20250630 Proposed Repairs and Bridge Construction Pond 3 Bid Plans.pdf

PDF 16 MB Posted

Attached to
Repair And Bridge Construction At Pond No. 3 Dam
Solicitation number
2124048
Issued by
Orange County, New York

About this file

The document is a comprehensive set of bid plans for the Village of Tuxedo Park, New York, detailing proposed repairs and bridge construction for Pond No. 3 Dam, located at 80 Lorillard Road. The project involves removing the existing bridge, repairing spillway abutments, and constructing a new bridge across the dam, with detailed engineering drawings by Weston & Sampson engineering firm. The bid plans include extensive technical specifications, site location maps, existing and proposed bridge plans, spillway abutment elevation views, reinforcing details, traffic sign and guide rail specifications, and on-site condition photographs documenting existing structural deterioration.

The project appears to be funded by the Village of Tuxedo Park and is prepared for competitive bidding, with the engineering documents dated July 2025 and assigned project number DPW25-002. The technical drawings reveal significant structural repairs needed, including mortar joint deterioration in the spillway abutments, and comprehensive reconstruction plans that include new pavement courses, reinforcement details, and safety infrastructure like traffic signs and guide rails. The bid documents are prepared in a standard engineering format with multiple detailed sheets covering various aspects of the dam and bridge reconstruction, suggesting a complex infrastructure rehabilitation project aimed at restoring the structural integrity of the Pond No. 3 Dam crossing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

