Addendum No. 1 to the Sunshine Park Trails Expansion Contract
This is Addendum No. 1 issued by the City of Roseburg Public Works Department on January 16, 2026, modifying the contract documents for the Sunshine Park Trails Expansion Project No. 20GR21 originally dated January 5, 2026. The project involves constructing multiple trail systems within Sunshine Park in Roseburg, Oregon, across seven trails classified as Universal Access (Trail 5), Beginner Class 2 (Trails 1, 2, 4, 6, and 7), and Blue Flow Class 3 (Trail 3). Addendum No. 1 implements significant scope modifications including the removal of erosion control and seeding bid items, reclassification of Trail 7 from Universal Access to Beginner Class 2 with excavation type changes, and consolidation of surfacing and compaction bid items into a single alternate bid schedule. The project includes excavation with estimated quantities ranging from 500 to 4,600 linear feet across various trails, installation of two culvert crossings (30" x 31' and 18" x 17'), armoring at 150 linear feet, and in-sloped turns totaling 20 installations. All construction-related work must be completed by June 30, 2026, with the Notice to Proceed anticipated in mid-March 2026. Bidders were required to acknowledge receipt of this addendum on the revised bid form or face potential disqualification.
The bid schedule is divided into Schedule A (Base Bid) covering all onsite trail work to achieve functional status and Schedule B (Alternate Bid) for optional surfacing and compaction of Beginner and Blue Flow trails at 53,400 square feet. Excavation pricing is now specified on a linear feet basis, with Type 2 excavation including clearing, grubbing of 8-foot clearing limits, grading, and compaction of native trail tread to maintain beginner trail classification with 2 percent outslope or crown. Surfacing and Compaction Type 1 requires placement of 3-inch lifts of 1.5-inch minus and additional minus crushed aggregate at minimum 5-foot width, while the alternate Schedule B specifies 1.5-inch lift of 1-inch minus crushed aggregate compacted with native base on a square feet basis. Earthwork specifications restrict compaction equipment to vibratory types with smooth drums or tamping plates not exceeding 52 inches in width, with an absolute prohibition on heavy equipment use within 300 feet of the cemetery. The project is subject to Oregon Prevailing Wage Law and Federal Davis-Bacon Act requirements, with workers compensated at the higher applicable rate. Contractors must comply with Workers' Compensation coverage requirements, employee drug testing programs, timely progress payment provisions, and Public Works Bond filing of $30,000 with the Construction Contractors Board. Liquidated damages are assessed at $150 per day for delays beyond June 30, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Roseburg Public Works Department – Engineering Division 900 SE Douglas Avenue Roseburg, Oregon 97470
(541) 492-6730
ADDENDUM No. 1
TO THE
CONTRACT DOCUMENTS FOR CONSTRUCTION OF
SUNSHINE PARK TRAILS EXPANSION
PROJECT # 20GR21
THIS ADDENDUM IS HEREBY MADE A PART OF THE CONTRACT DOCUMENTS DATED
JANUARY 5, 2026, TO THE SAME EXTENT AS THOUGH IT WERE ORIGINALLY
INCLUDED THEREIN.
ISSUED THIS 16TH DAY OF JANUARY, 2026.
Project# 20GR21 Addendum No. 1
NOTICE TO ALL BIDDERS AND PLAN HOLDER
This addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated January 5, 2026 as noted below. Acknowledge receipt of this addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
Bid Form
Replace Bid Form with attached revised bid form.
Summary of Changes
• Erosion control and seeding bid item was removed
• All bid items of surfacing and compaction Type 2 for all beginner (Class 2) and blue flow (Class 3) trails was removed from Schedule A and combined into one item in Schedule B to be an alternate bid.
• Trail 7 was reclassified from Universal Access to Beginner (Class 2).
• Trail 7 excavation type changed from Type 1 to Type 2.
• Removed the elapse time of 90 calendar day from section 10 of the bid form.
SPECIFICATIONS
SECTION 00190.15 - Payment Summary
3. Erosion Control and Seeding:
Remove Erosion Control and Seeding
(Seeding will be completed by the City of Roseburg post trail construction.)
5. Excavation:
Replace Excavation Type 2 in its entirety with the following:
“Paid on linear feet (LF) basis. Includes clearing and grubbing of 8 feet of clearing limit, earthwork, grading native material and compacting native trail tread to meet beginner trail classification and to be 2% out sloped or 2% crown where it is deemed applicable by contractor to maintain proper drainage.”
Replace Excavation Type 3 in its entirety with the following:
“Paid on linear feet (LF) basis. Includes clearing and grubbing of 8 feet of clearing limit, earthwork, grading native material and compacting native trail tread to meet blue flow (Class 3) trail classification and to be 2% out sloped or 2% crown where it is deemed applicable by contractor to maintain proper drainage.”
6. Surfacing and Compaction:
Replace Surfacing and Compaction Type 1 in its entirety with the following:
“Paid on linear feet (LF) basis. Includes placement of 3-inch lift of 1.5-inch minus crushed aggregate and 3-inch lift of ¾” minus crushed aggregate at a minimum of 5 feet wide and compacted. All material supplied by contractor.”
All Beginner (Class 2) and Blue Flow (Class 3) trails will remain compacted native unless awarded Schedule B – Bid Alternate.
Schedule B – Bid Alternate Replace Surfacing and Compaction Type 2 in its entirety with the following:
“Paid on square feet (SF) basis. Includes placement of 1.5-inch lift of 1-inch minus crushed aggregate compacted together with native base. All aggregate material supplied by contractor.”
SECTION 00330 - Earthwork
Replace this section in its entirety with the following:
“Comply with Section 00330 of the Standard Specifications with the following modifications and additions:
• Equipment for compaction must be of vibratory nature with smooth drum or taming plate and may not exceed 52 inches in width
• Equipment may not exceed 52 inches in width for all areas of the project except:
▪ Do not use heavy equipment for digging, trenching, or compacting within 300ft buffer of the cemetery as indicated in the plan set.”
DRAWINGS
Summary of Changes
Sheet C1:
• Changed site note #3
• Added proposed staging area
• Added equipment access points
• Changed classification of trail 7 from universal access to beginner
(class 2)
Sheet C2:
• Added proposed staging area
• Added equipment access point
• Changed classification of trail 7 from universal access to beginner (class 2)
Sheet C3:
• Changed construction note #9
• Added equipment access point
• Changed classification of trail 7 from universal access to beginner (class 2)
Sheet D1:
• Removed Seeding from Detail 1
• Removed Aggregate from Detail 2
• Replaced Table. See changes below:
o Removed trail 7 from Universal Access.
o Added trail 7 to beginner (class 2).
o Changed Trail surfacing for Beginner (Class 2) and Blue Flow
(Class 3) to be compacted native unless Schedule B – Alternate Bid is selected.
END OF ADDENDUM NO. 1
Audrey Bowers, EIT Project Manager Issued January 16, 2026
Page 13 - (Prevailing Wage Projects)
BID FORM
City of Roseburg 900 SE Douglas Avenue Roseburg, Oregon 97470
The undersigned bidder has carefully examined the Contract Documents for the construction of the
Sunshine Park Trails Expansion
20GR21
referred to in the Invitation to Bid dated January 5, 2026, inviting bids on such Project and also the site of the Project. Bidder will provide all necessary labor, equipment, tools, apparatus and other means of construction, do all the work and furnish all the materials called for by said Contract Documents in the manner prescribed therein to provide a complete Project.
The undersigned bidder understands that the quantities of work as shown herein are approximate only, unless noted otherwise, and are subject to increase or decrease. The bidder offers to perform the work, at the unit price stated in the following schedule, whether the quantities are increased or decreased.
The City of Roseburg reserves the right to Award the Contract to the lowest responsible, responsive bidder whose proposal is in the best interest of the Owner. Contract award will be based on the total construction cost for the Base Bid plus any Bid Schedules. The City reserves the right to accept bids on the entire project, or reduce the size by eliminating bid schedules for budgetary reasons. The bid tabulation is split into two schedules. Schedule A included all onsite work for the trails to be functional. Schedule B includes adding surfacing and compaction for all Beginner (Class 2) and Blue Flow (Class
3) trails.
Schedule A – Base Bid
Item No.
Description Unit* Estimated Quantity
Unit Price (in figures)
Estimated Total Price (in figures)
General
A-1 Mobilization LS 1 $ $
A-2 Temporary signage for trail closure LS 1 $ $
A-3 Construction staking LS 1 $ $
A-4 Armoring LF 150 $ $
Trail 1 – Beginner (Class 2)
A-5 Excavation Type 2 LF 1100 $ $
Trail 2 – Beginner (Class 2)
A-6 Excavation Type 2 LF 4600 $ $
A-7 30” x 31’ Aluminized steel pipe (pipe material supplied by City)
LS 1
Page 14 - (Prevailing Wage Projects)
A-8 18” x 17’ Galvanized metal pipe (pipe material supplied by City)
LS 1
A-9 In-sloped turns EA 10 $ $
Trail 3 – Blue Flow (Class 3)
A-10 Excavation Type 3 LF 3400 $ $
A-11 In-sloped turns EA 6 $ $
Trail 4 – Beginner (Class 2)
A-12 Excavation Type 2 LF 3500 $ $
A-13 In-sloped turns EA 4 $ $
Trail 5 – Universal Access
A-14 Excavation Type 1 LF 1100 $ $
A-15 Surfacing and compaction Type 1 LF 1100 $ $
Trail 6 – Beginner (Class 2)
A-17 Excavation Type 2 LF 500 $ $
Trail 7 – Beginner (Class 2)
A-18 Excavation Type 2 LF 1100 $ $
Schedule A Bid Item Total: $
Schedule B – Alternate Bid
Item No.
Description Unit* Estimated Quantity
Unit Price (in figures)
Estimated Total Price (in figures)
General
B-1 Surfacing and Compaction Type 2 SF 53400 $ $
Schedule B Bid Item Total: $
Abbreviations
LS – Lump Sum CY – Cubic Yard EA – Each
LBS – Pounds LF – Lineal Feet IN – Inches
SY – Square Yard TONS – Tons
BIDS WILL BE EVALUAVYTED ON THE SCHEDULE “A” BASE BID PRICE PLUS ANY
OR ALL OF THE SCEDULES CHOSEN BY THE OWNER.
SCEDULES LISTED IN THE BID FORMS WILL BE REVIEWED AND ACCEPTED OR
REJECTED AT THE OWNERS OPTION. ACCEPTED SCEDULES WILL BE
IDENTIFIED IN THE CONSTRUCTION CONTRACT.
The undersigned also declares and agrees as follows:
1. That the only persons or parties interested in this bid are those named herein, that the bid is in all respects fair and without fraud, and that it is made without any connection or collusion with any person making another bid on this Contract.
Page 15 - (Prevailing Wage Projects)
2. That the bidder, and any subcontractor upon which the bidder is relying, have carefully examined and had an opportunity to comment on, the Contract Documents for the construction of the proposed improvements including a full set of the plans and specifications, including all addenda thereto; that bidder has personally inspected the contemplated construction area or areas; that bidder is satisfied as to the adequacy and completeness of the plans and specifications, the feasibility of the work described therein, quantities of materials, items of equipment and conditions of work involved, including the fact that the description of work and materials as included herein are approximate only; and that this bid is made according to the provisions and under the terms of the Specifications which are hereto attached and hereby made a part of this bid.
3. All of the Specifications and Plans which are listed herein have been examined by the undersigned bidder and the terms and conditions thereof are hereby accepted.
4. It is understood that the Plans may be supplemented by additional Drawings and Specifications in explanation and elaboration of the Plans and it is agreed that such Supplemental Drawings, when not in conflict with those referred to in Paragraph 3 above, will have the same force and effect as if completed and attached hereto, and that when received, will be considered a part of the Contract Documents.
5. It is understood that all work will be performed under the price schedule outlined herein and that all services, materials, labor and equipment and all work necessary to complete the Project in accordance with the Plans and Specifications shall be furnished for the prices named in the bid. If there is a change in the scope of work or work which cannot be properly classified under the price schedule, then bidder agrees to do this work as "extra work". The undersigned bidder agrees to do any extra work and furnish materials, and to accept as full compensation therefore at such prices as may be agreed upon in writing by the City and the Contractor before extra work begins. Each party binds itself to agree to reasonable prices.
6. It is understood the work to be performed must meet the highest standards prevalent in the industry or business most closely related to the work to be performed. It is further understood that failure to meet such standards may result in consequences including, but not limited to, a reduction or withholding of payment; a requirement that bidder perform, at bidder’s own expense, additional work required to meet such standards; or termination of the contract, with damages being sought.
7. The bidder agrees that if this bid is accepted, the bidder will, within ten (10) calendar days after the notification of acceptance, execute the Construction Contract with the City in the form of Contract specified, and will, at the time of execution of the Contract, deliver to the City the Performance Bond, Payment Bond and Public Works Bond Filing Certification form as required herein, and will furnish
Page 16 - (Prevailing Wage Projects) all the materials necessary to complete the Project in the manner, in the time and according to methods as specified in the Specifications and required by the City.
8. The cash, certified check, cashier's check, irrevocable letter of credit or Bid Bond shall be payable to the City to the extent of 10% of the amount of the bid in case this bid is accepted by the City and the undersigned shall fail or refuse to execute the Contract and furnish a Payment Bond, a Performance Bond or the Public Works Bond Filing Certification form as required by the Specifications within the time limit named therein after notification that said bid is accepted, all in accordance with the provisions of this bid and the Plans and Specifications which are a part hereof.
9. All items for the Contract for which forms are provided herein have been completed in full by the showing of prices for each and every item thereof, and for the showing of other information indicated by the Bid Form.
10. The Contractor shall complete all construction related work on the Sunshine Park Trails Expansion Project under this contract before the elapse time of June 30, 2026. Construction related work defining the start of Contract includes mobilization, excavation, grading, surfacing, installation of culvert crossings, restorations, or any trail building activities. The Notice to Proceed is anticipated to be issued in mid-March 2026.
11. In the event the bidder is awarded the Contract and fails to complete the Project within the time limit or extended time agreed upon, as more specifically set forth in the General Conditions, liquidated damages shall be paid to or withheld by the City pursuant to Paragraph 4 of the Construction Contract (Time of Performance - Liquidated Damages) at the rate of one hundred and fifty Dollars ($150) per day, until the Project has been completed as provided in the General Conditions.
12. The undersigned bidder hereby states, as part of this bid, that the applicable provisions of Oregon’s Prevailing Wage Law (ORS 279C.800 to 279C.870) and the Federal Prevailing Wage Law (Davis-Bacon Act, 40 U.S.C. 3141-3148), shall be complied with. When the Project is subject to both the State and Federal Prevailing Wage Laws and rates, workers in each trade will be paid the higher of the two rates.
13. The undersigned bidder and bidder's subcontractors shall comply with ORS 656.017, which requires them to provide Workers' Compensation coverage for all their subject workers.
14. The undersigned bidder hereby states, as part of this bid, that bidder shall comply with ORS 279C.505(2) which requires bidder to have an employee drug testing program in place.
Page 17 - (Prevailing Wage Projects)
15. The undersigned bidder and bidders’ subcontractors shall comply with ORS 279C.570 and 279C.580, which require timely progress payments for public improvement projects and provide interest penalties for late payment.
