This is a bid plan set for a public sanitary sewer repair project issued by the Village of Tuxedo Park, New York, prepared by Weston & Sampson, PE, LS, LA, Architects, PC. The project, designated as DPW 2026-03, constitutes Year 3 of the SSES (Sanitary Sewer Evaluation Survey) Phase 3 construction contract and encompasses repairs across four sub-basins (5, 8, 16, and 17) within the Village of Tuxedo Park located in Orange County, New York. The scope of work includes rehabilitation of 45 manholes (involving repointing, bench repairs, invert sealing, and exterior chemical grouting as needed) and installation of cured-in-place pipe liners for approximately 3,600 linear feet of 6-inch diameter pipe and 2,400 linear feet of 8-inch diameter pipe, including cleaning, testing, and sealing operations. The project work areas span multiple roadways including Pine Hill Road, Pepperidge Road, Tuxedo Road, East Lake Road, Ridge Road, Acoma Road, West Lake Road, Summit Road, and Ontio Road. The bid set was issued in July 2026 with bidding scheduled through August 2026.
The bid plan set includes comprehensive construction documents with general notes, legends, abbreviations, location maps for the sub-basins, detailed site maps at various scales, construction details for manhole sealing and sewer trenches, erosion and sedimentation control specifications, and traffic maintenance and protection plans. The drawings reference standard New York State Department of Transportation specifications and include provisions for flagging operations, lane closures, and work zone traffic control in accordance with applicable state standards. The project documents indicate a status of "Not Released for Construction" as of the April 2026 approval date, with the bidding phase anticipated for July-August 2026. No information regarding contract pricing, set-asides, incumbents, or specific funding sources is provided in these bid plan documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REGIONAL LOCATION MAP
SCALE: NTS
VILLAGE OF TUXEDO PARK,NEW YORK
SSES PHASE 3
SUB BASINS 5,8,16,&17
PUBLIC SANITARY SEWER REPAIRS
YEAR 3 CONSTRUCTION
CONTRACT NO. DPW-2026-02
SITE MAP
SCALE: 1"=2000'
TUXEDO
LAKE
ORANGE COUNTY
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY
OF WESTON & SAMPSON, PE, LS, LA, ARCHITECTS,
PC THIS DRAWING MAY NOT BE REPRODUCED IN
WHOLE OR IN PART BY ANY MEANS WHATSOEVER
WITHOUT THE EXPRESS WRITTEN CONSENT OF
WESTON & SAMPSON PE, LS, LA, ARCHITECTS, PC
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE
EDUCATION LAW.
COA:
Seal:
DRAWING INDEX
SHEET TITLE
G-1 COVER SHEET
G-2 GENERAL NOTES, LEGENDS AND ABBREVIATIONS
C-1 OVERALL SUB-BASIN LOCATION MAP
C-2 SUB-BASINS 5 & 8 LOCATION MAP
C-3 SUB-BASINS 16 & 17 LOCATION MAP
C-4 PINE HILL ROAD
C-5 PEPPERIDGE ROAD, TUXEDO ROAD, AND EAST LAKE ROAD
C-6 TUXEDO ROAD
C-7 RIDGE ROAD AND ACOMA ROAD
C-8 WEST LAKE ROAD AND SUMMIT ROAD
C-9 ONTIO ROAD AND SUMMIT ROAD
D-1 DETAILS
D-2 DETAILS
D-3 EROSION AND SEDIMENTATION CONTROL
D-4 TRAFFIC MAINTENANCE AND CONTROL
www.westonandsampson.com
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
Village Office, Hall, & Court 80 Lorillard Road Tuxedo Park, NY 10987 United States
PHONE
(845) 351-4745 Ext. 1
WATER AND SEWER DEPARTMENT ADDRESS
VILLAGE OF TUXEDO PARK
BOARD OF TRUSTEES
Marc D. Citrin Mayor Michele Lindsay Trustee / Deputy Mayor Joshua Scherer Trustee Matthew Tinari Trustee Jedediah Turner Trustee
BID SET :
DPW 2026-03
JULY 2026AUGUST 2026
SMH
CB
TMH
FMCO
CO
ARMH
EMH
SDMH
GP
E
T
A
F
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o P ar k, NY
\E
NG
-X
XX
X
SS
ES
P ha se
3, S ub -B as ins
5, 8, \06
-B
IM
-C
AD
\01 -C ivi l-S ur ve y\G -2
G
EN
ER
AL
N
OT
ES
LE
GE
ND
.dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-03
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
GENERAL NOTES,
LEGENDS AND
ABBREVIATIONS
G-2
JULY 2026
BIDDING
AUGUST 2026
12''
6'
8'
4''
0'
CI 6''
0''
6'
0''
0''
CI 0
0''
0''
0''
4''
0''
0''
6'
4''
8'
8''
6''
2''
8''
0''
0''
CI 0''
CI 0''
8''
0''
0'
0'
2''
6'
8''
CI 4''
CI 0''
0''
12''
6'
8'
4''
0'
CI 6''
0''
6'
0''
0''
CI 0
0''
0''
0''
4''
0''
0''
6'
4''
8'
8''
6''
2''
8''
0''
0''
CI 0''
CI 0''
8''
0''
0'
0'
2''
6'
8''
CI 4''
CI 0''
0''
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o P ar k, NY
\E
NG
-X
XX
X
SS
ES
P ha se
3, S ub -B as ins
5, 8, \06
-B
IM
-C
AD
\01 -C ivi l-S ur ve y\C -1
S
UB
-B
AS
IN
LO
CA
TI
ON
M
AP
.dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-02
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
SUB-BASINS LOCATION
MAP
C-1
BIDDING
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o P ar k, NY
\E
NG
-X
XX
X
SS
ES
P ha se
3, S ub -B as ins
5, 8, \06
-B
IM
-C
AD
\01 -C ivi l-S ur ve y\C -2
S
UB
-B
AS
IN
S
5 &
LO
CA
TI
ON
M
AP
.dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-02
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
SUB-BASINS 5 & 8
LOCATION MAP
C-2
BIDDING
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o P ar k, NY
\E
NG
-X
XX
X
SS
ES
P ha se
3, S ub -B as ins
5, 8, \06
-B
IM
-C
AD
\01 -C ivi l-S ur ve y\C -3
S
UB
-B
AS
IN
S
LO
CA
TI
ON
M
AP
.dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-02
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
SUB-BASINS 16 & 17
LOCATION MAP
C-3
BIDDING
0'
0'
0'
0'
0'
0'73
0'
0'
0'
0'
0'68
0'
0'
0'
0'64
0'
0'
0'
0'
0'
0'
0'
0'
0'
780'
770'
760'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0' 71
0'
0' 69
0'
0'
0'
0'
0'
750'
0'
740'
710'
0'
0'60 0'59
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
520'
0'
0'
650'
780'
770'
760'
750'
740'
730'
720'
710'
700'
690'
680'
670'
650'
760'750'740'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
640'
0'
0'
0'
0'
0'
650'
820'
810'
800'
790'
0'
0'
0'
0'
0'
0'
560'
900'
0'
0'
860'
850'
840'
0'
930'
0'
0'
800'
800'
0'
0'
0'
0'
0'
0'
0'
0'
0'
710'
840'
0'
0'
0'
670'
620'
850'
0'
0'
630'
760'
690'
0'
710'
640'
0'
0'
610'
620'
0'
520'
0'
840'
0'
560'
560'
560'
0'
600'
590'
0'
0'
0'
560'
570'
650'
0'
820'
580'
710'
0'
530'
0'
740'
730'
730'
720'
720'
0'
0'
0'
690'
690'
0'
680'
670'
0'
660'
0'
660'
650'
0'
650'
640'
0'
640'
630'
630'
0'
0'
0'
0'
600'
0'
0'
590'
580'
580'
580'
580'
0'
560'
540'
550'
0'
0'
0'
0'
660' 650'
0'
640'
0'
0'
630'
0'
620'
0'
610'
0'
600'
0'
590'
590'
660'650'
640'
630'
860'
0'
830'
820'
800'
0'
0'
780'
0'
770'
0'
0'
0'
760'
0'
0'
740'
0'
0'
0'
0'
710'
0'
0'
0'
0'
0'
670'
0'
600'
0'
850'
0'
0'
0'
570'
0'
550'
540'
700'
0'
590'
820'
810'
800'
790'
840'
860'
770'
850'
710'
710'
720'
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o
Pa rk
, N Y\
EN
G2
5-
XX
XX
S
SE
S
Ph as e 3, S ub
-B as ins
, 8 , 1
\0
6-
BI
M -C
AD
\0
1- Ci vil -S ur ve y\C -4
P
IN
E
HI
LL
R
OA
D.
dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-03
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
PINE HILL ROAD
C-4
BIDDING
710'
650'
600'
700'
670'
690'
0'
0'
0'
0'
0'
0'73
0'
0'
0'
0'
0'68
0'
0'66 0'
0'64
0'
0'
0'
0'
0'
0'
0'
0'
0'
750'
750'
740'
520'
710'
820'
0'
0'
790'
780'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
0'
760'
750'
740'
730'
720'
710'
700'
690'
680'
670'
0'
0'
770'760'
750'
580'
0'
560'
0'
810'
800'
790'
0'
0'
0'
0'
0'
0'
0'
560'
800'
0'
0'
0'
0'
0'
560'
0'
0'
620'
0'
0'
630'
760'
750'
690'
710'
640'
0'
0'
0'
610'
620'
0'
520'
560'
560'
560'
560'
600'
590'
0'
0'
570'
650'
710'
0'
530'
0'
740'
740'
730'
0'
0'
720'
720'
0'
710'
0'
0'
690'
690'
690'
0'
0'
680'
0'
0'
670'
0'
0'
0'
660'
0'
0'
650'
640'
0'
640'
630'
0'
630'
0'
0'
0'
0'
0'
0'
600'
0'
0'
590'
580'
580'
580'
0'
580'
0'
560'
540'
0'
0'
0'
0'
0'
0'
660'
660' 650'
640'
0'
630'
620' 610'
600'
0'
590'
590'
650'
640'
630'
780'
770'
0'
760'
0'
0'
0'
0'
0'
0'
670'
600'
0'
0'
0'
0'
570'
550'
550'
540'
700'
590'
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o P ar k, NY
\E
NG
-X
XX
X
SS
ES
P ha se
3, S ub -B as ins
5, 8, \06
-B
IM
-C
AD
\01 -C ivi l-S ur ve y\C -5
.dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-03
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
PEPPERIDGE ROAD,
TUXEDO ROAD, AND
EAST LAKE ROAD
C-5
620'
610'
600'
0'
590'
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o
Pa rk
, N Y\
EN
G2
5-
XX
XX
S
SE
S
Ph as e 3, S ub
-B as ins
, 8 , 1
\0
6-
BI
M -C
AD
\0
1- Ci vil -S ur ve y\C -6
R
ID
GE
R
OA
D, E
AS
T
LA
KE
R
OA
D, T
OW
ER
H
IL
L
RO
AD
W
ES
T.
dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-03
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
TUXEDO ROAD
C-6
BIDDING
660'
640'
810'
820'
800'
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o P ar k, NY
\E
NG
-X
XX
X
SS
ES
P ha se
3, S ub -B as ins
5, 8, \06
-B
IM
-C
AD
\01 -C ivi l-S ur ve y\C -7
R
ID
GE
R
OA
D
AC
OM
A
RO
AD
.dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-03
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
RIDGE ROAD AND
ACOMA ROAD
C-7
12''
6'
740'
730'
720'
750'
690' 680'
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o P ar k, NY
\E
NG
-X
XX
X
SS
ES
P ha se
3, S ub -B as ins
5, 8, \06
-B
IM
-C
AD
\01 -C ivi l-S ur ve y\C -8
W
ES
T
LA
KE
R
OA
D
SU
MM
IT
R
OA
D.
dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-03
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
WEST LAKE ROAD AND
SUMMIT ROAD
C-8
710'
700'
650'
630'
590'
740' 730'
720'
680'
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o P ar k, NY
\E
NG
-X
XX
X
SS
ES
P ha se
3, S ub -B as ins
5, 8, \06
-B
IM
-C
AD
\01 -C ivi l-S ur ve y\C -9
O
NT
IO
R
OA
D
SU
MM
IT
R
OA
D.
dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-03
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
ONTIO ROAD AND
SUMMIT ROAD
C-9
D es cr ip tio n
SHEET
Ap p.
By C k.
By
D r.B y D at e
N o.
D E
V O
R P
P A
OF
FI
LE
N O
D
AT
E
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
P.
BY
D
SN
.B
Y D
R .B
Y
JO
B N
O
C O
N
TR
AC
T:
SC
AL
E:
C
AD
D
N O
C
H K.
BY
COPYRIGHT © 2022 BY WESTON & SAMPSON, PE, LS, LA, PC THIS DRAWING IS
AN INSTRUMENT OF SERVICE AND IS THE PROPERTY OF WESTON &
SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE REPRODUCED IN
WHOLE OR IN PART BY ANY MEANS WHATSOEVER WITHOUT THE EXPRESS
WRITTEN CONSENT OF WESTON & SAMPSON PE, LS, LA, PC
UNAUTHORIZED ALTERATION OR ADDITION TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209. SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION LAW.
5.
4.
w w w .w es to na nd sa m ps on
.c om
0.
SA
M
PS
O
N
W es to n
Sa m ps on , P
E, L
S, L
A, P
C H er ita ge E xe cu tiv e
Su ite s
R ou te
2, B ui ld in g 3, S ui te
H op ew el l J un ct io n, N
Y
D es cr ip tio n
SHEET
Ap p.
By C k.
By
D r.B y D at e
N o.
D E
V O
R P
P A
OF
FI
LE
N O
D
AT
E
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
P.
BY
D
SN
.B
Y D
R .B
Y
JO
B N
O
C O
N
TR
AC
T:
SC
AL
E:
C
AD
D
N O
C
H K.
BY
COPYRIGHT © 2022 BY WESTON & SAMPSON, PE, LS, LA, PC THIS DRAWING IS
AN INSTRUMENT OF SERVICE AND IS THE PROPERTY OF WESTON &
SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE REPRODUCED IN
WHOLE OR IN PART BY ANY MEANS WHATSOEVER WITHOUT THE EXPRESS
WRITTEN CONSENT OF WESTON & SAMPSON PE, LS, LA, PC
UNAUTHORIZED ALTERATION OR ADDITION TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209. SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION LAW.
5.
4.
w w w .w es to na nd sa m ps on
.c om
0.
SA
M
PS
O
N
W es to n
Sa m ps on , P
E, L
S, L
A, P
C H er ita ge E xe cu tiv e
Su ite s
R ou te
2, B ui ld in g 3, S ui te
H op ew el l J un ct io n, N
Y
D es cr ip tio n
SHEET
Ap p.
By C k.
By
D r.B y D at e
N o.
D E
V O
R P
P A
OF
FI
LE
N O
D
AT
E
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
P.
BY
D
SN
.B
Y D
R .B
Y
JO
B N
O
C O
N
TR
AC
T:
SC
AL
E:
C
AD
D
N O
C
H K.
BY
COPYRIGHT © 2022 BY WESTON & SAMPSON, PE, LS, LA, PC THIS DRAWING IS
AN INSTRUMENT OF SERVICE AND IS THE PROPERTY OF WESTON &
SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE REPRODUCED IN
WHOLE OR IN PART BY ANY MEANS WHATSOEVER WITHOUT THE EXPRESS
WRITTEN CONSENT OF WESTON & SAMPSON PE, LS, LA, PC
UNAUTHORIZED ALTERATION OR ADDITION TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209. SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION LAW.
5.
4.
w w w .w es to na nd sa m ps on
.c om
0.
SA
M
PS
O
N
W es to n
Sa m ps on , P
E, L
S, L
A, P
C H er ita ge E xe cu tiv e
Su ite s
R ou te
2, B ui ld in g 3, S ui te
H op ew el l J un ct io n, N
Y
DP
W
-0
1.
3B.
3A.
4.
5.
2.
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o P ar k, NY
\E
NG
-X
XX
X
SS
ES
P ha se
3, S ub -B as ins
5, 8, \06
-B
IM
-C
AD
\01 -C ivi l-S ur ve y\D -3
E
RO
SI
ON
A
ND
S
ED
IM
EN
TA
TI
ON
C
ON
TR
OL
.dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-02
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
EROSION AND
SEDIMENTATION
CONTROL
D-3D-2
BIDDING
TRAVEL LANE
SHOULDER
B
(SEE TABLE NY6H-3)
A
(SEE TABLE NY6H-3)
100'
DOWNSTREAM
TAPER
500'
MAXIMUM
BUFFER SPACE
(SEE TABLE 6C-2 AND NOTE 2)
NYR9-11 G20-1
(SEE NOTE 4) W20-1 W21-5
G20-2
(SEE NOTE 8)
300' - 500' POSTED
SPEED LIMIT < 45
1000' POSTED SPEED
LIMIT > 45
TRAVEL LANE
SHOULDER
OR
OR
NOTES:
W7-3 a
(SEE NOTES 3 AND 6)
SHOULDER
TAPER (L/3)
(SEE TABLE
6H-4 FOR L)
SHOULDER CLOSURE
SHORT OR INTERMEDIATE TERM STATIONARY
2-LANE 2-WAY ROADWAY
(NOT TO SCALE)
ROAD
WORK
AHEAD
SHOULDER
WORK
ROAD WORK
ENDLICENSE
SUSPENDED
AFTER TWO
WORK ZONE
SPEEDING
TICKETS
ROAD WORK
NEXT XX MILES
NEXT
XX MILES
CHANNELIZING DEVICES
(SEE NOTE 7)10' MINIMUM
(SEE NOTE 1)
BARRIER
VEHICLE
PLACEMENT
DISTANCE
(SEE TABLE NY2-A)
BARRIER VEHICLE
SETUP (SEE NOTE 5)
1. WHEN THE MINIMUM LANE WIDTH OF 10' CANNOT BE MAINTAINED DUE TO A SHOULDER
CLOSURE, USE THE DETAIL FOR SHORT OR INTERMEDIATE TERM STATIONARY
FLAGGING OPERATION.
2. NO WORK ACTIVITY OR STORAGE OF EQUIPMENT, VEHICLES, OR MATERIAL SHOULD
OCCUR WITHIN A BUFFER SPACE.
3. WHEN THE DISTANCE BETWEEN THE ADVANCE WARNING SIGNS AND WORK IS 2 MILES TO 5 MILES, A SUPPLEMENTAL DISTANCE PLAQUE (W7-3a) SHOULD BE USED WITH THE SHOULDER WORK SIGN (W21-5).
4. THE ROAD WORK NEXT XX MILES SIGN (G20-1) MAY BE USED INSTEAD OF THE ROAD WORK AHEAD SIGN
(W20-1) IF WORK LOCATIONS OCCUR OVER A DISTANCE OF MORE THAN 2 MILES.
5. FOR BARRIER VEHICLE USE REQUIREMENTS SEE TABLES NY1-A AND NY2-A ON THE
STANDARD SHEET TITLED "WORK ZONE TRAFFIC CONTROL LEGENDS AND NOTES".
6. IN SITUATIONS WHERE MULTIPLE WORK LOCATIONS EXIST WITHIN A LIMITED DISTANCE, THE DISTANCE
BETWEEN THE ADVANCE WARNING SIGN AND WORK SHALL NOT EXCEED 5 MILES.
7. CHANNELIZING DEVICE SPACING (CENTER TO CENTER) SHALL NOT EXCEED 40' IN THE ACTIVE WORK SPACE.
8. TRANSVERSE DEVICES SHALL BE REQUIRED (AS PER 619 STANDARD SPECIFICATIONS)
WHEN A PAVED SHOULDER HAVING A WIDTH OF 8' OR GREATER IS CLOSED FOR A
DISTANCE GREATER THAN 1500'.
C
(SEE TABLE NY6H-3)
B
(SEE TABLE NY6H-3)
L/3 SHOULDER TAPER
(SEE TABLE 6H-4 AND
NOTE 1)
100'
ONE LANE
TWO-WAY
TRAFFIC TAPER
(TYP.)
SEE NOTE 7
100'
ONE LANE
TWO-WAY
TRAFFIC TAPER
(TYP.)
(SEE NOTE 5)
A/2
(SEE NOTE 8)
A
(SEE TABLE NY6H-3)
B
(SEE TABLE NY6H-3) C
(SEE TABLE NY6H-3)
L/3 SHOULDER
TAPER
(SEE TABLE 6H-4
AND NOTE 1)
SHOULDER
TRAVEL LANE
(SEE NOTE 12) 100'
MINIMUM
100'
MINIMUM
(SEE NOTE 12)
NYR9-11
W20-1 W20-4
G20-2
(SEE NOTE 6)
G20-2
(SEE NOTE 6)
W20-7a W20-4 W20-1
NYR9-11
(SEE NOTE 9)
(SEE NOTE 9)
FLAGGER LOCATION
200' - 300'
SHOULDER
TRAVEL LANE
SHOULDER
TRAVEL LANE
TRAVEL LANE
SHOULDER
300' - 500' POSTED SPEED
LIMIT < 45 MPH
1000' POSTED SPEED LIMIT
> 45 MPH
300' - 500' POSTED
SPEED LIMIT < 45
MPH
1000' POSTED SPEED
LIMIT > 45 MPH NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
WHEN PAVED SHOULDERS HAVING A WIDTH OF 8' OR MORE ARE CLOSED, CHANNELIZING DEVICES SHALL BE USED TO CLOSE THE SHOULDER IN ADVANCE TO DELINEATE THE BEGINNING OF THE WORK AREA AND DIRECT VEHICULAR TRAFFIC
TO REMAIN IN THE TRAVEL WAY.
WHEN A SIDE ROAD OR DRIVEWAY INTERSECTS THE ROADWAY WITHIN A WORK ZONE TRAFFIC CONTROL AREA, ADDITIONAL TEMPORARY TRAFFIC CONTROL DEVICES AND/OR FLAGGERS SHALL BE PLACED AS NEEDED.ADDITIONAL FLAGGERS SHALL BE LOCATED AT ALL INTERSECTIONS AND COMMERCIAL DRIVEWAYS LOCATED WITHIN OR NEAR THE
ACTIVE WORK SPACE.
NO WORK ACTIVITY, EQUIPMENT, OR STORAGE OF VEHICLES, OR MATERIAL SHALL OCCUR WITHIN THE BUFFER SPACE AT
ANY TIME.
CHANNELIZING DEVICE SPACING (CENTER TO CENTER) SHALL NOT EXCEED 40' IN THE ACTIVE WORK SPACE.
TRANSVERSE DEVICES SHALL BE REQUIRED (AS PER 619 STANDARD SPECIFICATIONS)WHEN A PAVED SHOULDER HAVING
A WIDTH OF 8' OR GREATER IS CLOSED FOR A DISTANCE GREATER THAN 1500'.
THE END ROAD WORK SIGN (G20-2) SHALL BE PLACED A MAXIMUM OF 500' PAST THE END OF THE WORK SPACE.
WHERE DIRECTED BY THE ENGINEER, A BUFFER SPACE SHALL BE PROVIDED IN ORDER TO LOCATE THE ONE-LANE, TWO-WAY TRAFFIC TAPER PRIOR TO ANY HORIZONTAL OR VERTICAL CURVE, IN ORDER TO PROVIDE ADEQUATE SIGHT DISTANCE FOR THE FLAGGERS AND/OR
A QUEUE OF STOPPED VEHICLES.
THE FLAG TREE SHALL BE LOCATED ON THE SHOULDER, AT APPROXIMATELY 1/2 THE DISTANCE BETWEEN THE FLAGGER SIGN (W20-7a)
AND THE FLAGGER.
FLAGGER SIGN (W20-7a) AND ONE LANE ROAD AHEAD SIGN (W20-4) SHALL BE REMOVED, COVERED OR TURNED AWAY FROM ROAD USERS
WHEN FLAGGING OPERATIONS ARE NOT OCCURRING.
FLAGGER AND FLAG TREE SHALL BE ILLUMINATED TO LEVEL II ILLUMINATION DURING NIGHT TIME OPERATIONS.
ALL FLAGGERS SHALL USE 24" (MIN.) OCTAGON SHAPED STOP/SLOW PADDLES HAVING 6' STAFF.
CENTERLINE CHANNELIZING DEVICES ARE OPTIONAL AND MAY BE ELIMINATED WHERE SPACE CONSTRAINTS EXIST.
W20-7a
FLAGGING OPERATION
SHORT OR INTERMEDIATE TERM STATIONARY
LANE CLOSURE ON 2-LANE 2-WAY ROADWAY
(NOT TO SCALE)
A
(SEE TABLE NY6H-3)
A/2
(SEE NOTE 8)
(SEE NOTE 7)
ROAD
WORK
AHEAD
ONE LANE
ROAD
AHEAD
END
WORKROAD
ROAD
WORK
AHEAD
ONE LANE
ROAD
AHEADROAD
END
WORK
LICENSE
SUSPENDED
AFTER TWO
WORK ZONE
SPEEDING
TICKETS
LICENSE
SUSPENDED
AFTER TWO
WORK ZONE
SPEEDING
TICKETS
CHANNELIZING DEVICES
(SEE NOTE 4)
240 240
A
(SEE TABLE
NY6H-3)
100'
TAPER
(MAXIMUM)
(SEE NOTE 5)
A/2
(SEE
NOTE 6)
A
(SE
E T
AB
LE
NY
6H -3)
A/2 (SE
E
NO
TE
6)
(SE
E N
OT
E 5
100'
MINIMUM
A/2
(SEE
NOTE 6)
TA
PE
R (M
AX
IMU
M)
A
(SE
E T
AB
LE
NY
6H -3)
A/2 (SE
E
NO
TE
6)
MIN
IMU
M
NYR9-11
NYR9-11
NYR9-11
NYR9-11
W20-1
W20-1
W20-1
W20-1
W20-4
W20-4
W20-4
W20-4
(SEE NOTE 7)
(SEE NOTE 7)
(SEE NOTE 7)
(SEE NOTE 7)
(SEE NOTE 7)
G20-2
(SEE NOTE 4)
G20-2
(SEE NOTE 4)
TR
AV
EL
LA
NE
TRAVEL LANE
TRAVEL LANE
TR
AV
EL
LA
NE
TRAVEL LANE
FL
AG
GE
R L
OC
AT
ION
' - 3 15'
(T
YP
.) G20-2
(SEE NOTE 4)
G20-2
(SEE NOTE 4)
(SEE NOTE 7)
B (SE
E
TA
BL
E
NY
6H -3)
C (SE
E
TA
BL
E
NY
6H -3)
' - 5
00'
PO
ST
ED
SP
EE
D
LIM
IT
< 4
5 M
PH
0' P
OS
TE
D
SP
EE
D L
IMI
T >
MP
H
B
(SEE
TABLE
NY6H-3)
C
(SEE
TABLE
NY6H-3)
(SE
E
NO
TE
' - 5
00'
PO
ST
ED
SP
EE
D L
IMI
T <
MP
H
0' P
OS
TE
D
SP
EE
D L
IMI
T >
MP
H
C (SE
E
TA
BL
E
NY
6H -3)
B (SE
E
TA
BL
E
NY
6H -3)
300' - 500' POSTED SPEED
LIMIT < 45 MPH
1000' POSTED SPEED
LIMIT > 45 MPH
C
(SEE TABLE
NY6H-3)
B
(SEE TABLE NY6H-3)
(SE
E
NO
TE
5)
TR
AV
EL
LA
NE
TRAVEL LANE
TR
AV
EL
LA
NE
' TA
PE
R (M
AX
IMU
M)
MIN
IMU
M
(SE
E
NO
TE
A
(SEE TABLE NY6H-3)
300' - 500' POSTED SPEED
LIMIT < 45 MPH
1000' POSTED SPEED
LIMIT > 45 MPH
NOTE: SEE STANDARD SHEET TITLED "WORK ZONE TRAFFIC CONTROL
LEGENDS AND NOTES" FOR LEGEND OF SYMBOLS AND/OR LETTER
CODES USED IN THIS DRAWING.
NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
AT SIGNALIZED INTERSECTIONS, SIGNALS SHALL BE TURNED OFF FOR ANY FLAGGING OPERATIONS, UNLESS OTHERWISE AUTHORIZED BY THE
ENGINEER.
WHEN PAVED SHOULDERS HAVING A WIDTH OF 8' OR MORE ARE CLOSED, CHANNELIZING DEVICES SHALL BE USED TO CLOSE THE SHOULDER IN ADVANCE TO DELINEATE THE BEGINNING OF THE WORK AREA AND DIRECT VEHICULAR TRAFFIC TO REMAIN IN THE TRAVEL WAY.
CHANNELIZING DEVICE SPACING (CENTER TO CENTER) SHALL NOT EXCEED 40' IN THE ACTIVE WORK SPACE.
THE END ROAD WORK SIGN (G20-2) SHALL BE PLACED A MAXIMUM OF 500' PAST THE END OF THE WORK SPACE.
WHERE DIRECTED BY THE ENGINEER, A BUFFER SPACE SHALL BE PROVIDED IN ORDER TO LOCATE THE ONE-LANE, TWO-WAY TRAFFIC TAPER PRIOR TO ANY HORIZONTAL OR VERTICAL CURVE, IN ORDER TO PROVIDE ADEQUATE SIGHT DISTANCE FOR THE FLAGGERS AND/OR A QUEUE OF STOPPED
VEHICLES.
THE FLAG TREE SHALL BE LOCATED ON THE SHOULDER, AT APPROXIMATELY 1/2 THE DISTANCE BETWEEN THE FLAGGER SIGN (W20-7a) AND THE
FLAGGER.
FLAGGER SIGN (W20-7a) AND ONE LANE ROAD AHEAD SIGN (W20-4) SHALL BE REMOVED, COVERED OR TURNED AWAY FROM ROAD USERS WHEN
FLAGGING OPERATIONS ARE NOT OCCURRING.
FLAGGER AND FLAG TREE SHALL BE ILLUMINATED TO LEVEL II ILLUMINATION DURING NIGHT TIME OPERATIONS.
ALL FLAGGERS SHALL USE 24" (MIN.) OCTAGON SHAPED STOP/SLOW PADDLES HAVING 6' STAFF.
ADDITIONAL FLAGGERS SHALL BE LOCATED AT ALL INTERSECTIONS AND COMMERCIAL DRIVEWAYS LOCATED WITHIN OR NEAR THE ACTIVE WORK AREA.
CENTERLINE CHANNELIZING DEVICES ARE OPTIONAL AND MAY BE ELIMINATED WHERE SPACE CONSTRAINTS EXIST.
NO WORK ACTIVITY, EQUIPMENT, OR STORAGE OF VEHICLES, OR MATERIAL SHALL OCCUR WITHIN THE BUFFER SPACE AT ANY TIME.
FOR PEDESTRIAN DETOUR ACCOMMODATIONS REFER TO THE STANDARD SHEETS TITLED "SIDEWALK DETOUR OR DIVERSION" AND "CROSSWALK
CLOSURE AND PEDESTRIAN DETOUR".
W20-7a
W20-7a
W20-7a
W20-7a
FLAGGING OPERATIONSHORT OR INTERMEDIATE TERM STATIONARYLANE CLOSURE AT OR NEAR INTERSECTION
(NOT TO SCALE)
(SEE
NOTE 11)
/S/ DAVID J. CLEMENTS, P.E.
ROAD
WORK
AHEAD
ONE LANE
ROAD
AHEAD
ROAD WORK
END
ROAD
WORK
AHEAD
ONE LANE
ROAD
AHEAD
ROAD
END
WORK
ROAD
END
WORK
WORK
END
ROAD
ROAD
WORK
AHEAD
ONE LANE
ROAD
AHEAD
ROAD
WORK
AHEAD
ONE LANE
ROAD
AHEAD
LICENSE
SUSPENDED
AFTER TWO
WORK ZONE
SPEEDING
TICKETS
LICENSE
SUSPENDED
AFTER TWO
WORK ZONE
SPEEDING
TICKETS
LICENSE
SUSPENDED
AFTER TWO
WORK ZONE
SPEEDING
TICKETS
LICENSE
SUSPENDED
AFTER TWO
WORK ZONE
SPEEDING
TICKETS
STATE OF NEW YORK
DEPARTMENT OF TRANSPORTATION
ISSUED UNDER EB 08-036
U.S. CUSTOMARY STANDARD SHEET
APPROVED SEPTEMBER 18, 2008
FLAGGING OPERATION2-LANE 2-WAY ROADWAY INTERSECTION
619-61
\\w se
.lo ca l\W
SE
\P ro jec ts\
NY
\T ux ed o P ar k, NY
\E
NG
-X
XX
X
SS
ES
P ha se
3, S ub -B as ins
5, 8, \06
-B
IM
-C
AD
\01 -C ivi l-S ur ve y\D -4
T
RA
FF
IC
M
AI
NT
EN
AN
CE
A
ND
P
RO
TE
CT
IO
N.
dw g
COPYRIGHT © 2026 WESTON & SAMPSON, INC.
Project:
www.westonandsampson.com
Consultants:
Seal:
Revisions:
No. Date Description
Issued For:
Drawing Title:
Sheet Number:
Scale:
W&S File No.:
W&S Project No.:
Approved By:
Date:
Reviewed By:
Drawn By:
COPYRIGHT © 2026 BY WESTON & SAMPSON, PE, LS,
LA, ARCHITECTS, PC. THIS DRAWING IS AN
INSTRUMENT OF SERVICE AND IS THE PROPERTY OF
WESTON & SAMPSON, PE, LS, LA, ARCHITECTS, PC.
THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE
OR IN PART BY ANY MEANS WHATSOEVER WITHOUT
THE EXPRESS WRITTEN CONSENT OF WESTON &
SAMPSON PE, LS, LA, ARCHITECTS, PC.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209.
SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION
LAW.
COA:
Weston & Sampson, PE, LS, LA, Architects, PC 1 Winners Circle, Suite 130
Albany, NY 12205
518.463.4400 800.SAMPSON
DPW 2026-02
APRIL 2026
VILLAGE OF TUXEDO PARK,
NEW YORK
SSES PHASE 3, SUB-BASINS
5,8,16 & 17 PUBLIC SANITARY
SEWER REPAIRS
YEAR 3 CONSTRUCTION
NOT RELEASED FOR
CONSTRUCTION
ALPM
KRB
JMZ
AS NOTED
TRAFFIC
MAINTENANCE AND
PROTECTION
D-4D-3
BIDDING
| G-1 COVER |
| G-1 COVER |
| G-2 |
| G-2 GENERAL NOTES & LEGEND |
| C-2 |
| C-2 SUB-BASINS 2 & 10 LOCATION MAP |
| SUB-BASIN 10 LOCATION MAP |
| SUB-BASIN 2 LOCATION MAP |
| C-3 |
| C-2 SUB-BASINS 2 & 10 LOCATION MAP |
| SUB-BASIN 10 LOCATION MAP |
| SUB-BASIN 2 LOCATION MAP |
| C-4 |
| C-4 PINE HILL ROAD |
| CONTINENTAL ROAD |
| CONTINENTIAL ROAD |
| CURED-IN-PLACE PIPE LINER SCHEDULE |
| MANHOLE REPAIR SCHEDULE |
| MANHOLE REHABILITATION SCHEDULE |
| C-5 |
| C-5 PEPPERIDGE ROAD & TUXEDO ROAD & EAST LAKE ROAD |
| CONTINENTAL ROAD |
| CONTINENTIAL ROAD |
| CURED-IN-PLACE PIPE LINER SCHEDULE |
| MANHOLE REPAIR SCHEDULE |
| MANHOLE REHABILITATION SCHEDULE |
| C-6 |
| C-3 CONTINENTAL ROAD |
| CONTINENTAL ROAD |
| CONTINENTIAL ROAD |
| CURED-IN-PLACE PIPE LINER SCHEDULE |
| MANHOLE REPAIR SCHEDULE |
| MANHOLE REHABILITATION SCHEDULE |
| C-7 |
| C-3 CONTINENTAL ROAD |
| CONTINENTAL ROAD |
| CONTINENTIAL ROAD |
| CURED-IN-PLACE PIPE LINER SCHEDULE |
| MANHOLE REPAIR SCHEDULE |
| MANHOLE REHABILITATION SCHEDULE |
| C-8 |
| C-3 CONTINENTAL ROAD |
| CONTINENTAL ROAD |
| CONTINENTIAL ROAD |
| CURED-IN-PLACE PIPE LINER SCHEDULE |
| MANHOLE REPAIR SCHEDULE |
| MANHOLE REHABILITATION SCHEDULE |
| C-9 |
| C-3 CONTINENTAL ROAD |
| CONTINENTAL ROAD |
| CONTINENTIAL ROAD |
| CURED-IN-PLACE PIPE LINER SCHEDULE |
| MANHOLE REPAIR SCHEDULE |
| MANHOLE REHABILITATION SCHEDULE |
| D-1 |
| D-1 DETAILS |
| MANHOLE SEALING DETAIL |
| SEWER TRENCH DETAIL |
| MANHOLE FRAME AND COVER REPLACEMENT DETAIL |
| D-3 |
| D-3 EROSION AND SEDIMENTATION CONTROL |
| STONE CHECK DAM DETAIL |
| SLOPE STABILIZATION MATTING INSTALLATION DETAIL |
| STONE AND BLOCK DROP INLET PROTECTION DETAIL |
| SILT FENCE DETAIL |
| STABILIZED CONSTRUCTION ENTRANCE PAD DETAIL |
| DIVERSION SWALE DETAIL |
| D-4 |
| D-4 TRAFFIC MAINTENANCE AND PROTECTION |