This document is a comprehensive set of engineering and design plans for the North Mountain Avenue Overlay Project, a public infrastructure improvement initiative by the City of Ashland and Jackson County in Oregon. The project covers approximately 0.65 miles of North Mountain Avenue, extending from Interstate 5 to East Main Street (Phase 1), and involves roadway rehabilitation, curb ramp improvements, sidewalk reconstruction, bridge deck overlay, and associated infrastructure upgrades. The project includes multiple stages of construction, with work focused on full depth pavement reconstruction, ADA ramp installations, sidewalk improvements, drainage system enhancements, and traffic control measures.
The project documents indicate a construction timeline beginning in 2023 and projected completion in 2024, with an estimated total excavation of 10,586 cubic yards (net adjusted cut of 10,280 cubic yards). The engineering plans detail precise specifications for roadway sections, including aggregate base layers, asphalt concrete pavement, curb ramps, and pedestrian accessibility improvements. The project will implement various traffic control stages, utilizing detour routes and maintaining local access, and includes significant safety enhancements such as rectangular rapid flashing beacons, pedestrian crossings, and illumination upgrades. While specific budget figures are not explicitly stated, the comprehensive nature of the plans suggests a substantial municipal infrastructure investment focused on improving transportation infrastructure and pedestrian safety.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21-03 N Mtn_Ph1_Bid Schedule.xlsm | XLSM spreadsheet | |
| 6662-TO23 N MOUNTAIN AVE PVMT RPT.pdf | ||
| Notice of Intent to Award~23.pdf | ||
| 2021-03 N Mountain Ave Overlay Project ITB_FINAL.pdf | ||
| 2021-03 N Mountain Ave Overlay Project ITB_Addendum_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WWW.DOWL.COM
E S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
A01
0052-80159_ts_01.dgn :: Default 7/30/2025 11:43:59 AM SDinca 1"=100' Scale: Rotation: 0°
TITLE SHEET
PLANS FOR PROPOSED PROJECT
JACKSON COUNTY
PUBLIC WORKS DEPT.
CITY OF ASHLAND
CITY OF ASHLAND
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTS
PASS
Ashland
BURNS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
Unity Dayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
Goshen Florence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach
Seaside Rainier
Milton-Freewater
W
26 35 197
39519
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
CITY
OREGON
HILLSBORO
DALLAS
Redmond
Z
Z
Val ley Jordan
FALLS
KLAMATH
DATE
REVIEW COMPLETED BY:
GRADING, DRAINAGE, PAVING, CURB RAMPS, SIGNING & SIGNALS
SHEET NO. DESCRIPTION
A01 Title Sheet
INDEX OF SHEETS
A02
N. MOUNTAIN AVE OVERLAY
SEC. 4 & 9, T. 39 S., R. 1 E., W.M.
N
M O
U N
T A I
N
A V
E
BEGINNING OF PROJECT
STA. "M" 503+28.33
STA. "M" 537+46.34
END OF PROJECT
Overall Length Of Project - 0.65 Miles
& Curb Ramp Details Legend
Index Of Sheets Cont., Std. Dwg. Nos.
PUBLIC WORKS DIRECTOR
I-5 TO E. MAIN (PHASE 1)
HERSEY ST.
Phase 2 start
Phase 2 end karl.johnson Snapshot
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
A02
0052-80159_ts_02.dgn :: Default 8/20/2025 10:36:37 AM SDinca 1"=100' Scale: Rotation: 0°
SHEET NO. DESCRIPTION
INDEX OF SHEETS, CONT.
Curb Ramp Details
Std. Dwg. Nos.
General Construction
Typical Sections
- Unique Curb RampRD960
- Perpendicular Curb RampRD910
- Perpendicular Curb RampRD912
- Perpendicular Curb Ramp With ClosureRD913
- Perpendicular Curb Ramp Single RampRD916
- Curb Ramp Components And LegendRD900
- Detectable Warning Surface Details RD902
- Detectable Warning Surface Placement For Curb RampsRD904
- Parallel Curb RampRD920
- Detectable Warning Surface Placement For Directional CurbsRD905
- Detectable Warning Surface Placement For Accessible Route RD906
- Combination Curb RampRD930
- Combination Curb RampRD932
- Combination Curb Ramp Single RampRD938
- Combination Curb RampRD936
- Accessible Route IslandsRD710
- CurbsRD700
- Curb Line SidewalksRD720
- Sidewalk JointsRD722
LA01 Signing & Striping Legend
Signing & Striping Plan
MA01 Legend
- Approaches And Non-Sidewalk DrivewaysRD715
- Midwest Guardrail System TypesRD402
- Midwest Guardrail System Steel Post And BlockRD404
- Midwest Guardrail System (W-Beam)RD407
- Guardrail And Metal Median Barrier Parts (29" Rail Height)RD415
- Midwest Guardrail System Standard Hardware (Nuts, Bolts, Washers And Misc.)RD416
- Midwest Guardrail System Grading For TerminalsRD419
- Midwest Guardrail System Non-Flared Energy-Absorbing TerminalRD420
- Midwest Guardrail System Typical Layouts At Bridge EndsRD442
J02
J01 Plan And Elevation
- Trench Backfill, Bedding, Pipe Zone And Multiple InstallationsRD300
- Street CutRD302
- Pipe To Structure ConnectionsRD339
- Manhole Covers And FramesRD356
- Manhole Frame AdjustmentRD360
- Fill Height Tables For PVC PipeRD388
- Fill Height Table For Corrugated HDPE PipeRD390
- Fill Height Tables For Polypropylene PipeRD393
- Concrete Inlet Base Type CG-3RD371
- Concrete Inlet Top, Option 1, Type CG-3RD372
- Miscellaneous Drainage Structures Siphon Box, Inlet Cap & Inlet AdjustmentRD376 Erosion And Sediment Control
& CURB RAMP DETAILS LEGEND
INDEX OF SHEETS CONT., STD. DWG. NOS.
General Notes
J03
J04
Rail And Sidewalk Replacement Details
Joint And Overlay Details
Details
LC01, LC02
Sign & Post Data Table
Flashing Beacon Plan
PA01
Illumination Plan
Std. Dwg. Nos.
- Sign Installation DetailsTM200
- Miscellaneous Sign Placement DetailsTM201
- Conventional Roads Directional Sign Layout Street Name SignsTM223
- Illumination Control CabinetsTM300
- Illumination Control CabinetsTM301
- Pedestrian Signal Mount And Pedestrian Pushbutton DetailsTM467
- Wire & Cable InstallationsTM470
- Pedestal Foundation And Traffic Signal AssemblyTM457
- Pavement Marking Standard Detail BlocksTM500
- Pavement Marking Standard Detail BlocksTM501
- Pavement Marking Standard Detail BlocksTM502
- Pavement Marking Standard Detail BlocksTM503
- Pavement Marking Standard Detail BlocksTM504
- Rail Crossing Pavement MarkingsTM505
- Durable Pavement Markings Method "A" & Method "D" Surface Installed ProfiledTM520
- Intersection Pavement Markings (Crosswalk, Stop Bar & Bike Lane Stencil)TM530
- Turn Arrow Marking DetailsTM531
- Median And Left Turn Channelization DetailsTM539
- Alignment Layout: GeneralTM560
- Alignment Layout: Left Turn Lane, Centerline & MediansTM561
- 3 Second Gust Wind Speed MapTM671
- LRFD Ultimate Design Wind Speed MapTM672
- Sign AttachmentsTM676
- Sign MountsTM677
- Perforated Steel Square Tube (PSST) Sign Support InstallationTM681
- Perforated Steel Square Tube (PSST) Anchor FoundationTM687
HA01 Drainage Details
BA01 Thru BA03
BB01 Thru BB03
BC01 Thru BC14
C01 Thru C08
FB03 Thru FB06
LB01 Thru LB04
PB01 Thru PB06
- Temporary Sign SupportsTM821
- Temporary Sign SupportsTM822
- Temporary Concrete Barrier And Rumble Strip DetailsTM830
- Closure DetailsTM840
- Intersection Work Zone DetailsTM841
- 2-Lane, 2-Way RoadwaysTM850
- Bridge ConstructionTM870
- Temporary Pedestrian Access RoutesTM844
FB01
FB02
Erosion And Sediment Control Cover Sheet
Erosion And Sediment Control Details
BD01 Pipe Data Sheet
- Midwest Guardrail System Wood Post And BlockRD403
- Transition Concrete Bridge Rail To GuardrailBR203
- Pedestrian RailBR246
- Concrete Bridge Rail Type "F"BR200
- Construction EntrancesRD1000
- Inlet Protection Type 2, 3, 6, 7, 10 And 11RD1010
- Sediment FenceRD1040
- Concrete Truck Wash OutRD1070
- Breakaway Sign & Luminaire Supports - Support Location GuidelinesTM635
- Temporary PSST Vane Anchor InstallationTM689
- Temporary Pedestrian Access RoutesTM847
EA01 Traffic Control Plan
EA02 Traffic Control Details
Traffic Control PlanEB01 Thru EB05
Truncated dome detectable warning surface
Marked or intended crossing location
(Slope as required for drainage)
(Max. 5.0% finished surface slope)
Counter slope
Station, offset, elevation point
Slope 10% max.
(Max. 4.9% finished surface slope)
Running slope 4.0% max.
Sidewalk
Landscaping
(Max. 8.3% finished surface slope)
Slope 7.5% max.
(Normal sidewalk cross slope)
(Max. 2.0% finished surface slope)
Slope 1.5% max.
CURB RAMP DETAILS LEGEND
surface slope (For drainage) is considered level)
For the purposes of this application, a max. 2.0% finished longer dimension in direction of pedestrian street crossing).
When constrained 4.5' x 5.5' (4' x 5' min. finished surface with
When not constrained 4.5' x 4.5' (4' x 4' min. finished surface).
Turning space
City Std. Dwg. Nos.
- Junction Box DetailCD981
- Residential Street LightCD60a
- Electrical Conduit Trench DetailCD980
- Monument Case DetailCD115
- Mailbox SupportRD100
- Mailbox InstallationRD101
- Placement Of Guardrails On SlopesRD406
Illumination Legend And LIght Pole Table
MB01, MC01
Sign Details
LC03, LC04
- Sediment Barrier Type 8RD1032
- Tables, Abrupt Edge And PCMS DetailsTM800
- Temporary Pavement MarkingsTM810
- Temporary BarricadesTM820
L-1.0 Title Sheet
L-2.0
L-2.1
L-3.0
L-3.1
Planting Plan
Planting Legend & Details
Irrigation Plan
Irrigation Legend & Details
- Metal HandrailRD770
- Metal Handrail DetailsRD771
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
TYPICAL SECTIONS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BA01
0052-80159_ty_01.dgn :: Default 7/30/2025 1:31:12 PM SDinca 1"=100' Scale: Rotation: 0°
"M"
Match extg. sl. Match extg. sl.
Depth - 5" to 6"
Cold plane pvmt. removal sidewalk
Protect extg.
curb and gutter
Protect extg.
sidewalk
Protect extg.
curb and gutter
Protect extg.
Extg. grade
STA. "M" 507+69.05 To STA. "M" 509+25.70
"M" 508+53.21 To "M" 509+19.73
"M" 507+63.03 To "M" 508+03.36
STA. "M" 506+39.26 To STA. "M" 507+13.34
Sl. var.
STA. "M" 505+98.33 To STA. "M" 506+93.92
Depth - 5" pvmt. removal
Cold plane guardrail
Protect extg.
sidewalk
Protect extg.
curb and gutter
Protect extg.
3.5'
STA. "M" 503+28.38 To STA. "M" 503+78.18 guardrail
Protect extg.
Extg. ground
3.5' geotextile
Subgrade
Nom. comp. thkn. - 13"
Aggregate base
Sl. var.
Sl. var.
**"M" 509+35.39 To "M" 510+08.37 (Intersection - Fair Oaks Ave.)
*"M" 507+63.54 To "M" 509+35.39
"M" 507+00.88 To "M" 507+63.54 (Intersection - Nevada St.)
"M" 506+14.08 To "M" 507+00.88
"M" 505+50.95 To "M" 506+14.08 (Intersection - Skylark Pl)
STA. "M" 503+78.18 To STA. "M" 505+50.95
Sl.
:1
Sidewalk
Nom. comp. thkn. - 4"
Aggregate base
Var.
(For details, see BC shts.)
Curb and gutter, E=6" of curb
Top face
(See dwg. nos. RD700 & RD720)
(For details, see BC shts.)
Nom. thkn. - 4"
Conc. walk
Sl. 2:1
Nom. comp. thkn. - 13"
Aggregate base
Nom. thkn. - 2"
" 2 1Level 2, ACP wearing course w/fibers
Travel lane
5. For striping plans, see shts. LB01 thru LB07.
4. For curb ramp details, see shts. BC01 thru BC14.
See BB shts. for details.
3. Pavement width varies at intersections.
2. Side slopes are shown as horizontal to vertical.
1. ACP binder shall be PG 70-22.
NOTES:
Extg. pvmt. - var. 24.5' to 40' ground
Extg.
Nom. thkn. - 2"
" 2 1Level 2, ACP wearing course w/fibers geotextile
Subgrade
CURB RAMP TYPICAL SECTION
"M"
1.5' otherwise called out on C shts.
Permanent seeding unless
(Two equal lifts)
Nom. thkn. - 6"
" 2
Level 2, ACP base course
Nom. thkn. - 3"
" 2 1Level 2, ACP base course
(Two equal lifts)
Nom. thkn. - 6"
" 2 1Level 2, ACP base course
Sl. var. Sl. var.
Travel lane
Var. 13.5' to 12.5'13.5'
1.5'
0.5'
On street parking
Var. 8' to 8.5'
Sawcut
2'
Extg. ground
Var. 13.5' to 16'
Travel lane
**15'
*Var. 16' to 15'
Var. 12.5' to 16'
Travel lane
**15'
*Var. 16' to 15'
Profile grade
0'
Turn lane
**10'
*Var. 0' to 10'
Nom. thkn. - 2"
" 2
Level 2, ACP wearing course w/fibers
**1.75'
*Var. 1' to 1.75'
1' sidewalk
Protect extg.
curb and gutter
Protect extg.
Nom. thkn. - 0" to 1"
" 2 1Level 2, ACP leveling course extg. base
Recondition
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
TYPICAL SECTIONS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BA02
"M" sidewalk
Protect extg.
curb and gutter
Protect extg.
8' curb and gutter
Protect extg.
Protect extg. median
1' sidewalk
Protect extg.
curb and gutter
Protect extg.
STA. "M" 517+28.80 To STA. "M" 519+21.11
Sl. 3%
Extg. grade curb and gutter
Protect extg.
STA. "M" 515+07.19 To STA. "M" 515+29.16
Extg. ground
STA. "M" 522+00.00 To STA. "M" 523+25.00
Extg. ground and landscaping (Var.)
Protect extg. sidewalk
11'11' geotextile
Subgrade
Nom. comp. thkn. - 13"
Aggregate base
5'
Bike laneParking lane
7.8' and landscaping (Var.)
Protect extg. sidewalk
Parking lane
7.5'
Sl. 3%
Travel lane
11'
Bike lane
5'
Extg. ground
Sl. 3%Sl. 3%
Sl. 3%
Sl. 1:5:1
0052-80159_ty_02.dgn :: Default 7/30/2025 1:31:53 PM SDinca 1"=100' Scale: Rotation: 0°
Nom. thkn. - 2"
" 2 1Level 2, ACP wearing course w/fibers
(See dwg. no. RD700)
E = 6", width = 24"
Curb and gutter
Sawcut
STA. "M" 519+21.53 To STA. "M" 521+18.14
11'
Travel lane1' to 4:1
Var . 2:
5' mulching
Seeding and mulching
Seeding and
(Two equal lifts)
Nom. thkn. - 6"
" 2 1Level 2, ACP base course
Sl. var. Sl. var.
Bike lane
5'
5' 5' to 4:1
Var. 2:1 to 4:1
Var. 2:1 to 4:1
Var . 2:
(For details, see sht. BB02)
Stone embankment
1'
***"M" 524+76.63 To "M" 525+76.79 (Br. No. 29CY4)
**"M" 524+03.57 To "M" 524+76.63
*"M" 521+72.56 To "M" 524+03.57
*"M" 521+09.71 To "M" 521+72.56 (Intersection - Nepenthe Rd.)
*"M" 519+47.95 To "M" 521+09.71
"M" 516+99.06 To "M" 519+47.95
*"M" 516+55.76 To "M" 516+99.06 (Intersection - Mountain Meadows Dr.)
STA. "M" 510+08.37 To STA. "M" 516+55.76
Bike lane
***4.75' to 4.75'
**Var. 5'
*5'
Curb and gutter
Median
***0'
**0'
*0'
Travel lane
***10'
**Var. 11' to 10'
*11'
Travel lane
***10'
**Var. 11' to 10'
*11'
Bike lane
***4.75' to 4.75'
**Var. 5'
*5'
*"M" 524+03.57 To "M" 524+76.63
"M" 523+25.00 To "M" 523+58.39
STA. "M" 521+18.14 To STA. "M" 522+00.00
11'
*Var. 11' to 10'
Bike lane to 4.75'
*Var. 5'
5'
Bike lane
Sl. 3% system
Midwest guardrail
6. Place guardrail post face 6" minimum behind TBOC.
5. For striping plans, see shts. LB01 thru LB07.
4. For curb ramp details, see shts. BC01 thru BC14.
See BB shts. for details.
3. Pavement width varies at intersections.
bridge deck.
performed on the bridge. Protect extg.
3. Cold plane pavement removal not to be
2. Side slopes are shown as horizontal to vertical.
1. ACP binder shall be PG 70-22.
NOTES:
RD420, RD442, BR203)
RD406, RD407, RD415, RD416, RD419,
(See dwg. no. RD402, RD403, RD404, (See note 6)
8' steel posts
Midwest guardrail
1'
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
TYPICAL SECTIONS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BA03
0052-80159_ty_03.dgn :: Default 7/30/2025 1:32:36 PM SDinca 1"=100' Scale: Rotation: 0°
"M" sidewalk
Protect extg.
curb and gutter
Protect extg.
curb and gutter
Protect extg.
sidewalk
Protect extg.
geotextile
Subgrade
Nom. comp. thkn. - 13"
Aggregate base
"M"
Match extg. sl. Match extg. sl.
Depth - 5" to 6"
Cold plane pvmt. removal sidewalk
Protect extg.
curb and gutter
Protect extg.
Extg. grade
Extg. pvmt. - var. 26.5' to 31' sidewalk
Protect extg.
curb and gutter
Protect extg.
Nom. thkn. - 2"
" 2
Level 2, ACP wearing course w/fibers
Nom. thkn. - 2"
" 2 1Level 2, ACP wearing course w/fibers
Travel lane
5. For striping plans, see shts. LB01 thru LB07.
4. For curb ramp details, see shts. BC01 thru BC14.
See BB shts. for details.
3. Pavement width varies at intersections.
2. Side slopes are shown as horizontal to vertical.
1. ACP binder shall be PG 70-22.
NOTES:
Travel lane
(Two equal lifts)
Nom. thkn. - 6"
" 2 1Level 2, ACP base course
Var. 4.75' to 7' 10'
Travel lane
10'
Sl. var. Sl. var.
10'
10'
7' 7'
"M" 531+75.83 To "M" 537+46.34
"M" 531+11.19 To "M" 531+75.83 (Intersection - Briscoe Pl.)
"M" 529+17.67 To "M" 531+11.19
STA. "M" 528+50.00 To STA. "M" 529+17.67 (Intersection - Clinton St.)
bike lane
Buffered bike lane
Buffered bike lane
Buffered
*7' bike lane
Buffered
*7'
Var. 4.75' to 7'
*"M" 526+97.04 To "M" 528+50.00
STA. "M" 525+76.79 To STA. "M" 526+97.04
Nom. thkn. - 0" to 1"
" 2 1Level 2, ACP leveling course
Nom. thkn. - 3"
" 2 1Level 2, ACP base course extg. base
Recondition
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BB01
0052-80159_dt_01.dgn :: Default 7/30/2025 2:05:24 PM SDinca 1"=100' Scale: Rotation: 0°
REPAIR LOCATIONS
LEFT OFFSET RIGHT OFFSET
C DA B
"M"
B C
D rdwy. section
See typical
Aggregate subbase
Rdwy. subgrade
Asph. conc. pvmt.
Var.1'
Typ.
Depth - 21"
Sawcut and excavate
STA. START STA. END
Depth - 21"
Sawcut and excavate
ACP repair limits ACP repair limits
Adjacent traffic
Adjacent traffic
Face of extg. curb
Extg. conc. median
"M" crosswalk
Intended
PLAN
SECTION A-A
Top of island geotextile
Non-woven subgrade
A
Sawcut
Nom. comp. thkn. - 4"
Aggregate base
CUT THROUGH CURB RAMP DETAIL
V a r
2' min.
2' min.
5.6'
Aggregate base
Sidewalk sl. 1.5% ~
LEGEND
A
12" SUBGRADE STABILIZATION
BACK OF WALK STANDARD CURB DETAIL
(See C sheets for type)
Landscaping
E=6"
Standard curb to be determined per field conditions.
2. Depth of subgrade stabilization requirements.
in areas not meeting compaction
1. Subgrade stabilization to be used
NOTE:
12"
Excavation limits
6"
12"
Nom. thkn. - 2"
" 2 1Level 2, ACP wearing course w/fibers
Full depth ACP
21 INCH ASPHALT CONCRETE PAVEMENT REPAIR
A
(Two equal lifts)
Nom. thkn. - 6"
" 2 1Level 2, ACP base course
Nom thkn. - 13"
Class E backfill
Conc. island pay limits
Min. clear width
Nom. thkn. - 4"
P.C. conc. island
1.5% max.
E=6"
Standard curb
E=6"
Standard curb
"M" 508+47.00
"M" 508+09.00
"M" 507+99.00
"M" 507+15.00
"M" 506+91.00
"M" 506+88.00
"M" 506+55.00
"M" 506+06.00
"M" 505+53.00
"M" 505+39.00
"M" 508+71.00
"M" 508+45.00
"M" 508+10.00
"M" 507+30.00
"M" 507+11.00
"M" 506+94.00
"M" 506+75.00
"M" 506+36.00
"M" 505+59.00
"M" 505+58.00
9'
6.5'
6.5'
6.5'
2'
13'
10.5'
10.5'
10.5'
6'
4'
3.5'
4.5'
1.5'
2'
8'
8.5'
9.5'
6.5'
7'
5a: Nominal thickness - 4".
5. Rock mulch:
4b: Match existing color/size.
4a: Nominal thickness - 4".
4. Bark mulch:
3b: Place mix over 2" of topsoil.
" fine compost with lawn seeding.4 1 3a: Mix
3. Lawn seeding:
placement of landscaping.
2. Surface to be weed-free prior to
1. See C sheets for landscaping type and location.
NOTES:
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BB02
0052-80159_dt_02.dgn :: Default 7/30/2025 2:06:28 PM SDinca 1"=100' Scale: Rotation: 0° construction.
2. Benching work is incidental to embankment
(v:h) to provide positive bond with existing ground.
1. Construct benches on slopes steeper than 1:5
STANDARD EMBANKMENT GENERAL NOTES:
M
ax. sl.
STANDARD EMBANKMENT CONSTRUCTION
Incidental excavation
10' min.
10' min.
Min.
24"
Typ.
36" min.
T y p to m a x
T y p ground
Extg.
in horizontal layers placed & compacted
New embankment grubbed surface
Cleared & of slope
Extg. toe
Extg. ground after benching
Excavation surface
CURB RAMP CURB AND GUTTER DETAIL
Contraction joint
(See note 2)
Curb running slope
(See note 1)
Counter slope
Gutter pad width
18"
Gutter line var. 2 .0 % -
7.5 %Ramp run slop e cross slope
Extg. roadway
(At top face of curb)
Control Alignment
Sawcut
6' max.
(For course depths, see sht. BA02)
ACP match
12" Thkn. - 12"
Aggregate base
5. Maintain existing drainage patterns.
c) Stop/yield (SY) = prop. GFS < 2.0%
b) Signalized or Uncontrolled (SU) = prop. GFS < 5.0%
a) Midblock (MB) = prop. GFS < extg. GFS
4. Maximum gutter flow slopes (GFS) are as follows:
width up to 6' maximum if needed.
existing ACP cross slope. Adjust sawcut
3. Maximum ACP cross slope is +/-2% of the until maximum is reached.
negative grade). Match ramp running slope and combination style ramps is 4% (Positive or
2b. Maximum curb running slope on perpendicular style ramps is 2% (Positive or negative grade).
2a. Maximum curb running slope on parallel perpendicular to the curb flow line.
2' of the curb ramp and shall be measured curb ramp throat and road surfaces within negative grade). This applies to gutter at the
1. Maximum counter slope is 5.0% (Positive or
NOTES:
IRRIGATION SLEEVE DETAIL
Nom. thkn. - 4"
Conc. walk
(See C shts. for type)
Landscaping
(For details, see this sht.)
Const. curb and gutter
5'
PVC pipe
0.5% min.
4"-6' @
Nom. comp. thkn. - 4"
Aggregate base
5'
6" 6"
Cap both ends 24"
Curb and gutter width
(Material for benching is incidental)
Stone embankment material
Incidental benching excavation
Sl. 1:1.5
STONE EMBANKMENT CONSTRUCTION
See sht. BA01 material
Stone embankment
8' steel posts
Midwest guardrail
(Sl. var.)
Extg. ground
Pay limit
10' min.1
3" in size.
4. Material placed within 1' of guardrail post shall not exceed directed by Engineer.
3. Const. stone embankment one foot below extg. ground or as
2. Use 8' steel guardrail posts in areas of stone embankment.
1. Benching work is incidental to embankment construction.
NOTES:
m a x
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BB03
0052-80159_dt_03.dgn :: Default 7/30/2025 2:08:49 PM SDinca 1"=100' Scale: Rotation: 0°
ASPHALT APPROACH SURFACING
GRAVEL APPROACH SURFACING
Nom. comp. thkn. - 8"
Aggregate base geotextile
Subgrade geotextile
Subgrade
Nom. comp. thkn. - 6"
Aggregate base
Nom. thkn. - 2"
"2 1Level 2, ACP wearing course
Nom. thkn. - 2"
"2 1Level 2, ACP base course geotextile
Subgrade
Nom. comp. thkn. - 6"
Aggregate base
CONCRETE APPROACH SURFACING
Nom. thkn. - 6"
Conc. surfacing
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BC01
0052-80159_dt_10.dgn :: Default 7/30/2025 2:15:36 PM SDinca 1"=5' Scale: Rotation: 255.918°
N. MOUNTAIN AVE.
S K
Y L
A R
K P
L p la n s f o r d e ta il s
(S e e p a v e m e n t m a r k in g
In te n d e d c r o s s in g
Sawcut
Match extg.
curb
Match extg.
FEET
5 2.5 5
PLAN SCALE 1"=5'
RR3
curb
Match extg.
PROFILE AT GUTTER
Vert. scale: 1"=2'
Horiz. scale: 1"=10'
M
M
0"M" LINE
.0
.2
.85
7.5
(At gutter line)
Control alignment "CR01"
.0
.1
.9
.6
.9
-7.29%
-0.27%
10' V.C.
"CR01" LINE
0+60
Profile grade
Extg. ground
0+70 0+80 0+900+500+40
1826 1826
2.58'7.4%
5.5'1.5%
OFFSETRAMP POINT STATION
ELEVATION
FL
ELEVATION
TFC/SW
TFC - Top face of curb
SW - Sidewalk
FL - Flow line
FL=1824.45
N/A
N/A
FL=1824.18
N/A
N/A
FL=1824.14
N/A
N/A
N/A
FL=1825.13
"CR01" 0+91.88
"CR01" 0+82.61
"CR01" 0+82.61
"CR01" 0+82.61
"CR01" 0+74.60
"CR01" 0+74.60
"CR01" 0+74.60
"CR01" 0+54.08
"CR01" 0+54.08
"CR01" 0+47.00
"CR01" 0+47.00
0.00' Lt.
8.67' Lt.
3.17' Lt.
0.00' Lt.
8.67' Lt.
3.17' Lt.
0.00' Lt.
8.67' Lt.
3.17' Lt.
6.58' Lt.
0.00' Lt.
TFC=1824.95
SW=1824.45
SW=1824.37
TFC=1824.68
SW=1824.41
SW=1824.33
TFC=1824.64
SW=1825.37
SW=1825.29
SW=1825.76
TFC=1825.63
.4
2.89% 0.46%
.6
.7'
5.4
E=0"
E=0"
8. E=6" unless otherwise shown.
7. See sheet A02 for RRFB and illumination.
6. See sheet A02 for signing and striping.
5. Construct concrete joints as shown on plans, or as directed by Engineer.
4. All work is within existing right-of-way or perm. sidewalk ease.
3. See std. dwgs. for details not shown.
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES:
panel
Transition
7.3 6'
5.3
7.5 4'
4.5
.6
.7
2.58' 7.4%
5.5' 1.5%
.5
.5
.5
.2
.9
.5
R1
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BC02
0052-80159_dt_11.dgn :: Default 8/20/2025 4:09:01 PM AZavala 1"=5' Scale: Rotation: 255.918°
R/W
R/W
N. MOUNTAIN AVE.
S K
Y L
A R
K P
L panel
Transition panel
Transition Match extg.
extg. tree
Protect curb
Match extg.
curb
Match extg.
tree
Protect extg.
p la n s f o r d e ta il s
(S e e p a v e m e n t m a r k in g
In te n d e d c r o s s in g
22' R.
.5
Sawcut
FEET
5 2.5 5
PLAN SCALE 1"=5'
RR1
Match extg.
PROFILE AT GUTTER
Vert. scale: 1"=2'
Horiz. scale: 1"=10'
M
M
0"M" LINE
.0
.5
3.6'
0.8%
.5
.4
.5
.5
.0
.5
5.5
1.5
.5
.5
5.5
0.0
13 14
(At gutter line)
Control alignment "CR02"
E = 0"
OFFSETRAMP POINT STATION
ELEVATION
FL
ELEVATION
TFC/SW
TFC - Top face of curb
SW - Sidewalk
FL - Flow line
"CR02" 1+04.27
"CR02" 1+04.33
"CR02" 0+41.08
"CR02" 0+41.21
"CR02" 0+43.21
"CR02" 0+45.34
"CR02" 0+79.37
"CR02" 0+99.27
"CR02" 0+99.33
"CR02" 0+82.32
"CR02" 0+83.65
"CR02" 0+70.51
"CR02" 0+75.41
"CR02" 0+62.08
"CR02" 0+90.06
"CR02" 0+67.08
"CR02" 0+60.32
"CR02" 0+47.26
18 13.78' Lt.
7.76' Lt.
14.24' Lt.
9.38' Lt.
14.56' Lt.
9.49' Lt.
14.84' Lt.
13.26' Lt.
7.76' Lt.
13.15' Lt.
7.69' Lt.
10.68' Lt.
6.06' Lt.
3.78' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
FL=1821.30
FL=1822.65
FL=1822.75
FL=1824.37
SW=1821.76
SW=1821.65
SW=1825.33
SW=1825.38
SW=1825.19
SW=1825.19
SW=1823.31
SW=1822.09
SW=1822.01
SW=1823.31
SW=1823.23
SW=1823.39
SW=1823.31
SW=1822.78
TFC=1821.80
TFC=1823.15
TFC=1823.25
TFC=1824.87
.8
D E
.2
.8
D E
.7
.5
.5
.0
.8
5.0'
7.2%
5.0'
6.7%
10 17
"CR02" LINE
0+60
18241824
Profile grade
0+70 0+80 0+900+50
18221822
18211821 ground
Extg.
-12.37%
-1.48%
-10.16%
-1.89%
20' V.C.
.2
.3
.0
8 + .2
.0
.3
.7
.6
.5
.3
8. E=6" unless otherwise shown.
7. See sheet A02 for RRFB and illumination.
6. See sheet A02 for signing and striping.
5. Construct concrete joints as shown on plans, or as directed by Engineer.
4. All work is within existing right-of-way or perm. sidewalk ease.
3. See std. dwgs. for details not shown.
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES:
E=0" E=0"
8.9'
6.9%
8.9'
7.5%
5.9'
0.9%
4.9'
1.0%
.1
.6
.1
.6
15.0'
DE 8.2%
15.0'
DE 8.2%
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BC03
N. MOUNTAIN AVE.
0052-80159_dt_12.dgn :: Default 7/31/2025 9:51:39 AM SDinca 1"=5' Scale: Rotation: 258.1343°
F A
IR
O
A K S A
V E
R
W
R/W
R/W curb
Match extg.
curb
Match extg.
extg.
Match
Match extg.
p la n s f o r d e ta il s
(S e e p a v e m e n t m a r k in g In te n d e d c r o s s in g plans for details)
(See pavement marking
Intended crossing
26.8' R.
panel
Transition panel
Transition
.5
Sawcut
Curb Ramp Table.
See sht. BC03A for
NOTE:
R R
R R
FEET
5 2.5 5
PLAN SCALE 1"=5'
.5 '0
.5
.5
.5
.5
.5
.5
.5
5.5'
1.5%
5.5' 1.5%
.5
.5
.5
.8
5.5'
1.5%
.7
.2
.7
.9
%6 .5
.8
PROFILE AT GUTTER
Vert. scale: 1"=2'
Horiz. scale: 1"=10'
M
M
"M" LINE
(At gutter line)
Control alignment "CR03"
.3
.7
.4
.6
.0
.2
.0
4.85
1.50% 3.71
-1.27%
"CR03" LINE
0+60
0+70 0+800+500+40
1832 1832
.5
.5
.5 '1
.5
0.50%
.7
.8
3.9%
4.5%
.2
.5
.4
.5
.2
2.3%
E=3"
8. E=6" unless otherwise shown.
7. See sheet A02 for RRFB and illumination.
6. See sheet A02 for signing and striping.
5. Construct concrete joints as shown on plans, or as directed by Engineer.
4. All work is within existing right-of-way or perm. sidewalk ease.
3. See std. dwgs. for details not shown.
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES:
3.1'
3.1'10.0%
.5
.2
5.1'
7.5'
.1
R2
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
0052-80159_dt_12A.dgn :: Default 7/31/2025 9:58:53 AM SDinca 1"=5' Scale: Rotation: 270°
BC03A
OFFSETRAMP POINT STATION
ELEVATION
FL
ELEVATION
TFC/SW
TFC - Top face of curb
SW - Sidewalk
FL - Flow line
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
FL=1833.00
FL=1833.05
FL=1833.11
FL=1833.08
FL=1832.97
FL=1832.92
FL=1832.86
FL=1832.78
FL=1832.48
FL=1832.12
SW=1833.47
SW=1833.31
SW=1833.46
SW=1833.38
SW=1833.38
SW=1833.30
SW=1833.38
SW=1833.30
SW=1833.30
SW=1833.22
SW=1833.16
SW=1833.01
TFC=1833.50
TFC=1833.55
TFC=1833.11
TFC=1833.08
TFC=1833.22
TFC=1833.17
TFC=1832.86
TFC=1832.78
TFC=1832.98
TFC=1832.62
"CR03" 0+81.65
"CR03" 0+82.58
"CR03" 0+73.65
"CR03" 0+72.22
"CR03" 0+63.29
"CR03" 0+64.73
"CR03" 0+60.78
"CR03" 0+59.34
"CR03" 0+50.42
"CR03" 0+51.85
"CR03" 0+45.36
"CR03" 0+45.36
"CR03" 0+80.06
"CR03" 0+76.40
"CR03" 0+71.29
"CR03" 0+65.66
"CR03" 0+62.55
"CR03" 0+61.52
"CR03" 0+58.41
"CR03" 0+52.78
"CR03" 0+47.72
"CR03" 0+40.30
17.09' Rt.
12.36' Rt.
12.46' Rt.
7.04' Rt.
12.46' Rt.
7.04' Rt.
12.46' Rt.
7.04' Rt.
12.46' Rt.
7.04' Rt.
12.99' Rt.
7.99' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BC04
N. MOUNTAIN AVE.
0052-80159_dt_13.dgn :: Default 7/31/2025 10:13:30 AM SDinca 1"=5' Scale: Rotation: 258.1343°
F A
IR
O
A K
S A
V E p la n s f o r d e ta il s
(S e e p a v e m e n t m a r k in g In te n d e d c r o s s in g plans for detai ls)
(See pavement marking Intended cross ing panel
Transition extg.
Match tree extg.
Protect curb
Match extg.
curb
Match extg.
extg.
Match
25' R.
Sawcut hydrant
Protect extg.
water valve box
Adjust extg.
RR3
R R
R R
FEET
5 2.5 5
PLAN SCALE 1"=5'
PROFILE AT GUTTER
Vert. scale: 1"=2'
Horiz. scale: 1"=10'
M
M
"M" LINE
5.0'1.0%
5.0'1.4%
.0
.8
.0 '1
.4
.0
.4
.0
.4
5.5'
1.5%
5.5'
1.5%
.0
.4
.1
.1
.1
.1
.0
.4
6.0'
4.5%
9 11
12 15 18 21
(At gutter line)
Control alignment "CR04"
OFFSETRAMP POINT STATION
ELEVATION
FL
ELEVATION
TFC/SW
TFC - Top face of curb
SW - Sidewalk
FL - Flow line
N/A
N/A
FL=1835.18
N/A
N/A
FL=1834.92
N/A
N/A
FL=1834.84
N/A
FL=1834.66
N/A
FL=1834.50
N/A
FL=1834.01
N/A
FL=1833.93
N/A
FL=1833.62
N/A
FL=1833.36
SW=1835.63
SW=1835.60
TFC=1835.68
SW=1835.36
SW=1835.29
TFC=1835.42
SW=1835.28
SW=1835.21
TFC=1834.84
SW=1835.14
TFC=1834.91
SW=1834.82
TFC=1834.75
SW=1834.08
TFC=1834.01
SW=1834.00
TFC=1833.93
SW=1834.19
TFC=1834.12
SW=1833.91
TFC=1833.86
"CR04" 0+94.77
"CR04" 0+94.77
"CR04" 0+94.77
"CR04" 0+88.77
"CR04" 0+88.77
"CR04" 0+88.77
"CR04" 0+83.27
"CR04" 0+83.27
"CR04" 0+83.27
"CR04" 0+79.77
"CR04" 0+78.71
"CR04" 0+74.64
"CR04" 0+74.64
"CR04" 0+61.16
"CR04" 0+61.18
"CR04" 0+54.08
"CR04" 0+54.09
"CR04" 0+47.42
"CR04" 0+47.42
"CR04" 0+43.17
"CR04" 0+43.17
11.75' Rt.
6.91' Rt.
0.00' Rt.
11.68' Rt.
6.68' Rt.
0.00' Rt.
11.68' Rt.
6.68' Rt.
0.00' Rt.
11.68' Rt.
0.00' Rt.
5.58' Rt.
0.00' Rt.
5.58' Rt.
0.00' Rt.
5.58' Rt.
0.00' Rt.
5.58' Rt.
0.00' Rt.
5.61' Rt.
0.00' Rt.
"CR04" LINE
1834 1834
0+60 0+70 0+80 0+900+500+40
18331833
Profile grade
Extg. ground
5.20
5.24
1.13% 3.64% 3.93
% 3.95 % 1.45%
4.33
.3
.6
.9
.0
.5
.6
.8
.9
.1
.1
.1
.0
.1
.6
.7
.2
.7
.7
.0
.2
.0
.8
5.
5'
1.
5%
10.8
6.9%
13.5
5.5%
1.6%
5.5'
1.5%
E=3"
E=0"
RR3
6.0'
5.2%
.0 '4 .0
3.5'
4.0%
8. E=6" unless otherwise shown.
7. See sheet A02 for RRFB and illumination.
6. See sheet A02 for signing and striping.
5. Construct concrete joints as shown on plans, or as directed by Engineer.
4. All work is within existing right-of-way or perm. sidewalk ease.
3. See std. dwgs. for details not shown.
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES:
E=0"
E=0"
4.1'
2.7%
4.6'
.6
.9
7.
1'
1.
1%
.9
.0
.8
.6
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
J
BC05
N. MOUNTAIN AVE.
0052-80159_dt_14.dgn :: Default 7/31/2025 10:29:29 AM SDinca 1"=5' Scale: Rotation: 258.1343°
F A
IR
O
A K
S A
V E p la n s f o r d e ta il s
(S e e p a v e m e n t m a r k in g
In te n d e d c r o s s in g plans for details) (See pavement marking Intended crossing panel
Transition panel
Transition
Adjust inlet extg.
Match curb
Match extg.
curb
Match extg.
Match extg.
21.5' R.
.5
Sawcut extg. illumination pole
Preserve and protect hydrant
Protect extg.
FEET
5 2.5 5
PLAN SCALE 1"=5'
RR2
RR2
R R
Curb Ramp Table.
See sht. BC05A for
NOTE:
R R
R R private path
Match extg.
PROFILE AT GUTTER
Vert. scale: 1"=2'
Horiz. scale: 1"=10'
7.5'
5.1%
7.5'
5.2%
.0
.4
.0
.4
.0
.5
.0
.8
.5
.3
5.
0'
1.
4%
5.0'
1.5%
.0
.5
.0
.2
3.9'
0.3%
9 10
11 12
M
M
"M" LINE
(At gutter line)
Control alignment "CR05"
E = 0"
5.5'
0.5%
5.5'
0.5%
5.5'
0.5%
"CR05" LINE
0+60
0+70 0+80 0+900+50
1+00 1+10
Profile grade
Extg. ground
-6.35%
1.51% 1.51%
3.87
0.55% 0.25%
10' V.C.
.1
.6
.7
.8
.5
.6
.6
.0
.8
.3
.2
.3
.0
.8
1+20
RR2
.0
.8
11.0' 7.1%
15.0' 5.0%
.3
.7
.0
.5
4.
3'
7.
5%
.3
.5
.3
.5
6.2'
1.5%
6.2'
1.0%
.6
.5
E=0"
E=0"
8. E=6" unless otherwise shown.
7. See sheet A02 for RRFB and illumination.
6. See sheet A02 for signing and striping.
or as directed by Engineer.
5. Construct concrete joints as shown on plans, perm. sidewalk ease.
4. All work is within existing right-of-way or
3. See std. dwgs. for details not shown.
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES:
.5
.0
5.5' min.
' m in
28.7'
5.7%
20.0'
7.7% extg. park bench
Remove and reinstall
.3
.0
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
0052-80159_dt_14A.dgn :: Default 7/31/2025 10:31:30 AM SDinca 1"=5' Scale: Rotation: 270°
BC05A
OFFSETRAMP POINT STATION
ELEVATION
FL
ELEVATION
TFC/SW
TFC - Top face of curb
SW - Sidewalk
FL - Flow line
22 N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
FL=1834.65
FL=1834.61
FL=1834.58
FL=1833.86
FL=1833.74
FL=1834.16
SW=1835.33
SW=1835.22
SW=1835.39
SW=1835.31
SW=1835.00
SW=1834.93
SW=1834.97
SW=1834.90
SW=1834.19
SW=1834.15
SW=1834.13
SW=1834.06
SW=1834.88
SW=1834.80
SW=1834.88
SW=1834.87
TFC=1835.15
TFC=1835.11
TFC=1835.08
TFC=1834.36
TFC=1834.24
TFC=1834.66
"CR05" 1+11.01
"CR05" 1+11.01
"CR05" 1+04.86
"CR05" 1+04.86
"CR05" 0+97.36
"CR05" 0+97.36
"CR05" 0+91.86
"CR05" 0+91.86
"CR05" 0+73.27
"CR05" 0+73.27
"CR05" 0+65.32
"CR05" 0+65.32
"CR05" 0+51.50
"CR05" 0+51.50
"CR05" 0+47.00
"CR05" 0+47.00
"CR05" 1+21.02
"CR05" 0+97.36
"CR05" 0+91.86
"CR05" 0+73.27
"CR05" 0+65.32
"CR05" 0+47.00
9.25' Lt.
5.27' Lt.
9.33' Lt.
4.33' Lt.
9.33' Lt.
4.33' Lt.
9.33' Lt.
4.33' Lt.
9.33' Lt.
4.33' Lt.
9.33' Lt.
4.33' Lt.
9.33' Lt.
4.33' Lt.
9.41' Lt.
5.48' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BC06
N. MOUNTAIN AVE.
0052-80159_dt_15.dgn :: Default 7/31/2025 10:34:21 AM SDinca 1"=5' Scale: Rotation: 258.1343°
F A
IR
O
A K
S A
V E
R/W
R
W panel
Transition panel
Transition plans for details)
(See pavement marking
Intended crossing p la n s f o r d e ta il s
(S e e p a v e m e n t m a r k in g
In te n d e d c r o s s in g
20.5' R.
extg.
Match curb
Match extg.
extg.
Match
Sawcut vault
Protect extg.
FEET
5 2.5 5
PLAN SCALE 1"=5'
R R
RR3
R R
Curb Ramp Table.
See sht. BC06A for
NOTE:
PROFILE AT GUTTER
Vert. scale: 1"=2'
Horiz. scale: 1"=10' curb extg.
Match
5.5'
1.5%
.1
.5
.0
.5
.0
.5
.0
.8
.0
.8
5.5'
1.5%
.0
.5
.0
.5
5.0'
1.6%
5.0'
1.5%
2.0'
4.0% private path extg.Match
1 2 3
11 13
14 16
M
M
"M" LINE
(At gutter line)
Control alignment "CR06"
.0
.3
.3
.8
.9
.2
.5
.5
.9
.6
6.3 2%
3.50%
2.34% 1.50%
1.42%
"CR06" LINE
0+60
0+70 0+800+50
1832 1832
0+90
Profile grade
Extg. ground
.4
.5
5.5'
1.1%
.3
D E
.2
E=0"
.3
D E
.4
6.4'
1.9%
5.5'
3.5%
.1
.9
5.5'
1.5%
2.13'
5.3%
.8
.0
E=0"
6.4'
1.9% 7.3'
4.9%
.7
.0
3.9'
5.3%
.8
.2
4.9'
4.3%4 .9
.0
3.9'
4.1%
8. E=6" unless otherwise shown.
7. See sheet A02 for RRFB and illumination.
6. See sheet A02 for signing and striping.
5. Construct concrete joints as shown on plans, or as directed by Engineer.
4. All work is within existing right-of-way or perm. sidewalk ease.
3. See std. dwgs. for details not shown.
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES:
E=0"
1.4'
5.3%
3.0'
10.0%
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
0052-80159_dt_15A.dgn :: Default 7/31/2025 10:35:15 AM SDinca 1"=5' Scale: Rotation: 270°
BC06A
OFFSETRAMP POINT STATION
ELEVATION
FL
ELEVATION
TFC/SW
TFC - Top face of curb
SW - Sidewalk
FL - Flow line
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
FL=1833.63
FL=1833.51
FL=1833.40
FL=1833.02
FL=1832.83
FL=1832.63
FL=1832.36
SW=1834.91
SW=1834.70
SW=1834.71
SW=1834.64
SW=1833.65
SW=1833.57
SW=1833.48
SW=1833.56
SW=1833.53
SW=1833.44
SW=1833.45
SW=1833.36
SW=1833.52
SW=1833.38
SW=1833.36
SW=1833.17
SW=1833.06
SW=1833.00
TFC=1834.13
TFC=1834.01
TFC=1833.90
TFC=1833.52
TFC=1832.83
TFC=1833.13
TFC=1832.86
"CR06" 0+99.99
"CR06" 1+00.22
"CR06" 0+95.07
"CR06" 0+94.39
"CR06" 0+76.56
"CR06" 0+80.98
"CR06" 0+74.96
"CR06" 0+69.66
"CR06" 0+62.54
"CR06" 0+60.68
"CR06" 0+54.38
"CR06" 0+54.38
"CR06" 0+53.13
"CR06" 0+53.00
"CR06" 0+49.26
"CR06" 0+49.10
"CR06" 0+47.00
"CR06" 0+47.00
"CR06" 0+91.92
"CR06" 0+83.57
"CR06" 0+76.20
"CR06" 0+59.92
"CR06" 0+54.38
"CR06" 0+51.38
"CR06" 0+47.00
10.77' Lt.
5.82' Lt.
10.76' Lt.
5.81' Lt.
9.82' Lt.
5.60' Lt.
2.07' Lt.
5.53' Lt.
13.55' Lt.
7.61' Lt.
13.68' Lt.
7.68' Lt.
18.66' Lt.
13.66' Lt.
18.60' Lt.
13.60' Lt.
13.57' Lt.
7.68' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BC07
N. MOUNTAIN AVE.
0052-80159_dt_16.dgn :: Default 8/20/2025 4:23:07 PM AZavala 1"=5' Scale: Rotation: 270°
M T
M E
A D
O W
S D
R
R/W
R
W
Perm . ease.
.5 p la n s f o r d e ta il s
(S e e p a v e m e n t m a r k in g
In te n d e d c r o s s in g plans for details)
(See pavement marking
Intended crossing
7.5%
RR2 slope panel
Transition panel
Transition extg.
Match e a s e
P e r m
Match extg.
17' R.
wall retaining
Protect extg.
FEET
5 2.5 5
PLAN SCALE 1"=5'
R R
RR1
RR1
RR3
.5
.5
.5
.7
7.1' 1.0%
4.5' 1.3%
.5
.5
5.
5'
0.
5%
.5
.3
.1
.0
5.5'
1.5%
5.5'
1.5%
20.0'
DE 11.0%
20.0'
DE 11.2%
curb
Match extg.
