Access_Requirements.pdf
PDF 887 KB Posted
- Attached to
- Asset Protection - Painting and Coating
- Solicitation number
- 929-0213-26
- Issued by
- Tulare County, California
About this file
This is an Access Requirements document for Solano County, California, detailing vehicle and pedestrian access protocols during construction activities at multiple county justice and emergency services facilities. The document outlines three categories of vehicle access points and three categories of pedestrian access points across properties located at Union Avenue, Clay Street, Delaware Street, and Texas Street. Critical emergency vehicle access points (Category A) must remain open 24 hours daily with any disruptions requiring immediate mitigation. Important operational access points (Category B) require minimum two-week notice before disruption, while major traffic access ways (Category C) require minimum three-week notice along with traffic control plans and encroachment permits. Pedestrian access points are similarly categorized, with major public entries requiring three-week notice and accessible alternate pedestrian access plans, secure staff entries requiring two-week notice, and possible egress points requiring two-week notice with fire marshal approval for alternate exit plans.
The document specifies access requirements for critical county facilities including the Hall of Justice (North and South Wings), Solano Justice Center, Solano County Emergency Services, Solano Detention Facility, Sheriff Professional Standards, Communications, Coroner's Office, and the Cogeneration Plant. Key access routes include sally port entrances, loading bays, maintenance areas, and staff entrances at multiple locations. This access management plan is directly applicable to the Asset Protection–Painting and Coating project, which involves stormwater protection measures across multiple county properties and will require contractors to coordinate construction activities while maintaining operational access to these essential public safety and judicial facilities.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA LITE
AREA LITE
NO
PARKING
RESERVED
RESERVED
NO
PARKING
RESERVED
NO
PARKING
NO
PARKING
NO
PARKING
NO
PA
RK
IN
G
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
B
BB
B
B
B
B
B
B
B
B
B
B
B
B
B
BB
B
B
B
B
B
B
B
B
B
B
BB
B
B
NO
PA
RK
IN
G
NO
PARKING
NO
PARKING
CR
IC
C R
IC IC
IC
IC
C R
C R
C R
CR
IC
IC
CR
C R
C R
C R
CR
IC
IC
IC
IC
CR
C R
CR
C R
C R
CR
C R
C R
CONSTRUCTION
PHASING
X:
\1
\1
4.
\T
EC
H \C
AD
\P
AR
KI
N G
L O
T
IM
PR
O
VE
M
EN
TS
\G -0
C
O N
ST
R
U C
TI
O
N P
H
AS
IN
G
.D W
G
/2
1/
:4 9:
P
M
SHEET CONTENTS
or l
00 60 120
Vehicle Access Points
A Critical Emergency Vehicle Access Point.
Must remain open to large vehicle access 24 hours a day, 7 days a week. Any disruption to vehicle access route will require immediate mitigation.
B Important Operational Vehicle Access Point. Contractor to provide minimum 2 week notice prior to any activities disrupting access or vehicle route. Alternate access provisions by contractor may be required
C Major Traffic Access Way. Contractor to provide minimum 3 week notice prior to any activity disrupting access. A traffic control plan & encroachment permits are required.
Pedestrian Access Points
1 Major public & staff entry point. Contractor to provide minimum 3 week notice prior to any construction activities disrupting access. An Accessible Alternate Pedestrian Access Plan will be required.
2 Secure Staff entry point. Contractor to provide minimum 2 week notice prior to any activities disrupting access. An Accessible Alternate Pedestrian Access Plan may be required.
3 Possible egress point. Contractor to provide minimum 2 week notice prior to any activities disrupting egress. An alternate exit plan with fire marshal approval may be required.
501 Texas Co-Op Extension / Sheriff Investigations
600 Union Ave Hall of Justice North Wing
600 Union Ave Hall of Justice South Wing
530 Union Ave Solano Justice Center 530 Clay St
Solano County Emergency Services
500 Union Ave Solano Detention Facility
512 Clay St Sheriff Professional Standards
500 Clay St Communications
501 Delaware St Cogeneration Plant
512 Clay St Emergency Services Vehicle Storage
520 Clay st Solano Coroner's Office
Delaware Street
A
A
B
JCDF Sally Port Entrance
Coroner Sally Port Entrance
JCDF
Loading Bay
A JCDF Sally Port Entrance
B OES &
Facilities Vehicles
B
OES &
Facilities Vehicles
B Cogen Loading Bay
C
Washington Street C
Clay Street C
Access Requirements
B
Court Maintenance Area
B Judges Parking
B Sheriff Response Vehicle Parking
B Sheriff Response Vehicle Parking
OES Entry
Office of Professional Standards2 Staff
Entrance
2 Communications
Court Entry
1 Court Entry
1 JCDF
Entry
B Loading Bay
Coop & Sheriff Investigations
B
Maintenance Access
2 Maintenance
2 Maintenance
JCDF
Release Point
B Loading Bay
Staff Entry
2 Staff
Entry
B
Loading Bay
2 Staff Entry
B Loading Bay
2 Staff Entrance
2 Staff Entrance
2 Staff Entrance
A Sally Port
2 Staff Entrance
Staff Entrance
2 Staff Entrance
Staff Entrance 3
File details come from the government source that posted it. Updated .