M67854-21-R-1878 Attachment 001

001-1

Schedule of Supplies and Statement of Work Mesh Cold Weather Base Layer

Controlled By: PfM GCES, PM ICE CUI Category(ies): CUI//PROCURE//FEDCON Distribution/Dissemination Control: FEDCON POC: Eric.G.Daniels@usmc.mil

001-2

1. SCHEDULE OF SUPPLIES

CLIN Description Quantity Size Unit of

Issue 0001 MCWBL, Undershirt 39,000 max TBD Each 0002 MCWBL, Drawer 39,000 max TBD Each 0003 MCWBL, Undershirt – special size 100 max TBD Each 0004 MCWBL, Drawer – special size 100 max TBD Each

1.1 Contract minimum and maximum limitations

Minimum: 50 units (25 undershirts and 25 drawers) Maximum: 78,200 units (39,100 undershirts and 39,100 drawers)

1.2 Contract ordering period

The ordering period for this contract is 60 months, beginning at time of contract award.

2. SCOPE

Program Manager, Infantry Combat Equipment (PM ICE), Marine Corps Systems Command (MCSC), has a requirement for a government-designed, Berry Amendment compliant, next to skin mesh base layer. The mesh base layer is a supplement to the current Marine Corps Cold Weather Layering System to improve moisture management, thermal performance and dry out time in extreme cold weather environments. The Mesh Cold Weather Base Layer (MCWBL) consists of one undershirt and one drawer in Coyote 498 color. The undershirt and drawers are constructed with an open net like mesh material with a rib knit collar and cuffs, jersey knit reinforced knee patches, jersey knit inner thigh gussets, a two ply functional fly, and an elastic waistband with an integrated drawstring cord.

The vast majority of Marines fit within the size tariff contained within the

MCWBLTechnical Packages, MCWBL UNDERSHIRT TECH PACK 2021E and MCWBL DRAWERS TECH PACK 2021E (Attachment 002 and Attachment 003, respectively); however, there will be a small number of Marines (estimated between 1-10 per year) who will routinely require a special size. These Marines may require a special measurement for the MCWBL and the Contractor shall have the flexibility to accommodate this special measurement requirement.

3. APPLICABLE DOCUMENTS

The following documents form a part of this SOW to the extent specified herein. All parties shall use the most recent version of the referenced document at the time of contract, unless otherwise specified. In the event of conflict between the applicable documents and this SOW, the SOW shall take precedence. Nothing in this document, however, supersedes applicable laws

001-3 and regulations unless a specific exemption has been obtained. While the Government has made every effort to ensure the completeness of this list, documents may be referenced in the SOW that are not included below. Contractors shall meet all specified requirements cited in this SOW regardless of whether or not an applicable referenced document is listed below.

3.1 Government documents

MIL STD 129P Marking and Labeling Requirements for Department of Defense (DoD)

Shipments

3.2 Non-Government documents

ANSI/ASQ Z1.4, American National Standard, “Sampling Procedures and Tables for

Inspection by Attributes” National Aerospace Standard (NAS) 411

4. GENERAL INFORMATION

4.1 Organizational Conflict of Interest (OCI)

PM ICE may use Contractor and Subcontractor personnel to perform work in support of this contract. These personnel will have access to, or participate in, the review of proprietary information (e.g. specifications, or work statements) which may create a current or subsequent OCI as defined in Federal Acquisition Regulation (FAR) 9.5, Organizational and Consultant Conflicts of Interest. As necessary, the Contracting Officer will identify and evaluate potential OCIs and resolve in accordance with (IAW) FAR 9.5.

4.2 Government Furnished Information (GFI)

The Government will provide the GFI identified below to the Contractor. The Contractor shall secure, store, and account for the GFI. The Contractor shall inspect and inventory all GFI and report any discrepancies and deficiencies. As part of the GFI distribution process, the contractor's accessing of any of the GFI-Technical Packages and/or Patterns is a confirmation of the contractor's agreement to the following: “The contractor, to include its subcontractors and suppliers, agrees that it shall not, without the express written permission of the Government, use, modify, reproduce, release, perform, or display any of the GFI-Technical Packages and/or Patterns for any commercial purpose or disclose any of the GFI-Technical Packages and/or Patterns to a person other than its subcontractors, suppliers, or prospective subcontractors or suppliers, who require any of the GFI-Technical Packages and/or Patterns to submit offers for, or perform, contracts under this effort.”

MCWBL UNDERSHIRT TECH PACK 2021E (Attachment 002)

MCWBL DRAWERS TECH PACK 2021E (Attachment 003)

MCWBL Patterns (upon request)

001-4

5. REQUIREMENTS

5.1 General

The Contractor shall perform all tasks delineated in this SOW including providing all materials, equipment, hard tooling, personnel, and facilities necessary to manufacture, fabricate, integrate, produce, and deliver MCWBLs in accordance with MCWBL UNDERSHIRT TECH PACK 2021E and MCWBL DRAWERS TECH PACK 2021E. (Attachment 002 and Attachment 003), and data item deliverables as specified by the contract, Exhibits, and individual delivery orders.

5.2 Program, subcontractor, and data management

5.2.1 Program management

The contractor shall designate a single individual to serve as the primary point of contact (POC) between the Government and Contractor, who shall be responsible for coordinating all contractor activities related to this contract. This individual shall have the authority to commit the Contractor to specific courses of action and accept direction from the Contracting Officer, or from the Contracting Officer's authorized representative(s). This individual shall be responsible for coordinating all meetings between the Government and Contractor; shall be responsible for immediately bringing to the Contracting Officer's attention any conflicts in the Contractor's interpretation of the contract requirements (first by telephone verbal notification, to be followed by written notification); and shall be responsible for bringing to the Contracting Officer's attention any problems that could adversely affect the Contractor's ability to meet the contract quality, cost, production/delivery schedule, or other performance requirements.

5.2.2 Monthly status report

The Contractor shall provide a monthly contract status and management report for open delivery orders. Reports should detail delivery information (order quantity, items shipped, lot number, quantity by size, shipment date, shipment number, invoice number, delivery destination, delivery date, remaining balance and tracking information), and any problems that could adversely affect the Contractor's ability to meet the contract quality, cost, production/delivery schedule, or other performance requirements.

5.3 Post Award Conference (PAC)

At request of the Government, the Contractor shall host a PAC at their facility no later than 30 days after contract award. The PAC is for the Contractor to demonstrate to the Government its production, quality control, and management procedures for producing the MCWBLs, and for the Government and Contractor to discuss any specialty areas deemed pertinent at that time, and to ensure mutual understanding of contract requirements. The Contractor shall ensure its key operations and management personnel attend the PAC. The Contractor shall provide a meeting agenda prior to the PAC, as well as provide meeting minutes for Government approval after conference completion. Virtual conduct of PAC is acceptable.

001-5

5.4 Pre Production Validation (PPV)

A PPV shall be conducted to validate the suitability of the Contractor's production processes for achieving the requirements in the Technical Data packages (with MCWBL UNDERSHIRT TECH PACK 2021E and MCWBL DRAWERS TECH PACK 2021E (Attachment 002 and Attachment 003). The Government will conduct PPV before authorizing production. The contractor shall deliver 25 MCWBLs (25 undershirts and 25 drawers) in the sizes and quantities listed for verification no later than 30 days after contract award for Government inspection against the technical packages (MCWBL UNDERSHIRT TECH PACK 2021E and MCWBL DRAWERS TECH PACK 2021E (Attachment 002 and Attachment 003).

Sample Size Quantity - Undershirts

Quantity - Drawers

1 X-Small 5 5 2 Small 5 5 3 Medium 5 5 4 Large 5 5 5 X-Large 5 5

The PPV samples must meet all requirements in the Technical Packages. Inspection of the

PPV will take approximately five business days after Government receipt of samples. If samples do not pass inspection, the Government may require the Contractor to provide additional MCWBLs at the Contractor's expense and the Government will repeat the PPV process. All expenses the Contractor incurs preparing for retesting or revalidation processes shall be at the Contractor's expense and at no additional Government expense. Under no circumstances is the Contractor authorized to proceed into production without the cognizant Contracting Officer’s written authorization. If the Contractor fails PPV, the Government reserves the right to terminate the contract for cause at no additional Government expense.

All production quantities submitted after approval of PPV shall be produced using the same raw material suppliers, materials, processes, procedures, equipment, and facilities that resulted in the manufacture of the acceptable PPV items. This includes all raw materials and/or sub-components. Contractors desiring to make changes from the items approved during the PPV to include raw material supplier and production processes, must request in writing and receive written approval from the Contracting Officer prior to use. The Contracting Officer, along with the Government Project Officer, will determine if the request is approved or disapproved.

5.5 Quality Management System (QMS)

The Contractor shall have a QMS that meets the requirements of Quality stated in FAR 52.246-11, Higher Level Contract Quality Requirement, to ensure the product conforms to contractual requirements. The Contractor shall monitor, assess, and audit raw material quality, 001-6 product performance, and reliability at all subcontractor and supplier facilities. The Government reserves the right to audit products and processes, as well as the QMS at any stage of contract performance. The Contractor shall make available all quality management documentation for the Government’s review upon request.

5.6 Berry Amendment Compliance

A preference for certain domestic commodities is required by 10 USC § 2533a and DFARS 252.225-7012. These references require the Department of Defense to acquire specific end items or components that have been grown, reprocessed, reused, or produced in the United States. Items provided under this solicitation and the resulting contract shall be compliant with the above references.

6.0 PACKAGING AND MARKING

6.1 Preservation and packaging

Preservation and packaging shall be in accordance with MIL STD 129P, sufficient to protect and preserve all items supplied under contract during shipping to destination.

Packaging Requirements: Each undershirt and drawer shall be packaged individually and not as a set.

7.0 PRODUCTION RATES AND DELIVERY LOCATIONS

7.1 Pre-Production Validation (PPV) Units

The contractor shall be able to produce and delivery 25 MCWBLs (25 undershirts and 25 drawers) for PPV in the sizes and quantities listed for verification no later than 30 days after contract award to the address listed below.

DoDAAC: M67854 Marine Corps Systems Command Attn: Lucinda Stocks 2200 Lester St.

Quantico, VA 22134

7.2 Production Units

The contractor shall be able to produce and deliver a minimum of 3,000 MCWBLs (3,000 undershirts and 3,000 drawers) to a maximum of 6,000 MCWBLs (6,000 undershirts and 6,000 drawers) within 60 days of receiving production authorization. The contractor shall be able to maintain this production capacity and delivery capability throughout the period of performance.

Production quantities for CLINs 0001 through CLIN 0004 shall be delivered to the CONUS location(s) specified in the resultant delivery order(s). Size breakdown (Tariffs) for CLINs 0001 through 0004 will be provided at time of delivery order award.

1. SCHEDULE OF SUPPLIES
1.1 Contract minimum and maximum limitations
1.2 Contract ordering period
2. SCOPE
Program Manager, Infantry Combat Equipment (PM ICE), Marine Corps Systems Command (MCSC), has a requirement for a government-designed, Berry Amendment compliant, next to skin mesh base layer. The mesh base layer is a supplement to the current Marine ...
5.6 Berry Amendment Compliance
A preference for certain domestic commodities is required by 10 USC § 2533a and DFARS 252.225-7012. These references require the Department of Defense to acquire specific end items or components that have been grown, reprocessed, reused, or produced ...