6. Task Order Pricing Table.pdf
PDF 159 KB Posted
- Attached to
- General Construction Services MATOC for BEP Western Currency Facilities Federal contract opportunity
- Solicitation number
- 2031ZA24B00011
About this file
This document contains a task order pricing table and related federal contract opportunity for general construction services. The task order pricing table provides a template for pricing a task order to replace twenty-one air handlers at the Bureau of Engraving and Printing's Western Currency Facility in Fort Worth, Texas. It includes line items for direct materials, labor, equipment, overhead costs, profit, bonding, and total cost. The related federal contract opportunity is a Multiple Award Task Order Contract solicitation for general construction services at the Western Currency Facility with a total ceiling of $70 million. The solicitation sets aside the opportunity for small businesses and notes that a task order for the air handler refurbishment project will be awarded to a single offeror. It provides relevant dates for site visits, question deadlines, and proposal submissions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation 2031ZA24B00011 0002.pdf | ||
| 12. Questions and Answers.pdf | ||
| 13. 100%_Specifications.pdf | ||
| 14. Updated Drawings Package.pdf | ||
| Solicitation 2031ZA24B00011 0001.pdf | ||
| Solicitation 2031ZA24B00011.pdf | ||
| 11. List of Air Handler Units Requiring Replacement.pdf | ||
| 10. Questions and Answers - MATOC Site Visit.pdf | ||
| Solicitation 2031ZA24B00011.pdf | ||
| 9. Air Handler Refurbishment (Phase 4) Photos.pdf | ||
| 8. Attendance Record - Site Visit.pdf | ||
| 7. Air Handler Refurbishment (Phase 4) Drawings.pdf | ||
| Solicitation 2031ZA24B00011.pdf | ||
| 1. Past Performance Questionaire.docx | DOCX document | |
| 4. SOW - Task Order - Air Handler Refurbishment (Phase 4).pdf | ||
| 2. Davis-Bacon Wage Determination.pdf | ||
| 3. SOW - General Construction IDIQ.pdf | ||
| 5. IDIQ Pricing Table.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL FOR TASK ORDER CONTRACT
DATE:
CONTRACT TITLE: CONTRACT NO:
TASK ORDER NO:
OFFICE:
DESCRIPTION OF WORK:
PRIME CONTRACTOR'S WORK Revisions/Comments 1 Direct Materials 2 Sales Tax on Materials 0% of line 1 0% 3 Direct Labor 4 Insurance, Taxes, & Fringe Benefits 0% of line 3 0% 5 Rental Equipment 6 Sales Tax on Rental Equipment 0% of line 5 0% 7 Equipment Ownership 8 SUBTOTAL Add lines 1-7 9 Field Overhead 0% of line 8 0%
10 SUBTOTAL Add lines 8 & 9 Prime Remarks:
SUB-CONTRACTOR'S WORK Revisions/Comments 11 Direct Materials 12 Sales Tax on Materials 0% of line 11 0% 13 Direct Labor 14 Insurance, Taxes, & Fringe Benefits 0% of line 13 0% 15 Rental Equipment 16 Sales Tax on Rental Equipment 0% of line 15 0% 17 Equipment Ownership 18 SUBTOTAL add lines 11-17 19 Field Overhead 0% of line 18 0% 20 SUBTOTAL add lines 18 & 19 21 Home Office Overhead 0% of line 20 0% 22 Profit 0% of line 20 0% 23 SUBTOTAL Add lines 20 - 22
Sub Remarks:
24 Prime Contractor's Work from line 10 25 Sub-contractor's Work from line 23 26 SUBTOTAL add lines 24 & 25 27 Prime Overhead on sub-contractor 0% of line 25 0% 28 Prime's Home Office Overhead 0% of line 24 0% 29 Prime's Profit 0% of line 26 0% 30 SUBTOTAL add lines 26 - 29 31 Prime Contractor's Bond Premium % of line 30 % #VALUE!
32 TOTAL COST add lines 30 & 31 #VALUE!
Estimate time extension and justifications:
Prime Contractor name:
Sub-contractor name:
Signature & Title of preparer: Date
WCF Air Handler Refurbishments, Phase 4
Western Currency Facility (WCF)
Provide all expertise, labor, tools, materials, equipment, and supervision necessary to replace twenty one (21) AHUs , fully reintegrating them with existing WCF systems.
BREAKDOWN OF DIRECT COSTS Contract No. Date:
Task Order No.
ITEMS OF WORK FOR QTY UNIT MATERIAL LABOR R EQUIPMENT
Prime Contractor Unit Cost Total Cost Unit Cost Total Cost O Days Rate Total
DIRECT Prime Contractor's TOTALS R Total (Rental) O Total (Owned)
ITEMS OF WORK FOR QTY UNIT MATERIAL LABOR R EQUIPMENT
Sub-Contractor Unit Cost Total Cost Unit Cost Total Cost O Days Rate Total
Construction Contractor
R Total (Rental) O Total (Owned)