M
M
M curb extg.Match
"M" LINE
2 3
.9
.6
(At gutter line)
Control alignment "CR07"
Adjust inlet
See note 9
.0
.7
D E 1
.0
.0
D E 8 .4
.5
.8
.5
.8
E = 0"
OFFSETRAMP POINT STATION
ELEVATION
FL
ELEVATION
TFC/SW
TFC - Top face of curb
SW - Sidewalk
FL - Flow line
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
FL=1789.20
FL=1789.40
FL=1789.50
FL=1790.90
FL=1791.16
FL=1793.08
SW=1790.57
SW=1790.46
SW=1790.49
SW=1790.41
SW=1790.30
SW=1790.22
SW=1790.36
SW=1790.33
SW=1791.16
SW=1791.08
SW=1791.22
SW=1791.18
SW=1793.46
SW=1793.38
SW=1793.70
SW=1793.72
TFC=1789.70
TFC=1789.90
TFC=1790.00
TFC=1791.40
TFC=1791.66
TFC=1793.58
"CR07" 1+19.70
"CR07" 1+19.70
"CR07" 1+14.81
"CR07" 1+14.81
"CR07" 1+04.31
"CR07" 1+04.31
"CR07" 0+92.26
"CR07" 0+93.57
"CR07" 0+75.99
"CR07" 0+79.76
"CR07" 0+71.69
"CR07" 0+71.82
"CR07" 0+51.69
"CR07" 0+51.69
"CR07" 0+47.00
"CR07" 0+47.00
"CR07" 1+19.70
"CR07" 1+04.31
"CR07" 0+94.00
"CR07" 0+81.09
"CR07" 0+71.89
"CR07" 0+47.00
11.95' Rt.
7.04' Rt.
12.08' Rt.
6.58' Rt.
12.08' Rt.
6.58' Rt.
12.25' Rt.
6.78' Rt.
10.23' Rt.
5.12' Rt.
9.09' Rt.
3.59' Rt.
9.08' Rt.
3.58' Rt.
9.14' Rt.
5.28' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
PROFILE AT GUTTER
Vert. scale: 1"=2'
Horiz. scale: 1"=10'
"CR07" LINE
0+60 0+70 0+80 0+900+50
1+00 1+10
-7.70%
-2.83%
-10.84%
-0.97% 1.29%
.0
.1
.9
.5
.4
.6
.0
.8
.0
.0
.3
.7
1+20
Profile grade
Extg. ground
.3
.6
6.0'
DE 13.7%
6.
2'
DE 1
3.
4%
9.2'
2.8%
.9
.5
5.0
6.8
4.7'
5.1%
.7
.8
.9
.0
4.9'
2.3%
9. Do not construct gutter transition through ramp.
8. E=6" unless otherwise shown.
7. See sheet A02 for RRFB and illumination.
6. See sheet A02 for signing and striping.
5. Construct concrete joints as shown on plans, or as directed by Engineer.
4. All work is within existing right-of-way or perm. sidewalk ease.
3. See std. dwgs. for details not shown.
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES:
E=0"
E=0"
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BC08
N. MOUNTAIN AVE.
0052-80159_dt_17.dgn :: Default 7/31/2025 11:34:02 AM SDinca 1"=5' Scale: Rotation: 270°
M T
M E
A D
O W
S D
R
R/W
R
W
T e m p c o n s t.
e a s e inlet
Adjust curb
Match extg.
extg.
Match panel
Transition panel
Transition p la n s f o r d e ta il s
(S e e p a v e m e n t m a r k in g
In te n d e d c r o s s in g plans for details)
(See pavement marking
Intended crossing
20' R.
curb
Match extg.
Match extg.
Sawcut T e m p co n st e a se
Temp. const. ease.
R R
RR1
FEET
5 2.5 5
PLAN SCALE 1"=5'
PROFILE AT GUTTER
Vert. scale: 1"=2'
Horiz. scale: 1"=10' extg.
Match private path
Match extg.
M
M
"M" LINE
1.9'
1.1%
5.5' 0.5%
.6
.4
.3
.9
.0
.0
4.0'
7.5%
5.5' 1.1%
.7
.3
5.5'
1.5%
5.5'
1.5%
.5
.5
.5
.5
.7
.5
4.0'
10.3%
7.9'
9.2'
4 5
12 13
(At gutter line)
Control alignment "CR08"
OFFSETRAMP POINT STATION
ELEVATION
FL
ELEVATION
TFC/SW
TFC - Top face of curb
SW - Sidewalk
FL - Flow line
"CR08" LINE
0+60
0+70 0+800+50
1788 1788
0+90 1+00
Profile grade
Extg. ground
-0.77% -1.49%
-1.55% -1.40%
-4.06%
.0
.4
.1
.9
.6
.2
.3
.3
.2
.9
.8
.4
24 N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
FL=1788.46
FL=1788.89
FL=1788.97
FL=1789.20
FL=1789.30
FL=1789.38
"CR08" 0+78.90
"CR08" 0+64.38
"CR08" 0+95.23
"CR08" 0+95.23
"CR08" 0+87.33
"CR08" 0+86.07
"CR08" 0+77.08
"CR08" 0+78.35
"CR08" 0+65.34
"CR08" 0+78.46
"CR08" 0+67.53
"CR08" 0+63.39
"CR08" 0+56.24
"CR08" 0+55.51
"CR08" 0+52.05
"CR08" 0+55.10
"CR08" 0+47.02
"CR08" 0+47.01
"CR08" 0+95.23
"CR08" 0+84.63
"CR08" 0+78.92
"CR08" 0+64.32
"CR08" 0+57.41
"CR08" 0+47.00
1.07' Rt.
1.10' Rt.
11.58' Rt.
6.71' Rt.
12.02' Rt.
6.67' Rt.
12.77' Rt.
7.30' Rt.
7.30' Rt.
15.03' Rt.
12.70' Rt.
18.24' Rt.
14.40' Rt.
12.49' Rt.
11.53' Rt.
6.54' Rt.
10.71' Rt.
5.81' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
0.00' Rt.
SW=1788.92
SW=1789.22
SW=1789.35
SW=1789.33
SW=1789.45
SW=1789.37
SW=1789.53
SW=1789.45
SW=1789.68
SW=1790.06
SW=1789.76
SW=1790.21
SW=1789.80
SW=1789.78
SW=1789.80
SW=1789.77
SW=1789.84
SW=1789.80
TFC=1788.96
TFC=1789.39
TFC=1789.47
TFC=1789.70
TFC=1789.80
TFC=1789.88
4.9'
0.8%
.1
.8
6.3' 7.5%
6.3' 7.3%
3.
5'
6.
6%
.9
.9
8.
4'
2.
7%
R R
.7
.5
.7
.7
0.4%
1.3%
.9
.4
5.7'
1.4%
8. E=6" unless otherwise shown.
7. See sheet A02 for RRFB and illumination.
6. See sheet A02 for signing and striping.
5. Construct concrete joints as shown on plans, or as directed by Engineer.
4. All work is within existing right-of-way or perm. sidewalk ease.
3. See std. dwgs. for details not shown.
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES:
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BC09
N. MOUNTAIN AVE.
0052-80159_dt_18.dgn :: Default 7/31/2025 11:38:04 AM SDinca 1"=5' Scale: Rotation: 270°
M T
M E
A D
O W
S D
R
R/W
R
W
Temp. const. ease.
panel
Transition panel
Transition extg.
Match curb
Match extg.
Match extg.
curb
Match extg.
p la n s f o r d e ta il s
(S e e p a v e m e n t m a r k in g
In te n d e d c r o s s in g plans for details)
(See pavement marking
Intended crossing
20' R.
Sawcut power pole
Protect extg.
R R
RR3
R R
RR2
FEET
5 2.5 5
PLAN SCALE 1"=5'
Curb Ramp Table.
See sht. BC09A for
NOTE:
PROFILE AT GUTTER
Vert. scale: 1"=2'
Horiz. scale: 1"=10'
5.5'
1.5%
3.0'
7.3%
5.5'
1.5%
2.0'
4.0%
.5
.5
.0
.3
.5
.5
5.5'
1.5%
3.0'
7.3%
.5
.5
.5
.3
5.5'
1.5%
.5
.5
.5
.5
5.5'
1.5%
14.0'
2.7%
14.0'
2.7%
11 12
.5
.8
M
M
M
0"M" LINE
(At gutter line)
Control alignment "CR09"
E = 0"
"CR09" LINE
0+60
0+70 0+800+50
1788 1788
0+90 1+00 1+10
Profile grade
Extg. ground
0.36% -1.40% -2.63%
-1.40%
-3.92%
.0
.7
.2
.5
.2
.2
.0
.0
.9
8 1 .6
.5
.6
1787 1787
1790 1790
10.6' 2.9%
4.6'
1.7%
.1
.1
5.8' 5.5%
4.9'
1.4%
.9
.5
3.8'
1.9%
7.5' R.
7.5' R.
E=0"
E=0"
E=0"
.0
.6
Perm. ease.
.4
.5
.8
.8
%7 .2
.0
5.7'
1.4%
8. E=6" unless otherwise shown.
7. See sheet A02 for RRFB and illumination.
6. See sheet A02 for signing and striping.
5. Construct concrete joints as shown on plans, or as directed by Engineer.
4. All work is within existing right-of-way or perm. sidewalk ease.
3. See std. dwgs. for details not shown.
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES:
.3
.0
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
0052-80159_dt_18A.dgn :: Default 7/31/2025 11:38:58 AM SDinca 1"=5' Scale: Rotation: 270°
BC09A
OFFSETRAMP POINT STATION
ELEVATION
FL
ELEVATION
TFC/SW
TFC - Top face of curb
SW - Sidewalk
FL - Flow line
25 "CR09" 0+89.25
"CR09" 1+15.80
"CR09" 1+15.83
"CR09" 1+08.84
"CR09" 1+07.75
"CR09" 0+89.25
"CR09" 0+89.25
"CR09" 0+89.25
"CR09" 0+69.69
"CR09" 0+80.56
"CR09" 0+76.65
"CR09" 0+71.54
"CR09" 0+65.84
"CR09" 0+65.77
"CR09" 0+63.82
"CR09" 0+53.66
"CR09" 0+54.66
"CR09" 0+48.79
"CR09" 0+48.79
"CR09" 1+11.21
"CR09" 0+89.25
"CR09" 0+83.51
"CR09" 0+70.36
"CR09" 0+63.79
"CR09" 0+47.00
1.26' Lt.
0.58' Lt.
4.70' Lt.
9.42' Lt.
4.32' Lt.
16.42' Lt.
10.92' Lt.
8.42' Lt.
13.78' Lt.
7.35' Lt.
5.88' Lt.
2.15' Lt.
5.12' Lt.
11.16' Lt.
5.39' Lt.
10.04' Lt.
4.73' Lt.
8.87' Lt.
5.09' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
FL=1787.69
FL=1788.55
FL=1788.63
FL=1788.98
FL=1789.07
FL=1789.33
SW=1788.57
TFC=1788.08
SW=1788.25
SW=1788.56
SW=1788.48
SW=1788.94
SW=1788.86
SW=1788.84
SW=1789.02
SW=1788.92
SW=1789.14
SW=1789.06
SW=1789.14
SW=1789.24
SW=1789.16
SW=1789.73
SW=1789.65
SW=1789.81
SW=1789.74
TFC=1788.16
TFC=1789.05
TFC=1789.13
TFC=1789.48
TFC=1789.57
TFC=1789.83
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
.0
.8
.3
.2
.9
-6.99%
-4.11%
-7.91%
-1.41% -3.96%
.0
.3
.4
.4
.4
.3
.7
BC10
N. MOUNTAIN AVE.
0052-80159_dt_19.dgn :: Default 7/31/2025 11:44:06 AM SDinca 1"=5' Scale: Rotation: 270°
M T
M E
A D
O W
S D
R
R/W
R
W extg.
Match curb
Match extg.
panel
Transition panel
Transition curb
Match extg.
p la n s f o r d e ta il s
(S e e p a v e m e n t m a r k in g
In te n d e d c r o s s in g plans for details)
(See pavement marking
Intended crossing
20.5' R.
.5 extg. illumination pole
Preserve and protect
Sawcut private path
Match extg.
FEET
5 2.5 5
PLAN SCALE 1"=5'
RR3
RR2
R R extg.
Match
.0
.4
.0
.5
4.5'
1.3% 5 .0
.5
5.0'0.8%
.5
.3
5.0'
1.5%
6.3'
6.5%
6.5'
7.0% 18.0'
DE 10.3%
.5
.4
.1
.4
5.4'
1.6%
6.1'
4.1%
3.9'
2.0%
.4
.8
M
M
M
0"M" LINE
(At gutter line)
Control alignment "CR10"
.4
D E .0
OFFSETRAMP POINT STATION
ELEVATION
FL
ELEVATION
TFC/SW
TFC - Top face of curb
SW - Sidewalk
FL - Flow line
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
FL=1788.93
FL=1789.20
FL=1789.30
FL=1790.80
FL=1791.05
FL=1792.75
SW=1789.66
SW=1789.58
SW=1789.71
SW=1789.64
SW=1789.53
SW=1789.46
SW=1789.59
SW=1789.55
SW=1791.04
SW=1790.99
SW=1791.10
SW=1791.07
SW=1792.99
SW=1792.92
SW=1793.41
SW=1793.38
TFC=1788.43
TFC=1789.70
TFC=1789.80
TFC=1791.30
TFC=1791.55
TFC=1793.25
"CR10" 1+15.75
"CR10" 1+15.75
"CR10" 1+12.75
"CR10" 1+12.75
"CR10" 1+03.49
"CR10" 1+03.49
"CR10" 0+95.41
"CR10" 0+95.41
"CR10" 0+77.45
"CR10" 0+77.45
"CR10" 0+71.36
"CR10" 0+71.36
"CR10" 0+53.36
"CR10" 0+53.36
"CR10" 0+47.00
"CR10" 0+47.00
"CR10" 1+20.53
"CR10" 1+00.09
"CR10" 0+92.01
"CR10" 0+81.04
"CR10" 0+73.36
"CR10" 0+47.00
9.16' Lt.
5.22' Lt.
9.08' Lt.
4.08' Lt.
9.08' Lt.
4.08' Lt.
9.08' Lt.
4.08' Lt.
9.08' Lt.
4.08' Lt.
9.08' Lt.
4.08' Lt.
9.08' Lt.
4.08' Lt.
9.20' Lt.
5.27' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
0.00' Lt.
.1
.2
.0
.8
.0
.7
.5
.4
3.5'7.2% hydrant
Protect extg.
R R
3.5'
7.4%
5.0'
1.4%
.5
.6
RR1
PROFILE AT GUTTER
"CR10" LINE
0+60 0+70 0+80 0+900+50
17931793
1+00 1+10
Extg. ground
Vert. scale: 1"=2'
Horiz. scale: 1"=10'
Profile grade
1788 1788
D E .5
.0
E=0"
E=0"
8. E=6" unless otherwise shown.
7. See sheet A02 for RRFB and illumination.
6. See sheet A02 for signing and striping.
5. Construct concrete joints as shown on plans, or as directed by Engineer.
4. All work is within existing right-of-way or perm. sidewalk ease.
3. See std. dwgs. for details not shown.
2. Max. cross slope change on ramp 0.5% per foot.
1. Slopes hold over elevations.
CONSTRUCTION NOTES:
E=0"
.9
.5
18.0'
DE 10.5%
S
E OF
S
O N
E
I E
OREGON
R G I
TE
R
DPR E
SI
A L
N G N E R
102003PE
EXPIRES:
M
A
RCH 14,
3A
U S
T
IN JOSEPH
ZAV
A L
A
06/30/26
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
JACKSON COUNTY
CITY OF ASHLAND
I-5 TO E. MAIN (PHASE 1)
N. MOUNTAIN AVE OVERLAY
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
CURB RAMP DETAILS
Jaime Jordan
Matthew Phillips
Austin Zavala
Serban Dinca
BC11
N. MOUNTAIN AVE.
0052-80159_dt_20.dgn :: Default 8/20/2025 10:42:41 AM SDinca 1"=5' Scale: Rotation: 270° extg.
Match curb
Match extg.
R/W R/W panel
Transition curb
Match extg.
FEET
5 2.5 5
PLAN SCALE 1"=5'
PROFILE AT GUTTER
Vert. scale: 1"=2'
Horiz. scale: 1"=10'
.0
.3
.9
.5
.0
.3
.0
.4
.9
.5
.0
.3
12.9'
1.0%
.0
.3
9.0'
0.7%
9.0'
0.7%
10 12 14
11 13
3 4
M
M
M for details) marking plans
(See pavement
Intended crossing
"M" LINE
7.25' R.
7.25' R.
11.75' R.
2' R.
extg.
Match
7.25' R.
6.66' R.
"CR11" LINE
0+60
0+70 0+80 0+900+50
1787 1787
1784 1784
1+00
Profile grade
Extg. ground
.9
.8
.4
.6
.9
.5
.9
-0.49% 3.24%
-0.66% -0.66%
-1.35%
10' V.C.
7' V.C.
10' V.C.
1+10
.0
.5
SECTION A-A
Weed control geotextile extg. sign
Preserve and protect extg. tree
Preserve and protect
Match extg. path
6.1'
1.5%
.0
.2
6.1'
0.8%
30' R.
.8
A
A
Cu…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .