This is an Invitation to Bid (ITB) document issued by the City of Silverton, Oregon's Public Works Department for the 2025 Silverton Street Overlays project (PN251115). The project involves asphalt pavement grinding and overlay work on multiple city-owned roadways throughout Silverton. The scope includes grinding street areas, crack sealing pavement, placing geotextile fabric over travel lanes, applying 2" or 3" of hot mix asphalt, and completing asphalt density testing. Six base bid segments cover B Street (N. 1st to Mill Street), Grant Street (Pine Street to Florida Street), E. Main Street at Rock Street, E. Main Street at Ames Street, N. 2nd Street (Oak Street to Main Street), and S. 1st Street (Jersey Street to Lewis Street), with three additive bid options for S. 2nd Street, Brook Street, Alder Street, and Silver Street. The mandatory prebid meeting is scheduled for May 28, 2025 at 11:00 a.m. PST at City Hall, with written questions due by June 10, 2025. Bids are due June 17, 2025 at 2:00 p.m. PST at Silverton City Hall (410 N. Water Street). The anticipated Notice of Award is July 3, 2025, with project completion required by September 30, 2025 and final payment deadline of October 15, 2025. The contract will be awarded to the lowest responsive, responsible bidder.
Bidders must submit bid security equal to 10 percent of the total bid amount in the form of a bid bond, cashier's check, or certified check. Upon contract award, the successful bidder must provide performance and payment bonds each in an amount equal to 100 percent of the contract price, maintaining effectiveness for at least one year after final payment. A warranty bond equal to 20 percent of the contract amount covering defects in materials or workmanship for two years from acceptance is also required. The City will retain 5 percent from progress payments, with retainage released upon final project acceptance. All contractors must be licensed with the Oregon Construction Contractors Board or State Landscape Contractors Board and must have a public works bond filed with the CCB before commencing work. Prevailing wage rates apply under ORS 279C.800 through 279C.870. Bidders must comply with employee drug testing requirements, nondiscrimination certifications, and provide three references of comparable previously completed projects. The project is a public works capital improvement funded through the City of Silverton's capital budget, with no specific funding sources or budget limitations stated in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Zoom Bid Opening Instructions 6.4.25~1.docx | DOCX document | |
| 256050 Notice Intent to Award.pdf | ||
| 256050 Bid Manual.pdf | ||
| 256050 Bid Tabulation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 1 OF 96
PROJECT DOCUMENTS
2025 SILVERTON STREET OVERLAYS
PROJECT NO: PN25‐1115
DATE OF ISSUANCE: May 20, 2025
PROJECT TYPE: Public Works Street Capital
BIDS DUE BY: June 17, 2025, 2:00 p.m. local
CITY PROJECT MANAGER: Mike Dahlberg, Public Works Operations Manager
PM CONTACT INFORMATION: mdahlberg@silverton.or.us , 503‐874‐2209
CITY OF SILVERTON
Public Works Department
410 N. Water Street Silverton, Oregon 97381
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 2 OF 96
TABLE OF CONTENTS
Section Title Page Number
SECTION 1 INVITATION TO BID 3
SECTION 2 INSTRUCTIONS TO BIDDERS 6
SECTION 3 BID FORM 12
SECTION 4 BID BOND 25
SECTION 5 AGREEMENT 26
SECTION 6 PERFORMANCE BOND, PAYMENT BOND 34
SECTION 7 CERTIFICATE OF INSURANCE 41
SECTION 8 BOLI 42
SECTION 9 SPECIAL PROVISIONS 43
SECTION 10 MAPS/ PHOTOS/ PWDS 50‐84
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 3 OF 96
SECTION 1 INVITATION TO BID
I. INVITATION TO BID
The City of Silverton is seeking bids to complete an asphalt pavement grind and overlay project on multiple City owned roadways.
II. SCHEDULE
Documents Available Pre‐bid Meeting (Mandatory)
Tuesday May 20, 2025 Wednesday May 28, 2025
Bids Due Tuesday June 17, 2025 2PM PST Anticipated Notice of Award Thursday July 3, 2025 Project Completion Tuesday September 30, 2025
NOTE: The City reserves the right to modify this schedule at the City’s discretion. Proper notification of changes will be made to all interested parties via the City’s website www.silverton.or.us.
III. CONTRACTOR RESPONSIBILITIES AND DUTIES
All Bidders must be qualified and licensed to provide the goods and construction services requested in this document. Bidders shall have provided products and services similar to those listed in Scope of Work section for commercial and/or municipal customers. Bidders are required to submit documentation as outlined in this document, related to their ability to provide quality products and services for the identified Scope of Work.
IV. BID REQUIREMENTS AND SELECTION PROCESS
Pre‐Bid Site Visit There will be a mandatory pre‐bid meeting for this project. The pre‐bid meeting will be held at 410 N.
Water St Silverton, OR 97381 in room 156 on the first floor on May 28, 2025 at 11 a.m. PST. All areas of the project are public right‐of‐way that can be visited by contractors on their own. The City has marked in white paint the overlay project limits.
Pre‐Submission Questions All questions related to the project must be directed to the Project Manager no later than June 10, 2025 at 2:00 p.m. Questions must be submitted via e‐mail to mdahlberg@silverton.or.us
Contact with City Staff The City’s Project Manager is Mike Dahlberg and may be contacted at mdahlberg@silverton.or.us , or 503‐ 874‐2209. Communicating with other City staff or authority for information other than the Project Manager or assigned Designee may result in disqualification of bid.
Addenda Addenda are incorporated with the original solicitation as an attachment and can be viewed and downloaded by registered suppliers. Bidders should consult the City of Silverton website, www.silverton.or.us, regularly until closing to avoid missing any Addenda.
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 4 OF 96
Bid Withdrawal Any bid may be withdrawn at any time before the “Bids Due” date and time specified in the Schedule, by providing written request for the withdrawal of the bid to the City. The request shall be executed by a duly authorized representative of the firm. Withdrawal of a bid will not prejudice the right of the Bidder to file a new bid prior to the bid submission deadline.
Bid Content Requirements Bids must be sealed and identified per the “Bid Submission” requirements. Please list any bid content requirements i.e. list of previous jobs, cover letter, using an attached bid form, etc.
Bid Submission Bids shall be delivered by mail (prior to bid closing date and time) or hand carried.
Bids for 2025 Silverton Overlay, PN25‐1115 City of Silverton 410 N. Water St.
Silverton, OR 97381
The City shall not be responsible for the proper handling of any proposal not properly identified, marked and submitted in a timely manner. Proposals received after the date/time for Closing will not be considered for award.
The City will do the bid opening at the Silverton City Hall on June 17, 2025 at 2:00 PM located at 410 N.
Water Street, Silverton, OR 97381.
V. GENERAL INFORMATION
Public Records
This bid will be made a part of a file open to public inspection. If a bid contains any information that is considered a trade secret under ORS 192.501(2), each sheet of such information must be marked with the following legend:
“This data constitutes a trade secret and shall not be disclosed except in accordance with the Oregon Public Records Law, ORS Chapter 192.”
Nondisclosure of documents or any portion of a document submitted as part of a bid may depend upon official or judicial determinations made pursuant to the Oregon Public Records Law. The above restriction may not include cost or price information, which must be open to public inspection.
Identifying the bid in whole as a trade secret is not acceptable. Failure to identify a portion of the bid as a trade secret shall be deemed a waiver of any future claim of that information as a trade secret.
Reimbursement
All costs for bids and interviews to secure this project are the Bidder’s responsibility.
Contract Award
The City will award a contract to the lowest responsive, responsible bidder. The selected Bidder will be
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 5 OF 96 required to assume responsibility for all services outlined in the ITB, whether the Bidder or a representative of the Bidder produces them. The City considers the selected Bidder responsible for any and all contractual matters. The successful Bidder shall be required to execute a Public Works Contract. An example is in Section 5.
VI. SCOPE OF WORK
Project Completion Date The project must be completed no later than September 30, 2025, unless otherwise agreed upon, in writing, by the City and the Successful Bidder.
Examination of Contract Documents and Project Site Project Site is located at several streets within Silverton, Oregon, 97381. Each Bidder is solely responsible for all of the Invitation to Bid documents and the examination of the Project Site prior to submittal of bid.
Documents are available for download on the City of Silverton website, www.silverton.or.us, or for viewing by appointment only by contacting the Public Works Coordinator at 503‐874‐2206.
City obligations under this contract include:
1. Contract and Project Management services including all inspections.
2. Pavement markings and stripping.
Contractor Project Scope:
1. Grind street area to be overlayed per contract documents. (full street grind or edge/butt grind as noted)
2. Crack seal pavement area and place geotextile fabric over the 24’ of travel lane area.
3. Place 2” or 3” of hot mix asphalt on overlay area per contract documents.
4. Contractor will complete and pay for asphalt density testing during paving.
5. Contractor and subcontractors shall obtain City of Silverton business license prior to start.
6. Contractor shall notify homeowners on affected roads with a 72 hour notice.
7. Contractor is responsible for any signage to complete roadway work.
8. Contractor shall submit a full comprehensive traffic control plan for approval.
Warranty:
Successful Bidder shall warranty work product to be free from defects due to poor craftsmanship or materials for a minimum of one (1) year, or the duration of the Vendor’s standard warranty, whichever is greater. The Vendor’s craftsmanship warranty is in addition to any material warranty provided by manufacturer of materials used in construction. All warranty work will be provided without transportation charges. Warranty period begins after project goods are accepted by the City.
Bonds and Insurance The Bidder shall furnish performance and payment bonds, each in an amount at least equal to 100 percent (100%) of the contract price as security for the faithful performance and payment of all Bidder obligations.
These bonds shall remain In effect at least one year after the date when final payment is due. The Bidder shall deliver to the City certificates of insurance as specified in Section 7. The City including respective agents, officers and employees shall be named additional insured.
References The Bidder shall furnish at least three (3) references of comparable and previously completed projects, including the project owner’s name and phone number.
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 6 OF 96
SECTION 2 ‐INSTRUCTIONS TO BIDDERS
2.1 BIDDER'S QUALIFICATIONS:
No bids for construction contracts shall be received or considered by the City unless the bidder is licensed with the Construction Contractors Board or licensed by the State Landscape Contractors Board as required by ORS 671.530.
The Contractor shall have a public work bond filed with the Construction Contractors Board prior to starting work on the project, in accordance with ORS 279C.830. Additionally, the Contractor shall include in every subcontract a provision requiring the subcontractor to have a public works bond filed with the Construction Contractors Board before starting work, in accordance with ORS 279C.830, and submit it to the City for proof of Bonding.
2.2 EXAMINATION OF THE CONTRACT DOCUMENTS AND WORK SITE:
Bidders should carefully examine the bid and contract documents and familiarize themselves with the work site to fully acquaint themselves with all the conditions and matters which can in any way affect the work or the cost thereof.
Each bidder shall thoroughly examine and be familiar with legal and procedural documents, general conditions, specifications, drawings, plans, addenda (if any), any tests and/or reports, and all other Contract Documents. The submission of a bid shall constitute an acknowledgment upon which the City may rely, that the bidder is experienced in the uses and interpretation of plans and specifications such as those included in the Contract Documents and has thoroughly examined and is familiar with the Contract Documents.
The failure or neglect of a bidder to receive or examine any of the Contract Documents, perform site investigations and/or other investigations or examinations shall in no way relieve the bidder from any obligations with respect to the bid or the contract. No claim for additional compensation will be allowed which is based upon a lack of knowledge of any Contract Documents or existing site conditions.
All questions about the meaning or intent of the Bidding Documents are to be submitted to the Project Manager, listed in the Invitation to Bid, in writing. Interpretations or clarifications considered necessary by the Project Manager in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
2.3 CONTRACTOR'S RESPONSIBILITY:
It is understood that the specifications and other contract documents do not purport to control the method of performing the work, but only the requirements as to the nature of the completed work.
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 7 OF 96
The Contractor assumes the entire responsibility for the method of performing and installing the work. Suggestions as to the method included in the contract documents shall be deemed advisory only and the feasibility of such methods or the lack thereof shall not affect the Contractor's liability or status as an independent Contractor to complete the work under this contract.
2.4 LAWS AND REGULATIONS:
The bidder is assumed to be familiar with all Federal, State, County or City laws or regulations, which in any manner affect those engaged or employed in the work or the materials or equipment used in the proposed construction, or which in any way affect the conduct of the work, and no plea of misunderstanding will be considered on account of ignorance thereof. If the bidder shall discover any provision in these specifications, plans or contract documents which is contrary to or inconsistent with any law or regulations, he or she shall report it to the City in writing.
2.5 WAGE RATES:
The Contractor shall pay the existing rate of wage which may be paid to workers in each trade or occupation required for such public work employed in the performance of the contract either by the Contractor or subcontractor or other person doing or contracting to do the whole or any part of the work contemplated by the contract, and such workers shall be paid not less than the specified minimum hourly rate of wage as set forth in the latest applicable edition of the Prevailing Wage Rates for Public Works in accordance with ORS 279C.838 and 279C.840.
2.6 CONTRACT TIMES:
The number of days within which, or the dates by which, milestones are to be achieved and the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
2.7 LIQUIDATED DAMAGES:
Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
2.8 BID SECURITY:
Bid security shall be submitted with the Bid Proposal and failure to submit shall be cause for rejection of the bid. The bidder, at his or her option, shall furnish a bid bond, cashier's check or a certified check made to the City of Silverton for an amount equal to no less than ten (10) percent of the total amount of the bid. Security deposited by unsuccessful bidders will be returned as soon as practicable after the bid opening. Said bonds shall be in the form herein prescribed or approved substitute form and shall be the surety bonds of an incorporated surety company licensed to transact surety business in the State of Oregon, and said bonds shall be in all respects satisfactory and acceptable to ORS 279.C.365(5).
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 8 OF 96
2.9 PREPARATION OF BIDS:
Bidders must submit their proposals on the Bid Form attached hereto. The blank spaces in the proposal must be filled in correctly where indicated for each and every item for which a quantity is given, and the bidders must state the unit prices, typed or written in ink. Any correction to entries made on the proposal forms shall be initialed by the person signing the proposal. In case of discrepancy between the unit prices and amounts, the unit prices will govern.
Alternative bids will not be considered unless specifically called for. Bids must be mailed, or hand delivered to City Hall (410 N Water Street, Silverton, OR 97381).
Each bidder represents that their bid is based upon the specific material installation and equipment requirements, described in the Bidding Documents.
No substitutions will be considered unless a written request has been submitted to the Project Manager for approval prior to the closing date for bids. Each such request shall include a complete description of the proposed substitute, and any other data or information necessary for a complete evaluation. Substitutions will be accepted only with the understanding that the supplier guarantees substituted material or equipment to be equal or better than that specified and meets all requirements of the Specifications.
Accepted substitutes will be listed in addenda mailed or delivered to each person or firm recorded by the Project Manager as having received the Bidding Documents and will be available for inspection at the City of Silverton, City Hall 410 N. Water St. Silverton, OR 97381.
2.10 SPECIFICATION LIMITING COMPETITION:
Bidders may comment on any specification or requirement contained within this Bid which they feel limits competition in the selection of a bid to perform the services herein defined. Protests shall detail the reasons and any proposed changes to the specifications. Such comments shall be formal in writing and are to be addressed to Mike Dahlberg, Public Works Operations Manager, at mdahlberg@silverton.or.us .
Such comments shall be submitted no later than 5 days before the bid date. No comments will be accepted after that time. Any substitutions for items specified will not be accepted without prior written approval of the Project Manager.
2.11 PROTEST OF AWARD.
The Notice of Intent to Award by the City of Silverton shall constitute a final decision of the City to award the contract if no written protest of the award is filed with the City Project Manager within three (3) working days of issuing the Notice of Intent to Award. If a protest is timely filed, the Notice of Intent to Award is a final decision of the City only upon issuance of a written decision denying the protest and affirming the award. The Notice of Intent to Award and any written decision denying
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 9 OF 96 protest shall be sent to every bidder who provided an address.
2.12 RIGHT TO PROTEST.
Any actual bidder who is adversely affected or aggrieved by the City's Notice of Intent to Award to another bidder on the same solicitation shall have seven (7) working days after Notice of Intent to Award to submit to the City Project Manager a written protest of the award. The written protest shall specify the grounds upon which the protest is based. In order to be an adversely affected or aggrieved bidder with a right to submit a written protest, a bidder must be next in line for award, i.e. the protester must claim that all higher rated bidders are ineligible for award because they are non‐responsive or non‐responsible. The City will not entertain protests submitted after the time period established in this rule.
2.13 SUBMISSION OF BIDS:
Bids must be submitted at the time and location shown on the Invitation to Bid to Silverton City Hall (410 N. Water Street, Silverton, OR 97381). All forms required to be submitted are provided.
2.14 BASIS OF BID:
Bidders shall submit a Bid for each item of Work listed in the Schedule of Values in the Bid Form.
2.15 SUBCONTRACTORS:
When the contract value for a public improvement is greater than $100,000, bidders are required to disclose information about first‐tier subcontractors who will furnish labor or labor and materials (see ORS 279C.370).
Within two working hours of the date and time of the deadline when the bids are due to the City for a public improvement, the bidder shall submit to the City a disclosure of the first‐tier subcontractors that (A) will be furnishing labor, or will be furnishing labor and materials in connection with the public improvement, and (B) will have a contract value that is equal to or greater than five percent of the total project bid or $15,000, whichever is greater; or $350,000, regardless of the percentage of the total project bid. The disclosure of first‐tier subcontractors shall include the name of each subcontractor, the category of work that each subcontractor will perform, and the dollar value of each subcontract. See the form provided in Section 3.
The City shall consider the bid of any contractor that does not submit a subcontractor disclosure to the City to be a non‐responsive bid and may not award the contract to the contractor. The City is not required to determine the accuracy or the completeness of the subcontractor disclosure.
2.16 RECEIPT AND OPENING OF BIDS:
Bids shall be submitted prior to the time fixed in the Invitation to Bid. Bids received after the time designated will be considered late bids and will be returned unopened. No responsibility will be attached to any official of the City for the premature opening of, or the failure to open, a bid not
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 10 OF 96 properly addressed and identified.
2.17 WITHDRAWAL OF BIDS:
A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid and submit a new Bid prior to the date and time for the opening of Bids.
If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
2.18 PRESENCE OF BIDDERS AT OPENING:
At the time and place fixed for opening of bids, the contents of all bids will be made public for the information of all bidders and other interested parties who may be present in person, electronically, or by representative.
2.19 BIDDERS INTERESTED IN MORE THAN ONE BID:
If more than one bid is offered by one party, or by any person or persons representing a party, all such bids shall be rejected. A party who has quoted prices to a bidder is not thereby disqualified from quoting prices to other bidders or from submitting a direct bid on his or her own behalf.
2.20 AWARD OF CONTRACT:
The contract will be awarded as soon as practicable to the lowest responsive, responsible bidder, price and other factors considered, provided the bid is reasonable and it is to the interest of the City. Award will be made to one bidder and one bidder only.
Contractor or individuals awarded a contract shall provide the City with a correct Department of the Treasury Internal Revenue Service Tax Identification Number (TIN). In the event that the TIN is incorrect or inconsistent with the Contractor's name as described in this contract, the City may withhold taxes as required by law, or cancel or suspend further services under this contract, at the City's option, until the discrepancy is corrected.
The acceptance of a bid shall bind the successful bidder to execute the contract.
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 11 OF 96
2.21 REJECTION OF BIDS:
The City reserves the right to reject any and all bids. Bids may be rejected if they show any alteration of form, admissions not called for, conditions or alternate bids, irregularities of any kind, or if they contain a clause in which the bidder reserves the right to accept or reject a contract awarded to him except as herein provided, or if they do not comply with prescribed public contracting procedures and requirements including the requirement to demonstrate the bidders responsibility under ORS 279C.375(3)(b). Bids in which the prices are obviously unbalanced may be rejected.
The City reserves the right to waive any informality in bids received when such waiver is in the interest of the City and allowed by state statute.
2.22 SURETY BOND:
To guarantee the faithful performance of the contract, the successful bidder will be required to furnish a performance bond and a payment bond in an amount equal to the full amount of the contract as amended. Said bonds shall be in the form herein prescribed or approved substitute form and shall be the surety bonds of an incorporated surety company licensed to transact surety business in the State of Oregon and said bonds shall be in all respects satisfactory and acceptable to
ORS 279C.380.
The Contractor also agrees that at the completion of the project and prior to received final acceptance by the City, the Contractor shall provide the City with a Warranty Bond in the amount of 20% of the contracted amount, which covers any defects in either materials or workmanship, for a period of two years from the date of acceptance.
2.23 EXECUTION OF THE CONTRACT:
The successful bidder shall, within ten calendar days from the date of receiving from the City the contract prepared and ready for execution, furnish the City the corporate surety bonds specified herein and enter into contract with the City. If the successful bidder fails to comply with any of the requirements herein, the City may, at its option, determine that the bidder has abandoned the contract and there upon the security accompanying this proposal shall be forfeited and the same shall become the property of the City.
2.24 ENVIRONMENTAL AND NATURAL RESOURCES LAWS
In compliance with ORS 279C.525, lists of federal, state and local agencies of which the City has knowledge that have enacted ordinances or regulations relating to environmental pollution and the preservation of natural resources that may affect the performance of the Contract are listed in the 2021 Oregon Department of Transportation Standard Specifications for Construction, Section 00170.01.
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 12 OF 96
SECTION 3 ‐ BID FORM
Submitted by:
Address:
Date: Phone number:
Contractor Contact E‐mail Address:
Contractor CCB#:_____________________________________________
Federal Tax I.D. Number or Social Security Number
The undersigned, as a bidder, declares that he has carefully examined the location of the worksites, that he is aware of the general nature of the work, that he has examined the General and Supplemental Conditions, Special Provisions, Supplemental Special Provisions, Plans and Drawings, read the Instructions to Bidders, read and understood any reports, tests, or addenda that accompany this bid, and hereby proposes to furnish all materials and equipment and do all the work required to complete the project entitled 2025 Silverton Overlay in accordance with the said Specifications herein for the bid prices set forth in the Schedule of Values attached hereto in this form and forming a part of this proposal.
The Bidder hereby acknowledges the receipt of the following addenda:
Addendum No. Addendum Date
This proposal is accompanied by a certified check, cashier's check or bid bond in the amount of 10% of the total bid.
The Bidder, by his signature below, certifies that he is qualified to perform the work and hereby represents as follows:
A. That no Councilor, officer, agency or employee of the City of Silverton is personally interested directly or indirectly in this contract or the compensation to be paid hereunder, and that no representation, statement or statements, oral or in writing, of the City, its Councilors, officers, agents, or employees had induced him to enter into this contract and the papers made a part hereof by its terms.
B. That this bid is made without connection with any person, firm or corporation making a bid for the same material, and is in all respects, fair and without collusion or fraud.
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 13 OF 96
C. That the provisions required by ORS 279C.800 through ORS 279C.870 or 40 U.S.C. 3141 et seq.
relating to Prevailing Wage Rates shall be complied with.
D. In the event the Bidder is awarded the contract and shall fail to complete the work within the time frame specified, including extensions granted, liquidated damages and engineering expenses shall be paid to the City as outlined in section 00180.85 of the Supplemental Conditions for each day of delay in the completion of the work.
E. Contractor shall not perform any work under this contract until all bonding and insurance requirements have been met and a Notice to Proceed has been issued.
F. I, the undersigned, agree to be bound by the form of agreement and all remaining contract documents, including Instructions to Bidders; Standard Terms and Conditions; Special conditions;
Federal Provisions, if applicable; plans and specifications.
G. Upon receiving notice to proceed from the City, the Contractor shall meet with the City assigned Project Manager for a preconstruction conference at a time mutually agreed upon. At this conference the Contractor shall furnish the Project Manager with a proposed schedule of work, as well as any other required submittals.
H. Contractor shall not perform any work under this contract until the Contractor and every subcontractor has a public works bond filed with the Construction Contractors Board in accordance with ORS279C.830 and all other bonding and insurance requirements have been met and a Notice to Proceed has been issued.
I. I, the undersigned, certify that the Bidder holds current licenses that businesses or services professionals operating in this state must hold in order to undertake or perform the work specified in these contract documents.
J. I, the undersigned, certify that the Bidder is covered by liability insurance and other insurance in the amount(s) required by the Agreement.
K. I, the undersigned, certify that the Bidder qualifies as a carrier insured employer or a self‐ insured employer under ORS 656.407 or has elected coverage under ORS 656.128.
L. I, the undersigned, certify that the Bidder is legally qualified to contract with the City of Silverton.
M. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that
Bidder has discovered in the Bidding Documents, and confirms that the written resolution thereof by Engineer is acceptable to Bidder.
N. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract.
• “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 14 OF 96
• “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non‐ competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
• “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non‐ competitive levels; and
• “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
Specific Bidder Instructions
A. The undersigned agrees to comply with the provisions of ORS 279C.800 to 279C.870, the Oregon
Prevailing Wage law. The undersigned, as bidder, acknowledges that provisions of ORS 279C.800 ‐ 279C.870 relating to workers on public works to be paid not less than prevailing rate of wage (BOLI) shall be included in the Agreement, the undersigned Contractor agrees to be bound by and will comply with the provisions of ORS 279C.838, 279C.840.
B. The undersigned certifies that the undersigned Contractor is not ineligible to receive a contract for a public work pursuant to ORS 279C.860. Bidder further agrees, if awarded a contract, that every subcontractor will be eligible to receive a contract for a public work pursuant to ORS 279C.860.
C. The undersigned certifies that the undersigned Contractor has not discriminated against minority, women or emerging small businesses enterprises in obtaining any required subcontracts. The bidder understands and acknowledges that it may be disqualified from bidding on this public improvement project as set forth in OAR 137‐049‐0370, including but not limited to the City’s discovery of a misrepresentation or sham regarding a subcontract or that the Bidder has violated any requirement of ORS 279A.110 or the administrative rules implementing the Statute.
D. The undersigned bidder is registered with the Oregon Construction Contractors Board (CCB), the registration is current and valid, and the bidder’s registration number is stated below. Bidder understands that failure to have a current CCB license shall result in rejection of this bid in accordance with OAR 137‐049‐0230(1).
E. The undersigned bidder is licensed by the State Landscape Contractors Board, if applicable, the license is current and valid, and the bidder's registration number is stated below. Bidder understands that failure to have a current LCB license shall result in rejection of this bid.
F. The undersigned represents him/herself in this bid to be either a Resident or a Nonresident bidder by completing the check boxes below.
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 15 OF 96
Contractor shall check applicable box:
[ ] Resident Bidder, as defined in ORS 279A.120 [ ] Non‐Resident Bidder, Resident State:
G. The undersigned confirms that the Bidder has a Qualified Drug Testing Program for employees in place and will demonstrate this prior to award of contract in accordance with OAR 13 ‐049‐02.001 (c)(B). The undersigned represents him/her self in this bid to have a drug testing program in place at the time of bid by completing the check box below.
Contractor shall check if in compliance:
[ ] Drug Testing Requirement, as defined in ORS 279C.505
H. If the contract is for a public works project, subject to ORS 279C.800, 279C.870 and, no bid will be received or considered by the public contracting agency unless the box below is checked, certifying that the Bidder complies with the provisions of ORS 279C.800 through ORS 279C.870 or 40 U.S.C. 3141 et seq.
Contractor shall check if in compliance:
[ ] The Bidder certifies that the provisions of ORS 279C.800 through ORS 279C.870.
I. The undersigned confirms that if this contract involves asbestos abatement or removal, the bidder is licensed under ORS 468A.710 for asbestos removal. Asbestos abatement is not implicated in this contract.
J. The bidder understands that the City will be awarding the contract to the Responsible Bidder with the lowest Responsive Bid. Whether a Bidder is responsible will be determined by ORS 279C.375 and the City's review following the requirements laid out in Section 2.20 of the Instructions to Bidders, and that the Bidder has supplied all the required attachments listed in the “Attachments to this Bid” section listed on page 6 of the Bid Form.
K. Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment on or before the dates or within the number of calendar days indicated in the Agreement.
The Bidder further proposes to accept the following amount as full payment for the work proposed herein to complete the project and agrees that the price represents a true measure of the labor and materials required to perform the work, including all allowances for overhead and profit for each type of work called for in these Contract Documents. The total amount shall be shown in both words and figures. In case of a discrepancy, the amount shown in words shall govern.
If the Bidder is awarded a Contract on this proposal, the surety who will provide the Performance Bond will be whose address is .
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 16 OF 96
1. Mobilization, Bonds, Permits and Insurance, etc. ALL L.S. Lump Sum $
BASE BID SCHEDULE OF VALUES – 2025 Silverton Overlay, PN25‐1115, B St (N. 1st to Mill St)
ITEM
ODOT/
PWDS SPEC
QNTY UNIT UNIT PRICE TOTAL PRICE
1.
Temporary Work Zone Traffic Control, Complete
00221 ALL L.S. Lump Sum $
2.
Cold Plane Pavement Removal, 2” Deep as noted
00620 & 00622
ALL L.S. Lump Sum $
3.
Existing Street Cleaning & Preparation, Grinding, Adjustment of all existing utility structures to finish pavement grade (including saw cutting around water valves and other boxes if required), MH overlay ring, etc.
ALL L.S. Lump Sum $
4.
Pre‐level (fill depressions, potholes & pre‐level to 2” below finish surface) w/Level2, ½” Dense HMAC, complete
00350 ALL L.S. Lump Sum $
5.
Hot Oil Tack, Overlay Fabric & Overlay w/Level 2 , ½” Dense HMAC, 2” thick, complete (including compaction testing)
00744 ALL L.S. Lump Sum $
6.
NE corner B and 2nd replace existing ADA ramp, truncated domes, sidewalk extensions, etc., as indicated complete
00759 1 L.S. Lump Sum $
7.
SW corner B and Mill St, new pedestrian ramp, truncated domes, sidewalk extensions, etc., as indicated complete.
PWDS
214B
1 L.S. Lump Sum $
B ST BASE BID TOTAL: $
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 17 OF 96
BASE BID SCHEDULE OF VALUES‐ 2025 Silverton Overlay, PN25‐1115 Grant St (Pine St to Florida St)
ODOT/
PWDS SPEC
QNTY UNIT UNIT PRICE TOTAL PRICE
1.
Temporary Work Zone Traffic Control, Complete
00221 ALL L.S. Lump Sum $
2.
Cold Plane Pavement Removal, 2” Deep EDGE GRIND 6FT wide from curbline. Butt joint for transitions curb/curb 10’ wide.
00620 & 00622
ALL L.S. Lump Sum $
3.
Existing Street Cleaning & Preparation, Grinding, Adjustment of all existing utility structures to finish pavement grade (including saw cutting around water valves and other boxes if required), MH overlay ring, etc.
ALL L.S. Lump Sum $
4.
Pre‐level (fill depressions, potholes & pre‐level to 2” below finish surface) w/Level2, ½” Dense HMAC, complete
00744 ALL L.S. Lump Sum $
5.
Hot Oil Tack, Overlay Fabric & Overlay w/Level 2 , ½” Dense HMAC, 2” thick, complete (including compaction testing)
00744 ALL L.S. Lump Sum $
6.
SE corner of Grant & Florida replace and lower existing ADA ramp, curbs, truncated domes, sidewalk extensions, etc., as indicated complete
PWDS
214B
1 L.S. Lump Sum $
7.
SW corner of Pine & Florida replace existing ADA ramp, curbs, truncated domes, sidewalk extensions, etc., as indicated complete
PWDS
214B
Grant St BASE BID TOTAL: $
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 18 OF 96
BASE BID SCHEDULE OF VALUES‐ 2025 Silverton Overlay, PN25‐1115 E. Main St @ Rock St
PWDS SPEC
QNTY UNIT UNIT PRICE TOTAL PRICE
1.
Temporary Work Zone Traffic Control, Complete
00221 ALL L.S. Lump Sum $
2.
Cold Plane Pavement Removal, 2” Deep
00620 & 00622
ALL L.S. Lump Sum $
3.
Existing Street Cleaning & Preparation, Grinding, Adjustment of all existing utility structures to finish pavement grade (including saw cutting around water valves and other boxes if required), MH overlay ring, etc.
ALL L.S. Lump Sum $
4.
Pre‐level (fill depressions, potholes & pre‐level to 2” below finish surface) w/Level2, ½” Dense HMAC, complete
00744 ALL L.S. Lump Sum $
5.
Hot Oil Tack, Overlay Fabric & Overlay w/Level 2 , ½” Dense HMAC, 2” thick, complete (including compaction testing)
00744 ALL L.S. Lump Sum $
E. Main St @ Rock St BID TOTAL: $
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 19 OF 96
BASE BID SCHEDULE OF VALUES‐ 2025 Silverton Overlay, PN25‐1115 E. Main St @ Ames St
ODOT/
PWDS SPEC
QNTY UNIT UNIT PRICE TOTAL PRICE
1.
Temporary Work Zone Traffic Control, Complete
00221 ALL L.S. Lump Sum $
2.
Cold Plane Pavement Removal, 2” Deep
00620 & 00622
ALL L.S. Lump Sum $
3.
Existing Street Cleaning & Preparation, Grinding, Adjustment of all existing utility structures to finish pavement grade (including saw cutting around water valves and other boxes if required), MH overlay ring, etc.
ALL L.S. Lump Sum $
4.
Pre‐level (fill depressions, potholes & pre‐level to 2” below finish surface) w/Level2, ½” Dense HMAC, complete
00744 ALL L.S. Lump Sum $
5.
Hot Oil Tack, Overlay Fabric & Overlay w/Level 2 , ½” Dense HMAC, 2” thick, complete (including compaction testing)
E. Main St @ Ames St BID TOTAL: $
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 20 OF 96
BASE BID SCHEDULE OF VALUES‐ 2025 Silverton Overlay, PN25‐1115 N. 2nd St (Oak St to Main St)
ODOT/
PWDS SPEC
QNTY UNIT UNIT PRICE TOTAL PRICE
1.
Temporary Work Zone Traffic Control, Complete
00221 ALL L.S. Lump Sum $
2.
Cold Plane Pavement Removal, 2” Deep
00620 & 00622
ALL L.S. Lump Sum $
3.
Existing Street Cleaning & Preparation, Grinding, Adjustment of all existing utility structures to finish pavement grade (including saw cutting around water valves and other boxes if required), MH overlay ring, etc.
ALL L.S. Lump Sum $
4.
Pre‐level (fill depressions, potholes & pre‐level to 2” below finish surface) w/Level2, ½” Dense HMAC, complete
00744 ALL L.S. Lump Sum $
5.
Hot Oil Tack, Overlay Fabric & Overlay w/Level 2 , ½” Dense HMAC, 2” thick, complete (including compaction testing)
N. Second St (Oak St to Main St) BID
TOTAL:
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 21 OF 96
BASE BID SCHEDULE OF VALUES – 2025 Silverton Overlay, PN25‐1115, S. 1st St (Jersey St to Lewis St)
PWDS SPEC
QNTY UNIT UNIT PRICE TOTAL PRICE
1.
Temporary Work Zone Traffic Control, Complete
00221 ALL L.S. Lump Sum $
2.
Saw cut and excavate curb to curb 10’ wide. Install base rock per detail PWDS 202. “Blending Cut”
PWDS
2 L.S. Lump Sum $
3.
Existing Street Cleaning & Preparation, Grinding, Adjustment of all existing utility structures to finish pavement grade (including saw cutting around water valves and other boxes if required), MH overlay ring, etc.
4.
Pre‐level (fill depressions, potholes & pre‐level to 2” below finish surface) w/Level2, ½” Dense HMAC, complete
00744 ALL L.S. Lump Sum $
5.
Hot Oil Tack, Overlay Fabric & Overlay w/Level 2 , ½” Dense HMAC, 2” thick, complete (including compaction testing)
S. 1St St BID TOTAL: $
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 22 OF 96
ADDITIVE BID SCHEDULE OF VALUES – 2025 Silverton Overlay, PN25‐1115, S. 2nd St (Lane St to Koons St) Street Work
ITEM
ODOT/
PWDS SPEC
QNTY UNIT UNIT PRICE TOTAL PRICE
1.
Temporary Work Zone Traffic Control, Complete
00221 ALL L.S. Lump Sum $
2.
Saw cut and excavate curb to curb 10’ wide. Install base rock per detail PWDS 202. “Blending Cut”
PWDS
2 L.S. Lump Sum $
3.
Existing Street Cleaning & Preparation, Grinding, Adjustment of all existing utility structures to finish pavement grade (including saw cutting around water valves
& pre‐level to 2” below finish surface) w/Level2, ½” Dense HMAC, complete
00744 ALL L.S. Lump Sum $
5.
Hot Oil Tack, Overlay Fabric & Overlay w/Level 2 , ½” Dense HMAC, 2” thick, complete (including compaction testing)
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 23 OF 96
ADDITIVE BID SCHEDULE OF VALUES‐ 2025 Silverton Overlay, PN25‐1115, Brook St, Alder St, Silver St (From James St)
ITEM
ODOT/
PWDS SPEC
QNTY UNIT UNIT PRICE TOTAL PRICE
1.
Temporary Work Zone Traffic Control, Complete
00221 ALL L.S. Lump Sum $
2.
Saw cut and excavate curb to curb 14’ wide. Install base rock per detail PWDS 202. “Blending Cut”
PWDS
2 L.S. Lump Sum $
3.
Existing Street Cleaning & Preparation, Grinding, Adjustment of all existing utility structures to finish pavement grade (including saw cutting around water valves
& pre‐level to 2” below finish surface) w/Level2, ½” Dense HMAC, complete
00744 ALL L.S. Lump Sum $
5.
Hot Oil Tack, Overlay Fabric & Overlay w/Level 2 , ½” Dense HMAC, 2” thick, complete (including compaction testing)
00744 ALL L.S. Lump Sum $
6.
NW corner of Brook & James replace existing ADA ramp, curbs, truncated domes, sidewalk extensions, etc., as indicated complete
PWDS
214B
1 L.S. Lump Sum $
7.
SE corner of Alder & Silver replace existing ADA ramp, curbs, truncated domes, sidewalk extensions, etc., as indicated complete
PWDS
214B
1 L.S. Lump Sum $
8.
SW/SE corner of Willow & Silver replace existing ADA ramp, curbs, truncated domes, sidewalk extensions, etc., as indicated complete
PWDS
214B
2 L.S. Lump Sum $
9.
SW/NW corner of Silver & James replace existing ADA ramp, curbs, truncated domes, sidewalk extensions, etc., as indicated complete
PWDS
214B
2 L.S. Lump Sum $
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 24 OF 96
Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
TOTAL BASE BID AMOUNT (Written):
TOTAL BASE AND ADDITIVE BIDS AMOUNT (Written):
Contractor's Name:
Contact Name:
Signature:
ATTACHMENTS TO THIS BID FORM
The following documents are submitted with and made a condition of this Bid:
A. Bid Security
B. Construction Contractor’s Registration
C. First‐Tier Subcontractor Disclosure Form
D. Affidavit of Noncollusion (completed and notarized)
E. Employee Drug Testing Program (required under ORS 279C.505(2))
F. Certification of Non‐Discrimination (required under ORS 279A.110(3))
G. Contractor Project References
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 25 OF 96
CONSTRUCTION CONTRACTORS REGISTRATION
No bids for construction contracts shall be received or considered by the Agency unless the bidder is licensed with the Construction Contractors Board or licensed by the State Landscape Contractors Board as required by ORS 671.530. The undersigned states that the bidder is now registered with the Oregon Construction Contractors Board.
Indicate Registration Number and Expiration Date:
Workers' Comp Insurance Company:
Workers' Comp Policy/Binder Number:
The names of the principal officers of the corporation submitting this proposal; or of the partnership;
or of all persons interested in this proposal as principals; are as follows:
Name Title
Name Title
(If Sole Proprietor or Partnership) In witness hereto, the undersigned has set his (its) hand this day of June, 2025.
Name of Firm
Signature of Bidder
(If Corporation) In witness whereof the undersigned corporation has caused this instrument to be executed by its duly authorized officers this day of June, 2025.
Name of Corporation
By Title
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 26 OF 96
FIRST‐TIER SUBCONTRACTOR DISCLOSURE FORM FOR THE 2025 SILVERTON OVERLAY
BID OPENING: Date: June 17, 2025 Time: 2:00 PM PST
Failure to submit this form by the disclosure deadline will result in a non‐responsive bid. A nonresponsive bid will not be considered for award.
INSTRUCTIONS:
This form must be submitted at the location specified in the Instructions to Bidders on the advertised bid closing date, and within two working hours after the advertised bid closing time (ORS 279C.370).
Unless otherwise stated in the solicitation, this document shall not be submitted by facsimile. It is the responsibility of bidders to submit this disclosure form and any additional sheets with the project name clearly marked, at the location indicated by the specified disclosure deadline.
Subcontractor lists may be submitted with the bid in the same envelope at the bid closing date and time.
Those subcontractor lists submitted after the bid closing shall be delivered in a separate sealed envelope that clearly identifies the contents. However, the subcontractor list MUST be submitted within two (2) hours of the bid closing date and time.
List below the name of each subcontractor that will be furnishing labor, or labor and materials, for which disclosure is required, the category of work that the subcontractor will be performing, and the dollar value of the subcontract. Enter "NONE" if the value of the project bid is less than $100,000 or there are no subcontractors that need to be disclosed. ATTACH ADDITIONAL SHEETS IF
NECESSARY.
SUBCONTRACTOR DOLLAR CATEGORY
NAME VALUE OF WORK
1.
2.
3.
The above listed first‐tier subcontractor(s) are providing labor, or labor and material, with a Dollar Value equal to or greater than:
a) 5% of the total Contract Price, but at least $15,000. [If the Dollar Value is less than
$15,000 do not list the subcontractor above.] or
b) $350,000 regardless of the percentage of the total Contract Price.
Form Submitted By (Bidder):
Bidder Signature: Phone #
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 27 OF 96
AFFIDAVIT OF NONCOLLUSION
(for Standard Public Improvement Contracts)
TO: City of Silverton
PROJECT NAME: 2025 Silverton Overlay
KNOW ALL PERSONS BY THESE PRESENTS, that, Name of Contractor as a Bidder on the above‐named public improvement project, does hereby certify that no officer, agent, or employee of the State, County, or City who has a pecuniary interest in the Bid has participated in the Contract negotiations on the part of the City, that the Bid is made in good faith without fraud, collusion, or connection of any kind with any other Bidder, and that the Bidder is competing solely on its own behalf without connection with, or obligation to, any undisclosed person or firm.
IN WITNESS WHEREOF, the undersigned has duly authorized the execution of this document by the name and signature indicated below. If Contractor is an entity (Inc., LLC, LLP, Co., etc) or principal, their representative, by signing below, certifies that such representative is authorized by the entity or principal to execute this document.
Dated this day of June, 2025.
Signature
Title
STATE OF OREGON }
} ss
COUNTY OF }
Personally appeared before me this day of June, 2025, and has acknowledged the foregoing instrument to be his or her voluntary act and deed.
NOTARY PUBLIC FOR OREGON
My Commission expires:
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 28 OF 96
EMPLOYEE DRUG TESTING PROGRAM CERTIFICATION
TO: City of Silverton, a Municipal Corporation in the State of Oregon
In accordance with ORS 279C.505(2), as a Bidder on the above‐named public improvement project, does hereby certify to the City that the Bidder has an employee drug testing program in place in accordance with Oregon Law at the time of submitting its Bid, and that such employee drug testing program will be maintained in accordance with Oregon Law throughout the duration of the Contract, including any extensions.
Date
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 29 OF 96
CERTIFICATION OF NON‐DISCRIMINATION
TO: City of Silverton, a Municipal Corporation in the State of Oregon
In accordance with ORS 279A.110(4) and OAR 137‐049‐0440(3), as a Bidder on the above‐ named public improvement project, does hereby certify that the Bidder has not discriminated and will not discriminate, in violation of ORS 279A.110(1), against a disadvantaged business enterprise, a minority‐owned business, a woman‐owned business, a business that a service‐ disabled veteran owns or an emerging small business in obtaining or awarding of Subcontracts for this project.
Date
PN25‐1115 2025 Silverton Overlay 5/16/2024 PAGE 30 OF 96
CONTRACTOR PROJECT REFERENCES
This form must be submitted with the bid. 3 references of similar completed projects shall be provided by the Contractor.