2026-CB-046 Addendum 2_10.16.26.pdf
PDF 120 KB Posted
- Attached to
- 2026 Statewide Steel Repairs
- Solicitation number
- TCB27006870
- Issued by
- Providence County, Rhode Island
About this file
This is Addendum No. 2 to Rhode Island Contract No. 2026-CB-046, issued by the Rhode Island Department of Transportation on October 16, 2026, for the 2026 Statewide Steel Repairs project spanning multiple municipalities. The addendum modifies the contract plans and specifications by replacing Sheet No. 6 (Bridge Notes 2 of 2) with revised structural steel notes. The project encompasses steel beam end repairs and asphaltic joint replacement across seven bridges in Pawtucket, Providence, Warwick, North Kingstown, and Smithfield. The addendum establishes comprehensive technical requirements for structural steel fabrication, installation, welding, bolting, and painting, with specific focus on material certifications, quality standards, and inspection protocols. Additionally, the addendum includes detailed utility coordination requirements and special provisions governing work near AMTRAK infrastructure, including bonding, grounding, signal preview distances of minimum 1,500 feet, and compliance with AMTRAK's Engineering Practice standards EP3014 and EP3016. The contractor must coordinate all AMTRAK requirements prior to commencing work and submit a Site Specific Safety Work Plan for approval.
The addendum specifies that fabricating shops must hold current AISC Advanced Bridge Fabricator (ABR) certification and AISC Sophisticated Paint Endorsement P3 or SSPC-QP3 paint certification, while steel erectors must be certified as Certified Bridge Fabricator Simple (SBR). All AASHTO M 270 Grade 50 structural steel used in girders must meet Zone 2 Charpy V-Notch fracture toughness testing requirements, and all high-strength bolts must conform to ASTM F3125 Grade A325 with mechanical galvanizing per ASTM B695. Welding must comply with AASHTO/AWS D1.5 bridge welding code, including radiographic and magnetic particle testing with specific inspection protocols. The addendum requires contractors to verify all existing dimensions through field measurements, pre-fit all repair plates prior to application of epoxy paste, and complete installation immediately upon drilling without interruption. Surface preparation of deteriorated areas must meet SSPC-SP5 standards with cleaning extending six inches beyond the repair contact area, and all cleaned surfaces must receive an approved primer with final top coat matching existing finishes.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
ATTACHMENTS
October 16, 2026
STATE OF RHODE ISLAND
DEPARTMENT OF ADMINISTRATION
SOLICITATION NO. TCB27006870
RHODE ISLAND DEPARTMENT OF TRANSPORTATION
RHODE ISLAND CONTRACT NO. 2026-CB-046
FEDERAL-AID PROJECT NO. FAP Nos: 405-422-243
2026 STATEWIDE STEEL REPAIRS
CITIES OF PAWTUCKET, PROVIDENCE AND WARWICK
TOWNS OF NORTH KINGSTOWN AND SMITHFIELD
NOTICE TO PROSPECTIVE BIDDERS
ADDENDUM NO. 2 Prospective bidders and all concerned are hereby notified of the following changes in the Plans, Specifications, Proposal and Distribution of Quantities for this contract.
These changes shall be incorporated in the Plans, Specifications, Proposal and Distribution of Quantities, and shall become an integral part of the Contract Documents.
A. PLANS
1. SHEET NO. 6 - BRIDGE NOTES 2 OF 2:
Delete Sheet No. 6 in its entirety and replace with Sheet No. 6 (R-1) attached to this
Addendum. Notes have been revised.
STRUCTURAL STEEL NOTES
1. FRAMING DIMENSIONS ARE GIVEN ALONG CENTERLINES OF GIRDERS AND ALONG CENTERLINES OF
BEARINGS ON ABUTMENTS.
2. THE SHOPS FABRICATING THE STRUCTURAL STEEL MUST BE CERTIFIED BRIDGE FABRICATOR - ADVANCED
(ABR) IN ACCORDANCE WITH THE AISC QUALITY CERTIFICATION PROGRAM OR EQUIVALENT.
THE SHOPS SHALL ALSO BE CERTIFIED UNDER THE AISC “SOPHISTICATED PAINT ENDORSEMENT P3 (SPE)”
QUALITY PROGRAM OR THE SSPC-QP3 PAINT CERTIFICATION PROGRAM.
THE FABRICATOR MUST SUBMIT PROOF OF CURRENT CERTIFICATION AS SPECIFIED.
3. THE STEEL ERECTOR (FOR STRUCTURAL STEEL REPAIR) FOR THIS PROJECT SHALL BE CERTIFIED FOR CERTIFIED BRIDGE FABRICATOR - SIMPLE (SBR) IN ACCORDANCE WITH THE AISC QUALITY CERTIFICATION PROGRAM. THE ERECTOR OF THE STRUCTURAL STEEL SHALL BE REQUIRED TO SUBMIT PROOF OF CURRENT CERTIFICATION AS SPECIFIED, INCLUDING THE QUALITY CONTROL PLAN AND SAFETY PLAN THAT IS REQUIRED
TO OBTAIN CERTIFICATION.
4. SHOP DRAWINGS FOR ALL FABRICATED STEEL AND FALSEWORK SHALL BE SUBMITTED TO THE ENGINEER IN
SUFFICIENT TIME TO PERMIT CAREFUL CHECKING PRIOR TO FABRICATION.
5. INSPECTION OF WELDS INCLUDING RADIOGRAPHIC TESTING (RT) AND MAGNETIC PARTICLE TESTING (MT) SHALL BE IN ACCORDANCE WITH THE RI STANDARD SPECIFICATIONS AND THE AASHTO/AWS BRIDGE WELDING CODE, EXCEPT THAT THE REMAINING PERCENTAGE OF ALL GROOVE WELDS NOT RT TESTED SHALL BE MT OR
DYE-PENETRANT TESTED.
6. STRUCTURAL STEEL SHAPES AND PLATES SHALL CONFORM TO THE LATEST PROVISIONS OF AASHTO
DESIGNATION M 270 GRADE 50, AS DESIGNATED ON THE PLANS.
7. ALL AASHTO M 270 STRUCTURAL STEEL USED IN GIRDERS (INCLUDING CONNECTION PLATES AND STIFFENERS), SHALL MEET THE ZONE 2 CHARPY V-NOTCH FRACTURE TOUGHNESS TEST REQUIREMENTS AS SPECIFIED IN TABLE C6.6.2.1-1 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR “NONFRACTURE-CRITICAL” COMPONENTS. THE ZONE 2 FRACTURE TOUGHNESS REQUIREMENTS ARE AS
FOLLOWS:
NONFRACTURE-CRITICAL
GRADE 50 OR 50W 15 FT-LBS @ 40°F (UP TO AND INCLUDING 2 INCHES THICK)
GRADE 50 OR 50W 20 FT-LBS @ 40°F (FROM 2 INCH THICK UP TO AND INCLUDING 4 INCHES THICK)
SAMPLING AND TESTING PROCEDURES SHALL BE IN ACCORDANCE WITH AASHTO T 243. THE FREQUENCY OF TESTING SHALL BE IN ACCORDANCE WITH THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS.
THE CHARPY V-NOTCH FRACTURE TOUGHNESS TEST REQUIREMENT IS NOT MANDATORY FOR THE
FOLLOWING STEEL COMPONENTS:
· BEARINGS, MASONRY PLATES AND SOLE PLATES
· EXPANSION JOINTS AND MODULAR BRIDGE JOINT SYSTEMS
· DRAINAGE MATERIAL
· RAILINGS
· FOUNDATION H-PILES AND PIPE PILES
· SUPPORT OF EXCAVATION COMPONENTS
8. WELDING SHALL BE IN ACCORDANCE WITH THE LATEST BRIDGE WELDING CODE AASHTO/AWS D1.5
(INCLUDING ALL INTERIMS TO DATE) AND APPLICABLE SUPPLEMENTAL AWS PUBLICATIONS.
9. ALL HIGH STRENGTH BOLTS SHALL CONFORM TO ASTM F3125, GRADE A325, AND THEY SHALL BE INSTALLED IN ACCORDANCE WITH SECTION 824 OF THE RI STANDARD SPECIFICATIONS. ALL HIGH STRENGTH BOLTS, NUTS AND WASHERS SHALL BE MECHANICALLY GALVANIZED IN ACCORDANCE WITH ASTM B695, CLASS 50.
10. WASHERS MEETING ASTM F436 ARE TO BE USED OVER ALL HOLES THAT ARE MORE THAN 1/16” IN DIAMETER
GREATER THAN THE BOLT DIAMETER AND UNDER ALL PARTS TURNED DURING ASSEMBLY.
11. WELDING ELECTRODES SHALL HAVE THE SAME CORROSION RESISTANCE AS THE BASE METAL AND SHALL BE
FREE OF MOISTURE AT THE TIME OF USE.
12. WELDING OF ATTACHMENTS TO GIRDER FLANGES OR WEBS FOR CONSTRUCTION PURPOSES IS NOT
PERMITTED EXCEPT WHEN APPROVED BY THE ENGINEER.
13. ALL FILLET WELDS SHALL BE IN ACCORDANCE WITH THE BRIDGE WELDING CODE AASHTO/AWS D1.5 TABLE 2.1
(¼” MINIMUM).
BRIDGE NOTES 2 OF 2
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
RIDOT 2026 STATEWIDE STEEL REPAIRS
VOLUME 1
UTILITY NOTES:
1. CONSTRUCTION EQUIPMENT OR PERSONNEL SHALL FOLLOW OSHA REGULATION IN
REGARDS TO MINIMUM CLEARANCE TO ENERGIZED OVERHEAD LINES.
2. UNDERGROUND UTILITY LINES MAY BE IN CONFLICT WITH REQUIRED TEMPORARY OR
PERMANENT CONSTRUCTION, OR THE EQUIPMENT NECESSARYTO PERFORM THIS
REQUIRED CONSTRUCTION. DEPENDING UPON THE CONTRACTOR'S METHODS OF
CONSTRUCTION, THESE UTILITIES MAY NEED TO BE RELOCATED FOR PORTIONS OF THE
CONSTRUCTION PERIOD AND THEN MOVED BACK TO PERMANENT LOCATIONS WHICH MAY
BE OTHER THAN CURRENT LOCATIONS.
3. BOTH FEDERAL AND STATE LAW (RI. GENERAL LAW 39-1.2) REQUIRE NOTIFICATION OF
APPROPRIATE UTILITY COMPANIES BEFORE DIGGING, TRENCHING, BLASTING,
DEMOLISHING, BORING, BACK FILLING, GRADING, LANDSCAPING, OR OTHER EARTH MOVING
OPERATIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY ALL UTILITY
COMPANIES (INCLUDING THROUGH THE “DIG SAFE” PROGRAM) TO ENSURE THAT ALL
UTILITIES, BOTH UNDERGROUND AND OVERHEAD, HAVE BEEN MARKED BEFORE
COMMENCEMENT OF SUCH WORK. CONTRACTOR SHOULD UNDERSTAND THAT NOT ALL
UTILITIES SUBSCRIBE TO THE “DIG SAFE” PROGRAM. ANY DAMAGE TO EXISTING UTILITIES
MARKED IN THE FIELD, OR AS A RESULT OF FAILING TO CONTACT THE APPROPRIATE
UTILITY COMPANIES, SHALL BE REPAIRED OR REPLACED (AS DEEMED APPROPRIATE BY
THE STATE AND/OR THE IMPACTED UTILITY COMPANY AT NO ADDITIONAL COST TO THE
STATE).
4. DIG SAFE SHALL BE CALLED AT LEAST 72 HOURS PRIOR TO STARTING THE WORK TO
VERIFY LOCATIONS OF EXISTING UTILITIES.
STATEWIDE STEEL REPAIRS
STEEL REPAIR GENERAL NOTES:
1. ALL DIMENSIONS AND DETAILS SHOWN FOR THE EXISTING STRUCTURES HAVE BEEN
OBTAINED FROM RECORD DRAWINGS AND ARE NOT GUARANTEED. THE CONTRACTOR
SHALL DETERMINE AND ESTABLISH ALL DIMENSIONS AND DETAILS NECESSARY FOR
COMPLETION OF ALL WORK BY FIELD MEASUREMENTS AND SURVEY. ANY DISCREPANCIES
REQUIRING MODIFICATIONS TO THE STEEL REPAIR DETAILS SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
ADEQUACY THEREOF, AND ANY MATERIALS ORDERED PRIOR TO SHOP DRAWING
APPROVAL SHALL BE AT THE CONTRACTOR'S OWN RISK.
2. ALL EXISTING STRUCTURAL STEEL SHALL REMAIN UNLESS OTHERWISE NOTED. REMOVAL
OF MATERIAL OR DISCONNECTION OF MEMBERS SHALL NOT BE PERMITTED WITHOUT
EXPRESS WRITTEN APPROVAL OF THE ENGINEER.
3. THE LIMITS OF THE PROPOSED REPAIRS ARE BASED ON THE LATEST INSPECTION REPORTS.
THE CONTRACTOR SHALL FIELD VERIFY THE LIMITS OF DETERIORATION AT EACH REPAIR
LOCATION. ANY DETERIORATION EXTENDING BEYOND THE REPAIR LIMITS SHOWN ON THE
PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR REVIEW AND
APPROVAL PRIOR TO FABRICATION AND INSTALLATION OF THE REPAIR STEEL.
4. THE CONTRACTOR SHALL PRE-FIT REPAIR PLATES/ANGLES IN PLACE TO ENSURE NO
CONFLICTS PRIOR TO APPLICATION OF EPOXY PASTE. PLATES SHALL THEN BE
REINSTALLED OVER PASTE AND FIT SNUG TIGHT. FINAL TIGHTENING SHALL BE PERFORMED
AFTER PAST IS FULLY SET.
5. THE CONTRACTOR SHALL SCHEDULE THE WORK SUCH THAT NO HOLES ARE DRILLED UNTIL
ALL REQUIRED REPAIR PLATES/ANGLES ARE ON SITE AND HAVE BEEN PRE-FIT INTO PLACE.
INSTALLATION OF REPAIR MATERIALS SHALL BE COMPLETED IMMEDIATELY AND WITHOUT
INTERRUPTION AFTER HOLES HAVE BEEN DRILLED.
6. EPOXY PASTE (RIDOT APPROVED) FOR STEEL REPAIRS SHALL BE APPLIED TO
DETERIORATED SURFACES AND VOIDS BEHIND THE BENT PLATE RADIUS. NEW PLATES
SHALL BE FIT FLUSH AND TIGHT AGAINST THE EXISTING ELEMENTS AND BOLTS SHALL BE
SNUG TIGHTENED IN PLACE PRIOR TO THE SETTING OF THE EPOXY PASTE. THE PASTE
SHALL BE APPLIED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S LATEST WRITTEN
INSTRUCTIONS.
PAINTING STRUCTURAL STEEL NOTES:
1. NEW STRUCTURAL STEEL SHALL BE PREPARED AND PRIMED IN THE SHOP IN
ACCORDANCE WITH SECTION 825 OF THE RI STANDARD SPECIFICATIONS.
2. CLEAN AND PREPARE ALL DETERIORATED SURFACES TO SSPC-SP5 LEVEL
REQUIREMENTS OR BETTER TO PROVIDE PROPER CONTACT SURFACE FOR THE NEW
REPAIR ELEMENTS. CLEANED AREA SHALL BE THE LIMITS OF THE REPAIR CONTACT
AREA PLUS 6" ALL AROUND.
3. APPLY AN APPROVED PRIMER TO THE CLEANED SURFACE AREA.
4. THE FINAL TOP COAT AND COLOR SHALL MATCH THE EXISTING AND BE APPROVED
BY RIDOT.
5. ANY COMPONENT NOT DESIGNATED TO BE REPAINTED SHALL BE ADEQUATELY
PROTECTED FROM CLEANING OPERATION.
6. THE WORK ASSOCIATED WITH SETTING UP, MAINTAINING AND REMOVING THE
CONTAINMENT SYSTEM FOR THE SURFACE PREPARATION OF THE EXISTING
STRUCTURAL STEEL, MUST BE CONDUCTED IN ACCORDANCE WITH THE PROPOSED
MAINTENANCE AND PROTECTION OF TRAFFIC PLANS AND THE TIME RESTRICTION
SPECIFIED IN THE CONTRACT DOCUMENTS.
7. ANY DAMAGE RESULTING FROM CONTRACTOR'S CLEANING OPERATIONS, SHALL BE
REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE ENGINEER AT NO
ADDITIONAL COST TO THE STATE.
8. WHEN ACCESSING THE SUPERSTRUCTURE FROM ABOVE GROUND, THE
CONTRACTOR IS RESPONSIBLE FOR MAINTAINING PROPER CLEARANCES OVER THE
ROADWAYS. TEMPORARY PROTECTIVE SHIELDING IS REQUIRED WHEN WORKING
ABOVE ROADWAYS.
SPECIAL NOTES TO CONTRACTOR REGARDING AMTRAK:
1. THE CONTRACTOR SHALL BE ESPECIALLY AWARE THAT INFRASTRUCTURE FOR
ELECTRIFICATION OF THE RAILROAD IS IN PLACE AND IS ENERGIZED.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUCTING ALL NECESSARY
COORDINATION WITH AMTRAK PRIOR TO AND DURING ALL CONSTRUCTION ACTIVITIES.
3. AMTRAK SPECIFICATIONS REGARDING BONDING, GROUNDING, SHIELDING AND FOR
WORKING OVER AROUND AND WITHIN AMTRAK R.O.W. ARE CONTAINED IN THE
APPENDICES OF THE CS-PAGES OF THE CONTRACT DOCUMENTS. THE CONTRACTOR
SHALL CONDUCT A THOROUGH REVIEW OF THESE SPECIFICATIONS PRIOR TO
COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES AND SHALL SATISFY ALL AMTRAK
REQUIREMENTS AS DIRECTED BY AMTRAK AND/OR THE ENGINEER. THESE AMTRAK
SPECIFICATIONS INCLUDE THE FOLLOWING.
A. AMTRAK'S EP3014 ENGINEERING PRACTICE SECTION 01141A "MAINTENANCE AND
PROTECTION OF RAILROAD TRAFFIC DURING CONTRACTOR OPERATIONS"
B. AMTRAK’S EP3014 ENGINEERING PRACTICE, SECTION 01142A "SUBMISSION
DOCUMENTATION REQUIRED FOR AMTRAK REVIEW AND APPROVAL OF PLANS FOR
BRIDGE ERECTION, DEMOLITION AND OTHER CRANE/HOISTING OPERATIONS OVER
RAILROAD RIGHT-OF-WAY".
C. AMTRAK’S EP3014 ENGINEERING PRACTICE, SECTION 01520A "REQUIREMENTS FOR
TEMPORARY PROTECTION SHIELDS FOR DEMOLITION AND CONSTRUCTION OF
OVERHEAD BRIDGES AND OTHER STRUCTURES".
D. AMTRAK'S EP3016 ENGINEERING PRACTICE "STORM WATER DRAINAGE AND
DISCHARGE FROM ADJACENT PROPERTY ONTO AMTRAK RIGHT-OF-WAY AND
SPECIFICATION NO. 150" STORMWATER MANAGEMENT POLICY.
E. AMTRAK'S PROTECTIVE BARRIERS AND DEBRIS SHIELDS STANDARD DRAWINGS
ET-1446-D AND ET-1447-D.
4. BEFORE ANY WORK IS COMMENCED, COORDINATE WITH AMTRAK REGARDING
REQUIREMENTS OF TRACK AND/OR POWER OUTAGES FOLLOWING ALL STANDARD
PROCEDURES AND SAFETY RULES. SITE SPECIFIC SAFETY WORK PLAN (SSSWP) TO BE
SUBMITTED FOR APPROVAL PRIOR TO COMMENCING ANY WORK.
5. ANY WORK TO BE PERFORMED WITHIN 15 FEET OF THE OVERHEAD WIRES MUST BE
DONE UNDER THE PROTECTION OF AN AMTRAK ELECTRIC TRACTION CLASS "A"
EMPLOYEE.
6. WHENEVER WORK IS PERFORMED IN THE VICINITY OF THE ELECTRIFIED TRACKS
AND/OR HIGH VOLTAGE WIRES. PARTICULAR CARE MUST BE EXERCISED AND
RAILROAD'S REQUIREMENTS REGARDING CLEARANCE TO BE MAINTAINED BETWEEN
EQUIPMENT AND TRACKS AND/OR ENERGIZED WIRES. THE CONTRACTOR MUST
SUPPLY AN ADEQUATE LENGTH OF GROUNDING CABLE 4/0 COPPER WITH APPROVED
CLAMPS) FOR EACH PIECE OF EQUIPMENT WORKING NEAR OR ADJACENT TO ANY
OVERHEAD WIRE (SEE AMTRAK SPECIFICATION 16064).
7. ALL UNDERGROUND UTILITIES, CABLE, AND FACILITIES MUST BE LOCATED AND
PROTECTED BEFORE ANY EXCAVATING, DRILLING, BORING/DIRECTIONAL DRILLING,
GROUND PENETRATING ACTIVITIES OR CONSTRUCTION TAKES PLACE. THIS INCLUDES
RAILROAD AND COMMERCIAL UTILITIES, CABLES, DUCT LINES AND FACILITIES. THESE
ACTIVITIES WILL NOT BE PERFORMED IN CLOSE PROXIMITY TO THE AMTRAK DUCT
LINES UNLESS MONITORED BY ON-SITE AMTRAK COMMUNICATIONS AND SIGNAL (C&S)
DEPARTMENT PERSONNEL. HAND DIGGING MAY BE REQUIRED, AS DIRECTED BY
AMTRAK THROUGH THE ON-SITE AMTRAK C&S SUPPORT PERSONNEL. AMTRAK
MAINTAINS THE RIGHT TO ACCESS ALL EXISTING CABLES AND CONDUITS
THROUGHOUT CONSTRUCTION. AMTRAK ALSO RESERVES THE RIGHT TO UPGRADE
AND INSTALL NEW CABLES AND CONDUITS IN THE AFFECTED AREA. THE "ONE-CALL"
PROCESS MUST BE FOLLOWED. BE AWARE THAT AMTRAK IS NOT A PART OF THE
ONE-CALL PROCESS; CONTACT AMTRAK ENGINEERING TO HAVE ALL AMTRAK
UNDERGROUND UTILITIES AND ASSETS LOCATED. PRECAUTIONS MUST BE TAKEN TO
PREVENT ANY INTERRUPTION TO AMTRAK'S OPERATION.
8. SIGNAL PREVIEW MUST NOT BE OBSTRUCTED. CONSULTANTS PERFORMING WORK FOR
AMTRAK OR ON AMTRAK PROPERTY MUST SHOW THAT THERE IS ADEQUATE SIGNAL
PREVIEW. IN ADDITION, ALL TEMPORARY STRUCTURES, FORMWORK, EQUIPMENT, ETC.
MUST COMPLY WITH THIS DURING CONSTRUCTION.
9. A MINIMUM SIGNAL PREVIEW DISTANCE SHALL NOT BE LESS THAN 1500 FEET. SIGNAL
PREVIEW IS MEASURED FROM A POINT 13 FEET ABOVE THE TOP OF RAIL, AT A MINIMUM
OF 1500 FEET FROM THE TOP SIGNAL HEAD (“A” HEAD) OF THE SIGNAL THE TRAIN IS
APPROACHING. CONSULTANTS PERFORMING WORK FOR AMTRAK ON AMTRAK
PROPERTY SHALL PROVIDE A DRAWING SHOWING THAT THERE IS ADEQUATE SIGNAL
PREVIEW. THIS DRAWING MUST BE IN THE FINAL DESIGN. ALL TEMPORARY
STRUCTURES, FORMWORK, EQUIPMENT, ETC. MUST NOT OBSTRUCT SIGNAL PREVIEW
DURING CONSTRUCTION.
10. IF WORK INVOLVES HEAVY TRUCKS, EQUIPMENT, OR MACHINERY ALONG THE
RIGHT-OF-WAY, DUCT LINES AND PULL BOXES SHALL BE INSPECTED TO INSURE THEY
CAN WITHHOLD THE APPROPRIATE WEIGHT. REFER TO TIER TABLE DOCUMENT.
11. RAILS MUST BE PROTECTED AGAINST DEBRIS, RUST, SAND, METAL SHAVINGS OR
OTHER MATERIAL THAT CAN INTERFERE WITH THE PROPER SHUNTING SENSITIVITY OF
THE TRACK CIRCUIT.
R-1
ADDENDUM NO. 2