2026-28 Addendum 3.pdf
PDF 349 KB Posted
- Attached to
- Ceiling Replacement - Flood Middle School
- Solicitation number
- BID 2026-28
- Issued by
- Fairfield County, Connecticut
About this file
This Addendum #3, issued by the Town of Stratford, Connecticut on May 22, 2026, provides clarifications and supplemental instructions for the Ceiling Replacement project at Flood Middle School Library located at 490 Chapel Street, Stratford, Connecticut (Town Project Number 2026-28). The addendum addresses 24 requests for information submitted by prospective bidders between May 14 and May 21, 2026, establishing critical project scope definitions. Key clarifications include: the Town will move existing furniture; the contractor is responsible for protecting built-in fixtures, stacks, and shelving, providing temporary floor protection, professional final cleaning, and necessary temporary lighting; the contractor applies for the building permit; the contractor arranges for a licensed sprinkler contractor to relocate five sprinkler heads at the existing ceiling height; the contractor removes and replaces all ceiling-mounted devices except lighting fixtures, which the town's electrical contractor will handle; the contractor provides and installs new HVAC grilles; and the Town waives permit fees. The contractor must use onsite dumpster and restroom facilities, with no temporary toilets or third-party testing required. Hazardous materials testing results were pending inclusion in a subsequent addendum at the time of this issuance.
The addendum confirms that the scope is limited to the library space with final cleaning requirements adjusted to restore the room to pre-construction condition rather than broader building standards. No plumbing impact is anticipated, and no temporary sprinkler protection is required during construction. All responses were directed to the Project Architect/Project Manager (Snyder) and the Board of Education, with responses provided within three to five days of questions received. The clarifications establish clear delineation of responsibilities between the general contractor, electrical contractor, and town to prevent conflicts and ensure comprehensive coverage of all work required for project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5/22/2026
Addendum 3 1 of 2
ADDENDUM #3
Ceiling Replacement:
Flood Middle School Library
490 Chapel Street Stratford, CT
TOWN PROJECT NUMBER: 2026-28
ISSUED: 5/22/2026
PROJECT TEAM
Architect / Project Manager:
5/22/2026
Addendum 3 2 of 2
The work shall be carried out in accordance with the following supplemental instructions and in accordance with the Contract Documents.
MISCELLANEOUS CHANGES AND CLARIFICATIONS:
1. Requests for Information (RFI’s)
• See attached RFI Log.
*** END OF ADDENDUM #3 ***
RFI LOG
Ceiling Replacement:
Flood Middle School Library Date: 5/22/2026
Question Date Received
Directed To Response Response Date
1 Please advise who is responsible for moving existing furniture? 5/14/2026 Snyder/BOE Client will move all tables and chairs. 5/19/2026
2 Please advise who is responsible for protecting existing built-ins, stacks, etc …
5/14/2026 Snyder/BOE Contractor is responsible to cover and protect all existing conditions including built-in, stacks, etc …
5/19/2026
3 Please advise who is responsible for final cleaning. 5/14/2026 Snyder/BOE Contractor is responsible to professionally clean and dust entire space including stacks, shelves, etc … to pre-construction condition.
5/19/2026
4 Could you provide guidelines for the following site logistics?
a) Access for materials delivery and debris removal
b) Access to restroom facilities
c) Requirements for a trailer on-site
5/14/2026 Snyder See attached existing floor plan showing library, exits, and bathrooms.
5/19/2026
5 Will the town be waiving the permit fees? 5/14/2026 Snyder/Town Yes 5/19/2026 6 Is there an overall plan that shows the location of the library relative to the rest of the building?
5/14/2026 Snyder See attached existing floor plan. 5/19/2026
7 From Drawings A-101 Ceiling Plan – LEGEND, States:
-New Light Fixtures to be Provided and Installed by others (obviously by the Electrical Contractor awarded this project), Should the removal of the existing lighting fixtures and Light Motion Sensors (to be saved to reuse) also be included in the Electrical Contractor's scope?
The question arises because the Ceiling Replacement BID # 2026-28 doesn’t include any electrical work.
To prevent and/or avoid any discrepancies or conflicts, the concern is:
If the removal and disposal of existing lighting fixtures, accessories, and motion sensors is performed by someone other than the Electrical Contractor, SOME ITEMS, DEVICES, AND/OR WIRE CIRCUITS could be missed or misplaced, which could affect the Electrical Contractor's work.
PLEASE CLARIFY if the Removal and Disposal of existing Lighting Fixtures and Motion Sensors are on the Electrical Contractor's Scope of Work or not. So we can bid accordingly.
5/18/2026 Snyder Town electrical contractor shall remove, safe, and dispose of existing light fixtures. GC responsible for removal and replacement for ALL other ceiling mounted devises including but not limited to smoke detectors, clocks, speakers, sprinkler heads, etc ... GC shall also provide necessary temporary lighting to complete project.
5/19/2026
8 Are there any known hazardous materials related to work in this project? If suspected hazardous materials are found, please confirm testing and abatement is by the Owner.
5/20/2026 Snyder Existing ceiling materials are being tested now and results will be included in subsequent Addendum.
5/20/2026
9 Please confirm the Owner will pay town permit fees. 5/20/2026 Snyder Yes 5/20/2026 10 Please clarify who will apply for the building permit. 5/20/2026 Snyder Contractor 5/20/2026 11 Will the contractor need to provide temp floor protection? 5/20/2026 Snyder Yes. Contractor is responsible to protect existing surfaces including but not limited to the floor.
5/20/2026
12 Should the contractor provide Temp Toilets, or can we use existing facilities. Please confirm the Owner will clean the existing facilities.
5/20/2026 Snyder Contractor can use building toilets. 5/20/2026
13 Please confirm there will be an onsite location for the contractor’s dumpster, preferably on pavement.
5/20/2026 Snyder Yes 5/20/2026
14 Spec 01310 Para 3.02 – is the contractor to provide the meeting space and furniture, or will a space in the existing school be utilized?
5/20/2026 Snyder Any onsite meeting will be casual and meeting furniture not necessary.
5/20/2026
15 Spec 01400 – we do not see any testing, that requires a Third Party Testing Agency, for the work if this project. Please confirm or correct.
5/20/2026 Snyder Third party testing not necessary. 5/20/2026
16 Spec 01770 Para 1.06 call for Final Cleaning (professional cleaners) hired by the contractor. This Spec includes, among other things, cleaning glass both sides, polishing surfaces, cleaning ducts and exterior paved surfaces. Please define the expected final cleaning scope intended given the limited scope of the project in one room.
5/20/2026 Snyder Contractor shall clean and return spaces in the same condition as found.
5/20/2026
17 Will the sprinkler system be deactivated and drained? If so, who is responsible for this?
5/20/2026 Snyder Contractor responsible to retain licensed sprinkler contractor to relocate sprinkler heads as needed. Relocating 5 sprinkler heads is included in the basebid and unit price requested if more or less is needed.
5/20/2026
18 Is the elevation of the existing sprinkler heads changing? Or is the intent to set the new ceilings at the existing elevation?
5/20/2026 Snyder The intent is that the new ceiling height will be the same as existing.
5/20/2026
19 Addendum #1 RFI #7 – please clarify if existing sprinkler heads are intended to be removed and reinstalled.
5/20/2026 Snyder The intent is to provide a finished ceiling with trimmed out sprinkler heads to match existing.
5/20/2026
20 We do not see a plumbing impact related to the ceiling scope.
Please confirm there is not a plumbing impact.
5/20/2026 Snyder There is no known plumbing impact. 5/20/2026
21 Please clarify if the contractor is to include an HVAC contactor, or will the Owner hire this directly?
5/20/2026 Snyder Contractor is responsible for all work in the construction documents. Contractor shall determine if HVAC sub is necessary to address existing grills/diffusers.
5/20/2026
22 Please confirm that new HVAC grilles will be intended given that existing grilles will not likely sit in the new ACT grid.
5/20/2026 Snyder Contractor shall provide and install new gills. 5/20/2026
23 Addendum #1 RFI #7 & Drawing A101 calls out the new lighting note, “New lighting to be provided and installed by others.”
Please confirm the Owner’s electrician will furnish AND install the new lighting, and not the Contractors electrician.
5/20/2026 Snyder Refer to RFI #7 response. 5/20/2026
24 Will temporary upright sprinkler protection be required during construction?
5/21/2026 Snyder/ Fire Marshal
No 5/22/2026