10. Questions and Answers - MATOC Site Visit.pdf
PDF 51 KB Posted
- Attached to
- General Construction Services MATOC for BEP Western Currency Facilities Federal contract opportunity
- Solicitation number
- 2031ZA24B00011
About this file
This document contains Questions and Answers from a site visit related to a Multiple Award Task Order Contract (MATOC) for General Construction Services at the Bureau of Engraving and Printing's Western Currency Facility in Fort Worth, TX. The MATOC has a $70,000,000 ceiling and is a total small business set-aside under NAICS 236220 with a $45.0M size standard. The questions cover details such as the availability of the freight elevator, receipt of revised drawings, the minimum guarantee for each awardee, how the work will be competed among the 3 awardees, and requirements for superintendent, QC, and safety personnel. The solicitation has a site visit on March 18, 2024, with questions due by April 07, 2024 and offers due by April 21, 2024. A single award for an Air Handler Refurbishment task order will also be made under this MATOC.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation 2031ZA24B00011 0002.pdf | ||
| 14. Updated Drawings Package.pdf | ||
| 12. Questions and Answers.pdf | ||
| 13. 100%_Specifications.pdf | ||
| Solicitation 2031ZA24B00011 0001.pdf | ||
| Solicitation 2031ZA24B00011.pdf | ||
| 11. List of Air Handler Units Requiring Replacement.pdf | ||
| Solicitation 2031ZA24B00011.pdf | ||
| 9. Air Handler Refurbishment (Phase 4) Photos.pdf | ||
| 8. Attendance Record - Site Visit.pdf | ||
| 7. Air Handler Refurbishment (Phase 4) Drawings.pdf | ||
| Solicitation 2031ZA24B00011.pdf | ||
| 1. Past Performance Questionaire.docx | DOCX document | |
| 4. SOW - Task Order - Air Handler Refurbishment (Phase 4).pdf | ||
| 6. Task Order Pricing Table.pdf | ||
| 2. Davis-Bacon Wage Determination.pdf | ||
| 3. SOW - General Construction IDIQ.pdf | ||
| 5. IDIQ Pricing Table.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers from MATOC Site Visit
Q1. - Will we be able to use the freight elevator?
A1. - The freight elevator will be available for the contractor to use. BEP operations will have priority in the event of a conflict in schedules.
Q2. - Some units listed in the plans have been replaced (AHU 50). Will we receive a revised drawing?
A2. – BEP will provide a revised list.
Q3. - What is the minimum guarantee for each awardee?
A3. – $3,000.00
Q4. - How will this be competed between 3 contractors?
A4. – The 3 successful awardees will complete based on price-related factors only.
Q5. – Will BEP allow double hatting/triple hatting – Superintendent, QC, Safety?
A5. – This will depend on the complexity of the task order. Under normal circumstances the QC and Safety can be double hatted. Triple hatting is not allowed.
Q6. - Electric room S142. Where is it and what is going in there?
A6. – Main switchgear room. Substations and generators.
Q7. - When is final day to submit RFI’s?
A7. - April 08, 2024 by 12:00 noon EST.
Q8. – what is the planned timeline after RFI submission?
A8. – Scheduled for a 30-day review with planned award in July 2024.
Q9. - Will the MATOC have onboarding and offboarding?
A9. – No.