16. The undersigned bidder hereby states, as part of this bid, bidder and bidder's subcontractors shall comply with the provisions of Exhibit "A" - "Standard City Contract Provisions".
17. If applicable pursuant to Section 11 of “Information for Bidders”, the undersigned bidder hereby states, as part of this bid, that bidder has completed pay equity compliance training and received a certificate of completion from the Oregon Department of Administrative Services.
18. If the bidder is awarded the Contract for this work, the name and address of the Surety who will provide the Payment Bond, Performance Bond and Public Works Bond (if required) will be: ___________________________________.
19. The name and address of the bidder who is submitting this bid is:
___________________________________________________, which is the address to which all communications pertinent to this bid and the Contract shall be sent. The bidder’s email address is: ___________________________________.
20. The names of the principal officers of the corporation submitting this bid or of the partnership, or of all parties interested in this bid as principals are as follows:
21. The undersigned bidder acknowledges that Addenda No. _____ through ______ have been delivered to bidder and have been examined as part of the Contract Documents.
22. In the prosecution of this work, the bidder proposes to use the subcontractors listed on the First-Tier Subcontractor Disclosure Form presented within two working hours of the bid submission deadline as set forth in the Invitation to Bid. Any bidder not using subcontractors subject to the above referenced Disclosure Form shall indicate “NONE” on the Disclosure Form and sign and submit the form as required.
23. Declaration of Residency: I "am" or "am not" (circle one) a "resident bidder"* as defined by ORS 279A.120, a contractor that has paid unemployment taxes or income taxes in Oregon during the 12 calendar months immediately preceding submission of the bid, has a business address in this state and has stated in the bid whether the bidder is a "resident bidder" pursuant to ORS 279A.120.
24. The bidder's Construction Contractors Board License Number or Landscape Contractors Board License Number is: ________________.
Page 18 - (Prevailing Wage Projects)
25. Bidder’s Tax Identification Number: .
Email:____________________.
26. Public Works Bond: If the bid is accepted, prior to beginning work on the project, the bidder will file with the Construction Contractors Board, a Public Works Bond in the amount of $30,000 with a corporate surety authorized to do business in the State of Oregon; and before permitting a subcontractor to begin work on the project, the bidder will verify that the subcontractor has also filed the aforementioned bond. If the bidder, as a certified disadvantaged, minority, women or emerging small business enterprise, elects not to file the Public Works Bond, bidder will file written verification of such certification with the Construction Contractors Board and provide the Board and the City of Roseburg with notice of such election.
If sole Proprietor or Partnership:
In witness hereto, the undersigned as set his/her hand this __________ day of _____________, 2026.
Printed name of bidder:_______________ __ Signature of bidder:
Title:_________________________________ If Corporation:
In witness whereof, the undersigned corporation has caused this instrument to be executed and its seal affixed by its duly authorized officers this ____ day of _________________, 2026.
Name of Corporation:_______________ ______________________
Printed name of person signing:_______ ___________________________________
Signature:_____________________________
Title:_____________________________ ____
Attest:________________________________ Secretary
LINE IS 1 INCH
AT FULL SCALE
DESIGNED: DRAWN: REVISIONS
IF NOT 1-INCH - SCALE ACCORDINGLY
DRAWING NO.
SHEET NO.
OF
DATE
PROJECT NO.
CITY OF ROSEBURG
Public Works Department
900 SE Douglas Ave.
Roseburg OR 97470
SUNSHINE PARK TRAILS
6SITE PLAN
EXPANSION
C1
JAN 2026
20GR21AB
CONSTRUCTION
SITE NOTESNO.
DIAMOND LAKE BOULEVARD
SU
N
SH
IN
E R
O A
D
C
EM
ET
A
R Y
NORDIC VENEER
WETLAND
PARK BOUNDARY
PA
R
K B
O U
N D
A R
Y
PARKING LOT
PARK BOUNDARY
PARK BOUNDARY
PARK BOUNDARY
PARK BOUNDARY
PARK BOUNDARY
EX
IS
TI
NG
EX
IS
TI
NG
TRAIL
TR
A
IL
AutoCAD SHX Text
TRAIL 1
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
TRAIL 5
AutoCAD SHX Text
TRAIL 7
AutoCAD SHX Text
TRAIL 4
AutoCAD SHX Text
TRAIL 6
AutoCAD SHX Text
TRAIL 3
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
TRAIL 4
AutoCAD SHX Text
TRAIL 4
AutoCAD SHX Text
TRAIL 4
AutoCAD SHX Text
TRAIL 4
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
REV#
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text N
AutoCAD SHX Text
%%U PLAN SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING TRAILS TO REMAIN
AutoCAD SHX Text
NO TRAILS WITHIN 100 FT BUFFER
AutoCAD SHX Text DO NOT USE HEAVY EQUIPMENT FOR DIGGING, TRENCHING, OR COMPACTING WITHIN 300 FT BUFFER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GAZEBO
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND UNIVERSAL ACCESS TRAIL BEGINNER (CLASS 2) BLUE FLOW (CLASS 3) ADDENDUM #1
AutoCAD SHX Text
AutoCAD SHX Text
PROPOSED STAGING AREA
AutoCAD SHX Text
GATED EQUIPMENT ACCESS
AutoCAD SHX Text
AutoCAD SHX Text
DESIGNED: DRAWN: REVISIONS
IF NOT 1-INCH - SCALE ACCORDINGLY
DRAWING NO.
SHEET NO.
OF
DATE
PROJECT NO.
CITY OF ROSEBURG
Public Works Department
900 SE Douglas Ave.
Roseburg OR 97470
SUNSHINE PARK TRAILS
6TOPOGRAPHY- WEST SIDE
EXPANSION
C2
JAN 2026
20GR21AB
CONSTRUCTION
CONSTRUCTION NOTESNO.
EXISTING CREEK
WETLAND
PARKING LOT
PARK BOUNDARY
PARK BOUNDARY
PARK BOUNDARY
PARK BOUNDARY
PA
R
K B
O U
N D
A R
Y
SU
N
SH
IN
E R
O A
D
NORDIC VENEER
AutoCAD SHX Text
TRAIL 1
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
TRAIL 5
AutoCAD SHX Text
TRAIL 7
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
REV#
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text N
AutoCAD SHX Text
%%U PLAN SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCT UNIVERSAL ACCESS TRAIL. REFER TO TABLE ON SHEET D1
AutoCAD SHX Text
CONSTRUCT BEGINNER (CLASS 2) TRAIL. REFER TO TABLE ON SHEET D1.
AutoCAD SHX Text
CONSTRUCT BLUE FLOW (CLASS 3) TRAIL. REFER TO TABLE ON SHEET D1.
AutoCAD SHX Text
EXISTING BRIDGE TO REMAIN. DO NOT DISTURB
AutoCAD SHX Text
TRAILHEAD/HUB LOCATIONS
AutoCAD SHX Text
NO TRAIL WITHIN 100 FT BUFFER
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND UNIVERSAL ACCESS TRAIL BEGINNER (CLASS 2) ADDENDUM #1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCT IN-SLOPED TURN. REFER TO DETAIL 1 ON SHEET D.
AutoCAD SHX Text
CONSTRUCT TRAIL ARMORING. REFER TO DETAIL 2 ON SHEET D2.
AutoCAD SHX Text
30LF ARMORING
AutoCAD SHX Text
AutoCAD SHX Text
30LF ARMORING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROPOSED STAGING AREA
AutoCAD SHX Text
GATED EQUIPMENT ACCESS
AutoCAD SHX Text
DESIGNED: DRAWN: REVISIONS
IF NOT 1-INCH - SCALE ACCORDINGLY
DRAWING NO.
SHEET NO.
OF
DATE
PROJECT NO.
CITY OF ROSEBURG
Public Works Department
900 SE Douglas Ave.
Roseburg OR 97470
SUNSHINE PARK TRAILS
6TOPOGRAPHY - EAST SIDE
EXPANSION
C3
JAN 2026
20GR21AB
GENERAL
CONSTRUCTION NOTESNO.
WETLAND
PARK BOUNDARY
PARK BOUNDARY
PA
R
K B
O U
N D
A R
Y
PARK BOUNDARY
PARK BOUNDARY
C
EM
ET
A
R Y
AutoCAD SHX Text
TRAIL 4
AutoCAD SHX Text
TRAIL 6
AutoCAD SHX Text
TRAIL 3
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TRAIL 4
AutoCAD SHX Text
TRAIL 4
AutoCAD SHX Text
TRAIL 4
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
TRAIL 2
AutoCAD SHX Text
REV#
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text N
AutoCAD SHX Text
%%U PLAN SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCT BEGINNER (CLASS 2) TRAIL. REFER TO TABLE ON SHEET D1.
AutoCAD SHX Text
CONSTRUCT BLUE FLOW (CLASS 3) TRAIL. REFER TO TABLE ON SHEET D1.
AutoCAD SHX Text
EXISTING BRIDGE TO REMAIN.
AutoCAD SHX Text
CONSTRUCT TRAIL ARMORING. REFER TO DETAIL 2 ON SHEET D2.
AutoCAD SHX Text
CONSTRUCT CULVERT CROSSING REFER TO DETAIL 1 ON SHEET D2.
AutoCAD SHX Text
TRAILHEAD/HUB LOCATIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NO TRAIL WITHIN 100 FT BUFFER
AutoCAD SHX Text DO NOT USE HEAVY EQUIPMENT FOR DIGGING, TRENCHING, OR COMPACTING WITHIN 300 FT BUFFER
AutoCAD SHX Text
30LF ARMORING
AutoCAD SHX Text
AutoCAD SHX Text
30LF ARMORING
AutoCAD SHX Text
AutoCAD SHX Text
30LF ARMORING
AutoCAD SHX Text
AutoCAD SHX Text
30" X 31' CULVERT
AutoCAD SHX Text
AutoCAD SHX Text
18" X 17' CULVERT
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND UNIVERSAL ACCESS TRAIL BEGINNER (CLASS 2) BLUE FLOW (CLASS 3) ADDENDUM #1
AutoCAD SHX Text
CONSTRUCT UNIVERSAL ACCESS TRAIL. REFER TO TABLE ON SHEET D1.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCT IN-SLOPED TURN. REFER TO DETAIL 1 ON SHEET D.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
30LF ARMORING
AutoCAD SHX Text
AutoCAD SHX Text
30LF ARMORING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GATED EQUIPMENT ACCESS
DESIGNED: DRAWN: REVISIONS
IF NOT 1-INCH - SCALE ACCORDINGLY
DRAWING NO.
SHEET NO.
OF
DATE
PROJECT NO.
CITY OF ROSEBURG
Public Works Department
900 SE Douglas Ave.
Roseburg OR 97470
SUNSHINE PARK TRAILS
6TRAIL SECTIONS
EXPANSION
D1
JAN 2026
20GR21AB
DETAIL
D1
1 IN-SLOPED TURN TYPICAL
D1
2 TYPICAL TRAIL SECTION
AutoCAD SHX Text
REV#
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
SCALE: NTS
LEGEND ADDENDUM #1
| addendum 1 plans.pdf |
| Sheets and Views |
| addendum 1 plans-SITE PLAN |
| addendum 1 plans-TOPOGRAPHY - WEST SIDE |
| addendum 1 plans-TOPOGRAPHY - EAST SIDE |
| addendum 1 plans-TRAIL DETAILS |
File details come from the government source that posted it. Updated .