2025 Washington County Health Dept_ Generator.docx

DOCX document 22 KB Posted

Attached to
Generators 100Kw and 150Kw
Solicitation number
PE-33306-NONST-2025-000000019
Issued by
Georgia

About this file

This document is a project specification for a generator installation at the Washington County Health Department located in Sandersville, Georgia. The project involves a comprehensive 100 kW diesel generator installation that includes multiple critical infrastructure tasks such as sidewalk excavation, underground conduit installation, electrical system modifications, and technical generator placement. The scope of work encompasses 14 specific installation steps, including concrete pad preparation, generator and transfer switch mounting, electrical wiring, ground rod installation, and a required NFPA 110 startup with a 4-hour load bank test.

The project specifications detail specific technical requirements and inclusions, with notable provisions such as mandatory NFPA 110 compliance for emergency power systems, inclusion of permit fees, provision of 20 gallons of diesel fuel, and specification of all-copper wiring. The installation will be located on the north side of the building and involves intricate electrical infrastructure modifications, including a new 400-amp automatic transfer switch, underground conduit routing, and integration with existing electrical systems. The bid appears to be a fixed-price proposal covering both materials and labor for the complete generator installation project.

View the file

Other files

File Type Posted
2025 BID Invitation EMA Dept GENERATORS.docx DOCX document
2025 Washington county Courthouse generator S.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Washington County Health Dept.

201 Morningside Dr., Sandersville, Ga. 31082 100 Kw Generator install

Price includes labor and material to install the following tasks:

1. Saw cut out section of side walk and excavate from building to new generator location north side of building.

2. Install 2- 2 in and 3- ¾ in pvc conduits underground from north side of building through sidewalk to back side of main disconnect that is existing.

3. Install new 400-amp automatic transfer switch commercial grade mounted on back side of main disconnect wall.

4. Intercept existing conduit and wire and tie into transfer switch.

5. Install new conduit and copper wire from transfer switch to main disconnect.

6. Install concrete pad 12” larger than generator on north side of building.

7. Provide, offload, and set new 100 kw diesel generator commercial grade on new concrete pad.

8. Install 2 sets of 4 wire 3/0 copper wire plus ground from generator to transfer switch per code.

9. Install ground rod at generator.

10. Repour 1 section of sidewalk back that was removed.

11. Continue control conduit and wire to main reception desk and install remote annunciator.

12. continue other ¾ conduit to breaker panel and pull circuit for battery charger and block heater to generator.

13. Pull circuit for automatic start from transfer switch to generator.

14. Perform NFPA 110 start up and 4 hr. load bank test on generator after completion.

Notes:

1. Generator and transfer switch must meet NFPA 110 for emergency power

2. Bid includes permit fees.

3. Bid includes 20 gallons of diesel fuel.

4. Bid based on all copper wire.