y K
R E
P A
O
F
S
E C
T O
I N
S
A
H D
R
35% DESIGN
NOT FOR
CONSTRUCTION
TYPICAL DETAIL
SCALE: N.T.S
DT101
TYPCAL DETAIL
SCALE: N.T.S
DT101
TYPICAL DETAIL
SCALE: N.T.S
DT101
TYPICAL DETAIL
SCALE: N.T.S
DT101
TYPICAL DETAIL
SCALE: N.T.S
DT101
TYPICAL DETAIL
SCALE: N.T.S
DT101
TYPCAL DETAIL
SCALE: N.T.S
DT101
TYPCAL DETAIL
SCALE: N.T.S
DT101
TYPCAL DETAIL
SCALE: N.T.S
DT101
TYPCAL DETAIL
SCALE: N.T.S
DT101
File details come from the government source that posted it. Updated .