\\w se

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \F

O-

0 & S

-0

CO

VE

R

PA

GE

_V

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

TITLE PAGE

T000

VDK

ANR

ANR

AS NOTED

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \F

O-

0 & S

-0

CO

VE

R

PA

GE

_V

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

GENERAL NOTES

S000

VDK

ANR

D-1 S-101

D-2 S-102

\\w se

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \S

-0

's

- F

LO

OR

P

LA

N

LIB

RA

RY

_V 2-

BR

ID

GE

_ R

EP

LA

CE

ME

NT

_.d wg

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

EXISTING

PLAN VIEW

S001

VDK

ANR

D-2 S-102

D-1 S-101

\\w se

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \S

-0

's

- F

LO

OR

P

LA

N

LIB

RA

RY

_V 2-

BR

ID

GE

_ R

EP

LA

CE

ME

NT

_.d wg

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

BRIDGE

REMOVAL PLAN

S002

VDK

ANR

D-4 S-104

D-3 S-103

\\w se

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \S

-0

's

- F

LO

OR

P

LA

N

LIB

RA

RY

_V 2-

BR

ID

GE

_ R

EP

LA

CE

ME

NT

_.d wg

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

PROPOSED

BRIDGE PLAN

S003

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \S

-0

's

- F

LO

OR

P

LA

N

LIB

RA

RY

_V 2-

BR

ID

GE

_ R

EP

LA

CE

ME

NT

_.d wg

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

GUIDERAIL PLANS

S004

VDK

ANR

D-5 S-105

D-6 S-106

\\w se

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \S

-0

's

- F

LO

OR

P

LA

N

LIB

RA

RY

_V 2-

BR

ID

GE

_ R

EP

LA

CE

ME

NT

_.d wg

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

ABUTMENT

REPAIR PLAN

S005

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \F

O-

0's

FO

UN

DA

TI

ON

D

ET

AI

L L

IB

RA

RY

_V

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

EXISTING

NORTH SPILLWAY

ABUTMENT

ELEVATION VIEW

S101

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \F

O-

0's

FO

UN

DA

TI

ON

D

ET

AI

L L

IB

RA

RY

_V

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

EXISTING

EAST SPILLWAY

ABUTMENT

ELEVATION VIEW

S102

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \F

O-

0's

FO

UN

DA

TI

ON

D

ET

AI

L L

IB

RA

RY

_V

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

PROPOSED

NORTH SPILLWAY

ABUTMENT

ELEVATION VIEW

S103

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \F

O-

0's

FO

UN

DA

TI

ON

D

ET

AI

L L

IB

RA

RY

_V

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

S104

VDK

ANR

ANR

AS NOTED

PROPOSED

SOUTH SPILLWAY

ABUTMENT

ELEVATION VIEW

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \F

O-

0's

FO

UN

DA

TI

ON

D

ET

AI

L L

IB

RA

RY

_V

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

NORTH SPILLWAY

ABUTMENT ELEVATION

VIEW REPAIRS

S105

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \F

O-

0's

FO

UN

DA

TI

ON

D

ET

AI

L L

IB

RA

RY

_V

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

SOUTH SPILLWAY

ABUTMENT ELEVATION

VIEW REPAIRS

S106

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \F

O-

0's

FO

UN

DA

TI

ON

D

ET

AI

L L

IB

RA

RY

_V

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

ON-SITE PICTURES

S107

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \F

O-

0's

FO

UN

DA

TI

ON

D

ET

AI

L L

IB

RA

RY

_V

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

REINFORCING DETAILS

S108

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \S

-2

S- D

ET

AI

LS

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

TRAFFIC SIGN

DETAILS I

S201

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \S

-2

S- D

ET

AI

LS

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

GUIDE RAIL

DETAILS I

S202

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \S

-2

S- D

ET

AI

LS

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

GUIDE RAIL

DETAILS II

S203

VDK

ANR

.lo ca l\W

SE

\P ro jec ts\

NY

\T ux ed o P ar k, NY

\E

NG

-0

8 P on d 3 B rid ge

R ep lac em en t\0

6-

BI

M-

CA

D\

-S tru ctu ra l\R ev

0-

NO

W \S

-2

S- D

ET

AI

LS

.dw g

COPYRIGHT © 2024 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com

Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COPYRIGHT © 2024 BY WESTON & SAMPSON, PE, LS,

LA, PC THIS DRAWING IS AN INSTRUMENT OF

SERVICE AND IS THE PROPERTY OF WESTON &

SAMPSON, PE, LS, LA, PC THIS DRAWING MAY NOT BE

REPRODUCED IN WHOLE OR IN PART BY ANY MEANS

WHATSOEVER WITHOUT THE EXPRESS WRITTEN

CONSENT OF WESTON & SAMPSON PE, LS, LA, PC

UNAUTHORIZED ALTERATION OR ADDITION TO THIS

DOCUMENT IS A VIOLATION OF SECTION 7209.

SUBDIVISION 2 OF THE NEW YORK STATE EDUCATION

LAW.

COA:

Weston & Sampson, PE, LS, LA, PC 1 Winners Circle, Suite 130

Albany, NY 12205

518.463.4400 800.SAMPSON

ENG25-0308

JULY 2025

VILLAGE OF TUXEDO PARK

80 LORILLARD ROAD

NEW YORK 10987

PROPOSED REPAIRS & BRIDGE

CONSTRUCTION FOR

POND NO. 3 DAM

BIDDING

GUIDE RAIL

DETAILS III

S204

VDK

ANR

Sheets and Views
FO-000 & S-000 - COVER PAGE_V26-T-000
FO-000 & S-000 - COVER PAGE_V26-S-000
S-001's - FLOOR PLAN LIBRARY_V2-BRIDGE_ REPLACEMENT_-S-001
S-001's - FLOOR PLAN LIBRARY_V2-BRIDGE_ REPLACEMENT_-S-002
S-001's - FLOOR PLAN LIBRARY_V2-BRIDGE_ REPLACEMENT_-S-003
S-001's - FLOOR PLAN LIBRARY_V2-BRIDGE_ REPLACEMENT_-S-004
S-001's - FLOOR PLAN LIBRARY_V2-BRIDGE_ REPLACEMENT_-S-005
FO-100's - FOUNDATION DETAIL LIBRARY_V11-S-101
FO-100's - FOUNDATION DETAIL LIBRARY_V11-S-102
FO-100's - FOUNDATION DETAIL LIBRARY_V11-S-103
FO-100's - FOUNDATION DETAIL LIBRARY_V11-S-104
FO-100's - FOUNDATION DETAIL LIBRARY_V11-S-105
FO-100's - FOUNDATION DETAIL LIBRARY_V11-S-106
FO-100's - FOUNDATION DETAIL LIBRARY_V11-S-107
FO-100's - FOUNDATION DETAIL LIBRARY_V11-S-108
S-200S- DETAILS-S-201
S-200S- DETAILS-S-202
S-200S- DETAILS-S-203
S-200S- DETAILS-S-204

File details come from the government source that posted it. Updated .