20260330_PWS_Fire Alarm Systems DRAFT.pdf

PDF 454 KB Posted

Attached to
Maintenance and Repair of Emergency Alarm Systems
Solicitation number
W912CM26QA016
Issued by

About this file

This is a Performance Work Statement (PWS) for full preventive maintenance of fire alarm, evacuation, sprinkler, and fire suppression systems at United States Army Garrison (USAG) Wiesbaden, with an effective date of March 30, 2026.

The Contractor shall provide comprehensive maintenance, inspection, programming, and repair services for all fire protection systems within USAG Wiesbaden, including the Fire Alarm Dispatch Center and integrated fire department operating systems. Key service requirements include quarterly functionality testing of fire alarm and evacuation systems (4 times per year), semi-annual testing of sprinkler and suppression systems (2 times per year), and semi-annual maintenance of fire protection doors. The Contractor must furnish all personnel, equipment, supplies, tools, materials, and transportation necessary to perform work, with regular support hours from 0715–1600 Monday through Friday (excluding U.S. and German holidays) and 24/7 on-demand repair capabilities. Emergency repairs must be completed within 8 hours of notification; routine repairs within 24 hours; and major repairs exceeding 1,000 Euros require a detailed firm-fixed-price quote for Government approval. The Contractor shall submit 20 distinct deliverables including quality control plans, maintenance certificates, training documentation, inspection schedules, and monthly maintenance logs and inventory updates. The Contractor must maintain ISO9001 certification and VdS certification for fire alarm systems per DIN EN 14675, employ qualified technicians with "befaehigte Person mit Sachkundnachweis" credentials, provide a Master Electrician (Elektrotechniker-Meister), and ensure all personnel are fluent in English. Required training includes Anti-Terrorism Level I, OPSEC Level I, iWATCH, and Information Assurance training within 30 days of employment. All work must comply with German safety regulations (Baustellenverordnung), NFPA standards (12a/b, 13, 72, 101), and DIN/VDE regulations; the Contractor is responsible for all installation access requirements, background checks, security clearances, and German work permits for its personnel.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

409th CSB Ver 8 20250501

PERFORMANCE WORK STATEMENT (PWS)

Full Preventive Maintenance of Fire Alarm, Evacuation, Sprinkler, and

Fire Suppression Systems within USAG Wiesbaden 03/30/2026

Part 1 General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal service(s) PWS to provide maintenance, inspection, programming and repair of the fire alarm systems (including the Fire Alarm Dispatch Center and Fire Department full operating and integrated systems), evacuation systems, sprinklers, and fire suppression systems within United States Army Garrison (USAG) Wiesbaden. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance, programming, inspections, and repair of fire alarm systems, evacuation systems, sprinklers, and fire suppression systems within USAG Wiesbaden as defined in this PWS. The contractor shall perform to the minimum standards set forth in the PWS and contract.

1.2 Background: USAG Wiesbaden must ensure that all installed fire alarm (including the Fire Dispatch Center and Fire Department full operating and integrated systems), evacuation, sprinkler, and fire suppression systems, listed in the attached inventory (Attachment 1-3, Inventory Price book), are maintained, programmed and repaired in accordance with (IAW) established life safety standards as specified herein

1.3 Scope: The contractor shall provide maintenance, programming, inspections, and repair of the fire alarm, evacuation, sprinkler, and fire suppression systems listed on the attached inventory (Attachment 1-3, Inventory Price book). The Government shall not exercise any supervision or control over the contract service providers performing the services herein.

Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

1.4 Objectives: The Contractor shall perform all related administrative actions required to provide services including material requisitioning, quality control (QC), attend meetings, and prepare correspondence. The Contractor shall maintain accurate and complete records, files, and have access to libraries of documents to include all U.S., German, and local regulations, standards, provisions, codes, laws, technical manuals, and manufacturers’ instructions and recommendations that are necessary and related to the functions being performed. The Contractor shall compile historical data and prepare required reports. The required services include the performance of programming, repairs, replacements and maintenance on building fire alarm and evacuation systems, sprinkler systems, fire suppression systems and the complete integrated fire station main dispatch and connected subsystems. On-call repairs are required, as needed, for the equipment listed in Attachments 1-3.

1.5 General Information

1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract. The Contractor’s proposed QCP shall be submitted to the Contracting Officer’s Representative (COR) for review within 10 work days after date of contract award (Deliverable #A.001). The COR will review and notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 10 days. If the Government has provided comments, the Contractor shall address all comments and submit a final QCP within three (3) days. After receipt of the final QCP, the Contractor may receive the COR’s acceptance in writing. Any proposed changes to the accepted QCP shall be resubmitted for acceptance by the COR no later than 30 days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include the following to be acceptable:

(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;

(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);

(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;

(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance; N/A

(e) How the Contractor will ensure all keys issued will remain controlled items (Paragraph 1.7 Key Control);

(f) How the Contractor will inventory and track maintenance of any Government Provided Equipment / Materials;

(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and

(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.

1.5.1. The Contractor shall inform the COR of issues or potential issues that might affect the performance within 24 clock hours of identifying those issues. Verbal reports shall be followed up by written reports within 5 workdays (Deliverable #A.001).

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: Work shall or shall not be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day last Monday in May June Teenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th

1.5.3.2 Host Nation Holidays: Work shall or shall not be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.

New Year’s Day 01 January Good Friday varies yearly

Easter Monday varies yearly Labor Day 01 May Ascension Day varies yearly Whit Monday varies yearly Corpus Christi varies yearly Day of German Unity 03 October 1st Christmas Day 25 December 2nd Christmas Day 26 December

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements are 0715 to 1600, Monday through Friday except on U.S. or German holidays specified above. or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor shall not normally provide services on U.S. or German holidays. However, the Contractor may be required to provide On- Demand services on holidays, as coordinated with the COR.

1.5.4.1 Government Facility Office Hours: The Government facility office hours specified in 1.5.4 above..

1.5.4.2 Government Facility Operating Hours: The Contractor shall conduct business during the hours specified in 1.5.4 above.

1.5.4.3 Contractor Support Hours: The Contractor shall provide regular support during the hours specified in 1.5.4 above and 24/7 response for on-demand services. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.5.4.3.1 Contractor Work Plan: RESERVED.

1.5.5 Training Holidays: USAREUR has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.

1.5.6 Place of Performance: The services under the contract shall be performed at various locations and buildings within USAG Wiesbaden.

1.6 Security Requirements: The following information is provided on security related matters.

1.6.1 Security Program: RESERVED.

1.6.2 Personnel Security Clearance Requirements: RESERVED.

1.6.3 Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16) Installation Access Control or (AE) Regulation 604-1 for Germany specific contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of the contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or (AE) Regulation 604-1, the regulation takes precedent.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

AE Reg 190-16 (and AE 190-16-G German translation) can be found on the following website:

https://www.aepubs.eur.army.mil/AE-Regulations/

Below is the responsible Organizational Sponsor & Installation Access Control Office for the contract:

Organizational Sponsor: USAG Wiesbaden, Clay Kaserne Location: Clay Kaserne Building No: 1557 DSN Phone No: 548-4081 Commercial Phone No: 0611-143 548 4081

Installation Access Control Office:

Location: Clay Kaserne Building No: 1004 DSN Phone No: 548-47080/1/2/3 Commercial Phone No: 0611-143 548 7080/1/2/3

1.6.3.1: In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within five (5) calendar days after contract award (Deliverable #A.002). The log shall at a minimum contain the following information Last name, First name, nationality, date of birth, ID card number (Personalausweisnummer), Vehicle type and plate number. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log.

1.6.3.2 The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within five (5) working days. (Deliverable #A.002).

1.6.3.3 Upon termination or cancellation of the contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within five (5) working days. (Deliverable #A.002).

1.6.3.4 Common Access Cards (CAC): RESERVED.

1.6.4 Background Checks: Army in Europe (AE) Regulation 604-1 provides guidance pertaining to background checks for U.S. and Host Nation Contractors. The Contractor shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office, and residence permits for local national installation passes and access rosters. The Contractor workforce shall comply with all personal identity verification requirements as directed by DoD, HQDA, and local policy. The Contractor may have to complete additional security training to comply with the security standards of the contract. In addition to the changes otherwise authorized by the changes clause of the contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

1.6.4.1 U.S. Citizen: RESERVED.

1.6.4.2 Local Nationals and Third Country Nationals: Local national and third country national Contractors are subject to background checks as determined by the Requiring Activity Manager. Contractors employing local national and third country nationals shall submit to the COR a police good conduct certificate (Polizeiliches Fuehrungszeugnis), issued within the previous four months, no later than five (5) days after contract award (Deliverable #A.003). Forwarding correspondence from the Contractors shall identify the associated contract number. The Requiring Activity Manager will determine the favorability of the police good conduct certificate (Polizeiliches Fuehrungszeugnis) and notify the Contractor. The Contractor shall forward a copy of unfavorable police good conduct certificate (Polizeiliches Fuehrungszeugnis) to the Contracting Officer via the COR and the Requiring Activity Manager within five (5) days of receipt, identifying such with the appropriate contract number.

(Deliverable #A.003)

1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).

1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.

1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan and the Quality Control Plan (Deliverable #A.001).

Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying.

When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Quality Control Plan.

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel: The following personnel are considered key personnel by the Government:

The Contractor shall provide a Program/Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Program/Contract Manager, who shall act for the Contractor when the Program/Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer no later than during the post-award meeting (Deliverable #A.004). The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The Contract Manager or Alternate Contract Manager shall be available between 0730 - 1600 on working days. The Contractor shall be available 24 hours by phone, Monday thru Sunday, on Federal holidays and local holidays. Qualifications for all key personnel are listed below:

a. Special Qualifications: The Contractor shall be certified in accordance with the Verband der Schadenversicherer (VDS) and shall have a current and valid VDS Certificate in accordance with DIN EN 14675 and related additional certification in accordance with the related regulation for sprinkler, smoke exhaust and fire extinguishing sytems (VdS anerkannte Errichterfirmen für Brandmelde-, Sprinkler, Feuerlöschanlagen und Rauch - und Waermeabzugsanlagen). The Contractor shall be ISO9001 certified and provide a copy of the certification annually (Deliverable #A.006). The Contractor shall ensure that all personnel performing required services are professionally certified as required by regulation.

The Contractor shall provide current training certificates for all technicians (“befaehigte Person mit Sachkundnachweis”) responsible for maintaining Fire Detection Systems described in the PWS within five (5) calendar days after award (Deliverable #A.006). If any of the technicians change during contract performance, the Contractor shall notify the COR immediately and provide a substitute with the same qualifications within five (5) calendar days of the change. The Contractor shall provide the name, title, training status and telephone number of the personnel providing services on the contract to the COR within five (5) calendar days after award (Deliverable #A.006). This list shall be updated and submitted to the COR via email within 24 hours of changes that occur throughout the duration of the contract. Work performed by personnel not on this list will not be accepted by the COR and, as such, will not be compensated by the Government.The contractor shall be certified by the Main System builder, distributor or manufacturer, and shall provide VdS Certification for Fire Alarm Systems, in accordance to DIN 14675 and related additional certification in accordance to the regulation for Sprinkler Systems, Evacuation Systems and Suppression Systems (VdS-anerkannter Errichter fuer Brandmeldeanlagen, Sprinkler Anlagen, Rauch und Waermeabzugsanlagen) to the COR five (5) days after award (Deliverable #A.006).The Contractor shall also provide certification from TUEV for specialized speaking alert systems (Fachfirma fuer Sprachalarmanlagen) to the COR within five (5) days after award (Deliverable #A.006).The Contractor shall have a master craftsman (HWK) certificate for the fire alarm, sprinkler extinguishing systems or be registered in the Chamber of Commerce and Industry (IHK) accordingly. The contractor shall provide current DIN 14675 certification for fire alarm systems and related additional certification in accordance with the regulation for sprinkler, smoke exhaust and fire extinguishing systems” (VdS anerkannten Errichterfirmen für Brandmelde-, Sprinkler, Feuerlöschanlagen und Rauch -und Waermeabzugsanlagen) five (5) days after contract award to the COR (Deliverable #A.006).

b. Master Electrician:

The Contractor shall provide a certificate for at least one (1) employee qualified as a Master (Meister) in the category of "Master Electrician (Elektrotechniker-Meister)" and a specialized qualification for fire protection systems to the COR five (5) days after contract award (Deliverable #A.007). This person shall be responsible for all electrical work under the contract for the entire performance period IAW the PWS. If the Master Electrician changes during contract performance, the Contractor shall notify the COR immediately and provide a substitute with the same qualifications within two (2) calendar days prior to the change.

c. Technicians:

The Contractor shall provide only qualified personnel (“befaehigte Person mit Sachkundnachweis”) for all specialized work required for the equipment listed in the attached inventory list (Attachment 1-3, Inventory Pricebook). At least one (1) employee for each single system shall be qualified for smoke protection doors, fire flaps, fire shutters and kitchen installations (Ansul and Flamefast), and be specialized for speaking alert systems.

This person shall be responsible for all specialized work at the single system for the entire performance period IAW the PWS. If the personnel changes during contract performance, the contractor shall notify the COR immediately and provide a substitute with the same qualifications within (2) calendar days prior to the change.

d. English language: All Contractor personnel performing technical services under the contract shall read, write and speak English to communicate with Government personnel, accurately record data, and perform required work suppliers and as specified in this PWS.

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12.1 Contractor workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance 10 calender days after contract award (Deliverable #A.008).Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.

1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee.

A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes. (Deliverable #A.009).

1.13 Contractor Travel: RESERVED.

1.14 Other Direct Costs (ODCs): RESERVED.

1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.

1.17 The use of propaganda violates DoD Commercial Use of Imagery Guidelines stated at http://www.defenseimagery.mil/products/dodimagery/commercialuse.html The Contractor shall not cite any information

(e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.

1.18 Non-Disclosure Statements: RESERVED.

1.19 Organizational Conflict of Interest (OCI): RESERVED.

1.20 Phase In /Phase Out Period: RESERVED.

1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:

1.21.1 Host Nation Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)), and applicable Host Nation Safety Laws and Regulations.

The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:

(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel (Deliverable #A.010). Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.

(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1).

(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen (15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase.

(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:

(i) Short sleeve shirt.

(ii) Long trousers.

(iii) Steel-toed safety boots.

(iv) Hard hat.

1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes. In particular, within the requirements of the German Safety and Health Protection Regulation for Construction Sites, Baustellenverordnung (BaustellV) (current version in effect), the Contractor shall coordinate all work at the site, including development of plans and providing advance notices.

The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the Contractor shall comply with the non-exclusive list of duties described in this paragraph. If the Contractor determines that additional activities are required to fully comply, the Contractor shall ensure that compliance with the laws is complete. The duties include:

(a) Conditions of construction and operational activities to be considered include but are not limited to:

(i) For all construction activities meeting the following criteria: the work is scheduled to last longer than 30 working days and more than 20 workers are occupied simultaneously, or the volume of work is scheduled to exceed 500 person days, or the work presents particular tasks, e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater).

(b) If the Contractor determines that the BaustellV, dated 10 June 1998, applies, the Contractor shall prepare a Safety and Health Protection Plan (SIGE) as required under that regulation. The SIGE shall be submitted two weeks prior to mobilization. In addition, the Contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator must meet minimum training and experience requirements required under Host Nation laws.

(c) The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:

(i) Maintenance of tools and equipment.

(ii) Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.

(iii) Modifying performance periods for such work, taking into consideration the site conditions.

(iv) Organizing cooperation between different employers and Contractors without employees.

(v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed, and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.

1.21.1.2 The Contractor shall complete and provide safety notifications required by host nation authorities and will provide documented proof to the Contracting Officer via the COR, no later than five (5) days (Deliverable #A.010) that such notifications were made.

1.21.1.3 RESERVED.

1.22 Environmental Compliance: The following provides information on Environmental Compliance.

1.22.1 Environmental Compliance Plan and Program: The Contractor shall ensure that all of its operations and activities conform to the USAG Wiesbaden's environmental policy requirements. The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on USAG Wiesbaden installations are conducted in accordance with the USAG Wiesbaden Spill Prevention and Response Plan, Solid Waste Policy, Final Governing Standards-Germany, and applicable German environmental laws/standards.

The Contractor shall, prior to mobilization, inform the Contracting Officer (KO)/Contracting Officer Representative (COR) of the types and amount of hazardous materials needed to be brought onto the Garrison in order to fulfill their contractual requirements. Contractor shall also provide the Safety Data Sheets, storage requirements and proposed storage locations for the hazardous material. The KO/COR shall provide a copy of this information to the Garrison Fire Department and the Environmental Division.

The Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Germany and applicable German environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the Department of Public Works (DPW) Environmental Division.

The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department at CIV 0611-705-117.

The Contractor shall contact the COR or the USAG Wiesbaden Directorate of Public Works-Environmental Division (DPW- ED), DSN 548-4092, CIV 0611143-548-4092, Bldg. 1059, Clay Kaserne for a copy of the Garrison Environmental Policy, Spill Prevention and Response Red Plan, Garrison Solid Waste Policy and German Final Governing Standards.

Current Environmental Policy (Garrison policy Number 22) will be provided by the COR after award.

Current Prohibited Refuse Disposal Practices Policy (Garrison policy Number 27) will be provided by the COR after award.

1.23 Required Training: The following provides information on training requirements.

1.23.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 30 calendar days (Deliverable #A.012) after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion (Deliverable #A.012) for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within (Deliverable #A.012) after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil.

Contractor personnel shall complete refresher training (Deliverable #A.012) every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies

If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within 30 calendar days after completion of the training (Deliverable #A.012).

1.23.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 30 calendar days of employment under the contract (Deliverable #A.013). Verification of the training shall be provided to the COR within 30 calendar days after completion of the training (Deliverable #A.013). OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months (Deliverable #A.013). Verification of the training shall be provided to the COR within30 calendar days after completion of the training (Deliverable #A.013).

If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within 30 calendar days after completion of the training (Deliverable #A.013).

1.23.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.

This training shall be completed within 30 calendar days after the contract is awarded and within 30 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar days after the contract is awarded and within 30 calendar days after new employees commence contract performance (Deliverable #A.014).

Verification of the training shall be provided to the COR within 30 calendar days after completion of the training (Deliverable #A.014). Training slides can be found on the Army OneSource we site:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.

1.23.4 Information Assurance (IA) Training

1.23.4.1 All Contractor employees, including subcontractors, requiring access to Government information systems shall complete the Department of Defense (DoD) IA Cyber Awareness Training within 30 calendar days (Deliverable #A.015) after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Verification of the training shall be provided to the COR within 30 calendar days after completion of the training (Deliverable #A.015).

1.23.4.2 All Contractor employees, including subcontractors, working information technology (IT)/IA functions shall comply with DoD and Army training requirements per Information Assurance Training Certification and Workforce Management DoD Directive (DoDD) 8570.01, Information Assurance Workforce Improvement Program DoD 8570.01-M, and Information Assurance AR 25-2 within thirty (30) calendar days of employment.

1.23.4.3 All Contractor employees, including subcontractors, performing services under this contract with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS), the web address is p (requires CAC to access. Verification of registration shall be provided to the COR within 30 calender days after registration. (Deliverable #A.015). Contractor personnel must complete refresher training every twelve (12) months (Deliverable #A.015). Verification of the training shall be provided to the COR within 30 calender days after completion of the training (Deliverable #A.015).

1.24 Personally Identifiable Information (PII): RESERVED.

1.25 Authorization to Perform Services in Germany

1.25.1 Contractors performing services in the Federal Republic of Germany (FRG) shall comply with German law. The Contractor shall determine whether performance requires registration with German authorities or authorization to do business in Germany and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the Contractor shall determine what documents or authorization its employees and any subcontractor employees must possess to work in Germany. The Contractor shall ensure affirmatively that its employees and subcontractor employees possess such documents or authorizations.

1.25.2 Contractor employees who: (a) are not nationals of Germany or other European Union countries; (b) are not members of the force, the civilian component or their dependents; or c) do not have assimilated status under Articles 71, 72, or 73 of the Supplementary Agreement to the NATO SOFA shall possess work and residence permits.

1.25.3 By acceptance of and performance under this contract, the Contractor affirms that it has complied with the requirements above. Compliance with this requirement and German law is a material contract requirement. Noncompliance by the Contractor or subcontractor at any tier shall be grounds for issuing a negative past performance evaluation and terminating this contract for default.

1.26 Notice to Proceed: RESERVED.

1.27 Electromagnetic Compatibility Directive: RESERVED.

1.28 Government Property and Services: RESERVED.

1.29 Conventional Forces Europe (CFE) Treaty Verification Inspection: RESERVED.

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms

2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer – means a person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. Department of Defense Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart

202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, contracting officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing support personnel to assist the COR, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract, and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

Government-furnished property - means property furnished to the contractor the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Government property - means all property owned or leased by the Government. Government property includes both Government-furnished property and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .