Q and A N6449820R4044 6.12.10.pdf
PDF 193 KB Posted
- Solicitation number
- 20-MFF-074
About this file
This document is a combined synopsis and solicitation requesting quotes for access control personnel services at Naval Surface Warfare Center buildings in Philadelphia. The required services include providing access control professionals at 12 posts across multiple buildings from 5:00 AM to 4:30 PM Monday through Friday, as well as 24/7 coverage at Building 633. The performance period is from October 1, 2020 to September 30, 2023. Quotes are due by July 9, 2020 and the award will be made to the lowest price technically acceptable offer. This is an 8(a) small business set-aside. The incumbent contractor is Windwalker Group, LLC. Evaluation criteria include staffing and management approach, past performance, and cost. The place of performance is the Naval Surface Warfare Center in Philadelphia.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A N6449820R4044 6.25.20.pdf | ||
| Appendix B CBA Windwalker ACPs.pdf | ||
| N6449820R4044 0002.pdf | ||
| N6449820R4044 0001.pdf | ||
| N6449820R404400001.pdf | ||
| Navy Yard Philly Map.pdf | ||
| DD Form 254 - ACPs 20R4044.pdf | ||
| DOL Wage Determination ACPS.pdf | ||
| N6449820R4044.pdf | ||
| ACP CDRLS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6449820R4044 – QUESTIONS AND ANSWERS
Q1. Is an incumbent contract or contractor associated to the requirement?
A1. Incumbent: N64498-17-C-0018, Windwalker Group, LLC, Q2. Page 93. L.2.1 PAGE NUMBERS AND LIMITS, Paragraph 3: The RFP states that resumes are not included in the page limits; however, there are no specific requirements to include resumes as part of the submission. Can the government please clarify?
A2. Resumes are not required. “f. Resumes” shall be deleted from Section L.2.1 of the solicitation by
Amendment 1 of the solicitation.
Q3. Page 35, 1.2.1-1.2.2:, 1.2.5-1.2.6: The scope of work lists the number of post across the buildings
(12 posts total) and states, “Access control professionals are required for Buildings 4, 77L, 77H, 29, and
1000 for all workdays(Monday through Friday) from 5:00 AM to 4:30 PM, except for Federal Holidays.
Three (3) access control professionals are required for Building 633, 7 days per week/24 hours a day, including Federal Holidays. The requirement for 5AM-4:30PM spans 11.5 hours. Does the government have shift requirements (i.e.: minimum shift times) for the access control professionals? For example,
1.2.6 states that the Access Control Supervisor is required to work 8 hours shifts Monday – Friday. Also,
1.2.5 states ”At the top of every hour for 15 minutes, the Access Control Personnel are required to leave their assigned post and ensure that all doors and entryways remain closed and are properly secured, in accordance with the post orders, when not in use by building patrons.” Does this require a minimum of 2 personnel for each post location? Or would the post be unmanned during these times? Can the government please provide some additional information on expectations for coverage?
A3. There are no shift requirements for ACPs. The contractor determines how to man each post, including the 24/7 posts in Bldg. 633, during the times listed in the SOW. During the 15-minute period at the top of every hour, the contractor will not be required to cover the assigned post while ACP performs perimeter checks.
Q4. Page 36, 1.2.7: Can the government provide a map for the location of the posts as well as parking locations that contractors are allowed to park in?
A4. Contractors are not authorized to park in government parking lots however; there is street parking on the Navy Yard. Attached is a map of the Navy Yard with buildings numbers.
Q5. Will there be right of first refusal for incumbent personnel?
A5. Yes
Q6. Does the Government intend to keep key personnel from the incumbent for continuity?
A6. The contractor shall perform in Accordance with the Statement of Work, Section C.
Q7. Is a transition plan required?
A7. No, Contractor should propose in accordance with Section L of the Solicitation. Offers will be evaluated in accordance with Section M of the solicitation.
Q8. Does the wage determination rate for the Access Control Personnel of $19.98 include health and wellness?
A8. No.