20R4052 ATTACHMENT B - Basic_Pricing_Data.xlsx
XLSX spreadsheet 36 KB Posted
- Solicitation number
- N32205-20-R-4052
About this file
This document contains pricing templates and fuel consumption data for a container vessel time charter solicitation from the Department of the Navy's Military Sealift Command. Offerors are to provide pricing for a base period of 164 days plus five option periods ranging from 46 to 365 days for a total of 1854 days. Pricing templates require itemizing costs such as crew wages, vessel maintenance, insurance, and profit. Fuel consumption data templates ask offerors to specify fuel types used and corresponding prices per metric ton for evaluating fuel costs over the contract period.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOTAL EVALUATED PRICE
TOTAL EVALUATED PRICE
| PER DIEM | ||||
| DAILY CHARTER HIRE RATE | # OF DAYS | ESTIMATED FUEL COST | TOTAL PER DIEM/PERIOD | |
| BASE PERIOD | 164 | |||
| OPTION 1 | 365 | |||
| OPTION 2 | 365 | |||
| OPTION 3 | 366 | |||
| OPTION 4 | 365 | |||
| OPTION 5 | 46 | |||
| FAR 52.217-8 | 183 |
Total Days 1854
TOTAL EVALUATED FUEL
PORT CHARGES DIFFERENTIAL N/A
DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0
REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0
TOTAL EVALUATED PRICE $ - 0
| Note: |
| 1. OFFERORS SHALL USE THE OPTION PERIOD 4 DAILY CHARTER RATE AS THE DAILY RATE IN THE "FAR 52.217-8" PERIOD. |
Fuel Consumption Data
| Attachment B | Vessel: |
| Basic Pricing Data | RFP: N32205-20-R-4052 |
Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Select "Fuel Type" from the drop down menu in the list below and enter in the corresponding price per metric ton for that fuel type in Column G. If more than one fuel type is burned either underway or in-port please use extra rows provided.
| Box # | Description | # Days | Metric Tons/day | Fuel Type | Price per Metric Ton | Total |
| 68 | Fuel Underway (laden) | 1435 | ||||
| Other Fuel Type (if necessary) |
| 69 | Fuel Underway (ballast) | 0 |
| Other Fuel Type (if necessary) |
| 70 | Fuel Underway (auxiliaries) | 1435 |
| Other Fuel Type (if necessary) |
| 71 | In-Port Idle | 419 |
| Other Fuel Type (if necessary) |
| TOTAL: | $ - 0 | |
| Notes: |
| 1 | Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and | ||
| appropriate fuel conversion factors. The rates to be used are as follows: | |||
| DLA Std Price FY2020 | |||
| MGO: | per metric ton | $ 775.62 | |
| F76: | per metric ton | $ 750.40 |
Fuel conversion factors are as follows:
MGO/F76: 7.507 barrels per metric ton
2 Fuel Consumption shall be assuming moderate weather
3 Fuel Consumption shall be based upon Box 68, 69, 70 and 71 consumption rates. Fuel consumed during in-port periods when on shore power will not be evaluated.
Basic Pricing Data
| Attachment B | Vessel: | ||
| Basic Pricing Data | RFP: N32205-20-R-4052 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 164 day year | |||
| Base Period | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by ( c ) $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 1
| Attachment B | Vessel: | ||
| Basic Pricing Data | RFP: N32205-20-R-4052 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon 365 day year | |||
| Option Period One | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by ( c ) $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 2
| Attachment B | Vessel: | ||
| Basic Pricing Data | RFP: N32205-20-R-4052 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon 365-day year | |||
| Option Period Two | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by ( c ) $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 3
| Attachment B | Vessel: | ||
| Basic Pricing Data | RFP: N32205-20-R-4052 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon 366-day year | |||
| Option Period Three | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by ( c ) $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 4
| Attachment B | Vessel: |
| Basic Pricing Data | RFP: N32205-20-R-4052 |
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | ||
| (a) allocable to the services of the Vessels under this Charter | ||
| (b) in US dollars | ||
| (c) based upon 365-day year | ||
| Option Period Four | ||
| PRICE PER DAY | ||
| 1 | Crew wages, etc., as itemized in Attachment C | |
| 2 | Crew Training, not separately itemized in Attachment C | |
| 3 | Victualling, stores, and water | |
| 4 | Crew transportation/repatriation | |
| 5 | Other crew costs (itemize at lines 5-7) | |
| 6 | ||
| 7 | ||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 |
| 9 | Maintenance and repair | |
| 10 | Lubricants | |
| 11 | Survey and classification expenses | |
| 12 | Equipment and materials | |
| 13 | Capitalized costs (Vessel) | |
| 14 | Depreciation (Vessel) | |
| 15 | Other Vessel costs (itemize at lines 15-17) | |
| 16 | ||
| 17 | ||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 |
| 19 | Protection and indemnity premia | |
| 20 | Protection and indemnity deductibles paid | |
| 21 | Hull and machinery premia | |
| 22 | Hull and machinery deductibles paid | |
| 23 | Other insurance costs (itemize at lines 23-25) | |
| 24 | ||
| 25 | ||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 |
| 27 | Other (itemize at lines 27-30) | |
| 28 | ||
| 29 | ||
| 30 | ||
| 31 | General and administrative expenses | |
| 32 | Profit |
33 Total daily costs from above multiplied by ( c ) $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 5
| Attachment B | Vessel: | ||
| Basic Pricing Data | RFP: N32205-20-R-4052 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon 46-day option | |||
| Option Period Five | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by ( c ) $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
File details come from the government source that posted it. Updated .