N6449820R4044 0001.pdf
PDF 140 KB Posted
- Solicitation number
- 20-MFF-074
About this file
This document is a combined synopsis and solicitation for access control personnel services at Naval Surface Warfare Center buildings in Philadelphia. The Naval Surface Warfare Center Philadelphia Division seeks quotes to provide access control personnel to aid in emergency reporting and provide directions and information assistance to employees and visitors at buildings on the Navy Yard campus. The period of performance under contract is from October 1, 2020 to September 30, 2023. Quotes are due by July 9, 2020 and award will be made to the lowest price technically acceptable offer. The solicitation is set aside for 8(a) small businesses and has a NAICS code of 561612. Evaluation criteria include staffing approach, past performance, and cost. The incumbent contractor is Windwalker Group, LLC and there is a right of first refusal for keeping incumbent personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A N6449820R4044 6.25.20.pdf | ||
| Appendix B CBA Windwalker ACPs.pdf | ||
| N6449820R4044 0002.pdf | ||
| N6449820R404400001.pdf | ||
| Navy Yard Philly Map.pdf | ||
| Q and A N6449820R4044 6.12.10.pdf | ||
| DD Form 254 - ACPs 20R4044.pdf | ||
| DOL Wage Determination ACPS.pdf | ||
| N6449820R4044.pdf | ||
| ACP CDRLS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Questions and Answ ers to the Solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6449820R4044
X 9B. DATED (SEE ITEM 11)
08-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jun-2020
CODE
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0232, MAUREEN FAUSKE
215-897-1894, MAUREEN.FAUSKE@NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
N64498 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6449820R4044
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
N6449820R4044 – QUESTIONS AND ANSWERS
Q1. Is an incumbent contract or contractor associated to the requirement?
A1. Incumbent: N64498-17-C-0018, Windwalker Group, LLC, Q2. Page 93. L.2.1 PAGE NUMBERS AND LIMITS, Paragraph 3: The RFP states that resumes are not included in the page limits; however, there are no specific requirements to include resumes as part of the submission. Can the government please clarify?
A2. Resumes are not required. “f. Resumes” shall be deleted from Section L.2.1 of the solicitation by Amendment 1 of the solicitation.
Q3. Page 35, 1.2.1-1.2.2:, 1.2.5-1.2.6: The scope of work lists the number of post across the buildings (12 posts total) and states, “Access control professionals are required for Buildings 4, 77L, 77H, 29, and 1000 for all workdays(Monday through Friday) from 5:00 AM to 4:30 PM, except for Federal Holidays. Three (3) access control professionals are required for Building 633, 7 days per week/24 hours a day, including Federal Holidays. The requirement for 5AM-4:30PM spans 11.5 hours. Does the government have shift requirements (i.e.: minimum shift times) for the access control professionals? For example, 1.2.6 states that the Access Control Supervisor is required to work 8 hours shifts Monday – Friday. Also, 1.2.5 states ”At the top of every hour for 15 minutes, the Access Control Personnel are required to leave their assigned post and ensure that all doors and entryways remain closed and are properly secured, in accordance with the post orders, when not in use by building patrons.” Does this require a minimum of 2 personnel for each post location? Or would the post be unmanned during these times? Can the government please provide some additional information on expectations for coverage?
A3. There are no shift requirements for ACPs. The contractor determines how to man each post, including the 24/7 posts in Bldg. 633, during the times listed in the SOW. During the 15-minute period at the top of every hour, the contractor will not be required to cover the assigned post while ACP performs perimeter checks.
Q4. Page 36, 1.2.7: Can the government provide a map for the location of the posts as well as parking locations that contractors are allowed to park in?
A4. Contractors are not authorized to park in government parking lots however; there is street parking on the Navy Yard. Attached is a map of the Navy Yard with buildings numbers.
Q5. Will there be right of first refusal for incumbent personnel?
A5. Yes
Q6. Does the Government intend to keep key personnel from the incumbent for continuity?
A6. The contractor shall perform in Accordance with the Statement of Work, Section C.
N6449820R4044
Q7. Is a transition plan required?
A7. No, Contractor should propose in accordance with Section L of the Solicitation. Offers will be evaluated in accordance with Section M of the solicitation.
Q8. Does the wage determination rate for the Access Control Personnel of $19.98 include health and wellness?
A8. No.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .