2025 APPENDIX A ISW.pdf

PDF 204 KB Posted

Attached to
Integrated Solid Waste Services HAFB Federal contract opportunity
Solicitation number
FA282525Q1546
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

This document is Appendix A for an Integrated Solid Waste Services contract at Hanscom Air Force Base, containing detailed estimated workload data for waste and recycling services. The appendix includes five comprehensive tables (A1-A5) that specify waste management requirements across multiple locations:

Table A1 provides overall estimated workload data for a two-year period, including 2,500 tons of municipal solid waste, 430 tons of single-stream recyclables, 40 tons of e-waste, 75 tons each of wood and metal recyclables, and 50 construction/demolition container placements. Tables A2-A4 break down specific waste collection frequencies and container sizes for numerous buildings at Hanscom AFB, Family Camp, Patriot Golf Course, and geographically separated units in Humarock and Hamilton, Massachusetts. Table A5 details transfer station requirements, including monthly metal disposal, weekly demolition waste, monthly wood waste, and quarterly e-waste collection, all using roll-off containers at Building 1855.

View the file

Other files for this federal contract opportunity

Other files attached to Integrated Solid Waste Services HAFB, newest first.
File Type Posted
Integrated Solid Waste Services HAFB Questions and Answers.pdf PDF
2025 ISW Bid Schedule.xlsx XLSX spreadsheet
Combo FA283525Q1546.pdf PDF
Hanscom ISW PWS 2025_Redacted.pdf PDF
2025 APPENDIX B ISW.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A

TABLE A1- Estimated Workload Data

Hanscom AFB (to include Fam Camp and Patriot Golf Course, GSUs)

ITEM # NAME QUANTITY UOM (2 Years Data)

1 Municipal Solid Waste 2500 Tons 2 Recyclable- Single Stream 430 Tons 3 Recyclable- E Waste 40 Tons 4 Recyclable – Wood 75 Tons 5 Recyclable- Metal 75 Tons 6 Special Event/Unscheduled

Container Placements 20 Each

7 Construction and Demolition (C&D) Container Placements

50 Each

8 Construction and Demolition (C&D) Debris

550 Tons

9 Bulk Container Relocations 60 Each

TABLE A2- TASKS & ESTIMATED FREQUENCIES- MSW/SINGLE STREAM

BUILDING LOCATION MSW

COUNT/SIZE

RECYCLING

COUNT/SIZE

FREQUENCY

1101 Parking lot E of bldg. 1- 2 yd. 1- 6 yd. 1x/week 1102 Parking lot S of bldg. 1- 8 yd. 1- 8 yd. 1x/week

DCMA

Parking lot N of bldg. 1- 8 yd. 1-8 yd. 1x/week

1106 Parking lot SE corner 1- 8 yd. 1- 8 yd. 5x/week 1110 W side of building 1- 8 yd. 1- 6 yd. 1x/week 1121 N side of building 1- 8 yd. 1- 2 yd. 1x/week 1201 SW side of building 1- 8 yd. 1- 2 yd. 1x/week 1212 Parking lot E of bldg. 1- 8 yd. 1- 8 yd. 1x/week 1217 Parking lot S of bldg. 1- 8 yd. 1- 8 yd. 2x/week 1240 North side of bldg. 1- 8 yd. 1-8 yd. 2x/week 1305 E side of building 1- 8 yd. 1- 8 yd. 5x/week 1315 (Scout house)

Edge of parking lot S of building

1- 3 yd. n/a As needed

1412 N side of bldg. 1- 8 yd. 1- 6 yd. 3x/week 1423 SE corner of building 1- 8 yd. 1-6 yd. 2x/week 1425 Behind bldg. N side 1- 8 yd. 1-8 yd. 1x/week 1426 Parking lot W corner of building 1- 8 yd. 1- 2 yd. 1x/week

1435 W of bldg. 1- 8 yd. 1- 6 yd. 2x/week 1436 Across street, NW corner of building 1- 8 yd. 1- 6 yd. 2x/week

1444 E side of building 1- 8 yd. 1- 6 yd. 1x/week 1503 Pad east of building 1- 8 yd. 1- 8 yd. 2x/week 1505 Loading bay area; S side of building facing Randolph Rd

1- 8 yd. 1-8 yd. 1x/week

1511 Across street, edge of parking lot

1- 8 yd. 1- 6 yd. 3x/week

AAFES

Behind bldg. W side 1- 8 yd. 1- 6 yd. 3x/week

1520 Behind bldg. S side 1- 8 yd. 1- 2 yd. 3x/week 1530 Edge of parking lot S of bldg.

1- 8 yd. 1- 8 yd. 3x/week

1534E

AAFES

Edge of parking lot, SE of bldg.

1- 8 yd. 1 – 8 yd. 2x/week

1534W Edge of parking lot, SW of bldg.

1- 8 yd. n/a 2x/week

1548 Near ball field 1- 8 yd. 1 – 6 yd. ( backside of building)

2x/week

1549 Edge of parking lot, N side

1- 8 yd. 1- 6 yd. 1x/week

1600 Pad, NW of bldg. 1- 8 yd. 1 – 2 yd. 2x/week 1603 Pad, W side of bldg. 1- 8 yd. 1 – 2 yd. 1x/week 1604 Pad, E of bldg. 1- 8 yd. 1 – 8 yd. 2x/week 1606 Pad, N of bldg. 2- 8 yd. 1 - 8 yd. 3x/week 1607 Edge of pavement, W of bldg.

1- 8 yd. 1 – 8 yd. 2x/week

1608 Edge of parking lot, SW of bldg.

1- 8 yd. 1- 6 yd. 2x/week

1612 Edge of street, S of bldg.

1- 8 yd. 1- 8 yd. 3x/week

1614E East end of bldg; N side

1- 8 yd. 2 – 8 yd.

(middle of bldg, north side)

5x/week

1614W West end of bldg.; N side

1- 8 yd. n/a 5x/week

1624 Edge of street, S of bldg.

1- 8 yd. 1- 8 yd. 3x/week

1630 Edge of parking lot; W of bldg.

1- 8 yd. 1- 8 yd. 3x/week

AAFES

Behind bldg., N side 1- 8 yd. 1- 8 yd. 1x/week

1642 Edge of parking lot, E side

1- 8 yd. 1- 8 yd. 1x/week

1646 Edge of parking lot, N side

1- 8 yd. 1- 8 yd. 1x/week

1700 Edge of parking lot, S side

1- 6yd 1- 6 yd. 1x/week

1707 Edge of parking lot, W of bldg.

1- 3 yd. 1- 6 yd. 2x/week

1709N

AAFES

Edge of parking lot, N side

1- 8 yd. 2x/week

1709W

DECA

Edge of parking lot, W side

1- 8 yd. 2x/week

1709N

DECA

Next to bldg., NW side 1- 8 yd. 2x/week

1712 Behind bldg. SE corner 1- 3 yd. 1- 6 yd. 1x/week 1721 Edge of parking lot, SW of bldg.

1- 8 yd. 1- 6 yd. 2x/week

1722 Edge of parking lot, SE of bldg.

1- 8 yd. 1- 6 yd. 2x/week

1723 East of bldg. 1- 8 yd. 1- 2 yd. 2x/week 1726 NE corner of bldg. 1- 8 yd. 1- 8 yd. 1x/week

1810 Parking lot E of bldg. 1- 8 yd. 1 – 8 yd. 2x/week 1811 East end of bldg. 1- 8 yd. n/a 1x/week 1813 Across street, S of bldg.

1- 8 yd. 1- 8 yd. 1x/week

1825 Edge of parking lot, W of bldg.

1- 8 yd. 1- 6 yd. 2x/week

1833 Edge of parking lot 1- 8 yd. 1-8 yd. 1x/week 1900 Edge of pavement, SW of bldg.

1- 8 yd. 1- 8 yd. 5x/week

1993 Edge of parking lot, SE corner

1- 8 yd. 1- 8 yd. 2x/week

1994 Pad, W of bldg. 1- 8 yd. 1- 8 yd. 2x/week 1999 Across parking lot, W of bldg.

1- 8 yd. 1- 8 yd. 2x/week

Fam Camp North of Camp Pads 2- 8 yd. n/a 1x/week (Oct- Apr)- FRIDAYS 2x/week (May- Sept) MON/FRI

Fam Camp North of bldg. 1004 1- 8 yd. 1- 8 yd. 1x/week (Oct- Apr)- FRIDAYS 2x/week (May- Sept) MON/FRI

Patriot Golf Course

Far edge of parking lot by driving range

1- 8 yd. 1- 8 yd. 1x/week (April- Nov)

Patriot Golf Course

Patriot Golf Course 1-30 yd. n/a 1x/week (April- Nov)

Lincoln School

Lincoln School ( Bldg.

1996 and 1997) n/a 2- 8 yd. 1x/week

TABLE A3 - TASKS & ESTIMATED FREQUENCIES – Compactors

BUILDING LOCATION SIZE

(CY)

COUNT TYPE FREQUENCY COMMENTS

South Lab-

MIT

East of bldg. 42 1 Dry

MSW

5x/week Breakaway dumpster

1700 Edge of parking lot; S side

17 1 Dry

MSW

2x/week/ As needed

Self-contained compactor

1709S Edge of parking lot, N Side

35 1 MSW 2x/week Self-contained compactor

1812 W side of bldg.

15 1 Sawdust Once per qtr. Breakaway dumpster, carpenter shop

1855 N side of bldg.

42 1 Single Stream recycling

1x/week Breakaway dumpster

TABLE A4 - TASKS & ESTIMATED FREQUENCIES – Geographically Separated Units

(GSU)

LOCATION SIZE (CY) COUNT TYPE FREQUENCY COMMENTS

Fourth Cliff 8 1 MSW 1x/week (Oct-

Apr)-

FRIDAYS

2x/week (May-Sept)

MON/FRI

Humarock, MA

Fourth Cliff 6 1 MSW 1x/week (Oct- Apr)-

FRIDAYS

2x/week (May-Sept)

MON/FRI

Humarock, MA

Fourth Cliff .45 28 MSW 1x/week (Oct- Apr)-

FRIDAYS

2x/week (May-Sept)

MON/FRI

Humarock, MA

Sagamore Hill

3 1 Each MSW/ Recycling

As needed Hamilton, MA

Fourth Cliff 6 1 Single Stream Recycling

1x/week Humarock, MA

Sagamore Hill

3 1 Single Stream Recycling

1x/week Hamilton, MA

TABLE A5 - TASKS & ESTIMATED FREQUENCIES – Transfer Station

BUILDING SIZE (CY) COUNT TYPE FREQUENCY COMMENTS

1855 30 1 Metal 1x/month Roll off 1855 30 1 Demolition 1x/week Roll off 1855 30 1 Wood 1x/month Roll off 1855 50 1 E Waste 1x/quarter Roll off

APPENDIX A

File details come from the government source that posted it. Updated .