About this file
This is a Scope of Work document for the Water Pollution Control Facility in Stratford, Connecticut, outlining a flood protection project involving structural and site restoration work. The project encompasses removal of existing stone riprap, excavation to approximately 3-4 feet depth, drilling of micropiles, formation and pouring of concrete pile caps and concrete walls, placement of fill for earthen embankment, installation of a gabion wall, reinstallation of stone riprap, and comprehensive site restoration. The flood protection work extends 3,100 linear feet along the facility. A non-mandatory pre-bid conference is scheduled for Tuesday, February 17, 2026, at 1:30 PM at the Water Pollution Control Facility, 105 Beacon Point Road, Stratford, CT 06615.
The document specifies that bids must be submitted in physical form and explicitly prohibits electronic bid submissions. Pricing terms, set-asides, specific funding sources, and contract award dates are not detailed in this portion of the project documentation. Additional contract terms, including bid submission deadlines, contract duration, and detailed pricing requirements, would be contained in supplementary project documents not included in this file excerpt.
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .