About this file
This is a Scope of Work document for the Connecticut Water Pollution Control Facility's Flood Protection Project. The project involves comprehensive flood mitigation work spanning 3,100 linear feet at the facility located at 105 Beacon Point Road, Stratford, Connecticut. The scope of work includes removal of existing stone riprap, excavation to approximately 3-4 feet depth, drilling micropiles, forming and pouring concrete pile caps and concrete walls, placement of fill for earthen embankment, installation of a gabion wall, reinstallation of stone riprap, and site restoration. A non-mandatory pre-bid conference is scheduled for Tuesday, February 17, 2026, at 1:30 PM at the Water Pollution Control Facility site to allow potential bidders to review the project location and specifications.
Bidders are explicitly instructed not to submit bids electronically; all submissions must be made through alternative methods as specified in the contract documents. The document does not contain specific pricing information, contract award dates, or renewal options within the provided excerpt. Funding sources, contract term details, and other financial requirements are not detailed in this scope of work section, indicating that such information is contained in other sections of the complete solicitation package.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .