20260107_Addendum 2 Industrial Road Detour Plan.pdf

PDF 373 KB Posted

Attached to
RECONSTRUCTION OF EAST INDUSTRIAL ROAD STATE PROJECT NUMBER 0014-0191
Solicitation number
34339
Issued by
New Haven County, Bridgeport City, Connecticut

About this file

This is an Addendum 2 detour plan document for the Town of Branford, Connecticut, prepared by Stantec Consulting Services Inc., in support of the Reconstruction of East Industrial Road project (State Project Number 0014-0191). The project involves the reconstruction of East Industrial Road from Station 0+00 to Station 32+50, extending from the Leetes Island Road intersection to west of Pin Oak Drive, including portions of the I-95 on and off ramps. The detour plan document establishes four construction phases (1A, 1B, 2, 3A, and 3B) with specific traffic management requirements to maintain at least one lane of traffic in each direction throughout the construction period. The contractor must notify the Town of Branford Emergency Services at least two weeks prior to any road closure. Bids for the project were due on Thursday, January 8th, 2026, at 2:00 PM, with public bid opening immediately following the submission deadline. All bids must be held for ninety days beyond the bid opening date.

The detour plan specifies that all construction signs, including diamond-shaped post-mounted signs with high-intensity barricade warning lights, shall be installed according to engineer specifications with exact locations determined in the field. The cost of detour signs is to be paid under the "Construction Signs" line item. The contractor is responsible for maintaining access to all driveways during construction and shall cover existing signs that conflict with detour signage as directed by the engineer. Relocation of temporary precast concrete barrier curb for work area access is not eligible for payment. All sign locations shown on the plan are approximate, and signs must be covered when the detour is not in operation and removed when no longer required.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV. DATE REVISION DESCRIPTION SHEET NO. Stantec Project No.:

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE:

RECONSTRUCTION OF

EAST INDUSTRIAL ROAD

STATION 0+00 - STATION 32+50

TOWN:

BRANFORD

DRAWING TITLE:

DATE:

SHEET NO.

192311596

THE INFORMATION, INCLUDING ESTIMATED

QUANTITIES OF WORK, SHOWN ON THESE

SHEETS IS BASED ON LIMITED

INVESTIGATIONS BY THE STATE AND IS IN

NO WAY WARRANTED TO INDICATE THE

CONDITIONS OF ACTUAL QUANTITIES OF

WORK WHICH WILL BE REQUIRED.

SCALE: TOWN OF BRANFORD

Stantec Consulting Services Inc.

OF 72

011-25-25

DETOUR PLANS 72SCALE 1"=500'

500 10000

SCALE IN FEET

PHASE 3B

PHASE 3A

MAINTAIN ONE LANE

OPEN AT ALL TIMES

PHASE 1B

PHASE 1A

MAINTAIN ONE LANE

OPEN AT ALL TIMES

PHASE 2

E MAIN ST

S C H

O O

L G R O

U N

D R

D

I-95

E INDUSTRIAL RD

SYCAM

O

RE W

AY

PIN

O

A K D

RBUSINESS PARK DR

E MAIN ST

LEETES ISLAND RD

E MAIN ST

SC

H

O O

L G R O

U N

D R

D

I-95

BUSINESS

PARK DR

LEETES ISLAND RD

E INDUSTRIAL RD

DETOUR NOTES:

DETOUR PLAN

PHASE-1

DETOUR PLAN

PHASE-3

B

B

B

B

H

SIGN LEGEND:

M

AHEAD

DETOUR

STOP

M

M

1. ALL SIGN LOCATIONS INDICATED ON THIS PLAN ARE APPROXIMATE. EXACT LOCATIONS OF SIGNS SHALL BE

DETERMINED IN FIELD AS DIRECTED BY THE ENGINEER.

2. DETOUR SIGNS SHALL BE COVERED WHEN THE DETOUR IS NOT IN OPERATION.

3. DETOUR SIGNS SHALL BE REMOVED WHEN THE DETOUR IS NO LONGER REQUIRED.

4. ALL CONSTRUCTION SIGNS ARE TO BE INSTALLED SUCH THAT THEY DO NOT BLOCK, OR ARE NOT BLOCKED BY, EXISTING SIGNS, AND DO NOT INTERFERE WITH SIGHT LINES.

5. EXISTING SIGNS WHICH CONFLICT WITH THE DETOUR SIGNS SHALL BE COVERED WHILE THE DETOUR IS IN

EFFECT, AS DIRECTED BY THE ENGINEER.

6. BARRICADE WARNING LIGHTS - HIGH INTENSITY SHALL BE MOUNTED ON ALL DIAMOND SHAPED

POST-MOUNTED CONSTRUCTION SIGNS AND SIGN N.

7. CONTRACTOR TO NOTIFY THE ENGINEER AND THE CITY OF BRANFORD EMERGENCY SERVICES AT LEAST TWO

WEEKS PRIOR TO THE CLOSURE.

8. THE COST OF DETOUR SIGNS SHALL BE PAID FOR UNDER THE ITEM "CONSTRUCTION SIGNS".

9. RELOCATION OF TEMPORARY PRECAST CONCRETE BARRIER CURB FOR ACCESS TO WORK AREA SHALL NOT

BE MEASURED FOR PAYMENT.

10. MAINTAIN ACCESS TO ALL DRIVEWAYS DURING CONSTRUCTION.

H J ROAD CLOSED

THRU TRAFFIC

TO

DETOUR

B

M

M

JM

F

B

M

A

B

B

B

H

B

A E INDUSTRIAL ROAD

DETOUR

B F

LOCAL TRAFFIC ONLY

E INDUSTRIAL RD

ROAD CLOSED

DETOUR

SCHOOL GR. RD. TO

PIN OAK DR.

E INDUSTRIAL ROAD

DETOUR

A

A

A

A

MAINTAIN ONE LANE

OPEN IN EACH

DIRECTION AT ALL

TIMES (TWO WAY

TRAFFIC)

MAINTAIN ONE LANE FOR ON

AND ONE LANE FOR OFF

RAMP AT ALL TIMES

ONE LANE/LANE

SHIFT AHEAD

PHASE 2

E INDUSTRIAL RD

DETOUR PLAN

PHASE-2

H

HH

H

SYCAM

O

RE W

AY

A

A

PIN

O

A K

D R

A

H

SYCAM

O

RE W

AY

E MAIN ST

J

E MAIN ST

F

C E INDUSTRIAL ROAD

DETOUR

C

File details come from the government source that posted it. Updated .