2025-2 Subtrades - Shift-Differential.pdf

PDF 2 MB Posted

Attached to
Advertisement for Request for Qualification - Best Value JOC -Healthcare General Building
Solicitation number
ANE223-ANE2C-6162
Issued by
San Bernardino County, California

About this file

This file is a General Prevailing Wage Determination issued by the California Director of Industrial Relations under Labor Code sections 1770, 1773, and 1773.1 for commercial building, highway, heavy construction, and dredging projects across multiple California counties including Alameda, Alpine, Amador, and Butte. The determination establishes prevailing wage rates for numerous construction trade classifications organized by craft and work shift (second shift, third shift, or special shift designations). The determinations are effective from August 22, 2025, with expiration dates ranging from November 30, 2025, through June 30, 2026, depending on the specific craft classification and county. The document provides comprehensive wage tables specifying basic hourly rates, health and welfare contributions, pension contributions, vacation and holiday pay, training allocations, and overtime multipliers for straight-time, daily overtime, Saturday overtime, and Sunday/holiday overtime work.

The wage rates vary by craft classification and shift differential, with examples including bricklayers earning between $63.97 and $74.29 per hour basic rate, electricians earning between $42.93 and $114.87 per hour depending on specialty, and sheet metal workers earning between $45.02 and $90.97 per hour. Total hourly rates including all fringe benefits and premiums range substantially higher. The determination specifies detailed overtime provisions, including rates for the first two to four daily overtime hours versus double-time rates for additional hours, weekend work premiums, and holiday pay calculations. Additional provisions include premium pay for specialized work such as wallcovering, lead abatement, fall restraint work at various heights, metalizing and thermal spray operations, suspended platform work, and underground work. The determination requires contractors to provide travel and subsistence payments to workers as mandated by Labor Code sections 1773.1 and 1773.9, with specific provisions and amounts obtainable through the Director's office or website.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS

PURSUANT TO CALIFORNIA LABOR CODE PART 7,

CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: ALAMEDA COUNTY

DETERMINATION: ALA-2025-2

CRAFT CLASSIFICATION CRAFT

FOOTNOTE

ISSUE

DATE

EXPIRATION

DATE

BASIC

HOURLY

RATE

BASIC

HOURLY

RATE

FOOTNOTE

HEALTH

AND

WELFARE

HEALTH

AND

WELFARE

FOOTNOTE

PENSION PENSION

FOOTNOTE

VACATION/

HOLIDAY

VACATION/

HOLIDAY

FOOTNOTE

TRAINING TRAINING

FOOTNOTE

OTHER

PAYMENTS

OTHER

PAYMENTS

FOOTNOTE

HOURS HOURS

FOOTNOTE

STRAIGHT-

TIME

TOTAL

HOURLY

RATE

DAILY

OVERTIME

HOURLY

RATE

DAILY

OVERTIME

HOURLY

RATE

FOOTNOTE

SATURDAY

OVERTIME

HOURLY

RATE

SATURDAY

OVERTIME

HOURLY

RATE

FOOTNOTE

SUNDAY

AND

HOLIDAY

OVERTIME

HOURLY

RATE

SUNDAY

AND

HOLIDAY

OVERTIME

HOURLY

RATE

FOOTNOTE

#BRICKLAYER,

BLOCKLAYER,

POINTER, CLEANER,

CAULKER,

WATERPROOFER

(2ND SHIFT)

08/22/2025 06/30/2026* $71.200 A $13.100 $15.120 $0.000 B $1.720 $0.430 8.0 C $101.570 $137.170 D $137.170 E $172.770

#BRICKLAYER,

BLOCKLAYER,

POINTER, CLEANER,

CAULKER,

WATERPROOFER

(3RD SHIFT)

08/22/2025 06/30/2026* $74.290 A $13.100 $15.120 $0.000 B $1.720 $0.430 8.0 C $104.660 $141.810 D $141.810 E $178.950

#BRICKLAYER,

BLOCKLAYER:

