Structural Drawing Set Summary
This document is a set of structural construction drawings (sheets S001-S601) for the Fermilab South Cavern Platform (4850L) at Sanford Underground Research Facility in Lead, South Dakota. The project, designed by Albertson Engineering Inc., includes a platform framing system with specifications for steel construction, post-installed anchors, reinforcement, and decking installations.
The structural system is designed for Risk Category II with dead loads of self-weight plus 5 PSF and live loads of 100 PSF, with no seismic design required. Key structural materials include ASTM A992 steel (Fy=50 KSI) for W-shapes, ASTM A36 steel (Fy=36 KSI) for miscellaneous shapes, and ASTM A53 Grade B structural pipe. Post-installed anchors specified include adhesive anchors (Hilti HIT-HY 200 V3, Simpson AT-XP, DeWalt AC200+) for concrete and hollow masonry, expansion anchors (Hilti Kwik Bolt series, Simpson Strong Bolt 2, DeWalt Power-Stud+), and screw anchors (Simpson Titen HD, DeWalt Screw-Bolt+). All adhesive anchor installations require two-component epoxy systems meeting ASTM C-881 specifications with minimum 12,650 PSI compressive yield strength and must be installed by manufacturer-trained personnel with ACI/CRSI certification for sustained tension applications. Special inspection and testing per the 2021 International Building Code are required, performed by an independent testing agency at owner expense. The drawings reference design codes including 2021 IBC, ACI 318-19, AISC 360-16, and ASCE 7-16, with detailed construction specifications for welding, bolting, concrete placement, and tolerance requirements outlined on the general notes sheet.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POST INSTALLED ANCHORS & REBAR
ANCHOR TYPE
ADHESIVE ANCHORS /
REBAR IN CONC
REMARKS
ADHESIVE ANCHORS / REBAR
IN CONC W/ > 12" EMBEDMENT
PRODUCT
HILTI HIT - HY 200 V3
SIMPSON AT-XP
DEWALT AC200+
HILTI HIT - RE 500 V3
SIMPSON SET-3G
DEWALT PURE220+
ADHESIVE ANCHORS /
REBAR IN GROUT FOR
HOLLOW MASONRY
HILTI HIT - HY 270
SIMPSON SET-XP
DEWALT AC100+ GOLD
PROVIDE
MANUFACTURER'S
RECOMMENDED
SCREEN TUBES IN
HOLLOW MASONRY
---EXPANSION ANCHORS
IN CONC
HILTI KWIK BOLT TZ
SIMPSON STRONG BOLT 2
DEWALT POWER-STUD+
SD2
---EXPANSION ANCHORS IN
GROUTED MASONRY
HILTI KWIK BOLT 3
SIMPSON STRONG BOLT 2
DEWALT POWER-STUD+
SD1
---SCREW ANCHORS IN CONC
OR GROUTED MASONRY
SIMPSON TITEN HD
DEWALT SCREW-BOLT+
1/2" 1"0" 2"SCALE: FULL
XC1 R1
XN
XXNNN
XN
XXNNN
XN
XXNNN
F1 A
HSS 4X4X1/4
B1
20GA TYPE 'W3' MTL DECK
PC SPAN
HX R15:12
STRUCTURAL GENERAL NOTES SYMBOLS LEGEND
W--X--
(XXX'-XX")
ELEVATION
INDICATOR
CUT SECTION
INDICATOR
WALL
REINFORCING
INDICATOR
PC SPAN
IDENTIFIER
STEP TOP OF
WALL INDICATOR
COLUMN & PIER TAG INDICATOR
ROOF SLOPE
INDICATOR
STEP TOP OF
FOOTING
IDENTIFIER
MASONRY PIER
INDICATOR
CORNER REINF
INDICATOR
CONTINUOUS
BEAM
INDICATOR
MATCH LINE INDICATOR
PLAN NORTH ORIENTED 90°
TO THE SHEET W/ MAGNETIC
NORTH (OPTIONAL)
DETAIL BUBBLE
INDICATOR
DETAIL/SECTION/PLAN
BLOCK TITLE INDICATOR
EXT ELEVATION
INDICATOR
COLUMN
INDICATOR(S)
KEYNOTE
IDENTIFIER
REVISION
SYMBOL
FOOTING/PIER
IDENTIFIER
STEP
INDICATOR
HOLDOWN
INDICATOR
BEAM
INDICATOR(S)
MOMENT
INDICATOR
DECK INDICATOR
SHEAR WALL
INDICATOR
HEADER OR
MASONRY LINTEL
INDICATOR
RAFTER
INDICATOR
ASTERISK
INDICATOR
SLOPE
INDICATOR
WORK POINT
INDICATOR
XN
ELEVATION INDICATORSECTION
INDICATOR
COLUMN/FND
GRID INDICATOR
SLAB CONTROL JT &
CONSTRUCTION JT
INDICATOR
STRUCTURAL HATCH PATTERNS
BRICK
CONCRETE
NATIVE
UNDISTURBED SOIL
BACKFILL/FILL
ENGINEERED FILL
DRAINAGE COURSE
GYPSUM BOARD
WD- BLKG OR SHIM
PLYWD/OSB
/PARTICLE BD
WD- GLUED/LAMINATED
WD- CONT FRMG
INSUL/FIRE SAFING
METAL FLOOR GRATING
GROUT
RIGID INSUL/ICF/SIP
/EIFS SYSTEMS
METALS
MORTAR
CMU
ROUGH LOG
WALL
WOOD STUD BRG WALL
CONC WALL HOLDOWN
(BLOCKOUT)
STONE/ROCK WALL
C1
Hx
NTRUE
NORTH
CONT
MC-X
-xx"
/REF - ---
/REF - ---
INSULATED PRECAST WALL
SW
-X
SOLID PRECAST WALL
HSS 4X4X1/4
24" X 24" CONC PIER
TOP 102' - 6"
A
A
C JS J
MLX
STRUCTURAL SHEET INDEX
S001 GENERAL STRUCTURAL NOTES
S002 IBC INSPECTION TABLES
S101 PLATORM FRAMING PLAN
S102 DECKING AND RAILING PLAN
S401 FRAME ELEVATIONS
S501 DETAILS
S601 STANDARD DETAILS / SCHEDULES
PROJECT NO:
CONSULTANT
PROJECT IDEN:
ISSUE BLOCK:
MANAGEMENT:
DRAWN BY:
CHECKED BY:
SHEET TITLE:
SHEET IDENTIFICATION:
OF
A
B
C
2 3 4
1 2 3 4
F0321.26001
DDL
SJK
NO ISSUE TYPE ISSUE DATE
FERMILAB
SOUTH CAVERN
PLATFORM
(4850L)
SANFORD UNDERGROUND
RESEARCH FACILITY
LEAD, SD
100 CD's 04/30/2026
S001
STRUCTURAL
GENERAL NOTES
01 07
1.
2.
3.
4.
5.
6.
7.
STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH JOB
SPECIFICATIONS. CONSULT THESE DOCUMENTS FOR INFORMATION NOT SHOWN ON
STRUCTURAL DRAWINGS.
ALL DIMENSIONS AND CONDITIONS MUST BE VERIFIED IN THE FIELD. ANY
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE
PROCEEDING WITH THE AFFECTED PART OF THE WORK.
THE STRUCTURE IS DESIGNED TO BE SELF SUPPORTING AND STABLE AFTER THE
BUILDING IS COMPLETE. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO
DETERMINE ERECTION PROCEDURES AND SEQUENCE TO ENSURE SAFETY OF THE
BUILDING AND ITS COMPONENTS DURING ERECTION. THIS INCLUDES THE ADDITION
OF NECESSARY SHORING, SHEETING, TEMPORARY BRACING (AND ACCOMPANYING
FOOTINGS), GUYS OR TIE-DOWNS.
ADDITIONAL OBSERVATIONS AS A RESULT OF REJECTION OF WORK COMPLETED
AND/OR ADDITIONAL OBSERVATIONS DUE TO THE DEFICIENCIES IN WORK OBSERVED
WILL BE AT THE EXPENSE OF THE CONTRACTOR.
ALL STRUCTURAL SHOP DRAWINGS TO BE REVIEWED BY JOB SUPERINTENDENT IN
ADDITION TO ALL PERSONNEL DEEMED NECESSARY BY CONTRACTOR PRIOR TO
SUBMITTAL TO ENGINEER FOR APPROVAL.
ALL SHOP DRAWINGS TO BE REVIEWED BY ALBERTSON ENGINEERING INC. SHALL
HAVE ELECTRONIC COPIES PROVIDED TO ALBERTSON ENGINEERING INC. FOR
REVIEW. AN ELECTRONIC MARKED SET OF THOSE DRAWINGS WILL BE RETURNED TO
THE CONTRACTOR. NO ADDITIONAL HARD COPIES OF THE SHOP DRAWINGS NEED TO
BE PROVIDED TO ALBERTSON ENGINEERING INC., ALTHOUGH OTHER PARTIES MAY
REQUIRE HARD COPIES OF THE MARKED UP DRAWINGS. THESE REQUIREMENTS ARE
IN ADDITION TO THE TYPICAL PROJECT SHOP DRAWING SUBMITTAL REQUIREMENTS
STATED IN THE PROJECT SPECIFICATIONS.
THE DESIGN OF THE STRUCTURE SHOWN IN THESE CONSTRUCTION DOCUMENTS IS
FOR THE ONE-TIME USE AT THE SPECIFIC SITE REFERENCED IN THE TITLEBLOCK.
1. SHALL BE ASTM F1554, GR. 36 ROD WITH THREADED ENDS.
1.
2.
3.
4.
5.
A.
6.
7.
STEEL SHALL CONFORM TO ASTM A992 (Fy=50 KSI) FOR ALL W-SHAPES, AND ASTM A36 (Fy=36 KSI) FOR ALL OTHER MISCELLANEOUS SHAPES AND PLATES.
STRUCTURAL PIPE SHALL CONFORM TO ASTM A53, GRADE B, TYPE "E" OR "S"
(Fy=35 KSI).
STEEL SHALL CONFORM TO THE LATEST EDITION OF AISC SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS.
ALL SHOP CONNECTIONS TO BE WELDED (UTILIZING E70XX ELECTRODES) AND FIELD
CONNECTIONS TO BE BOLTED, UNLESS OTHERWISE NOTED. STEEL TO RECEIVE ONE
SHOP COAT AND ONE FIELD TOUCH UP COAT OF APPROVED PAINT, EXCEPT WHERE
GALVANIZED IS INDICATED ON THE DRAWINGS.
WELDS FOR ALL EXPOSED STRUCTURAL STEEL SHALL BE GROUND SMOOTH UNLESS
NOTED OTHERWISE.
ALL BOLTED CONNECTIONS SHALL CONSIST OF 3/4" DIA. (MIN.) ASTM F3125 GRADE
F1852 (A325-TC) BOLTS, UNLESS NOTED OTHERWISE.
FAILURE OF A BOLT OR NUT DURING INSTALLATION PROCESS RESULTING IN A
CRACK IN THE BOLT OR NUT SHALL BE GROUNDS FOR REJECTION OF ALL THE
FAILED BOLTS OR NUTS COMING FROM THE SAME LOT. IF THE DOCUMENTATION
OF THE LOT OF ORIGIN FOR THE FAILED NUT(S) OR BOLT(S) DOES NOT EXIST, OR
IS NOT PROVIDED, THEN ALL OF THE BOLT(S) OR NUT(S) SHALL BE ASSUMED TO
COME FROM THE LOT CONTAINING THE FAILED NUT(S) OR BOLT(S).
CONTRACTOR SHALL MAINTAIN ERECTION TOLERANCES OF STRUCTURAL STEEL AND
ARCHITECTURALLY EXPOSED STRUCTURAL STEEL WITHIN AISC'S CODE OF
STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES.
ANCHOR BOLT HOLES IN STRUCTURAL STEEL SHALL BE OVERSIZED PER THE AISC
MANUAL.
THE STRUCTURAL SYSTEM FOR THIS BUILDING HAS BEEN DESIGNED WITH THE
FOLLOWING SUPERIMPOSED LOADINGS BASED ON A RISK CATEGORY II:
DEAD LOAD SELF WEIGHT + 5 PSF
LIVE LOAD 100 PSF
NO SEISMIC LOADS REQUIRED FOR DESIGN CATEGORY A, USE NOTIONAL
LOADS = 0.01 X DEAD LOAD PER ASCE 7-16, SECTION 1.4.
GENERAL NOTES:
DESIGN LOADS:
ANCHOR RODS:
STRUCTURAL STEEL:
1. ANCHORING ADHESIVE SHALL BE A TWO-COMPONENT SOLID EPOXY BASED SYSTEM
SUPPLIED IN MANUFACTURER'S STANDARD SIDE-BY-SIDE CARTRIDGE AND
DISPENSED THROUGH A STATIC-MIXING NOZZLE SUPPLIED BY THE MANUFACTURER.
EPOXY SHALL MEET THE MINIMUM REQUIREMENTS OF ASTM C-881 SPECIFICATION
FOR TYPE I, II, IV, AND V, GRADE 3, CLASS B, AC, AND D AND MUST DEVELOP A
MINIMUM 12,650 PSI COMPRESSIVE YIELD STRENGTH AFTER 7 DAY CURE. EPOXY
MUST HAVE A HEAT DEFLECTION TEMPERATURE OF A MINIMUM 136 FA (58 AC).
ADHESIVE SHALL BE EPOXY-TIE SET FROM SIMPSON STRONGTIE OR THE HILTI HIT
HY-200 ADHESIVE SYSTEM. ANCHORS SHALL BE INSTALLED PER THE
MANUFACTURERS INSTRUCTIONS.
HIGH STRENGTH EPOXY:
1.
2.
3.
4.
A.
B.
C.
D.
E.
5.
6.
ALL PERSONNEL INSTALLING POST-INSTALLED ANCHORS SHALL HAVE COMPLETED
INSTALLATION TRAINING FROM THE MANUFACTURER FOR ALL OF THE ANCHORING
PRODUCTS SPECIFIED. TRAINING MUST HAVE BEEN COMPLETED NO MORE THAN 5
YEARS FROM THE DATE OF PROJECT INITIATION. IF TRAINING HAS NOT BEEN
COMPLETED OR IF TRAINING OCCURRED MORE THAN 5 YEARS BEFORE THE DATE OF
PROJECT INITIATION, THE CONTRACTOR SHALL ARRANGE AN ANCHOR
MANUFACTURER'S REPRESENTATIVE TO PROVIDE ON-SITE INSTALLATION TRAINING.
CONTRACTOR SHALL SUBMIT DOCUMENT CONFIRMING THAT ALL PERSONNEL
INSTALLING ANCHORS HAVE PASSED THE TRAINING COURSE PRIOR TO THE
COMMENCEMENT OF INSTALLING ANCHORS.
ADHESIVE ANCHORS INSTALLED HORIZONTALLY OR UPWARDLY INCLINED INTO
CONCRETE THAT WILL SUPPORT SUSTAINED TENSION LOADS WILL BE MARKED WITH
(SUSTAINED) ON THE DRAWINGS. PERSONNEL WHO WILL INSTALL THESE ANCHORS
SHALL BE CERTIFIED BY THE ACI/CRSI ADHESIVE ANCHOR INSTALLER CERTIFICATION
PROGRAM. CONTRACTOR SHALL SUBMIT A DOCUMENT CONFIRMING THAT PERSONNEL
HAVE PASSED THE CERTIFICATION PROGRAM PRIOR TO INSTALLING ANCHORS.
ALL POST INSTALLED ANCHORS AND REBAR SHALL BE INSTALLED ACCORDING TO
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
THE FOLLOWING CONDITIONS MUST BE MET FOR ALL ADHESIVE ANCHORS AND
ADHESIVE ANCHORED REINFORCEMENT UNLESS WRITTEN APPROVAL IS RECEIVED
FROM THE ENGINEER PRIOR TO INSTALLATION.
DRY CONCRETE UNLESS NOTED OTHERWISE
CONCRETE TEMPERATURE AT TIME OF INSTALLATION THROUGH CURE TIME MUST
BE WITHIN THE TEMPERATURE RANGE SPECIFIED IN MANUFACTURER'S PRINTED
INSTALLATION INSTRUCTIONS. SEE MANUFACTURER'S PRINTED INSTALLATION
INSTRUCTIONS FOR ADHESIVE GEL AND CURE TIMES.
ANCHOR HOLES SHALL BE HAMMER DRILLED.
ANCHOR HOLES TO BE CLEANED PER MANUFACTURER'S PRINTED INSTALLATION
INSTRUCTION PRIOR TO ADHESIVE INJECTION.
CONCRETE MUST BE AT LEAST 21 DAYS OLD BEFORE INSTALLATION OF ANCHORS.
THE LOCATION OF EXISTING REINFORCING STEEL BARS, POST-TENSIONED STEEL
STRANDS, OR PRE-TENSIONED STEEL STRANDS SHALL BE ESTABLISHED PRIOR TO
INSTALLING POST INSTALLED ANCHORS OR REINFORCEMENT. LOCATION SHALL BE
ESTABLISHED BY USING A SCANNER, GPR, X-RAY, CHIPPING OR OTHER MEANS.
EXISTING REINFORCEMENT OR STRAND SHALL NOT BE DAMAGED UNLESS PRIOR
APPROVAL IS GIVEN BY THE ENGINEER.
ALTERNATE PRODUCTS MUST BE APPROVED IN WRITING BY THE STRUCTURAL
ENGINEER PRIOR TO USE. CONTRACTOR SHALL PROVIDE CALCULATIONS AND
PRODUCT DATA SHOWING THAT THE SUBSTITUTED PRODUCT IS IN COMPLIANCE WITH
THE RELEVANT BUILDING CODES, LOAD RESISTANCE, INSTALLATION CATEGORY,
CREEP, IN-SERVICE TEMPERATURE AND INSTALLATION TEMPERATURE OF THE
SPECIFIED PRODUCT.
POST INSTALLED ANCHORS AND REBAR:
2021 INTERNATIONAL BUILDING CODE.
ACI 318-19 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND
COMMENTARY.
AISC 360-16 SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS.
ASCE 7-16 MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND
OTHER STRUCTURES.
DESIGN CODES:
SEISMIC:
PALLET CART
(MODEL/STYLE)
5160 LBS
1.
2.
3.
4.
5.
6.
SPECIAL INSPECTION AND MINIMUM TESTING SHALL BE PERFORMED IN ACCORDANCE WITH 2021
IBC AND ALL REFERENCED MATERIALS AND TABLES.
INSPECTION SHALL BE PROVIDED BY AN INDEPENDENT TESTING AGENCY HIRED AT THE OWNER'S
EXPENSE. AGENCY INSPECTION PERSONNEL SHALL MEET THE INSPECTOR QUALIFICATIONS FOR
EACH MATERIAL ITEM AS INDICATED IN THE SPECIFICATIONS.
ANY MATERIAL OR PLACEMENT DEVIATIONS FROM MINIMUMS SHOWN ON THE DRAWINGS OR IN
SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER.
IN ADDITION TO THE IBC INSPECTION TABLES, THE INSPECTOR SHALL VERIFY THAT ALL STEEL
MAINTAIN ERECTION TOLERANCES OF STRUCTURAL STEEL AND ARCHITECTURALLY EXPOSED
STRUCTURAL STEEL WITHIN AISC'S CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND
BRIDGES.
IN ADDITION TO THE CONCRETE AND MASONRY IBC INSPECTION TABLES, THE INSPECTOR SHALL
VERIFY THAT ALL CONCRETE AND MASONRY MAINTAIN TOLERANCES SPECIFIED IN ACI 117-10
STANDARD SPECIFICATIONS FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS.
TESTING - ANY FAILED FIELD TEST SHALL BE REPORTED TO ALBERTSON ENGINEERING INC
IMMEDIATELY.
SPECIAL INSPECTION AND TESTING:
AISC 360-16 TABLE N5.4-1
INSPECTION TASKS PRIOR TO WELDING
AISC 360-16 TABLE N5.4-2
INSPECTION TASKS DURING WELDING
AISC 360-16 TABLE N5.4-3
INSPECTION TASKS AFTER WELDING
AISC 360-16 TABLE N5.6-1
INSPECTION TASKS PRIOR TO BOLTING
AISC 360-16 TABLE N5.6-2
INSPECTION TASKS DURING BOLTING
AISC 360-16 TABLE N5.6-3
INSPECTION TASKS AFTER BOLTING
INSPECTION TASKS PRIOR TO WELDING
WELDING PROCEDURE SPECIFICATIONS (WPSs) AVAILABLE
MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE
MATERIAL IDENTIFICATION (TYPE/GRADE)
WELDER IDENTIFICATION SYSTEM (a)
FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)
• JOINT PREPARATION
• DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL)
• CLEANLINESS (CONDITION OF STEEL SURFACES)
• TACKING (TACK WELD QUALITY AND LOCATION)
CONFIGURATION AND FINISH OF ACCESS HOLES
FIT-UP OF FILLET WELDS
• DIMENSIONS (ALIGNMENT, GAPS AT ROOT)
• CLEANLINESS (CONDITION OF STEEL SURFACES)
• TACKING (TACK WELD QUALITY AND LOCATION)
CHECK WELDING EQUIPMENT
INSPECTION INTERVAL
USE OF QUALIFIED WELDERS
CONTROL AND HANDLING OF WELDING CONSUMABLES
• PACKAGING
• EXPOSURE CONTROL
NO WELDING OVER CRACKED TACK WELDS
ENVIRONMENTAL CONDITIONS
• WIND SPEED WITHIN LIMITS
• PRECIPITATION AND TEMPERATURE
WPS FOLLOWED
• SETTINGS ON WELDING EQUIPMENT
• TRAVEL SPEED
• SELECTED WELDING MATERIALS
• SHIELDING GAS TYPE/FLOW RATE
• PREHEAT APPLIED
• INTERPASS TEMPERATURE MAINTAINED (MIN/MAX)
• PROPER POSITION (F, V, H, OH)
WELDING TECHNIQUES
• INTERPASS AND FINAL CLEANING
• EACH PASS WITHIN PROFILE LIMITATIONS
• EACH PASS MEETS QUALITY REQUIREMENTS
(a) THE FABRICATOR OR ERECTOR, AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY WHICH A WELDER WHO HAS WELDED A JOINT OR
MEMBER CAN BE IDENTIFIED. STAMPS, IF USED, SHALL BE THE LOW-STRESS TYPE.
P
P
O
O
O
O
O
O
O
O
O
O
O
O
WELDS CLEANED
SIZE, LENGTH AND LOCATION OF WELDS
WELDS MEET VISUAL ACCEPTANCE CRITERIA:
CRACK PROHIBITION
WELD/BASE-METAL FUSION
CRATER CROSS SECTION
WELD PROFILES
WELD SIZE
UNDERCUT
POROSITY
ARC STRIKES
k-AREA(a)
BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED)
REPAIR ACTIVITIES
DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER
O
P
P
P
P
P
P
O
(a)WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE k-AREA, VISUALLY INSPECT THE WEB k-AREA FOR CRACKS WITHIN 3" (75 mm) OF THE WELD.
(b) AFTER ROLLED HEAVY SHAPES (SEE SECTION A3.1c) AND BUILT-UP HEAVY SHAPES (SEE SECTION A3.1d) ARE WELDED, VISUALLY
INSPECT THE WELD ACCESS HOLE FOR CRACKS.
INSPECTION TASKS PRIOR TO BOLTING
MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER MATERIALS
FASTENER ASSEMBLIES PLACED IN ALL HOLES AND WASHERS AND NUTS ARE
POSITIONED AS REQUIRED
O
O
O
O
O
P
O
O
O
O
O
DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS P
FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS
CORRECT FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE, BOLT LENGTH IF
THREADS ARE TO EXCLUDED FROM SHEAR PLANE)
CORRECT BOLTING PROCEDURE SELECTED FOR JOINT DETAIL
CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITION AND
HOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS
PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL
OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES AND METHODS USED
PROTECTED STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND OTHER
FASTENER COMPONENTS
JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE PRETENSIONING
OPERATION
FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM ROTATING
FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC SPECIFICATION,
PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT TOWARD THE FREE
EDGES
O-OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS.
P-PERFORM THESE TASKS FOR EACH WELDED JOINT OR MEMBER.
OBSERVATION OF WELDING OPERATIONS AND VISUAL INSPECTION OF IN-PROCESS AND COMPLETED WELDS SHALL BE THE PRIMARY METHOD TO CONFIRM THAT THE MATERIALS, PROCEDURES AND WORKMANSHIP ARE IN CONFORMANCE WITH THE CONSTRUCTION
DOCUMENTS.
FOR STRUCTURES IN RISK CATEGORY II (ASCE/SEI 7, TABLE 1.5-1), ULTRASONIC TESTING SHALL BE PERFORMED ON 10% OF COMPLETE- JOINT-PENETRATION GROOVE WELDS SUBJECT TO TRANSVERSELY APPLIED TENSION LOADING IN BUTT, T- AND CORNER JOINTS, IN
MATERIALS 5/16" (8 MM) THICK OR GREATER.
FOR STRUCTURES IN RISK CATEGORY III / IV (ASCE/SEI 7, TABLE 1.5-1), ULTRASONIC TESTING SHALL BE PERFORMED ON ALL COMPLETE- JOINT-PENETRATION GROOVE WELDS SUBJECT TO TRANSVERSELY APPLIED TENSION LOADING IN BUTT, T- AND CORNER JOINTS, IN
MATERIALS 5/16" (8 MM) THICK OR GREATER.
ALL NONDESTRUCTIVE TESTING OF WELDED JOINTS SHALL BE DOCUMENTED.
SEE AISC360-16 CHAPTER N FOR ADDITIONAL WELD INSPECTION REQUIREMENTS.
SEE AISC360-16 CHAPTER N FOR ADDITIONAL BOLT INSPECTION REQUIREMENTS.
EXPOSED CUT SURFACES OF GALVANIZED STRUCTURAL STEEL MAIN MEMBERS AND EXPOSED CORNERS OF RECTANGULAR HSS SHALL BE
VISUALLY INSPECTED FOR CRACKS SUBSEQUENT TO GALVANIZING.
INSPECTION SHALL OCCUR DURING THE PLACEMENT OF ANCHOR RODS AND OTHER EMBEDMENTS SUPPORTING STRUCTURAL STEEL FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS, INCLUDING DIAMETER, GRADE, TYPE AND LENGTH OF THE ANCHOR ROD OR
EMBEDDED ITEM, AND THE EXTENT OR DEPTH OF EMBEDMENT INTO THE CONCRETE.
FABRICATED STEEL AND ERECTED STEEL FRAMES, AS APPROPRIATE, SHALL BE INSPECTED FOR COMPLIANCE WITH THE DETAILS SHOWN ON THE CONSTRUCTION DOCUMENTS, INCLUDING BRACES, STIFFENERS, MEMBER LOCATIONS AND PROPER JOINT DETAIL APPLICATION.
INSPECTION TASKS DURING BOLTING
INSPECTION TASKS AFTER BOLTING
INSPECTION TASKS DURING WELDING
INSPECTION TASKS AFTER WELDING
STEEL CONSTRUCTION
WELD ACCESS HOLES IN ROLLED HEAVY SHAPES AND BUILT-UP HEAVY SHAPES (b)
NO PROHIBITED WELDS HAVE BEEN ADDED WITHOUT THE APPROVAL OF THE EOR
YES
PLACEMENT AND INSTALLATION OF STEEL HEADED STUD ANCHORS P
YES
WELDER QUALIFICATION RECORDS AND CONTINUITY RECORDS P YES
FIT-UP OF CJP GROOVE WELDS OF HSS T-, Y- AND K-JOINTS WITHOUT BACKING
• JOINT PREPARATIONS
• DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL)
• CLEANLINESS (CONDITION OF STEEL SURFACES)
• TACKING (TACK WELD QUALITY AND LOCATION)
P
REQUIRED ON PROJECT
YES
YES
YES
YES
YES
YES
YES
YES
REQUIRED ON PROJECTINSPECTION INTERVAL
REQUIRED ON PROJECTINSPECTION INTERVAL
YES
YES
YES
YES
YES
YES
O
O
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
INSPECTION INTERVAL REQUIRED ON PROJECT
INSPECTION INTERVAL REQUIRED ON PROJECT
INSPECTION INTERVAL REQUIRED ON PROJECT
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
PROJECT NO:
CONSULTANT
PROJECT IDEN:
ISSUE BLOCK:
MANAGEMENT:
DRAWN BY:
CHECKED BY:
SHEET TITLE:
SHEET IDENTIFICATION:
OF
A
B
C
2 3 4
1 2 3 4
F0321.26001
DDL
SJK
NO ISSUE TYPE ISSUE DATE
FERMILAB
SOUTH CAVERN
PLATFORM
(4850L)
SANFORD UNDERGROUND
RESEARCH FACILITY
LEAD, SD
100 CD's 04/30/2026
S002
IBC INSPECTION
TABLES
02 07
A
1 2 3 4
1' 2'0' 4'SCALE: 12"=1'-0"1 PLATFORM FRAMING PLAN
B
C
D
E
S401
S401
S401
S401
1 2 3 4
W x1
B
C
D
E
A
PROFILE PRIOR TO FABRICATION
(E) CONCRETE ABUTMENT
W12x19 TOG = 99'-51 2"
C6X13 TOB = 99'-111
2"
(E) SHOTCRETE, VIFSIM
SIM
W6x15 TOB = 99'-111 2"
WALL PLATE W/ EPOXIED
THREADED RODS, SEE FRAMING
ELEVATION & DETAILS
6'-6" 6'-6" 6'-6"
2' -7
2'
-7
2' -7
2'
-7
19'-6"
'-4
VA
R
IE
S, V
IF
VA
R
IE
S, V
IF
1' -6
1 2" , V
AR
IE
S
G R
ID
S
2" T
YP
(E) DRIFT
1'-4", VIF 11'-8", VIF
(E) EXTENTS OF
ABUTMENT (BLW)
W12x19 TOG = 99'-51 2" W12x19 TOG = 99'-51
2" W12x19 TOG = 99'-51 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
W6x15 TOB = 99'-111 2"
S501
1' -0
1 2"
PROJECT NO:
CONSULTANT
PROJECT IDEN:
ISSUE BLOCK:
MANAGEMENT:
DRAWN BY:
CHECKED BY:
SHEET TITLE:
SHEET IDENTIFICATION:
OF
A
B
C
2 3 4
1 2 3 4
F0321.26001
DDL
SJK
NO ISSUE TYPE ISSUE DATE
FERMILAB
SOUTH CAVERN
PLATFORM
(4850L)
SANFORD UNDERGROUND
RESEARCH FACILITY
LEAD, SD
100 CD's 04/30/2026
S101
PLATFORM FRAMING
PLAN
03 07
PLATFORM FRAMING PLAN NOTES
SEE SHEET S001 FOR STRUCTURAL NOTES.
VERIFY ALL DIMENSIONS, ELEVATIONS, AND EXISTING CONDITIONS WITH FIELD CONDITIONS
BEFORE CONSTRUCTION COMMENCES.
ELEVATIONS OF THE STRUCTURAL DRAWINGS REFER TO THE ADJACENT UTILITY DRIFT
ELEVATION SET AT 100'-0" (MAIN FLOOR).
ALL GIRDER TO WALL PLATE CONNECTIONS SHALL BE SHEAR TAB CONNECTIONS. SEE SHEAR
TAB CONNECTION SCHEDULE ON SHEET S-601, UNLESS OTHERWISE NOTED OR DETAILED.
TOB = "TOP OF BEAM" INDICATING THE TOP OF STEEL FOR INFILL BEAMS.
TOG = "TOP OF GIRDER" INDICATING THE TOP OF STEEL FOR GIRDERS.
SHEET NOTES
PLAN
NORTH
1' 2'0' 4'SCALE: 12"=1'-0"1 PLATFORM DECKING AND HANDRAIL PLAN
DECKING EDGE, TYP
A
1 2 3 4
B
C
D
E
1 2 3 4
B
C
D
E
A
(E) DRIFT
(E) SHOTCRETE, VIF PROFILE
PRIOR TO FABRICATION
FLOOR FASTENERS @ 8" OC
4'-0" 4'-0" 4'-0" 3'-51 2"
5' -1
VI
F
PR
IO
R
T O
F
AB
R
IC
AT
IO
N
6' -8
7 16
6' -8
7 16
VI
F
PR
IO
R T
O F
AB
R
IC
AT
IO
N
VI
F
PR
IO
R T
O F
AB
R
IC
AT
IO
N
19'-41
2" GUARDRAIL SECTION
5'-0" 5'-0" 5'-0" 4'-41 2"31
2"
'-9
" G U
AR
D
R
AI
L
SE
C
TI
O N
2' -7
2'
-7
2' -7
2'
-7
6'-6" 6'-6" 6'-6"
19'-6"
1' -5
4'-0"
POST BASE, SEE TYPICAL POST
BASE DETAIL ON SHEET S601
FOR ADD'L INFO, TYP
16"
16"
3"
TO DECK PLATE
100'-0"
8" GAP AT PLATE
JOINTS, TYP
T3 S601
T4 S601
PROJECT NO:
CONSULTANT
PROJECT IDEN:
ISSUE BLOCK:
MANAGEMENT:
DRAWN BY:
CHECKED BY:
SHEET TITLE:
SHEET IDENTIFICATION:
OF
A
B
C
2 3 4
1 2 3 4
F0321.26001
DDL
SJK
NO ISSUE TYPE ISSUE DATE
FERMILAB
SOUTH CAVERN
PLATFORM
(4850L)
SANFORD UNDERGROUND
RESEARCH FACILITY
LEAD, SD
100 CD's 04/30/2026
S102
PLATFORM DECKING
AND HANDRAIL PLAN
04 07
SHEET NOTES
DECK PLATE & GUARDRAIL PLAN NOTES
SEE SHEET S001 FOR STRUCTURAL NOTES.
VERIFY ALL DIMENSIONS, ELEVATIONS, AND EXISTING CONDITIONS WITH FIELD CONDITIONS
BEFORE CONSTRUCTION COMMENCES.
ELEVATIONS OF THE STRUCTURAL DRAWINGS REFER TO THE TOP OF EXISTING FLOOR SLAB
CONCRETE REFERENCE ELEVATION SET AT 100'-0".
DECK PLATE TO BE 12" THICK ASTM A786 DECKING AND ARE TO HAVE CHECKERED (RAISED
DIAMOND) SURFACE FOR SLIP RESISTANCE.
MINIMUM TWO SPAN CONDITION REQUIRED FOR ALL DECK PLATE SECTIONS.
CONTRACTOR TO MAINTAIN A 18" MINIMUM SPACING BETWEEN SHEETS AT JOINTS.
EXISTING CONDITIONS ALONG THE DRIFT WALL SHALL BE VERIFIED BY THE CONTRACTOR PRIOR
TO DECK PLATE FABRICATION.
ALL DECK PLATES ARE TO BE FASTENED TO STRUCTURAL STEEL BEAMS WITH LFF050 FAST
FLOOR CLAMPS W/ M12 X 11
2" COUNTER SUNK SCREWS. PREP AND INSTALL FAST FLOOR
CLAMPS PER THE MANUFACTURERS REQUIREMENTS.
PLAN
NORTH
1' 2'0' 4'SCALE: 12"=1'-0"
FRAMING ELEVATION1
S401
A B C D E
(E) CONCRETE ABUTMENT
(E) SHOTCRETE, VIF PRIOR TO FABRICATION
(E) CONCRETE SLAB
DECKING, SEE PLAN & PLAN NOTES
(E) DRIFT
STL GIRDER, SEE PLAN
S501
W8X18 LOWER BRACE,
TYP @
ALL GIRDERS
S501
S501
CJP, TYP
4" X 41
2" X CONT TOE KICKER PLATE
WELDED TO POSTS @ SIM CONDITION
SIM
AT SIM CONDITION ONLY, GUARDRAIL SECTION TO CONSIST
OF 11
2" STD PIPE FOR ALL POSTS, MID AND TOP RAILS
1' -1
1'
-1
1' -5
3' -7
2'-7"
SEE PLAN
40° MIN
STL INFILL BEAM, SEE PLAN
TOG
SEE PLAN
TOB
SEE PLAN
4"
TO DECK PLATE
SEE PLAN
10'-3 7 16", VIF PRIOR TO FABRICATION
T2 S601
WEB STIFFENERS
S501
0' 5'1'SCALE: 3 8"=1'-0"
FRAMING ELEVATION2
S401
A B C D E
(E) SHOTCRETE, VIF PROFILE
PRIOR TO FABRICATION
DECKING, SEE PLAN & PLAN NOTES
(E) DRIFT
STL INFILL BEAM, SEE PLAN, TYP
S501
S501
S501
S501
40° MIN
TOG
SEE PLAN
TOB
SEE PLAN
STL GIRDER, SEE PLAN
3' -7
1' -5
1'
-1
1' -1
2'-7"
SEE PLAN
10'-3 7 16", VIF PRIOR TO FABRICATION
WEB STIFFENERS
S501
W8X18 LOWER BRACE,
TYP @
ALL GIRDERS
PROJECT NO:
CONSULTANT
PROJECT IDEN:
ISSUE BLOCK:
MANAGEMENT:
DRAWN BY:
CHECKED BY:
SHEET TITLE:
SHEET IDENTIFICATION:
OF
A
B
C
2 3 4
1 2 3 4
F0321.26001
DDL
SJK
NO ISSUE TYPE ISSUE DATE
FERMILAB
SOUTH CAVERN
PLATFORM
(4850L)
SANFORD UNDERGROUND
RESEARCH FACILITY
LEAD, SD
100 CD's 04/30/2026
S401
FRAMING ELEVATIONS
05 07
BRACE MITERED AT ENDS W/ 12" CAP
PLATES EA FACE,
SECTION A-A
8" X 12" X 3 4" SEAT PLATE
(3) 3 4" STL GUSSET PLATES
1" Ø ALL THREAD ROD W/ 12" MIN
EMBED INTO ROCK W/ HILTI HIT-HY
200 V3 EPOXY OR APPROVED EQUAL
(E) SHOTCRETE
(E) DRIFT
16" X 16" X 1" THICK
STL WALL PLATE W/ 1"
NON-SHRINK GROUT
CL
1/4
1/4 1/4
3 SIDES
8" 16"0" 32"SCALE: 3 4"=1'-0"
FRAMING DETAIL1
S501
1/4 ALL PARTS TO WALL PL
MITERED BRACE W/ 12" CAP PLATES
4" THICK STL GUSSET PL
4" THICK STL SEAT PLATE
PJP, TYP GUSSET TO PL1/4
12" MIN
1'-4" TYP
2" TYP
" T
YP
4"
3"
8"
STL GIRDER, SEE PLAN
SHEAR TAB CONNECTION, SEE
SHEAR TAB CONNECTION SCHEDULE
16" X 16" X 11
2" THICK STL
WALL PLATE W/ 1"
NON-SHRINK GROUT
DECKING, SEE PLAN & PLAN NOTES
(E) SHOTCRETE
(E) DRIFT
(E) CONCRETE SLAB
(E) CONCRETE BRIDGE
ABUTMENT
STL INFILL BEAM, SEE PLAN, TYP
FLOOR FASTENERS @ 8" OC, SEE
DECKING & RAILING PLAN
1" Ø ALL THREAD ROD W/ 13" EMBED
INTO FDN WALL W/ HILTI HIT-HY 200
V3 EPOXY OR APPROVED EQUAL
8" 16"0" 32"SCALE: 3 4"=1'-0"
FRAMING DETAIL2
S501
TOB
SEE PLAN
TOG
SEE PLAN
TO DECK PLATE
SEE PLAN
(4) 3 4" Ø THRU BOLTS, TYP
2"
A
1'-01 2"6"
21 2"
STL GIRDER, SEE PLAN
SHEAR TAB CONNECTION, SEE
SHEAR TAB CONNECTION SCHEDULE
16" X 16" X 11
2" THICK STL WALL
PLATE W/ 1" NON-SHRINK GROUT
DECKING, SEE PLAN &
PLAN NOTES
STL INFILL BEAM, SEE PLAN, TYP
FLOOR FASTENERS @ 8" OC,
SEE DECKING & RAILING PLAN
1" Ø ALL THREAD ROD W/ 12" EMBED
INTO ROCK W/ HILTI HIT-HY 200 V3
EPOXY OR APPROVED EQUAL
(E) SHOTCRETE
(E) DRIFT
8" 16"0" 32"SCALE: 3 4"=1'-0"
FRAMING DETAIL3
S501
PLATE EDGE SUPPORT BEAM, SEE
PLAN, C6X13 W/ (1) 3 4" DIA THRU BOLT
TO BM FLANGE @ SIM
TOB
SEE PLAN
TOG
SEE PLAN
TO DECK PLATE
SEE PLAN
A
1'-01 2"6"
CL
DECKING, SEE PLAN & PLAN NOTES
STL INFILL BEAM, SEE PLAN
FLOOR FASTENERS @ 8" OC, SEE
DECKING & RAILING PLAN
MAINTAIN 18" GAP @ SHEET BOUNDARIES
8" 16"0" 32"SCALE: 3 4"=1'-0"
FRAMING DETAIL4
S501
@ ALL GUARDRAIL POSTS,
PROVIDE 516" Ø THRU HOLE FOR
4" Ø DOUBLE WIRE SAFETY PIN
POST BASE, SEE TYP POST BASE DTL
RAILING @ SIM CONDITION, SEE PLAN
& FRAMING ELEVATION
1/4 TYP
STL GIRDER, SEE PLAN
TOG
SEE PLAN
TOB
SEE PLAN
2"
31 2"
GRID
(4) 3 4" DIA THRU BOLTS
BRACE MITERED AT ENDS W/ 12" CAP
PLATES EA FACE, SEE DETAILS
DECKING, SEE PLAN & PLAN NOTES
STL INFILL BEAM, SEE PLAN
8" 16"0" 32"SCALE: 3 4"=1'-0"
FRAMING DETAIL5
S501
FLOOR FASTENERS @ 8" OC, SEE
DECKING & RAILING PLAN
STL GIRDER, SEE PLAN
TOG
SEE PLAN
TOB
SEE PLAN
8" X FULL HEIGHT X FULL
WIDTH WEB STIFFENERS EA
SIDE OF WEB
CL
NOTE:
RAILING AT SIM
CONDITION NOT SHOWN
FOR CLARITY
TO DECK PLATE
SEE PLAN
GRID
2" 2"
16" 53
8"
8" 16"0" 32"SCALE: 3 4"=1'-0"
FRAMING DETAIL6
S501
4" X 41
2" X CONT TOE KICKER PLATE
TYP1/4
1/4DECKING, SEE PLAN & PLAN NOTES
INFILL BEAM, SEE PLAN
GIRDER, SEE PLAN
FLOOR FASTENERS @ 8" OC, SEE
DECKING & RAILING PLAN
RAILING, SEE PLAN &
FRAMING ELEVATION
TOB
SEE PLAN
TOG
SEE PLAN
TO DECK PLATE
SEE PLAN
(4) 3 4" Ø THRU BOLTS
31 2"
4"
4"
GRID
VIF PRIOR TO
FABRICATION
EA END
CHANNEL1/4
1/4
INFILL BEAM, SEE PLAN
INFILL BEAM, SEE PLAN
GIRDER, SEE PLAN
16" X 16" X 11
2" THICK STL WALL
PLATE W/ 1" NON-SHRINK GROUT
1" DIA ALL THREAD ROD W/ 12" MIN
EMBED INTO ROCK W/ EPOXY
(E) SHOTCRETE
(E) DRIFT
6" 1'0' 2'SCALE: 1"=1'-0"
FRAMING DETAIL7
S501
PROJECT NO:
CONSULTANT
PROJECT IDEN:
ISSUE BLOCK:
MANAGEMENT:
DRAWN BY:
CHECKED BY:
SHEET TITLE:
SHEET IDENTIFICATION:
OF
A
B
C
2 3 4
1 2 3 4
F0321.26001
DDL
SJK
NO ISSUE TYPE ISSUE DATE
FERMILAB
SOUTH CAVERN
PLATFORM
(4850L)
SANFORD UNDERGROUND
RESEARCH FACILITY
LEAD, SD
100 CD's 04/30/2026
S501
DETAILS
06 07
12"
2"Ø SOLID STEEL ROD
W/ TAPER @ TOP
16"Ø THRU HOLE FOR
DBL WIRE PINS
2" 4"0" 8"SCALE: 3"=1'-0"
TYPICAL POST BASE DETAILT2
S601
5" 1"
31 2"
1"
2"
W W
STL BM, SEE PLAN
1/2" 2"
1 1/2"
1 1 /4"
3"
SP
AC
IN
G
1 1 /4"
4" WIDE PL, SEE SCHEDULE
FOR THICKNESS AND LENGTH
LE
NG
TH
PE
R
SC
HE
D
FO SUPPORT
COL OR BM
4"
ELEVATION
SHEAR TAB CONNECTION SCHEDULE
BEAM
W12 & 14
ADDITIONAL REMARKS:
SHOP WELD 'W'
LENGTH
8-1/2"
3/4"Ø BOLTS
F3125 GR F1852
CONNECTION PLATE
THICKNESS
3/8" (SEE DIAGRAM)
1.
2.
PLATE LENGTH AND NUMBER OF BOLTS ARE GOVERNED BY THE SMALLER BEAM WITHIN THE CONNECTION.
PROVIDE SHORT SLOTTED HORIZONTAL HOLES IN CONNECTION PLATE WHEN CONNECTION PLATE IS ATTACHED TO A SUPPORTING COLUMN. USE STANDARD HOLES WHEN ATTACHING TO SUPPORTING BEAM.
1/4" FILLET
DECKING, SEE PLAN & PLAN NOTES
DECKING JOINT
2" 4"0" 8"SCALE: 3"=1'-0"
TYPICAL FLOOR FAST INSTALLATIONT3
S601
2 FLANGE 9
16"
16" Ø BOLT HOLE1
8" TYP
16"Ø HOLE
INFILL BEAM, SEE PLAN
TO DECK PLATE
SEE PLAN
16" COUNTERSUNK Ø
GIRDER BELOW NOT
SHOWN, SEE PLAN &
FRAMING ELEVATIONS
CL
2" 4"0" 8"SCALE: 3"=1'-0"
TYPICAL FASTENER PLAN LAYOUTT4
S601
INFILL BEAM
16"
16"
COUNTERSUNK Ø, TYP
BOLT HOLE Ø, TYP
2" 8" 8"11
2"
8", TYP
INFILL BEAM FLANGE BELOW
9 16
T
YP
DECKING EDGE
CL
PROJECT NO:
CONSULTANT
PROJECT IDEN:
ISSUE BLOCK:
MANAGEMENT:
DRAWN BY:
CHECKED BY:
SHEET TITLE:
SHEET IDENTIFICATION:
OF
A
B
C
2 3 4
1 2 3 4
F0321.26001
DDL
SJK
NO ISSUE TYPE ISSUE DATE
FERMILAB
SOUTH CAVERN
PLATFORM
(4850L)
SANFORD UNDERGROUND
RESEARCH FACILITY
LEAD, SD
100 CD's 04/30/2026
S601
STANDARD DETAILS
07 07
SCALE: NTS
SCHEDULE - SHEAR TAB CONNECTIONT1
S601
File details come from the government source that posted it. Updated .