20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf

PDF 2 MB Posted

Attached to
Asset Protection - Painting and Coating
Solicitation number
929-0213-26
Issued by
Tulare County, California

About this file

This is a preliminary drawing for a temporary sewer bypass plan prepared for the City of Fairfield and County of Solano as part of the Justice Campus Asset Protection project. The document, dated February 24, 2026, depicts sanitary sewer bypass provisions for the Downtown Fairfield Justice Campus with horizontal scaling of 1 inch equals 30 feet. The drawing is marked "Preliminary - Not for Construction" and serves as part of the Justice Campus Asset Protection initiative designed to protect county assets from seasonal flooding and stormwater damage. The document was generated from project files last revised on February 24, 2026, at 8:57 a.m., with the final drawing location and revision history maintained in the project management system.

The temporary sewer bypass plan is a supporting technical document within the broader multi-property Asset Protection Project that includes barrier walls, berms, landscaping, hardscape, flood gates, underground utility reconfiguration, and pump systems across ten properties in Tulare County. This specific drawing addresses sanitary sewer infrastructure protection and routing during construction activities at the Justice Campus site. As a preliminary design document, it establishes the baseline for sewer system provisions that will be refined and incorporated into final construction documents, with the overall project completion scheduled for January 12, 2027, under FEMA-funded federal assistance.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R, S

EP

FE

BR

UA

RY

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ Ov erl an d S S

By pa ss P lan .dw g F eb

4,

- 8 :57 am

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

JU

ST

IC

E

CA

MP

US

A

SS

ET

P

RO

TE

CT

IO

N

CI

TY

O F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

SS1

TE

MP

OR

AR

Y

SE

W

ER

B

YP

AS

S

TEMPORARY SEWER BYPASS PLAN

HORIZONTAL: 1"=30'

SANITARY SEWER BYPASS PROVISIONS

File details come from the government source that posted it. Updated .