2026 0501 Nottawa School Roof Replacement Addendum #1.pdf
PDF 2 MB Posted
- Attached to
- Roof Replacement
- Solicitation number
- RFP NOTT 260000001817 2
- Issued by
- Saginaw County, Michigan
About this file
This addendum document is related to a roof replacement project issued by the Nottawa Community School District in Sturgis, Michigan. Addendum #1, dated May 1, 2026, modifies the original contract documents for the Nottawa School Roof Replacement project (Project No. 0826) and is prepared by Ehresman Architects. The project scope includes removal of existing metal roofing and built-up roof system (approximately 11,917 square feet), installation of new insulation and fully-adhered EPDM membrane, construction of new parapet and gable walls with steel pipe bracing and siding, installation of new perimeter metal edge fascia and flashings, installation of new prefinished metal gutter and downspout systems, and raising of existing rooftop mechanical and electrical equipment as necessary. The addendum includes drawing revisions to the Title Sheet and Sections & Details sheets, as well as specification revisions to the Affidavit of Compliance—Iran Economic Sanctions Act. A pre-bid meeting was held on April 30, 2026, with eight roofing contractors in attendance. Bids are due on May 12, 2026, at 1:00 p.m. at the school location, with an anticipated award date of May 19, 2026. The contractor must begin on-site operations by June 1, 2026, with substantial completion targeted for August 14, 2026, and final completion by August 21, 2026, prior to the school's resumption on August 24, 2026.
The project requires a fixed stipulated sum bid with a 5% bid bond and 100% performance and payment bonds included in the base proposal cost. No prevailing wage or union labor requirements apply to this project. Unit prices are requested for potential unforeseen conditions or small additions and deletions. The contractor is responsible for documenting pre-construction conditions and any damage to existing items during construction will be repaired at the contractor's expense. Site staging, product storage, and equipment placement (including crane locations) must be coordinated with the school owner prior to commencement. All addenda will be issued through SIGMA and posted on the district's website, with contractor questions due by May 5, 2026, at noon, and final addenda issued by May 6, 2026, at 4:00 p.m. The total roof area is 11,917 square feet, consisting of Roof Area A (862 square feet) and Roof Area B (11,055 square feet).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
e h r e s m a n a r c h i t e c t s . c o m
801 W. Big Beaver Road, Suite 250, Troy, MI 48084 | 248.244.9710 | (f ) 248.244.9712
ADDENDUM
Project: Nottawa Community School District Nottawa School Roof Replacement Roof Replacement
Project No.: 0826
Date: May 1, 2026
Addendum Number: 1
Each Bidder's proposal amount shall include the work described herein.
This Addendum is hereby made a part of the Contract Documents. Unless otherwise indicated, the work described herein shall comply with, and be equal in all respects to the original Specification and Drawings accompanying same. Include incidental work required to properly complete the work, whether stated herein or not.
DRAWING REVISIONS
TTL – Title Sheet CHANGE: Client name FROM: Manchester Community School District TO: Nottawa Community School District
Sheet A9.10 – Sections & Details CHANGE: Drawing Note #6 FROM: Two (2) rows Simpson SDS22 screws @ 24” o.c., 1-1/2” penetration into 2x.
TO: Two (2) rows Simpson SDS22 screws @ 24" o.c. to attach plate through tectum roof deck and to continuous wood blocking below, 1-1/2" penetration to 2x.
CHANGE: Drawing Note #12 FROM: #10 @ 12" o.c. to plate (typ).
TO: #10 @ 12" o.c. to to attach bottom track to plate (typ).
SPECIFICATION REVISIONS
Affidavit Of Compliance – Iran Economic Sanctions Act CHANGE: Name in paragraph #2 FROM: “…certification shall be ineligible to bid on a GPPSS request for proposal…” TO: “…certification shall be ineligible to bid on a NCSD request for proposal…”
GENERAL
Non-Mandatory Pre-Bid Meeting Attendee sign-in list is attached.
Pre-Bid Meeting Agenda Agenda is attached for reference only as an outline of our meeting. No information in the agenda should be considered binding. Refer to drawings and specifications for contractual conditions.
Questions and Answers Question 1: Is the insulation mechanically fastened, adhesive applied, etc.?
Answer 1: Refer to Roofing Composition notes on drawing sheet A2.50 for insulation attachment method.
© Ehresman Architects
TTLProject No. 0826
Nottawa Community School District Nottawa Community School (26438 M-86) Roof Replacement
Title Sheet
Addendum #1: 01 May 2026
Bidding and Permits: 23 April 2026
Nottawa Community School District 26438 M-86 Sturgis, MI 49091 Contact Name: Jerome Wolff, Superintendent Contact Phone: 269-467-7153
ARCHITECT:
STRUCTURAL ENGINEER:
LOCATION PLAN
NOT TO SCALE
ROOF PLAN
NOT TO SCALE
APPLICABLE CODES:
MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS: 2021 EDITION
MICHIGAN COMMERCIAL ENERGY CODE: 2021 EDITION
ASHRAE 90.1-2019:
USE GROUP:
GROUP E: EDUCATION
CONSTRUCTION TYPE:
CONSTRUCTION TYPE: ASSUMED IIB (II-000 FROM SCHOOL FIRE SAFETY RULES)
TOTAL FLOOR AREA:
ROOF AREA 'A': 862 SF (GROSS ROOF AREA)
ROOF AREA 'B': 11,055 SF (GROSS ROOF AREA)
TOTAL ROOF AREA: 11,917 SF (GROSS FLOOR AREA)
LIST OF DRAWINGS
ARCHITECTURAL DRAWINGS:
TTL TITLE SHEET
A0.00 GENERAL INFORMATION
A0.50 MANUFACTURER'S ROOFING DETAILS
A0.51 MANUFACTURER'S ROOFING DETAILS
A0.52 MANUFACTURER'S ROOFING DETAILS
A0.60 REPRESENTATIVE PHOTOGRAPHS
A0.61 REPRESENTATIVE PHOTOGRAPHS
A0.62 REPRESENTATIVE PHOTOGRAPHS
A0.63 REPRESENTATIVE PHOTOGRAPHS
A1.50 ROOF REMOVALS PLAN
A2.50 ROOF PLAN
A9.10 SECTIONS & DETAILS
DEFERRED SUBMITTALS:
PER SECTION 107.3.4.1, ANY REQUIRED SUBMITTALS WILL BE SUBMITTED TO THE AUTHORITY HAVING JURISDICTION BY THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE ASSUMING THE
DUTIES OF CONSTRUCTION SUPERVISION AT THE APPROPRIATE TIME.
DEFERRED SUBMITTALS:
1. NONE
NOTTAWA COMMUNITY SCHOOL DISTRICT
NOTTAWA COMMUNITY SCHOOL
26438 M-86, Sturgis, MI 49091 Roof Replacement
Nottawa Community School 26438 M-86 Sturgis, MI 49091
AVERAGE R-VALUE:
ROOF AREA 'A': R-VALUE = 30.4 AVERAGE
ROOF AREA 'B': R-VALUE = 37.1 AVERAGE
Location of Work (Represented by shade)
ADD-1
© Ehresman Architects
A9.10Project No. 0826
Nottawa Community School District Nottawa Community School (26438 M-86) Roof Replacement
Sections & Details
Addendum #1: 01 May 2026
Bidding & Permits: 23 April 2026
Scale: 1-1/2"=1'-0" Section at Gabled Entry1
A9.10
GENERAL NOTES:
DO NOT SCALE DRAWING. DRAWING SCALE IS SHOWN FOR GENERAL REFERENCE ONLY.G1.
REFER TO MANUFACTURER SPECIFICATIONS, REQUIREMENTS, ETC. FOR PROPER ROOFING INSTALLATION
PER ARCHITECTURAL SPECIFICATIONS AND WARRANTY CONDITIONS.
Scale: 1-1/2"=1'-0" Section at Roof Area "B" Overhang Edge2
A9.10Scale: 1-1/2"=1'-0" Section at Roof Area "A" Edge3
A9.10
Scale: 1-1/2"=1'-0" Section at Roof Area "A" Overhang Edge4
A9.10
Scale: 1-1/2"=1'-0" Section at Roof Area "B" Edge5
A9.10
Scale: 1-1/2"=1'-0" Section at Existing Drainage Trough6
A9.10
Scale: 1-1/2"=1'-0" Brace Rail Connection Plan7
A9.10
Scale: 1-1/2"=1'-0" Center Brace Plate Detail9
A9.10
Scale: 1-1/2"=1'-0" Side Brace Plate Detail10
A9.10
Scale: 1-1/2"=1'-0" Brace Rail Connection Plan8
A9.10
A9.10
A9.10
A9.10
A9.10
CENTER
SIDES
4 4
TYP
TYP
9 8
REFER TO NOTE #24
BEYOND
RE
FE
R
TO
N
OT
E #2
1'-6"
6" 41 2" 6"
4"
9 8
1 1 2 " 2014
11 2"
2"
1'-6" 3 4"
6" 41 2" 6"
4"
1'-6"
1'- 0"
TYP
1'-6"
2'- 4"
TYP
8" O
.C
TY
P)
4"
2 6 2 6
2 62 8
2 6
2 6 2 6
2 6
2 8 2 6
2 6
2 6 2 4
L.P. ROOFING
H.P. ROOFING
TOP OF WALL
53 4" M
IN
(V
.M
EXISTING TECTUM ROOF DECK2"
75 8"
L.P. ROOFING
H.P. ROOFING
TOP OF WALL
53 4" M
IN
(V
.M
EXISTING TECTUM ROOF DECK2"
1 2"
202323 31
2323 31
L.P. ROOFING
H.P. ROOFING
TOP OF WALL
53 4" M
IN
(V
.M
EXISTING TECTUM ROOF DECK2"
1 2"
32REFER TO NOTE #19
E.C.U. (C.F.V.)
TOP OF WALL
EXISTING TECTUM ROOF DECK
6'-
31 4" (
MA
TC
H
EX
IS
TI
NG
G
AB
LE
H
EI
GH
T
AT
H
IG
H
PO
IN
T-
-C .F
.V
(R
EF
ER
T
O
NO
TE
#3
5 E
NT
IR
E
W
AL
L)
G2.
DRAWING NOTES:
METAL STUD TOP / BOTTOM TRACK (600T125-33)--SECURE WITH TWO (2) #10 EACH STUD.1.
STUD BRACING (600S137-43) WITH TWO (2) #10 AT EACH STUD.2.
4" x 3" GALVANIZED STEEL PLATE WITH TWO (2) 38" DIAMETER BOLTS THROUGH DOUBLE-STUDS WITH
WASHERS.
3.
METAL STUD WALL FRAMING (600S137-43) @ 24" O.C.4.
16-GAUGE CONTINUOUS PLATE.5.
TWO (2) ROWS SIMPSON SDS22 SCREWS @ 24" O.C. TO ATTACH PLATE THROUGH TECTUM ROOF DECK AND TO CONTINUOUS WOOD BLOCKING BELOW, 1 12" PENETRATION INTO 2x.
6.
CONTINUOUS 2 x 6 PRESERVATIVE TREATED BLOCKING.7.
SLOT PIPE AT KNIFE PLATE AND ATTACH WITH 12" DIAMETER BOLT (TYP).8.
1 12" DIAMETER SCHEDULE 40 GALVANIZED PIPE @ 9'-0" O.C.9.
DOUBLE METAL STUD (AT PLATE).10.
2" DIAMETER BOLT.11.
#10 @ 12" O.C. TO TO ATTACH BOTTOM TRACK TO PLATE (TYP).12.
2" x 1'-6" GALVANIZED STEEL PLATE--REFER TO LOCATION FOR SIZE.13.
8" x 6" x 10" GALVANIZED STEEL PLATE WELDED TO BASE PLATE (VERIFY EXACT HEIGHT PRIOR TO
FABRICATION WITH ROOF SYSTEM THICKNESS).
14.
SHIM TOP OF WALL / VOID SOLID.15.
2" DIAMETER THREADED ROD EPOXY SET WITH HILTI HY-270 (MINIMUM 6" EMBEDMENT) INTO EXISTING
BOND BEAM. CONTRACTOR TO FIELD VERIFY BOND BEAM PRESENCE AND CONDITIONS.
16.
EXISTING CMU / MASONRY WALL--E.C.U. (C.F.V.).17.
EXISTING BOND BEAM--VERIFY PRESENCE AND CONDITION IN THE FIELD. REPORT ANY DISCREPANCIES
TO THE ARCHITECT FOR DIRECTION.
18.
EXISTING DRAINAGE TROUGH WITH HEAT TAPE--REMOVE AND REINSTALL HEAT TAPE IN ORDER TO
PROPERLY TIE-IN PER MANUFACTURER REQUIREMENTS.
19.
ROOFING SYSTEM (MEMBRANE & INSULATION)--REFER TO SHEET A2.50 FOR FURTHER INFORMATION.20.
EXISTING TECTUM ROOF DECK--E.C.U. (C.F.V.).21.
CARRY ROOFING MEMBRANE UP FACE OF WALL AND OVER TOP OF WALL.22.
4" PRESERVATIVE TREATED PLYWOOD SHEATHING.23.
EXISTING SOFFIT MATERIAL TO REMAIN--E.C.U. (C.F.V.). CONTRACTOR TO REMOVE AND REINSTALL SOFFIT
AS REQUIRED FOR MEANS AND METHODS OF CONSTRUCTION.
24.
EXISTING FRIEZE BOARD--E.C.U. (C.F.V.).25.
MANUFACTURER'S 25-YEAR GUTTER TIE-IN DETAIL.26.
2x PRESERVATIVE TREATED WOOD BLOCKING.27.
PREFINISHED METAL GUTTER--SLOPE TO DOWNSPOUT LOCATIONS.28.
GUTTER BRACKET AND FASTENER @ 32" O.C. MAXIMUM.29.
GUTTER STRAP SPACER.30.
2x PRESERVATIVE TREATED WOOD BLOCKING / WALL.31.
EXISTING SLOPED METAL ROOF TO REMAIN--CONTRACTOR TO TIE IN PER MANUFACTURER'S
REQUIREMENTS.
32.
ALL PREFINISHED METAL COPING, EDGE METAL, ETC. TO BE COMPLETE WITH CONCEALED CLIP ANCHORS
ON BOTH SIDES (NO VISIBLE ANCHORS).
G3.
CARRY ROOFING UP AND OVER ALL WALLS, PARAPET EDGES, ETC.G4.
TYP
2 8 2 6
PREFINISHED METAL SIDING COMPLETE WITH ALL ACCESSORIES, CLOSURES, CLIPS, OUTSIDE CORNERS, ETC. FOR A COMPLETE INSTALLATION (SIMILAR TO ATAS INTERNATIONAL; DESIGN WALL: DWH120 WITH 6"
UP, 6" DOWN).
33.
PREFINISHED METAL SIDING CLOSURE / DRIP AT TOP AND BOTTOM OF WALL TO SUIT CONDITIONS.34.
SELF-ADHERING WEATHER RESISTIVE BARRIER AT FACE OF PLYWOOD SHEATHING (UNDER SIDING).35.
PREFINISHED METAL CAP WITH PRE-SLOPED CONTINUOUS CLEAT.36.
Scale: 3"=1'-0" Gutter Detail11
A9.10
A9.10
A9.10
SIMILAR2 4
REINFORCED EPDM MEMBRANE.37.
6" PRESSURE SENSITIVE TAPE.38.
EPDM ROOFING MEMBRANE.39.
SHEET METAL FASCIA AND CONTINUOUS CLEAT.40.
CLEAT FASTENER--INSTALL TYPE AND SPACING PER MANUFACTURER REQUIREMENTS.41.
42. FLANGE FASTENER--INSTALL TYPE AND SPACING PER MANUFACTURER REQUIREMENTS.
ADD-1
ADD-1
Ehresman Architects Affidavit Of Compliance – Iran Economic Sanctions Act Nottawa Community School District Project No.: 0826 Nottawa Community School Roof Replacement Page 1
AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized officer of the below named contractor (the “Contractor”), pursuant to the compliance certification requirement provided in this Request For Proposal (the “RFP”) issued by Nottawa Community School District (“NCSD”), hereby certifies, represents and warrants that the Contractor (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Contractor is awarded a contract as a result of the aforementioned RFP, the Contractor will not become an “Iran linked business” at any time during the course of performing the Work or any services under the contract.
The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School District’s investigation, and reasonable attorney fees, in addition to a fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a NCSD request for proposal for three (3) years from the date it is determined that the person has submitted the false certification.
CONTRACTOR:
Name of Contractor
By:
Its:
Date:
STATE OF )
)ss.
COUNTY OF ____________ )
This instrument was acknowledged before me on the _____ day of ____________, 20__, by
, Notary Public
______________ County, _______________
My Commission Expires:________________
Acting in the County of :_________________
Addendum #001
Marc Highlight
LIST OF PLAN HOLDERS
Project: Nottawa Community School District Nottawa Community School Roof Replacement
Project No.: 0826
Date: April 23, 2026
Bids Due At: Nottawa Community School
26438 M-86 Sturgis, MI 49091
Bid Date Due: May 12, 2026 Time Due: 1:00 p.m. (local time)
Addendum Issued
COMPANY NAME / ADDRESS
COMPANY PHONE CONTACT EMAIL ADDRESS:
1:
2:
3:
PRE-BID MEETING ATTENDEES
Division 7 Building Contractors 8233 Neptune Drive Kalamazoo, MI 49009
O: 866-377-6634 C: 517-375-9869 Name: Kyle Menard kyle.menard@d7bci.com
Hoekstra Roofing Company 1963 Olmstead Road Kalamazoo, MI 49009
O: 269-343-5536 C: 616-914-7112 Name: Beam Beverly beam@hoekstraroofing.com
Great Lakes O: 616-325-9636 C:
Name: Fernando Diaz fdiaz@weathershieldusa.com
Slatile Roofing & Sheet Metal Co.
1703 S. Ironwood Drive South Bend, IN 46613
O: 574-233-7485 C: 574-721-0662 Name: Rich Taylor rich.taylor@slatile.com
Nottawa Roofing Solutions 61727 Lepley Road Burr Oak, MI 49030
O: 269-659-0071 C:
Name: Calvin Schmucker
(no email address)
Excel Roof Systems 58854 M-66 Centreville, MI 49032
O:
C: 269-244-0032 Name: Merle Miller excelroofing96@gmail.com
Lyster Contracting 2211 Miller Road Kalamazoo, MI 49001
O: 855-597-8377 C: 269-207-1643 Name: Tony Koshar tony@lysters.biz
Tek-Pro Commercial Roofing
68905 IN-19
Nappanee, IN 46550
O: 574-354-3237 C: 574-202-9868 Name: Francisco Lopez pancholopez@tekproroofing.com
O:
C:
Name:
PRE-BID MEETING ATTENDEES (OWNER, ARCHITECT, CM/GC)
Nottawa Community Schools 26438 M-86 Sturgis, MI 49091
O: 269-467-7153 C: 269 625-7067 Name: Jerome Wolff jwolff@nottawaschool.org
Ehresman Architects 801 W. Big Beaver Road, ste. 250 Troy, MI 48084
O: 248.244.9710 C:
Name: Marc Chamberlin marc@ehresmanarchitects.com
COMPANIES KNOWN TO HAVE PLANS (DID NOT ATTEND PRE-BID MEETING)
Bloom Roofing Systems Inc.
12238 Emerson Drive Brighton, MI 48116
O: 248.264.7200 C: 248.834.8480 Name: Logan Brown sales@bloomroofing.com
Butcher & Butcher Construction 3885 Industrial Drive Rochester Hills, MI 49309
O: 248.852.2323 C:
Name: Bob Meller rmeller@bbconstruct.com
Mayer Builders O:
C:
Name: Athony Mayer mayerbuilders1@gmail.com
Schena Roofing & Sheet Metal 28299 Kehrig Drive Chesterfield, MI 48047
O: 586.949.4777 C:
Name: Gary Burnett gburnett@schenaroofing.com
Tek-Pro Roofing
68905 IN-19
Nappanee, IN 46550
O: 574.285.0130 C:
Name: Niko Lopez nikolopez@tekproroofing.com
PLAN ROOM LIST
Builders Exchange
DODGE
REED
CAM (Michele Milks) BX Lansing Construct Connect Builders Exchange-Kalamazoo Construction Site projects@grbx.com dodge.docs@construction.com docprocessing@cmdgroup.com editor@buildwithcam.com bids@bxlansing.com content@constructconnect.com kbe@builder-exchange.com jday@constructionsite.org
PRE-BID MEETING AGENDA
Project: Nottawa Community School District Nottawa Community School Roof Replacement
Project No.: 0826
Date: April 30, 2026
Agenda
1. Welcome
2. Introduction
a. Jerome Wolff, NCSD Superintendent
b. Marc Chamberlin, Ehresman Architects
3. Contact Information
a. All technical questions regarding the plans and/or specifications should be directed to the architect at architects@ehresmanarchitects.com.
4. Non-Mandatory Meeting
a. Please make sure the email and other contact information on the sign-in sheet is complete and legible (business cards are appreciated).
b. If the Contractor wishes to coordinate subsequent site visit(s), they are to contact Jerome Wolff (269-625-7067 or 269-467-7153).
a. Do not show up to the building expecting to review conditions without a pre-arranged visit scheduled
5. Project Description
a. Remove the existing metal roofing and associated metal support structure (above existing roofing system)—approximately 11,917 sf.
b. Remove the existing built-up (BUR) roof system down to the existing tectum roof deck— approximately 11,917 sf.
c. Remove the existing perimeter metal edge fascia or other flashings / caps as required for the work.
d. Install new insulation (flat and tapered), and fully-adhered EPDM membrane.
e. Install new “parapet” walls, gable walls, etc. including steel pipe bracing and siding.
f. Install new perimeter metal edge fascia or other flashings / caps as designated or required for the project.
g. Install new prefinished metal gutter, downspouts, and downspout extensions.
h. Raise existing rooftop mechanical and/or electrical equipment as necessary to satisfy warranty requirements.
a. Contractor will need to review and determine what needs to be raised or modified and included in the bid
i. Items that are shown on the plan are either items that were visible or shown on a previous roof replacement drawing.
a. Items taken from previous drawings are not able to be verified due to metal roofing
6. Alternates
a. Currently, there are no alternates included with this project.
7. Plans and specifications
a. If you have not received yet, please contact the architect at architects@ehresmanarchitects.com to obtain an electronic copy of the plans and specifications
8. Addenda
a. All addenda will be issued to SIGMA, posted on the district’s website, and will be emailed by the architect to companies known to have the bidding documents.
b. At a minimum, addendum #1 will include the pre-bid meeting sign-in sheet, pre-bid meeting agenda, clarifications, and any contractor questions that come out of today’s meeting.
c. Other questions that arise will be answered in subsequent addenda.
d. Contractor questions must be submitted by Tuesday, May 5, 2026 @ 12:00 p.m.
e. The final Addenda will be issued no later than Tuesday, May 6, 2026 @ 4:00 p.m.
9. Bid Due Date
a. No later than Tuesday, May 12, 2026 @ 1:00 p.m. (local time).
b. Bids are due at this building (26438 M-86, Sturgis, MI 49091) at the main office.
c. Bids will be opened and read aloud at this time and place if anyone wants to stay for the opening.
10. Type of Bidder
a. Prime Contractor (to include all work scopes).
11. Type Bid
a. Fixed stipulated sum.
12. Allowances
a. There are no allowances to be included in the Base Bid Proposal.
13. Unit Prices
a. There are several unit prices that are requested to be filled in as requested (include all items regardless if they don’t seem to apply as unforeseen conditions may require).
b. Unit prices are to be used for small unforeseen conditions or additions / deletions.
a. If there are situations where large scale replacements are needed, a Proposal
Request will be issued and isn’t necessarily based on unit prices
14. Bid Bond
a. Submit with the bid in the amount of 5% of the contract amount.
15. Performance and Payment Bonds
a. Are to be Included in the Base Proposal cost.
b. Are to be in the amount of 100% of the contract amount.
16. Prevailing Wages
a. There are no requirements for prevailing wages on this project.
17. Union
a. There are no requirements for the use of union labor on this project.
18. Schedule:
a. Anticipated award date: May 19, 2026
b. Start on-site operations: June 1, 2026
c. Substantial completion: Friday, August 14, 2026
d. Final completion: Friday, August 21, 2026 (school resumes August 24th)
19. Site Access / Other Work / Staging Area
a. Staging, product storage, etc. will be in the parking lots and contractor will need to review with Owner (for crane locations, storage, etc.) prior to starting on-site operations.
a. Preconstruction meeting will assist in identifying these locations
b. Coordinate with Building Engineer for parking and access to water, electric, etc. if required.
c. Damage to existing to remain items will be repaired at no additional expense to the Owner
(including asphalt / concrete parking lots and lawn damage from cranes, sky tracks, etc.).
a. Contractor will need to document pre-construction conditions based on proposed path to building(s), etc.
b. Owner reserves the option to have their vendor(s) make any repairs and the contractor’s contract will be reduced via change order to cover such costs
d. For any temporary tie-ins, Contractor must make all provisions to make roof water-tight.
20. Permits
a. Plans have been submitted to the State for plan review and permitting (no status yet but don’t expect any issues).
21. Work Hours
a. Contractor must conform to local municipality requirements for allowable construction times
a. Contractor to confirm with municipality for day or time restrictions
b. If work is not complete prior to the start of school, the completion work may be required to be done after school hours (depends on type of work, noise, etc.)
22. Roof Cores
a. A roof core has been performed and that information is included on the drawings as the existing roofing composition information (limited access).
23. Adjourned
| 2026 0501 Riverside Roof Replacement Addendum #1 |
| TTL |
| Sheets and Views |
| TTL |
| A9.10 |
| Sheets and Views |
| A9.10 |
| AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT - Addendum #1 - Editable |
| Nottawa Community School Roof Replacement Plan Holders List |
| 2026 0430 Nottawa Roof Replacement Pre-bid Meeting Agenda |
| Name of Contractor: |
| By: |
| Its: |
| STATE OF: |
| Date: |
| COUNTY OF: |
| This instrument was acknowledged before me on the: |
| undefined: |
| day of: |
| Notary Public: |
| undefined_2: |
| County: |
| My Commission Expires: |
| Acting in the County of: |
File details come from the government source that posted it. Updated .