Attachment J4 - 0008 - Initial Task Order - Data Network Support.pdf
PDF 195 KB Posted
- Attached to
- IT Operational Support Services IDIQ
- Solicitation number
- 2026-CIO-0044
- Issued by
-
Library of Congress
About this file
This is a Firm Fixed Price (FFP) Initial Order for Data Network Support issued under an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with the Library of Congress. The contract requires comprehensive data network engineering services to support IP data network installation, configuration, maintenance, and management across Library-wide infrastructure. Performance begins with a one-month transition period (August 1-31, 2026), followed by a base year (September 1, 2026 – July 31, 2027) and four option years extending through July 31, 2031. Work is performed onsite at multiple Washington DC Metropolitan area facilities including Madison, Adams, Jefferson, Fort Meade Annex, Culpeper, and other Library locations, with occasional after-hours support (estimated less than four times annually) and limited travel to remote facilities.
The contractor must provide technical support for network infrastructure monitoring, incident response, and project-based engineering work estimated at 60% reactive support and 40% project-based support. Key responsibilities include monitoring network health using Cisco Prime and ServiceNow, configuring switches and routers, managing DWDM optical circuits and telecommunication services, and resolving OSI layer 1-3 connectivity issues. Service response and resolution times are governed by a priority matrix ranging from P1 (critical, 15-minute response/4-hour resolution) to P6 (routine, 1-day response/6-month resolution). A Data Network Engineer with minimum 10 years of experience and Cisco CCNA certification (desired) is designated as key personnel. The contractor must deliver weekly reports and quarterly accomplishment reports, develop transition-in and transition-out plans, and operate during Library core business hours (6:30 am – 6:00 pm, Monday-Friday) with capability for emergency response within four hours at Capitol Hill locations. All network equipment and materials are government-furnished; invoices are submitted monthly per Library of Congress instructions.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J4 – 0008 - Initial Order - Data Network Support 04/08/2026
SECTION A – CONTRACT TYPE
This is a Firm Fixed Price (FFP) order issued pursuant to Indefinite Delivery/Indefinite Quantity (IDIQ) contract TBD. All terms and conditions of IDIQ contract TBD shall apply to this order.
SECTION B – PERIOD AND PLACE OF PERFORMANCE
Period of Performance:
Transition Services – August 01, 2026 – August 31, 2026 Base Year – September 01, 2026 – July 31, 2027 Option Year 1 – August 01, 2027 – July 31, 2028 Option Year 2 – August 01, 2028 – July 31, 2029 Option Year 3 – August 01, 2029 – July 31, 2030 Option Year 4 – August 01, 2030 – July 31, 2031
Place of Performance: Work to be performed under this task order shall be completed onsite at one of the facilities in the Washington DC Metropolitan area. Remote work may be authorized by the COR on a case-by-case basis. Travel to remote locations outside of the Washington DC Metropolitan area may be required. For historical context, travel to remote locations has typically occurred two times or less per year.
• Madison
• Adams
• Jefferson
• Fort Meade Annex
• Culpeper
• Alternate Computing Facility
• Child Care Center
• Landover Facilities Annex
• Landover Cabin Branch
• Any other Required Library of Congress Facilities
The day-to-day supervision and direct control over the work performed by on-site contractor personnel will be the sole responsibility of the contractor.
Contractor Travel: Contractor personnel will be required to travel to the Library of Congress locations below during the performance of the contract to attend meetings, conferences, and training, and to address outages and maintenance of networking infrastructure equipment. Travel to the Library of Congress locations may be required periodically and travel to other Library remote offices and facilities, such as DC4, may be required sometimes by business need for the performance of this contract. However, all of the locations that the contractor will be required to travel to are provided below. Travel expenses will not be reimbursed separately. All travel requires written authorization by the COR in advance of its occurrence. An email will suffice as the COR’s “written authorization.”
Library of Congress Locations:
Library of Congress Madison Building including TOC 101 Independence Ave. SE Washington, DC 20540
Attachment J4 – Initial Order - Data Network Support
DC2
Manassas, VA 20109* *Complete address to be provided at time of award
NAVCC Packard Campus including DC3 Culpeper, VA 22701* *Complete address to be provided at time of award
DC4
Wise, VA 24293* *Complete address to be provided at time of award
Library of Congress Jefferson Building:
10 1st Street SE Washington, DC 20540
Library of Congress Adams Building:
101 Independence Avenue, SE Washington, DC 20540
Cabin Branch:
1505 Cabin Branch Drive Hyattsville, MD 20785
Fort Meade:
100 Montgomery Meigs Road Fort Meade, MD 20755
Little Scholar Child Development Center:
601 East Capitol Street SE Washington, DC 20003
SECTION C – STATEMENT OF WORK
1. Overview The Library of Congress (Library) requires contractor support to facilitate Data Network Services. The Data Network Engineers will support IP data network installation, configuration, maintenance, and management. They activate end user data monuments; enable/disable data switch ports, make configuration changes on routers/switches/wireless controllers/network management tools/DWDM optical equipment, install updates, and troubleshoot end user network issues primarily OSI layer 1-3 connection issues, and monitoring and managing network equipment and telecommunication circuits.
The table below provides the closed ticket counts from 07/15/2024-07/15/2025 for historical context. The tickets are for incidents and tasks by category and the average elapsed days that it took to resolve (not the effort required to resolve). Note: these numbers should be used as an estimate only, as they also include internal tickets and tickets which originate outside of the OCIO Service Desk.
Type of Incident Tickets
Count
Average elapsed days
Hardware & Peripherals 13 8.96 Intranet Sites (LoC sites/pages) 16 2.03 Network 55 4.50 Network Resource Access 3 2.15 Other 9 15.21
Type of Task Tickets
Count
Average elapsed days Audio Visual Equipment 2 2.56 Connection and Cabling 118 6.09 Data Center Request 1 7.97 General IT Request 2 8.59 Load Balancing 1 1.03 Microsoft 365 - Teams 12 9.18 Network Consulting Services 52 0.90 Network Services 4 34.48 Network/Domain User Accounts 1 3.12 Networking General 1 0.87 Networking Request 10 7.09 Networking vLan Creation 1 29.74 Office Move 246 1.77 Office Phone 1 14.10 Standard Workstation 17 2.26 Teams Conference Rooms 6 3.58
2. Scope of Work The contractor shall provide technical support expertise in the provisioning and management of end user data network across the Library-wide infrastructure. All materials, supplies, and network equipment will be government furnished.
The contractor shall provide staff during Library of Congress business hours and shall support occasional after-hours outages, which shall be responsible for restoring services or fulfilling service requests where appropriate and maintaining an enterprise network as well as external networks such as carrier services for T1, DSL, dark fiber and ISP services.
3. Requirements The contractor shall provide comprehensive network and cabling support to maintain the operational integrity and availability of end-user and telecommunication networking infrastructure. This includes continuous monitoring of system health, availability, and environmental conditions in data centers and network closets to ensure optimal performance. Utilizing Cisco Prime for real-time alert monitoring and ServiceNow for task management, the contractor shall promptly address critical issues such as system outages, connectivity problems, and catalog tasks to support uninterrupted network operations.
The contractor shall provide project-based support which includes the installation, configuration, and testing of system hardware components, along with updating and managing operating IOS as needed.
This includes remote management setup, as well as routine installations, upgrades, troubleshooting, and maintenance of access devices like wireless and wired switches, with attention to port utilization and accurate documentation. Additionally, the contractor shall manage and maintain telecommunication circuits—including DWDM/WAN optical circuits—while configuring switch ports, VLANs, and resolving end-user network issues.
The contractor shall leverage advanced network management tools and diagnostic equipment, and shall ensure timely reporting, quality documentation, and accurate tracking of all work through ServiceNow.
Clear and effective communication with the Library’s technical staff and management is a key priority, along with proper execution of notification and escalation protocols as defined by the Office of the Chief Information Officer (OCIO). The contractor shall also participate in meetings as OCIO telecommunication representatives and subject matter experts when required by the Library.
3.1 Data Network and Cabling Support from SN ticket – estimated 60% The contractor shall:
• Provide network and cabling support.
• Continuously monitor the availability of the end user and telecommunication networking infrastructure to ensure the operational integrity and overall health of the network.
• Monitor environmental factors of data centers and network closets.
• Use Cisco Prime Monitor and DNA Center to daily check for alert messages and respond to emergencies and critical alert notifications, i.e.: system outages or link down connectivity issue.
• Use ServiceNow Queue, daily monitor Catalog Tasks to be completed and continue to monitor system health and availability.
3.2 Project Based Support from Production Engineering and Mgmt. - estimated 40% The contractor shall provide project support by:
• Installing and configuring system hardware components per specification. This includes setting up new offices, and office moves.
• Installing/Updating/Testing the operating Cisco IOS as required.
• Configuring remote management access.
• Performing installations, upgrades, troubleshooting, configurating, and maintaining access devices (wireless and wired switches) including port utilization, assignment and overall documentation as needed.
• Perform monitoring, troubleshooting, and maintenance telecommunication circuits including DWDM/WAN optical circuits.
• Enable/Disable end user data monuments, configure switch ports and vlans, and troubleshoot end user network issues.
• Uses network management tools and related test equipment.
• Prepare necessary reports.
• Ensure that complete, quality documentation is maintained.
• Clearly and accurately detail, monitor, and track all work through Service Now Work
Requests opened and assigned by Service Desk.
• Effectively communicate directly with technical and management personnel.
• Execute notification escalation procedures as defined by OCIO; coordinate services and status with Service Desk.
• Attend meetings as an OCIO telecommunication representative and Subject Matter Expert when requested by the Library.
3.3 Service Response and Resolution Time
The OCIO Service Catalog establishes Service Targets which are driven by a pre-established priority matrix. Consistent failure to meet these targets will result in further discussions with the contractor.
Currently, the service targets are as follows:
Priority Significance Response Time Resolution Time
P1 Critical (business-stopping issues) 15 Minutes 4 Hours
P2 High (major workflow degradation) 30 Minutes 1 Day
P3
Standard (important but with a workaround)
4 Hours
5 Days
P4 Low (minor or cosmetic issues) 1 Day 10 Days
P5 Routine Process 1 Day 30 Days P6 Non-Routine Tasks 1 Day 6 Months
OCIO Service Desk utilizes industry-standard ITSM tools, currently ServiceNow. All incidents and service requests are recorded and categorized according to the above pre-determined priority levels.
The table below provides the priority ticket counts from 07/15/2024-07/15/2025 for historical context.
Note: The tickets are for incidents and should be used as an estimate only, as they also include internal tickets and tickets which originate outside of the OCIO Service Desk.
Priority Count of Priority
P2 - High 6 P3 - Standard 18 P4 - Low 72
The OCIO Networking group operates in a mixed environment of contractors and government employees. Some OCIO Services are managed entirely by government personnel, while others are solely contractor supported. These separations are documented in the Library’s Service Catalog and corresponding ITSM tool, and the contractor will not be held responsible for work performed outside of the scope of this contract.
3.4 Transition Services
The Library requires no service disruption during the transition of services. The Contractor shall ensure the continuity of service without degradation or lapse of service before, during, and after transition. The Contractor shall develop and deliver a Transition-In Plan to facilitate a seamless handover of responsibilities and ensure uninterrupted service delivery from the incumbent contractor. The Transition-In Plan shall detail the process required to ensure continuity of service from the incumbent to the incoming Contractor at the service transition date. The Contractor shall Deliver a finalized Transition-In Plan within 5 days of the period of performance start date. During the transition period, the contractor will review all process documentation from the previous contractor to determine its suitability. The Contractor shall identify how it will coordinate with the incumbent and the Library to transfer knowledge regarding the following:
• Scope of effort to review and/or rewrite standard operating procedures from previous contractor
• Timeline, schedules, and milestones
• Process to transfer service without disruption
• Access for all records, circuit numbers, and locations
• Location of technical and project management documentation
• Points of contact
• Status of ongoing technical initiatives
• Testing and service verification and acceptance
• Appropriate coordination between incumbent and incoming Contractor to ensure error free service transition
• Communication and regular meetings with incumbent provider for transition period
Further, the contractor shall develop and deliver a Transition-Out Plan within 60 days of the performance end date.
4 Contract Performance
4.1 Schedule of Deliverables
Paragraph Reference
Deliverable Description Deliverable Quantity
Deliverable Due Date
3.1 Data network service incidents and
requests logged in ServiceNow
52 (weekly) Weekly Report on Wednesdays.
3.2 Weekly Report and Quarterly/Yearly
Accomplishment Report, but not limited to other report
52 (weekly) Weekly Report on Wednesdays.
3.4 Final Transition-In Plan 1 Within 5 days of the
start of the Period of Performance
3.4 Transition-Out Plan 1 60 Days prior to the
end of the Period of Performance
4.2 Quality Control
The Contractor is responsible for delivering all work products on time and at a high level of quality.
The Contractor shall seek the Government’s input or guidance to develop deliverables that achieve these goals and meet the Government’s expectations. Unless otherwise stated, the Government will review deliverables and notify the Contractor of acceptance or non-acceptance within five (5) business days. Deliverables that are not accepted will be returned to the Contractor with clear, concise, and actionable feedback to facilitate remediation. This feedback shall be provided via the insertion of comments and/or edits in track-changes mode within a single copy of the electronic version of the deliverable. The Contractor is encouraged to seek the Government’s input on the content, file format, and organization of all work products before embarking on the process of developing these products. Seeking early input will help to mitigate the risk of producing an artifact that fails inspection and acceptance.
5 Additional Information
5.1 Hours of Operation
The contractor is responsible for conducting the work described in this task order between the Library of Congress core business hours of 6:30 am to 6:00 pm Mondays through Fridays, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor may be tasked to support quarterly scheduled after hours maintenance in support of emergency hardware maintenance, configuration, installation, and other services outside of the Library of Congress core business hours. After hours support hours will be scheduled in advance and the contractor hours may be shifted to accommodate the afterhours required. For historical context, after hours support has typically occurred less than four times per year.
Upon contract award, the Contractor shall provide the Library with contact number(s), schedule, and procedures for emergency service calls that are acceptable to the Library. The Library will designate authorized personnel to initiate emergency service call requests. For emergency (P1) service calls, at the Capitol Hill campus (which consists of the Madison, Adams and Jefferson Buildings), the Contractor shall arrive at the designated place of maintenance within four (4) hours of notification (or on an agreed upon time) by the Library authorized personnel. For emergency service calls outside the Capitol Hill campus, the Contractor shall arrive at the designated place of maintenance at a time agreed-upon by the Library authorized personnel and the contractor’s authorized representative. Scheduled support of special projects that may involve multiple contractors shall be coordinated with the Contractor five business days in advance. Required travel for training and technical support shall be coordinated with the Contractor five business days in advance.
5.2 Government-Furnished Property
The Government will provide all Government furnished property required in configuring a suitable workstation (laptops, monitors, mice, chair, desk, telephone) and general office supplies, such as pens and paper, for assigned onsite personnel only. In addition, access to required Library of Congress approved software needed to perform the services outlined in the order. In the event that additional Government furnished equipment will be provided, a log will be kept to include a list describing the information that will be furnished, with both the date provided and if (and when) it has to be returned.
The contractor shall be responsible for providing all reference tools, training tools, and additional supplies to its personnel, as required. Any training materials, policies, procedures, timelines or other documentation, and electronic work product is the property of the Library. The contractor shall not copyright or own exclusive rights to products developed by contractor employees for the Library.
5.3 Key Personnel
Key personnel assigned to this project shall possess a deep understanding of building infrastructure, including but not limited to, wiring pathways, conduits, and general building construction. This expertise is critical for ensuring seamless integration with existing facilities and minimizing unforeseen challenges.
The following position is considered key personnel, in accordance with LC52.237-1 KEY PERSONNEL:
Role: Data Network Engineer
The duties of the Data Network Engineer include:
• Installation and maintenance of routers, switches, wireless controllers utilizing appropriate tools and procedures
• Ensure that router, switch, and other network equipment installation, repair and maintenance by Cisco’s proper procedures
• Monitor environmental factors of data centers and network closets.
• Using the ServiceNow Ticketing system to track and document all changes to switch runs, closet configurations, and monument setups
• Maintain network equipment records in automated system, update network maps and perform
Configuration Management
• Use tools to perform monitoring, troubleshooting, and maintenance telecommunication circuits including DWDM optical circuits.
• Uses network management tools and related test equipment
• Prepare necessary reports
• Ensure that complete, quality documentation is maintained
• Clearly and accurately detail, monitor, and track all work through ServiceNow
• Work Requests opened and assigned by Service Desk
• Effectively communicate directly with technical and management personnel
• Execute notification escalation procedures as defined by OCIO; coordinate services and status with Service Desk
• Attend meetings as an OCIO telecommunication representative and Subject Matter Expert when requested by the Library
5.4 Minimum Knowledge, Skills, and Requirements for the Data Network Engineer
• Cisco Certified Network Associate is desired
• A minimum of 10 years of network engineering/administration experience
• Must be able to ensure that router, switch, and other network equipment installation, repair and maintenance follow manufacturer’s proper procedures
• Security+ and Network+ certification or equivalent desired
• Must have familiarity with Microsoft Windows operating systems, and most of Microsoft
Office Suite and Microsoft Visio
• Familiarity with DWDM optical and telecommunication circuits is desired
5.5 Invoice
Invoices shall be submitted monthly in accordance with LC52.232-1 – Library of Congress Invoice Instructions of the IDIQ and LC52.232-2 – Schedule of Payments of the finalized order.
| SECTION A – CONTRACT TYPE |
| SECTION B – PERIOD AND PLACE OF PERFORMANCE |
| Library of Congress Locations: |
| 1. Overview |
| 2. Scope of Work |
| 3. Requirements |
| 3.1 Data Network and Cabling Support from SN ticket – estimated 60% |
| 3.2 Project Based Support from Production Engineering and Mgmt. - estimated 40% |
| 3.3 Service Response and Resolution Time |
| 4 Contract Performance |
| 4.1 Schedule of Deliverables |
| 5 Additional Information |
| 5.2 Government-Furnished Property |
| 5.3 Key Personnel |
| 5.5 Invoice |
| Invoices shall be submitted monthly in accordance with LC52.232-1 – Library of Congress Invoice Instructions of the IDIQ and LC52.232-2 – Schedule of Payments of the finalized order. |