2026-15 Flood Protection Project - WPCF_Part3.pdf.crdownload
CRDOWNLOAD file 50 MB Posted
- Solicitation number
- BID 2026-15
- Issued by
- Fairfield County, Connecticut
About this file
This document pertains to a Flood Protection Project for the Water Pollution Control Facility in Stratford, Connecticut. The project encompasses the removal of existing stone riprap, excavation to approximately 3-4 feet depth, drilling of micropiles, forming and pouring concrete pile caps and concrete walls, placement of fill for earthen embankment, installation of gabion wall, reinstallation of stone riprap, and site restoration. The total scope of flood protection work extends 3,100 linear feet. A non-mandatory pre-bid conference is scheduled for Tuesday, February 17, 2026, at 1:30 PM at the Water Pollution Control Facility located at 105 Beacon Point Road, Stratford, CT 06615.
Bids must be submitted in physical form only, with electronic bid submissions explicitly prohibited. Additional specific information regarding pricing terms, contract duration, renewal options, funding sources, and other financial requirements is not detailed in the available documentation provided.
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .