20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf
PDF 2 MB Posted
- Attached to
- Asset Protection - Painting and Coating
- Solicitation number
- 929-0213-26
- Issued by
- Tulare County, California
About this file
This is a preliminary drawing document for a temporary sewer bypass plan prepared for the City of Fairfield and County of Solano's Justice Campus Asset Protection Project, dated February 24, 2026. The document, identified as Sheet SS1, depicts the horizontal sanitary sewer bypass provisions at a scale of 1"=30' and is designated as preliminary and not for construction. The drawing reflects the Justice Campus Asset Protection initiative and includes a signature block for officer approval. The file location references the project directory (S:\Projects\2025\2558-0010\3_Drawings\Improvement Plan\2558-0010_Overland_SS_Bypass_Plan.dwg), indicating this is part of a larger multi-property protection project involving infrastructure modifications to safeguard county assets from seasonal flooding and stormwater damage.
This drawing serves as a supporting technical document for the broader Asset Protection Project, which is being procured under a multi-prime method with federal FEMA funding. The temporary sewer bypass plan is one component of the comprehensive project that also includes barrier walls, berms, landscaping, hardscape, flood gates, and underground utility reconfiguration across multiple properties on Union Avenue, Clay Street, Delaware Street, and Texas Street. The project documentation includes issued-for-construction drawings, geotechnical reports, and technical specifications, with project completion scheduled for January 12, 2027, and a mandatory pre-bid conference that was held February 19, 2026, with sealed bids due March 9, 2026.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R, S
EP
FE
BR
UA
RY
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ Ov erl an d S S
By pa ss P lan .dw g F eb
4,
- 8 :57 am
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
JU
ST
IC
E
CA
MP
US
A
SS
ET
P
RO
TE
CT
IO
N
CI
TY
O F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
SS1
TE
MP
OR
AR
Y
SE
W
ER
B
YP
AS
S
TEMPORARY SEWER BYPASS PLAN
HORIZONTAL: 1"=30'
SANITARY SEWER BYPASS PROVISIONS
File details come from the government source that posted it. Updated .