20250130_Statement_Of_Work.pdf

PDF 2 MB Posted

Attached to
Interior/Exterior Painting of Garrison Buildings
Solicitation number
W911SD-25-B-A001
Issued by

About this file

This Statement of Work details requirements for interior/exterior painting of public buildings at the United States Military Academy (USMA) at West Point. The work includes surface preparation, interior and exterior painting, removal/reinstallation of items, wire brushing/priming/painting of ornamental ironwork and metal surfaces, caulking, putty replacement, repair/replacement of wood components, masonry repairs, floor refinishing, lath and plaster work, wall coverings, ceramic tile cleaning/sealing, carpentry, and lead paint removal.

The SOW contains extensive requirements for lead paint abatement, including detailed worker protection protocols, medical monitoring, training certifications, respiratory protection programs, containment procedures, and waste disposal requirements. The contractor must provide quality control supervision separate from the construction superintendent, submit detailed work plans and schedules within 5 days of work commencement, coordinate with ceremonial activities on campus, maintain proper housekeeping, and protect historical/archaeological resources. Work areas must be secured daily, with parking restricted to designated lots. The contractor must erect project signage, maintain daily logs, and comply with all environmental and safety regulations, particularly regarding lead paint removal and disposal.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I

STATEMENT OF WORK

SW-01. DESCRIPTION OF WORK: The work consists of furnishing all paint, labor, materials, supervision, equipment, and performing all work in strict accordance with these specifications and drawings forming part thereof for Interior/Exterior Painting of Public Buildings.

SW-02. PRINCIPAL FEATURES: The work to be performed includes, but is not limited to the following principal features:

a. Cleaning and preparation of all surfaces to be painted or repainted.

b. Interior and exterior painting.

c. Removal of indicated items and reinstallation of same after painting is completed.

d. Wire brush, prime, and paint all ornamental iron work and metal surfaces.

e. Caulking.

f. Replacement of defective putty.

g. Replace deteriorated wood fascia, soffit, trim, and siding.

h. Repair/repoint exterior masonry.

i. Floor refinishing.

j. Lath and Plaster work.

k. Wall covering work.

l. Cleaning & Sealing Ceramic Tile

m. Carpentry work.

n. Removal of lead paint.

The above general outline of principal features of work does not in any way limit the responsibility of the Contractor to perform all work and furnish all labor, supervision, materials, and equipment required to fulfill the intent of these specifications and contract drawings referred to herein.

SPECIAL CONDITIONS

SC-01. WORKING CONDITIONS

The Contractor shall submit for approval by the Contracting Officer a construction plan indicating the type and extent of construction to be performed. The plan shall be submitted 14 calendar days prior to actual construction. Open trenches or road restrictions will not be permitted without the approval of the Contracting Officer.

Parades, reviews, or similar ceremonies are routinely conducted three or four times a week. Hours of such ceremonies are normally 5:00 p.m. on weekdays and 1130 a.m. on Saturdays, although there are exceptions to these hours. Detailed schedules of ceremonies may be obtained two (2) months in advance on request from the Contracting Officer. In addition, the following requirements shall apply to all contractor's activities in connection with these ceremonies.

(a) Right of way shall be given to cadets marching in formation to or from ceremonies.

(b) During the actual ceremonies, the Contractor's activities that produce noise to an extent which would distract or interfere with the ceremony, such as the operation of loud and noisy machinery, shall be suspended until the ceremony is over.

Sallyports and other access ways shall be fully usable. The sallyports will be actively used by the Corps of Cadets.

All cost for conformance with the above stated requirements shall be included with contract amount and no claim for extra cost shall be considered.

SC-02 SCHEDULES FOR CONSTRUCTION CONTRACTS:

(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three (3) copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, paint, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall enter the actual progress on the chart as directed by the

Contracting Officer, and upon doing so shall immediately deliver three (3) copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

SC-03. Not Used

SC-04. ARTIFACTS, PRESERVATION & PROTECTION OF HISTORICAL,

ARCHAEOLOGICAL AND CULTURAL RESOURCES: All items of prehistoric, historic, and military relics or memorabilia, which may be discovered during the construction activities, shall remain the property of the Government.

Examples of such items include but are not limited to: printed matter or other papers, buttons, buckles, or fragments of uniforms, buried weapons, bayonets, sabers, cannon balls, ammunition, fragments of structures or foundations, in short, any item of historical or archaeological value. Federal legislation provides for the protection, preservation, and collection of scientific, pre-historical, historical, and archaeological data, including relics and specimens which might otherwise be lost due to alteration of terrain or building features because of any federal construction project. Any person who, without permission, injures, destroys, excavates, appropriates, or removes any historical or pre-historical artifact, object of antiquity or archaeological resource from public lands of the United States is subject to arrest and penalty of law.

Cultural resources on Federal property are protected and managed by the Archaeological Resources Protection Act of 1979 and other applicable laws. The Contractor shall exercise care so as not to disturb or damage artifacts or fossils (should any be uncovered) during the excavation operations. Should the Contractor or any parties operating or associated with the performance of this contract discover evidence of possible scientific, prehistoric, historic, or archaeological finds within the work limit lines or adjacent to work area shall immediately cease work at that location and notify the Contracting Officer, in accordance with USMA SOP 16-1. The Contractor shall provide the Contracting Officer with all information as to the specific location and nature of the findings. USMA SOP 16.1 will be furnished to the Contractor at the pre-construction meeting. The Contractor shall cooperate fully with the Contracting Officer in implementing the procedures of USMA SOP 16.1, except that all notifications by the Contractor shall be to the Contracting Officer and that all directions to the Contractor will be from the Contracting Officer. Where appropriate by reason of discovery, the contracting officer may order delays in time of performance or changes in the work or both. If such delays or changes are ordered, an equitable adjustment will be made in the contract in accordance with the applicable clauses of the contract.

SC-05. SUBMITTAL PROCESS: See Technical Specifications, Section 01300.

SC-06. SUBMITTAL PROCEDURE: See Technical Specifications, Section 01305.

SC-07. GOVERNMENT FURNISHED PROPERTY: The Government will not furnish the Contractor with any equipment or property for installation.

SC-08. SALVAGE: Items to be salvaged shall be removed carefully and reused in locations indicated on plans and specifications.

SC-09. FIELD OFFICE, SHOP OR STORAGE: The Contractor shall set up his trailer for use as an office, shop, or storage area for supplies at the staging area located within 5 miles of the Construction Site. The Contracting Office will designate the Staging Area.

The contractor shall construct a temporary 6-foot-high chain link fence around trailers and materials. The fence shall include nylon fabric privacy screening on the inside, colored green, or black so that visibility through the fence is obstructed. Fence post may be driven, in lieu of concrete bases, where soil conditions permit. Trailers, materials, or equipment shall not be placed or stored outside the fenced area unless such trailers, materials or equipment are assigned a separate and distant storage area by the Contracting Officer away from the vicinity of the Staging Area but within the military boundaries. Trailer, equipment, or materials shall not be open to outside the fence in preparation for the next day’s work. At the end of each workday mobile equipment, such as public view except for those items which are in support of ongoing work on any given day. Materials shall not be stockpiled tractors, wheeled lifting equipment, cranes, trucks, backhoes, and like equipment, shall be parked within the fenced area.

SC-10. PARKING FACILITIES: No parking is allowed within or adjacent to the project area. All vehicles can be parked in the Buffalo Soldier, H-Lot, or Clinton Field areas.

SC-11. HOUSEKEEPING:

a. The Contractor shall take into full account the special Public, Military and Academic nature of the United States Military Academy and its prominence as a tourist attraction, all of which will be in operation during this construction. Where materials or plants cannot be kept on the designated site area in neat, clean, and orderly fashion, and thereby cause an unnecessary eyesore, they shall be moved to other locations, on or off Government property, as directed by the Contracting Officer. The Contractor shall, always, furnish from his own organization a sufficient force to carry out the housekeeping and cleanup requirements on both exterior and interior areas affected by his contract operations, on a day-to-day basis throughout the life of the contract. On Fridays before the home football game, the Contractor shall either temporarily backfill all excavations or plate them.

b. The Contractor shall provide & maintain a dumpster of sufficient size at each project site. The dumpster shall be replaced at regular intervals to avoid overfilling and spillage and the area around the dumpster shall be always kept clean.

c. The Contractor shall mow the areas within his operations to maintain the grass/vegetation to a height of 3 ½ to 4 inches, until the entire project is accepted by the government.

d. If, at any time during the progress of the work, the Contracting Officer determines that the Contractor is failing to comply with the requirements of the subparagraph above, he may direct the contractor to take such measures as he deems necessary to constitute corrective action. Such measures may include the requirement to increase the work force assigned to the housekeeping and cleanup operations or to work overtime during evenings or weekends until proper job conditions have been restored.

SC-12. DISPENSARY AND HOSPITAL FACILITIES: The facilities of the United States Military Academy Post Hospital are available for use by the Contractor only for the emergency treatment of his personnel injured at the job site. Charges to the Contractor for the use of said facilities will be at prevailing rates for the services provided and billing and payment will be made by separate transaction between the USMA Hospital and the Contractor.

SC-13. TOILET FACILITIES: Portable toilets shall be located as directed by the Contracting Officer's Representative. Upon completion of contract, all temporary toilet facilities shall be removed and any damage to the areas rectified.

SC-14. IDENTIFICATION: The Contractor shall supply identification badges, which shall be worn by all the Contractor's personnel while working at the USMA. The badges shall be visible and contain the contractor's name, employee's name and contract number and project description.

SC-15. DISPOSAL AND BURNING: Construction debris and other rubbish shall be disposed of, off the Military Reservation. Burning of rubbish or site removal items will not be permitted. Scrap, debris and surplus construction materials are not to be disposed of in the "Post Sanitary Disposal Containers" (Dumpsters), which are distributed throughout the area, but must be loaded in the Contractor's dumpsters for disposal at a location other than the United States Military Academy.

SC-16. PROTECTION OF BUILDING AND CONTENTS: Any damage to the existing structure and contents within the building, caused by the neglect of the Contractor, shall be repaired, restored, or replaced promptly by and at the expense of, the Contractor.

As a precaution to protect the contents of the building, the Contractor is required to secure the work area at the end of every workday, using an approved means, which shall be submitted to the Contracting Officer for approval prior to work.

SC-17. Not Used

SC-18. SCAFFOLDING: Contractor shall provide and install all necessary scaffolding and staging to accomplish all phases of the contract work. The Contractor shall be responsible for the strength and safety and be in full compliance with the laws governing safety standards of scaffolding.

SC-19. COORDINATION: It shall be the responsibility of the prime Contractor to be fully informed of the extent of the limits of work to be performed by his sub-contractors.

The prime Contractor shall coordinate and be responsible for all coordination of various trades and work.

SC-20. ENVIRONMENTAL RESPONSIBILITY: West Point is committed to a safe environment and take seriously our steward role as defenders of the National treasure and Hudson Watershed (Constitution Area). Contractors are expected to comply with all environmental requirements. Immediate actions shall be taken by the Contractor to minimize the effect of any environmental associated incidents (e.g. oil spillage, hazardous waste handling, lead abatement removal, and chemical spillage). Clean up shall be performed by the contractor in accordance with all applicable Federal, State, and local laws and regulations.

I. CONTRACTOR REPORTING REQUIREMENTS: If an incident occurs on the installation pursuant to Contractor performance, whether caused by the Contractor, the Contractor shall immediately notify (no later than 15 minutes) USMA Environmental Management Office at 938-3224/5263, 4129, or 5175, and the Contracting Officer. If a project related incident occurs off the installation, the Contracting Officer immediately following discovery and shall also comply with applicable State requirements including reporting to the New York State DEC Spill Hotline at 800-457-7362, and USTNRC at 800-424-8802. When an incident is reported by phone to any of the above agencies, the Contractor shall provide the following information:

a. Description of Incident

b. Time and Location of incident

c. Any injuries incurred

d. Estimated quantity of materials (tons, gallons, drums, etc.) involved in incident.

e. Whether the incident has reached any storm drains, sanitary sewers, ponds, or waterways.

f. Containment procedures already initialized (brief description of containment, i.e.

booms, pad, embankments, sandbags).

g. The Contractor’s Point of Contract.

A written follow-up report shall be submitted to the Contracting Officer no later than five

(5) calendar days after the initial incident. The written report shall be in a narrative form and as a minimum include the following:

a. Description of the material involved (including identify, quantity, and manifest number).

b. What time the incident was reported, and to whom it was reported.

c. Exact Location of the incident, including description of the area involved.

d. Cause of incident and equipment and personnel involved.

e. Injuries or property damage of incident.

f. Containment procedures initiated.

g. Summary of any communications Contractor has with press, agencies, or Government officials other than the COR.

h. Description of cleanup procedures employed or to be employed at the site, including disposal location of incident materials.

A follow-up meeting will be held within 5 calendar days after receipt of the written report to discuss after action procedures to eliminate or prevent this type of incident in the future. The Contractor will be required to attend the follow-up meeting.

The reporting requirement is in addition to any other environmental related actions, notices, reports, certifications, or compliances required by other contract clauses or provisions or by federal, state, or local law.

II. EPA OR DEC INSPECTION: The Contractor shall immediately inform the Environmental Management Division (EMD), Directorate of Engineering and Housing, USMA THROUGH the Contracting Officer or the Contracting Officer's Representative when the United States Environmental Protection Agency (EPA) and/or the New York State Department of Environmental Conservation (DEC) inspector visits the site for an official inspection.

SC-21. PROJECT SIGN: The Contractor shall furnish and erect a project sign at a location directed by the Contracting Officer. The castle and helmet logo to be used on the sign will be Government furnished. The Contractor will be given this logo at the time of the pre-construction conference and shall position the logos on the sign in accordance with the sample sign drawing listed in Section J. The decal shall receive a thin coat of clear spar varnish after application. The Contractor shall maintain the sign in good condition throughout the construction period. Upon completion of the project, the Contractor shall remove the sign from the worksite.

SC-22. QUALITY CONTROL SUPERVISOR

The Contractor shall employ a competent Quality Control Supervisor who shall always attend the project site, during performance of the work. The Quality Control Supervisor and the Construction Superintendent shall not be the same person.

SC-23. CONTRACTOR QUALITY CONTROL: The Contractor shall provide and maintain an effective quality control program that complies with contract clause of the contract entitled "Inspection of Construction."

a. The Contractor shall establish a quality control system to perform sufficient inspection and tests of all items of work, including that of his sub-contractors, to ensure conformance to applicable specifications and drawings with respect to the materials, workmanship, construction, finish, functional performance, and identification. This control will be established for all construction except where the Technical Provisions of the contract provide for specific Government control by inspections, tests, or other means. The Contractor's control system will specifically include the surveillance and tests required in the Technical Provisions of the contract specifications. For purposes of the above description, shop manufacture of standard products is not defined as construction.

b. The Contractor's quality control system is how he assures himself that his construction complies with the requirements to cover all construction operations, including both on-site and off-site fabrication and will be keyed to the proposed construction sequence and shall include as a minimum at least three phases of inspection for all definable items or segments of work, as follows:

(1) Preparatory Inspection: To be performed prior to beginning any work on any definable segment of work. To include a review of contract requirements; a check to assure that all new materials and/or equipment have been tested, submitted and approved; a check to assure that provisions have been made to provide required control testing; examination of the work area to ascertain that all preliminary work had been completed; and a physical examination of materials and equipment to assure that they conform to approved shop drawings or submittal data and that all materials and/or equipment are on hand. The Contractor shall submit to the Contracting Officer a memo for record of the preparatory inspection within two (2) days after the inspection is held.

(2) Initial Inspection: To be performed as soon as a representative segment of the particular item of work has been accomplished and to include examination of the quality of workmanship and a review of control testing for compliance with contract requirements, use of defective or damaged materials, omissions, and dimensional requirements.

(3) Follow-Up Inspection: To be performed daily or as frequently as necessary to assure continuing compliance with contract requirements, including control testing, until completion of the segment of work.

c. The Contractor shall maintain current records of all inspections and tests performed. These records should provide factual evidence that the required inspections or tests have been performed, including type and number of inspections or tests involved; results of inspections or tests; nature of defects, cause for rejection, etc.; proposed remedial action; and corrective actions taken. The Contractor shall not build upon or conceal any feature of the work containing uncorrected defects, and payment on deficient items will be withheld until they are satisfactorily corrected or other action has been taken as authorized, pursuant to the contract clause entitled "INSPECTION OF CONSTRUCTION". These records must cover both conforming and defective items and must include signed statements verifying that the designated person in the Contractor's quality control organization has personally checked the materials, methods and workmanship installed on that day. Legible copies of these records must be furnished to the Contracting Officer's Representative no later than 0800 hours the day after the work has been accomplished. This reporting is a daily requirement.

d. The Contractor shall furnish the Chief, Engineering Support Services Branch, within fifteen (15) days of award, an original and four (4) copies of a quality control plan which shall include the personnel, procedures, instructions, and records to be used.

(1) The quality control organization.

(2) Qualifications of personnel to be used for this purpose.

(3) Authority and specific areas of responsibilities of each of the quality control personnel.

(4) Methods of performing quality control inspections including that for his sub-contractors' work. Mechanical and electrical testing procedures shall be described in quality control plan in detail and approved prior to performing actual work. Where technical specifications require recording of test data, a proposed test log including planned duration of tests, readings to be taken, and instrumentation to be used, will be made a part of the Quality Control Program. Tests of air conditioning systems, boilers, chillers, and the like would be covered as described above.

(5) The Contractor's Quality Control Plan shall include a subplan titled "Testing

Plan". The Testing Plan shall include the following:

(a) Designate how testing will be performed either by technical employee, by the Contractor or an industry recognized testing laboratory.

(b) Name and qualifications of each employee designated for the performance of specific types of tests.

(c) A list of the control tests which he understands he is to perform, not only by name, but also by numerical designation, section of specifications, feature of work and frequency of testing. A statement to the effect that the laboratory has a copy of each such procedure and has facilities and serviceable testing equipment to perform tests conforming thereto.

(d) His understanding of the procedure to be followed should his test results indicate lack of compliance with the specification requirement.

(6) Method of documenting quality control operation, inspection, and testing. A copy of proposed daily record form shall be made a part of the submittal.

(7) A copy of a letter of direction to the Contractor's representative responsible for quality control, outlining his duties and responsibilities and signed by a responsible officer of the firm.

e. Before Construction operations are commenced, the Contractor shall meet with the Contracting Officer or his representative and discuss his quality control plan. The meeting shall develop mutual understanding relative to details of the system, including the forms to be used for recording the quality control operations, inspections, administration of the system, and the interrelationship of Contractor and Government inspection.

f. Unless specifically authorized by the Contracting Officer, no construction and/or off-site fabrication shall be started until the Contractor's quality control plan is approved.

Construction of any feature of work will only be permitted after approval of the quality control plan, or at least approval of that portion of the plan applicable under this contract until the quality control program has been approved by the Government. The Contractor shall notify the Contracting Officer or his representative in writing of any proposed change to this inspection system; no such change shall be implemented prior to approval in writing by the Contracting Officer or his authorized representative.

g. If recurring deficiencies in an Item or Items indicate that the quality control system is not adequate, such corrective actions will be taken as directed by the Contracting Officer.

h. The Contractor agrees to insert the substance of this clause, including this paragraph h, in all subcontracts hereunder.

A copy of these records and corrective tests, as well as the records of corrective action taken, shall be furnished to the Government as directed by the Contracting Officer.

SC-24. CERTIFICATES OF COMPLIANCE: Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in 4 copies. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements. (ECI 7-670-3).

SC-25. IMPLEMENTING GUARANTEES: At any time, after the acceptance by the Government of a completed installation under this contract, which installation is required to be covered by a specific guarantee under terms of the various sections in the TECHNICAL PROVISIONS, the Contracting Officer will be an authorized party for the purpose of implementing the provisions of such guarantees on behalf of the Government.

SC-26. SAFETY: In performing this contract, the Contractor shall provide for protecting the lives and health of employees and other persons; preventing damage to property, materials, supplies, and equipment; and avoiding work interruptions. For these purposes, the Contractor shall--

a. Provide appropriate safety barricades, signs, and signal lights. Plastic safety fencing is not considered adequate at USMA. The Contractor shall as a minimum provide wooden lath, standard height, snow fence, rigidly supported with metal posts on 8 ft centers.

b. Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for this purpose are taken. All work done on USMA reservation shall be performed in a safe manner, that is, in compliance with Corp of Engineer, Federal, State, and local safety laws and regulations.

To ensure this is accomplished, prior to commencement of work at any job site an acceptable accident prevention plan written by the prime contractor for the specific work and implementing in detail pertinent requirements of US Corp of Engineers Safety and Health Requirements Manual CEM 385 1-1 and other applicable regulations shall be forwarded to the Contracting Officer and USMA Safety Manager. The plan shall include but not limited to control measures the contractor shall take to control hazards associated with materials, services, operations, or equipment.

This plan shall provide for frequent and regularly scheduled safety/health inspections of the work site by contractor management who are knowledgeable of OSHA 1910 (Industrial), OSHA 1926 Construction and EM 385 1-1. The Safety/Health representative shall correct any unsafe/violated condition immediately.

Prior to bringing hazardous substances, as defined in 29 CFR 1910.1200, on to the job site, all employees involved shall be advised of Material Safety Data Sheet (MSDS) information and a copy of each hazardous substance's MSDS shall be provided to the contracting officer. All materials requiring MSDS information shall be inventoried by the Contractor on a weekly basis. This inventory shall be put into a report named "Hazardous Substances Location Report" (HS). For all materials requiring MSDS information, the report shall include as a minimum the following:

a. Common Name for each material

b. Location of each material

c. Hazardous substance & Chemical Abstract Substance Registry Number (CAS)

d. Quantity of each substance

The inventory shall be conducted every Friday by the Contractor and shall be submitted the following Tuesday morning at 0800 to the Contracting Officer. This requirement is in accordance with the Emergency Planning and Community Right to Know Act (EPCRA) Inventory. Additional instruction on this act can be acquired from the West Point Environmental Management Office upon request through the Contracting Officer.

Any job performed in an unsafe or hazardous manner that creates an imminent danger to USMA or contractor employees will be shut down by the USMA Safety Manager or his designate.

The following publications/standards are recommended for contractor reference files.

This is not intended as an all-encompassing list.

OSHA 1926 Construction

OSHA 1910 Industrial

EM 385 1-1 (Oct 87 or most recent version) Applicable ANSI

Standards

National Electric Code (NEC)

National Fire Protection Association Codes (NFPC)

New York State Vehicle Traffic Law (most recent edition) New York State Building

Construction Code

New York State Industrial Code Rule 23

(Dept of Labor) SC-27. Not Used

SECTION 01300

SUBMITTAL

DESCRIPTIONS

PART I GENERAL

1.1 SUMMARY (Not Applicable)

1.2 REFERENCES (Not Applicable)

1.3 SUBMITTALS

The submittals described below are those required and further described in other sections of the specifications. Other requirements pertaining to submittals are included in Section 01305 SUBMITTAL PROCEDURES. Submittals required by the CONTRACT CLAUSES and other non-technical parts of the contract are not included in this section.

SD-01 Data

Submittals which provide calculations, descriptions, or documentation regarding the work. SD-04 Drawings

Submittals which graphically show relationship of various components of the work, schematic diagrams of systems, details of fabrication, layouts of elements, connections, and other relational aspects of the work.

SD-06 Instructions

Preprinted material describing installation of a product, system of material, including special notices and material

SD-07 Schedules

Tabular lists showing locations, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.

SD-08 Statements

A document required of the Contractor, or through the Contractor, from a supplier, installer, manufacturer, or other lower tier Contractor, the purpose of which is to confirm the quality or orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel, qualifications, or other verifications of quality.

SD-09 Reports

Reports of inspections or tests, including analysis and interpretation of test results.

Each report shall be properly identified. Test methods used shall be identified and test results shall be recorded.

SD-13 Certificates.

II-01300-1/2

Statements signed by responsible official of a manufacturer of a product, systems, or material, attesting that the product, system, or material meets specified requirements.

The statement must be dated after the award of this contract, must name the project, and must list the specific requirements which are being certified.

SD-14 Samples

Samples including both fabricated and unfabricated physical examples of materials, products, and units of work as complete units or as portions of units of work.

SD-18 Records

Documentation to record compliance with technical or administrative requirements SD-19 Operation and

Maintenance Manuals

Data which forms a part of an operation and maintenance manual.

PART 2 PRODUCTS (Not

Applicable) PART 3 EXECUTION

(Not Applicable)

SECTION 01305

SUBMITTAL

PROCEDURES

PART I GENERAL

1.1 SUMMARY (Not Applicable)

1.2 REFERENCES (Not Applicable)

1.3 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.3.1 Government Approved (GA)

Governmental approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.

1.3.2 Information Only (FIO)

All submittals not requiring Government approval will be for information only. They are not considered to be

1.4 APPROVED SUBMITTALS

The approval of submittals by the Contracting Officer shall not be construed as a complete check but will indicate Only that the general method of construction, materials, detailing, and other information are satisfactory. Approval will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the CQC requirements of this contract, is responsible for the dimensions and design of adequate connections, details, and satisfactory construction of all work. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be given consideration unless accompanied by an explanation as to why a substitution is necessary.

1.5 DISAPPROVED SUBMITTALS

The Contractor shall make all corrections required by the Contracting Officer, and promptly furnish a corrected submittal in the form and number of copies as specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change of the contract, notice as required under the Contract

1.6 WITHHOLDING PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained. PART 2 PRODUCTS (Not Applicable)

II-01305-1/4

II-01305-2/4

PART 3 EXECUTION

3.1 GENERAL

The Contractor shall submit all items on the Submittal Register (ENG Form 4288 (or specified in the other sections of these specifications. The Contracting Officer may request submittals in addition to those listed when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same used in the contract drawings. Submittals shall be made in the respective number of copies and submitted to the Chief, Engineering, Plans & Services Division (DHPW), ATTN: Chief, Engineering Support Services Branch, Bldg. 667A, USMA, West Point, NY 10996. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Prior to submittal, all items transmittal form (ENG Form 4025) shall be stamped, signed, and dated by the CQC representative certifying that the accompanying submittal complies with the contract requirements. Proposed deviations from the contract requirements shall be clearly identified. Submittals shall include items such as:

curves; test reports, test cylinders, samples: O&M manuals including parts list:

certifications: warranties and other such required submittals. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby.

3.2 SUBMITTAL REGISTER (ENG FORM 4288)

At the end of this section is one set of ENG Forms 4288 listing each item of equipment and material for which submittals are required by the specifications. Columns “c” thru “o” have been completed by the Government Contractor shall columns “a”, “b”, and “p” and return (4) four completed copies to the Contracting Officer with his bid documents. The approved submittal register will become the scheduling document and will be used to control submittals throughout the life of the contract. This register and the progress schedules shall be coordinated.

3.3 SCHEDULING

Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. Shop drawings, samples and descriptive literature shall be submitted to the Chief, Engineering, Plans & Services Division, DHPW, not later than thirty (30) calendar days after the receipt of Notice to

II-01305-2/4

Proceed and that these thirty (30) days are included in the time for completion of the contract. The Government will require fifteen

(15) calendar days to pass judgment on these submissions, said period of time commencing on the day that the submissions are received in the Office of the Chief of Engineering, Plans and Services Division. All submittals rejected as unacceptable shall be resubmitted within seven (7) calendar days after receipt of Notice of Rejection has been given to the contractor. Submittals required for the contract are listed specifically under the Technical Provisions of these specifications. No delays, damages or time extensions will be allowed for time lost in late submittals.

3.4 TRANSMITTAL FORM (ENG Form 4025)

The sample transmittal form (ENG Form 4025) attached to this section shall be used for submitting both Government approved and information only submittals, in accordance with instructions on the reverse side of the form. These forms will be furnished to the Contractor. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care will be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.

II-01305-3/4

3.5 SUBMITTAL PROCEDURE

Submittals shall be made as follows:

3.5.1 Procedures

SUBMITTALS: The Contractor shall submit to the Chief, Engineering Support Service Branch, eight (8) copies of all submittals and other descriptive literature requiring approval, as called for under the various technical section of these specifications. The submittals shall be complete and detailed. The adequacy and accuracy of submittals and their compliance with the contract documents are the responsibility of the Contractor. The Contractor shall submit two (2) sets of samples requiring approval as called for under the various technical sections of these specifications. All proposed deviations shall also be noted on the transmittal form, and the submittals.

The Contractor shall provide all submittals specified in each section of the technical provisions in its entirety and not piecemeal the submittals. If those requirements are not met, the submittal shall be returned to the Contractor for corrective action. All approval actions taken by the Government will in no way relieve the Contractor of his quality control requirements. If approved by the Contracting Officer, each copy of the submittals will be identified as having received such approval by being so stamped and dated. The Contractor shall make only corrections required by the Contracting Officer.

Five sets of all submittals required for approval will be retained by the Contracting Officer. Five sets of all submittals required for approval will be retained by the Contracting Officer and three (3) sets of all submittals will be returned to the Contractor, including any reproducible submitted. The approval of the submittals by the Contracting Officer shall not be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory. Approval of such drawings will not relieve the Contractor of the responsibility for any error which may exist as the Contractor shall be responsible for the dimensions and design of adequate connections, details, and satisfactory construction of all work. The Contractor or an official of the company authorized to act on behalf of the Contractor shall certify, that they have reviewed the submittals in detail and that they are correct and in strict conformance with the contract drawings and specifications except as may be otherwise explicitly stated.

3.5.2 Deviations

For submittals which include proposed deviation

4025 shall be checked. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

II-01305-3/4

3.6 CONTROL OF SUBMITTALS

The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submitt

3.7 GOVERNMENT APPROVED SUBMITTALS

Upon completion of review of submittals requiring Government approval, the submittals will be identified as having received approval by being so stamped and dated. Five (5) copies of the submittal will be retained by the Contracting Officer and three (3) copies of the submittal will be returned to the Contractor.

3.8 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals. These submittals will be used for information purposes. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve

II-01305-4/4

the Contractor from obligation to furnish material conforming to the plans and specifications and will not prevent the Contracting Officer from requiring removal and replacement if nonconforming material is incorporated in the work. This does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or check testing by the Government in those instances where the technical specifications so prescribe.

3.9 STAMPS

Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements shall be similar to the following:

CONTRACTOR

(Firm Name)

Approved

Approved with corrections as noted on submittal data and/or attached sheet(s).

SIGNATURE:

TITLE:

DATE:

-End of Section-

PART II

TECHNICAL

PROVISIONS

SECTION 02050 DEMOLITION

02050-01. SCOPE: The work covered by this section includes furnishing all plant, labor, equipment, materials, and transportation necessary for demolition and disposal required in this project.

02050-02. APPLICATION PUBLICATIONS: The publications listed below form a part of this section to the extent referenced. The publications are referred to in the text by basic designation only.

a. American National Standards Institute (ANSI) Standard:

Z133.1-88 Safety Requirements for Tree Care Operations. Pruning, Trimming, Repairing, Maintaining, and Removing Trees, and Cutting Brush

b. Defense Reutilization and Marketing Office Standard Operating Procedures (DRMO

SOP):

19 Turn in Procedures for Excess Surplus Property; 1 April 1992

19A Turn in Procedures for Hazardous Materials/Hazardous Waste; 1 Oct

c. U.S. Army Technical Manual (TM):

5-630 Natural Resources Land

Management July 1982 02050-03. SUBMITTALS

Demolition and Disposal Plan

02050-04. DEMOLITION AND DISPOSAL; The Contractor shall demolish or remove from the work site all items designated or removed as part of the replacement process, and any other items necessary to accomplish the required work. The specifications may not designate all demolition and removal items existing at the work site. Therefore, prior to beginning demolition or removal work, the Contractor shall verify with the Contracting Officer all items to be demolished or removed and all items to remain. The Contractor is responsible for loading, hauling, and unloading salvage items and debris. The Contractor is also responsible for preparing salvage items for turn into the Government.

a. Removal: Carefully remove salvage items to prevent unnecessary damage to items to be salvaged or portions of components and structures to remain. Salvageable items shall be removed and protected to prevent unnecessary damage. Items, embedded in concrete or masonry, or which are otherwise nonremovable, shall be neatly cut off at or beneath the surrounding surface. Open piping or conduit shall be capped or plugged, and the surrounding surface repaired as specified.

b. Disposition of Nonsalvageable and Nonrecyclable Items: Construction materials and debris, which will have no salvage or recycling value because of the type of material, or the procedures required for dismantling or demolition, shall be disposed of at an off-post landfill.

II-02050-1/2

02050-05. CUTTING AND PATCHING:

a. Cutting: Cutting shall be accomplished using power tools and equipment which are best suited for the task being accomplished and least likely to damage adjoining or adjacent surfaces.

b. Patching: Patch adjoining or adjacent surfaces using materials which match the existing materials. Joints and seams shall be durable and as inviable as possible.

Restore finishes of patched areas to match the existing finishes.

02050-06. VEGETATION TRIMMING AND PRUNING: The Contractor shall professionally trim and prune trees, vines, and other vegetation as necessary to accomplish the required work. Vegetation trimming and pruning includes removal of vegetation from surfaces to be painted down to the ground and pruning trees so that branches are a minimum of three feet away from building surfaces. Dead tree branches shall be cut back to where they join with living branches. Trimming and pruning shall be accomplished in accordance with TM 5-630 and ANSI Z133.1.

Damages caused by the Contractor during vegetation trimming, pruning and removal operations shall be repaired by the Contractor at no additional cost to the Government.

02050-07. CLEANUP: Removal of debris and general cleanup of the work site shall be accomplished at the end of each workday and upon completion of the required work.

The Contractor shall ensure that waste and debris at the work site does not blow off the site. The Contractor shall be responsible for immediate cleanup of his spillage on roadways and elsewhere.

II-02050-2/2

PROVISIONS

SECTION 02070

REMOVALS, PATCHING AND REINSTALLATIONS

02070-01. GENERAL:

a. Removals shall be performed without damage to adjacent retained work;

however, where such work is damaged, the Contractor shall restore all damaged areas to equal or better than original condition, and all the restoration work shall be performed at no cost to the Government. All existing materials which are removed or disconnected but are not indicated or specified for reuse in the new work shall become the property of the Contractor and shall be removed from the site by the Contractor at his expense.

Removals shall be as indicated and as specified herein and shall be performed in a neat and workmanlike manner to the limits indicated or specified, or to the minimum extent necessary or required for the proper installation of new work. Existing surfaces remaining after removals to which new work is to be applied shall be left in a condition suitable for the application of the new work. Reinstallation of removed items shall be performed by workmen skilled in the trade involved.

Items to be reinstalled which are damaged because of removals shall be repaired or replaced with new undamaged

b. Procedures shall provide for safe conduct of work and the protection of work which is to remain.

02070-02. SUBMITTALS: The procedures proposed for the accomplishing of removal work shall be submitted to the Contracting Officer and approved before work is started.

The procedures shall provide for coordination with other work in progress. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations.

02070-03. PROTECTION: At openings through exterior walls where items are to be removed, the interior of the buildings, including furnishings, shall be protected from weather damage. Exteriors shall be protected against damage from falling materials.

Temporary protection such as a sidewalk bridge shall be provided whenever work is being performed over an active building entry.

II-02070-1/2

02070-04. EXECUTION:

a. Extreme care shall be exercised in removing existing work so that existing adjoining work or other portions of the work to remain will not be damaged.

b. Removals shall be performed in a neat workmanlike manner to the minimum extent necessary for the proper installation of new work.

c. Patching: Where removals leave holes and damaged surfaces that will be exposed in the finished work, these holes and damaged surfaces shall be patched and repaired to match adjacent finished surfaces. Where new work is to be applied to existing surfaces, removals and patching shall produce surfaces that are suitable for the provision of the new work. Patching shall be performed by workmen skilled in the trade involved and shall be performed in a neat and workmanlike manner.