BRICKLAYER,

BLOCKLAYER,

STONEMASON (2ND

SHIFT)

08/22/2025 04/30/2026** $61.400 A $13.100 $12.770 $3.250 F $0.800 $2.260 G 8.0 C $93.580 $125.910 H $125.910 H $158.230

#BRICKLAYER,

BLOCKLAYER:

BRICKLAYER,

BLOCKLAYER,

STONEMASON (3RD

SHIFT)

08/22/2025 04/30/2026** $64.340 A $13.100 $12.770 $3.250 F $0.800 $2.260 G 8.0 C $96.520 $130.320 H $130.320 H $164.110

#BRICK

TENDER

BRICK TENDER

(SPECIAL SINGLE

SHIFT)

08/22/2025 06/30/2026** $47.090 I $11.100 $14.770 $0.000 B $0.450 $0.550 8.0 $73.960 $97.510 J $97.510 J $121.050

#CARPET,

LINOLEUM,

SOFT FLOOR LAYER

(SPECIAL SHIFT) 08/22/2025 12/31/2025** $73.150 A $11.750 $21.380 $0.000 K $1.100 $0.460 8.0 $107.840 $180.990 $180.990 $180.990

#ELECTRICIAN:

COMM & SYSTEM

INSTALLER,

SECOND SHIFT

02/22/2025 11/30/2025** $66.490 L $15.650 $10.000 M $0.000 $1.000 $0.260 N 8.0 $95.720 $130.130 O $130.130 O $164.540 P

#ELECTRICIAN:

COMM & SYSTEM

INSTALLER, THIRD

SHIFT

02/22/2025 11/30/2025** $74.480 L $15.650 $10.000 M $0.000 $1.000 $0.260 N 8.0 $103.990 $142.530 O $142.530 O $181.080 P

#ELECTRICIAN:

COMM & SYSTEM

TECH., SECOND

SHIFT

02/22/2025 11/30/2025** $76.460 L $15.650 $10.000 M $0.000 $1.000 $0.260 N 8.0 $106.040 $145.610 O $145.610 O $185.180 P

#ELECTRICIAN: COMM & SYSTEM

TECH., THIRD SHIFT 02/22/2025 11/30/2025** $85.650 L $15.650 $10.000 M $0.000 $1.000 $0.260 N 8.0 $115.560 $159.890 O $159.890 O $204.210 P

#ELECTRICIAN: INSIDE WIREMAN,

2ND SHIFT 08/22/2025 05/31/2026** $89.170 $21.820 $25.570 Q $0.000 B $2.620 $1.630 R 7.5 S $143.490 $189.870 $236.270 T $236.270 P

#ELECTRICIAN: INSIDE WIREMAN,

3RD SHIFT 08/22/2025 05/31/2026** $99.890 $23.380 $27.390 Q $0.000 B $2.840 $1.790 R 7.0 U $158.290 $210.260 $262.220 T $262.220 P

#ELECTRICIAN: CABLE SPLICER-

WELDER, 2ND SHIFT 08/22/2025 05/31/2026** $102.550 $21.820 $25.570 Q $0.000 B $2.620 $1.770 R 7.5 S $157.410 $210.760 $264.110 T $264.110 P

#ELECTRICIAN: CABLE SPLICER-

WELDER, 3RD SHIFT 08/22/2025 05/31/2026** $114.870 $23.380 $27.390 Q $0.000 B $2.840 $1.950 R 7.0 U $173.880 $233.640 $293.400 T $293.400 P

#FIELD

SURVEYOR:

CHIEF OF PARTY

(NIGHT SHIFT) V 02/22/2025 02/28/2026** $69.810 $13.380 $14.510 W $5.100 X $1.260 $0.280 8.0 $104.340 $139.250 Y $139.250 Y $174.150

#FIELD

SURVEYOR:

CHAINMAN/RODMAN

(NIGHT SHIFT) V 02/22/2025 02/28/2026** $59.150 $13.380 $14.510 W $5.100 X $1.260 $0.280 8.0 $93.680 $123.260 Y $123.260 Y $152.830

#GLAZIER GLAZIER (SPECIAL

SHIFT) Z 08/22/2025 12/31/2025** $65.630 A $11.750 $21.590 AA $0.000 $1.100 $0.550 AB 7.5 S $100.620 $166.250 $166.250 $166.250

#MARBLE

FINISHER

MARBLE FINISHER

(2ND SHIFT) AC 08/22/2025 07/31/2026** $48.140 AD $13.100 $6.780 $0.000 K $0.450 $0.970 8.0 $69.440 $93.510 AE $117.580 $117.580

#MARBLE

MASON

MARBLE MASON

(2ND SHIFT) AC 08/22/2025 07/31/2026** $70.010 AD $13.100 $16.220 $0.000 K $0.800 $1.330 8.0 $101.460 $136.470 AE $171.470 $171.470

#PAINTER PAINTER (SPECIAL

SHIFT) AF 08/22/2025 12/31/2025** $64.010 I $11.750 $15.220 W $0.000 K $1.070 $0.550 8.0 C $92.600 $124.610 AG $124.610 AG $156.610

#PAINTER

INDUSTRIAL

PAINTER (SPECIAL

SHIFT)

AH 08/22/2025 12/31/2025** $67.010 I $11.750 $15.220 W $0.000 K $1.070 $0.550 8.0 C $95.600 $129.110 AG $129.110 AG $162.610

#PAINTER BRIDGE PAINTER

(SPECIAL SHIFT) AI 08/22/2025 12/31/2025** $69.410 I $11.750 $15.220 W $0.000 K $1.070 $0.550 8.0 C $98.000 $132.710 AG $132.710 AG $167.410

#PAINTER: TAPER (SPECIAL

SHIFT) 08/22/2025 12/31/2025** $80.890 AJ $11.750 $21.240 $0.000 K $1.050 $0.780 8.0 $115.710 $156.160 AK $156.160 AK $196.600 AL

#PLASTERER PLASTERER: 2ND

SHIFT 08/22/2025 06/30/2026** $55.170 AM $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AN $94.090 $117.780 AO $117.780 AP $141.470

#PLASTERER PLASTERER: 3RD

SHIFT 08/22/2025 06/30/2026** $56.170 AM $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AN $95.090 $118.780 AO $118.780 AP $142.470

#PLUMBER:

SPRINKLER FITTER

(FIRE PROTECTION

AND FIRE CONTROL

SYSTEMS), 2ND

SHIFT

08/22/2025 08/02/2026** $94.810 A $13.850 $24.400 $0.000 B $1.850 $0.400 8.0 $135.310 $182.720 H $182.720 H $230.120

#PLUMBER:

SPRINKLER FITTER

(FIRE PROTECTION

AND FIRE CONTROL

SYSTEMS), 3RD

SHIFT

08/22/2025 08/02/2026** $94.810 A $13.850 $24.400 $0.000 B $1.850 $0.400 8.0 $135.310 $182.720 H $182.720 H $230.120

#SHEET METAL

WORKER

SHEET METAL

WORKER (SPECIAL

SHIFT)

08/22/2025 06/28/2026* $90.970 I $18.270 AQ $34.920 AR $0.000 B $1.740 $1.110 8.0 $147.010 $197.250 AS $197.250 AS $247.480

#SHEET METAL

WORKER

SHEET METAL

WORKER (2ND

SHIFT)

08/22/2025 06/28/2026* $87.010 I $18.270 AQ $34.920 AR $0.000 B $1.740 $1.110 7.5 AT $143.050 $191.310 AS $191.310 AS $239.560

#SHEET METAL

WORKER

SHEET METAL

WORKER (3RD

SHIFT)

08/22/2025 06/28/2026* $90.970 I $18.270 AQ $34.920 AR $0.000 B $1.740 $1.110 7.0 AU $147.010 $197.250 AS $197.250 AS $247.480

#SHEET METAL

WORKER

TOTAL SHEET

METAL CONTRACT

OF $200,000 OR

LESS (SPECIAL

SHIFT)

08/22/2025 06/28/2026* $78.050 I $18.070 AQ $32.870 AR $0.000 B $1.740 $1.110 8.0 $131.840 $174.870 AS $174.870 AS $217.890

#SHEET METAL

WORKER

TOTAL SHEET

METAL CONTRACT

OF $200,000 OR

LESS (2ND SHIFT)

08/22/2025 06/28/2026* $74.660 I $18.070 AQ $32.870 AR $0.000 B $1.740 $1.110 7.5 AT $128.450 $169.790 AS $169.790 AS $211.110

#SHEET METAL

WORKER

TOTAL SHEET

METAL CONTRACT

OF $200,000 OR

LESS (3RD SHIFT)

08/22/2025 06/28/2026* $78.050 I $18.070 AQ $32.870 AR $0.000 B $1.740 $1.110 7.0 AU $131.840 $174.870 AS $174.870 AS $217.890

#SHEET METAL

WORKER

SERVICE MECHANIC

(TOTAL SHEET

METAL CONTRACT

OF $200,000 OR

LESS) (SPECIAL

SHIFT)

08/22/2025 06/28/2026* $60.950 I $17.070 AQ $17.840 AR $0.000 B $1.510 $1.110 8.0 $98.480 $130.390 AV $130.390 AV $162.280

#SHEET METAL

WORKER

SERVICE MECHANIC

(TOTAL SHEET

METAL CONTRACT

OF $200,000 OR

LESS) (2ND SHIFT)

08/22/2025 06/28/2026* $58.300 I $17.070 AQ $17.840 AR $0.000 B $1.510 $1.110 7.5 AT $95.830 $126.410 AV $126.410 AV $156.980

#SHEET METAL

WORKER

SERVICE MECHANIC

(TOTAL SHEET

METAL CONTRACT

OF $200,000 OR

LESS) (3RD SHIFT)

08/22/2025 06/28/2026* $60.950 I $17.070 AQ $17.840 AR $0.000 B $1.510 $1.110 7.0 AU $98.480 $130.390 AV $130.390 AV $162.280

#SHEET METAL

WORKER

SERVICE

TECHNICIAN (TOTAL

SHEET METAL

CONTRACT OF

$200,000 OR LESS)

(SPECIAL SHIFT)

08/22/2025 06/28/2026* $55.580 I $17.070 AQ $11.690 AR $0.000 B $1.510 $1.110 8.0 $86.960 $115.740 AV $115.740 AV $144.490

#SHEET METAL

WORKER

SERVICE

TECHNICIAN (TOTAL

SHEET METAL

CONTRACT OF

$200,000 OR LESS)

(2ND SHIFT)

08/22/2025 06/28/2026* $53.160 I $17.070 AQ $11.690 AR $0.000 B $1.510 $1.110 7.5 AT $84.540 $112.110 AV $112.110 AV $139.650

#SHEET METAL

WORKER

SERVICE

TECHNICIAN (TOTAL

SHEET METAL

CONTRACT OF

$200,000 OR LESS)

(3RD SHIFT)

08/22/2025 06/28/2026* $55.580 I $17.070 AQ $11.690 AR $0.000 B $1.510 $1.110 7.0 AU $86.960 $115.740 AV $115.740 AV $144.490

#SHEET METAL

WORKER

AIR CONDITIONING

SPECIALIST (TOTAL

SHEET METAL

CONTRACT OF

$200,000 OR LESS)

(SPECIAL SHIFT)

08/22/2025 06/28/2026* $47.920 I $17.070 AQ $5.770 AR $0.000 B $1.490 $1.110 8.0 $73.360 $98.160 AS $98.160 AS $122.930

#SHEET METAL

WORKER

AIR CONDITIONING

SPECIALIST (TOTAL

SHEET METAL

CONTRACT OF

$200,000 OR LESS)

(2ND SHIFT)

08/22/2025 06/28/2026* $45.840 I $17.070 AQ $5.770 AR $0.000 B $1.490 $1.110 7.5 AT $71.280 $95.040 AS $95.040 AS $118.770

#SHEET METAL

WORKER

AIR CONDITIONING

SPECIALIST (TOTAL

SHEET METAL

CONTRACT OF

$200,000 OR LESS)

(3RD SHIFT)

08/22/2025 06/28/2026* $47.920 I $17.070 AQ $5.770 AR $0.000 B $1.490 $1.110 7.0 AU $73.360 $98.160 AS $98.160 AS $122.930

#SHEET METAL

WORKER

AIR CONDITIONING

PRO (TOTAL SHEET

METAL CONTRACT

OF $200,000 OR

LESS) (SPECIAL

SHIFT)

08/22/2025 06/28/2026* $56.780 I $17.070 AQ $12.170 AR $0.000 B $1.490 $1.110 8.0 $88.620 $117.970 AS $117.970 AS $147.290

#SHEET METAL

WORKER

AIR CONDITIONING

PRO (TOTAL SHEET

METAL CONTRACT

OF $200,000 OR

LESS) (2ND SHIFT)

08/22/2025 06/28/2026* $54.310 I $17.070 AQ $12.170 AR $0.000 B $1.490 $1.110 7.5 AT $86.150 $114.260 AS $114.260 AS $142.350

#SHEET METAL

WORKER

AIR CONDITIONING

PRO (TOTAL SHEET

METAL CONTRACT

OF $200,000 OR

LESS) (3RD SHIFT)

08/22/2025 06/28/2026* $56.780 I $17.070 AQ $12.170 AR $0.000 B $1.490 $1.110 7.0 AU $88.620 $117.970 AS $117.970 AS $147.290

#TERRAZZO

FINISHER

TERRAZZO

FINISHER, 2ND

SHIFT

AW 08/22/2025 06/30/2026** $51.600 AX $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AS $96.980 AS $120.110

#TERRAZZO

FINISHER

TERRAZZO

FINISHER, 3RD

SHIFT

AW 08/22/2025 06/30/2026** $51.600 AX $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AS $96.980 AS $120.110

#TERRAZZO

WORKER

TERRAZZO

WORKER, 2ND

SHIFT

AW 08/22/2025 06/30/2026** $70.810 AX $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AS $133.620 AS $165.440

#TERRAZZO

WORKER

TERRAZZO

WORKER, 3RD

SHIFT

AW 08/22/2025 06/30/2026** $70.810 AX $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AS $133.620 AS $165.440

#TILE

FINISHER

TILE FINISHER, 2ND

SHIFT 08/22/2025 03/31/2026* $42.780 AY $12.400 $6.270 $1.250 $0.530 $1.600 8.0 C $64.830 $83.720 $83.720 E $102.610

#TILE

FINISHER

TILE FINISHER - RED

CIRCLED FINISHER,

2ND SHIFT

08/22/2025 03/31/2026* $48.050 AY $12.400 $7.170 $1.750 $0.530 $1.660 8.0 C $71.560 $93.090 $93.090 E $114.610

#TILE SETTER TILE SETTER, 2ND

SHIFT 08/22/2025 03/31/2026** $64.950 AY $12.400 $9.270 $3.000 $0.800 $2.170 8.0 C $92.590 $122.070 $122.070 E $151.540

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

X

Y

Z

AA

AB

AC

AD

AE

AF

AG

AH

AI

AJ

AK

AL

AM

AN

AO

AP

AQ

Go to increase page

FOOTNOTES

EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT

DETERMINATION IS ISSUED.

THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR

SPECIFIC RATES AT (415) 703-4774.

INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.

THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.

INCLUDED IN STRAIGHT-TIME HOURLY RATE.

SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.

RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.

VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER

INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY

COUNCIL.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.

RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE

NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.

INCLUDED IN BASIC HOURLY RATE.

INCLUDES AN AMOUNT EQUAL TO 6% OF THE HOURLY RATE FOR VACATION/WORKING DUES WHICH IS FACTORED INTO OVERTIME RATES.

IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.

IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT OVERTIME HOURLY RATE.

DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.

IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

INCLUDES AN AMOUNT (1.05% OF THE BASIC HOURLY RATE) FOR THE CONTRACT ADMINISTRATION FUND, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.

8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE

DISREGARD THIS RATE. USE THE SATURDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.

8 HOURS PAY FOR 7 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE.

ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.

INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.

INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.

RATE APPLIES TO DAILY OVERTIME HOURS UP TO AND INCLUDING 12 HOURS WORKED, SUNDAY NIGHT THROUGH THURSDAY NIGHT, OR OTHER OVERTIME HOURS BEYOND 40 HOURS IN A WORKWEEK. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY SHIFT DIFFERENTIAL RATE. IN THE EVENT THAT THERE ARE LESS THAN 40 HOURS WORKED SUNDAY THROUGH THURSDAY, THEN THE BALANCE OF HOURS WORKED UP TO AND INCLUDING 40 HOURS FOR THE WORKWEEK, OR UP TO 8 HOURS FOR THE WORKDAY, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME SHIFT DIFFERENTIAL

RATE.

CERTIFIED MANIPULATOR WORK SHALL RECEIVE $2.00 PER HOUR ABOVE THE BASIC WAGE RATE

INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.

INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE

EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.

INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.

RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF

RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE

NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.

INCLUDES AMOUNTS WITHHELD FOR DUES CHECK OFF, VACATION, AND SHIFT PREMIUM WHICH ARE NOT FACTORED INTO OVERTIME. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.

8 HOURS PAY FOR 7 HOURS WORKED AT STRAIGHT-TIME BASIC HOURLY RATE.

RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER

INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND file:///OPRL/2025-2/PWD/Increases/Subtrades/Shift/Shift-ALA-Pre.html

AR

AS

AT

AU

AV

AW

AX

AY

OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES. INCLUDES AN AMOUNT FOR HEALTH & WELFARE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.

INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7.5 HOURS WORKED

8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7 HOURS WORKED

RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.

THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).

INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.

INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES AN AMOUNT OF PREMIUM RATE PER HOUR ABOVE THE REGULAR STRAIGHT-TIME RATE, WHICH IS NOT FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND

SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF

THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page file:///OPRL/2025-2/PWD/Determinations/Subtrades/Shift/shiftlist.html

PURSUANT TO CALIFORNIA LABOR CODE PART

7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING

PROJECTS

LOCALITY: ALPINE COUNTY

DETERMINATION: ALP-2025-2

CRAFT CLASSIFICATION CRAFT

FOOTNOTE

ISSUE

DATE

EXPIRATION

DATE

BASIC

HOURLY

RATE

BASIC

HOURLY

RATE

FOOTNOTE

HEALTH

AND

WELFARE

HEALTH

AND

WELFARE

FOOTNOTE

PENSION PENSION

FOOTNOTE

VACATION/

HOLIDAY

VACATION/

HOLIDAY

FOOTNOTE

TRAINING TRAINING

FOOTNOTE

OTHER

PAYMENTS

OTHER

PAYMENTS

FOOTNOTE

HOURS HOURS

FOOTNOTE

STRAIGHT-

TIME

TOTAL

HOURLY

RATE

DAILY

OVERTIME

HOURLY

RATE

DAILY

OVERTIME

HOURLY

RATE

FOOTNOTE

SATURDAY

OVERTIME

HOURLY

RATE

SATURDAY

OVERTIME

HOURLY

RATE

FOOTNOTE

SUNDAY

AND

HOLIDAY

OVERTIME

HOURLY

RATE

SUNDAY

AND

HOLIDAY

OVERTIME

HOURLY

RATE

FOOTNOTE

#BRICKLAYER,

BLOCKLAYER,

POINTER,

CLEANER,

CAULKER,

WATERPROOFER

(2ND SHIFT)

08/22/2025 06/30/2026* $63.970 A $13.100 $13.370 $0.000 B $1.640 $0.430 8.0 C $92.510 $124.500 D $124.500 E $156.480

#BRICKLAYER,

BLOCKLAYER,

POINTER,

CLEANER,

CAULKER,

WATERPROOFER

(3RD SHIFT)

08/22/2025 06/30/2026* $66.760 A $13.100 $13.370 $0.000 B $1.640 $0.430 8.0 C $95.300 $128.680 D $128.680 E $162.060

#BRICKLAYER,

BLOCKLAYER:

BRICKLAYER,

BLOCKLAYER,

STONEMASON

(2ND SHIFT)

08/22/2025 04/30/2026** $57.230 A $13.100 $11.620 $2.750 F $0.800 $2.200 G 8.0 C $87.700 $117.690 H $117.690 H $147.680

#BRICKLAYER,

BLOCKLAYER:

BRICKLAYER,

BLOCKLAYER,

STONEMASON

(3RD SHIFT)

08/22/2025 04/30/2026** $59.960 A $13.100 $11.620 $2.750 F $0.800 $2.200 G 8.0 C $90.430 $121.790 H $121.790 H $153.140

#BRICK

TENDER

BRICK TENDER

(SPECIAL SINGLE

SHIFT)

08/22/2025 06/30/2026** $45.500 I $11.100 $14.350 $0.000 B $0.450 $0.550 8.0 $71.950 $94.700 J $94.700 J $117.450

#CARPET,

LINOLEUM,

RESILIENT TILE

LAYER (2ND

SHIFT)

08/22/2025 12/31/2025** $61.910 A $11.750 $15.310 $0.000 K $0.880 $0.340 8.0 $90.190 $152.100 $152.100 $152.100 L

#ELECTRICIAN:

COMM & SYSTEM

INSTALLER,

SECOND SHIFT

02/22/2024 02/28/2025* $42.930 $15.000 $6.850 M $0.000 $1.000 $1.110 N 8.0 $68.390 $90.600 O $90.600 O $112.820 P

#ELECTRICIAN:

COMM & SYSTEM

INSTALLER,

THIRD SHIFT

02/22/2024 02/28/2025* $48.090 $15.000 $6.850 M $0.000 $1.000 $1.110 N 8.0 $73.730 $98.620 O $98.620 O $123.510 P

#ELECTRICIAN:

COMM & SYSTEM

TECH., SECOND

SHIFT

02/22/2024 02/28/2025* $49.370 $15.000 $6.850 M $0.000 $1.000 $1.110 N 8.0 $75.060 $100.610 O $100.610 O $126.160 P

#ELECTRICIAN:

COMM & SYSTEM

TECH., THIRD

SHIFT

02/22/2024 02/28/2025* $55.310 $15.000 $6.850 M $0.000 $1.000 $1.110 N 8.0 $81.210 $109.830 O $109.830 O $138.460 P

#ELECTRICIAN:

INSIDE

WIREMAN, 2ND

SHIFT

08/22/2025 01/31/2026** $61.820 $14.060 $13.250 M $0.000 B $1.890 $7.900 Q 8.0 $101.760 $134.100 R $134.100 R $166.430 P

#ELECTRICIAN:

INSIDE

WIREMAN, 3RD

SHIFT

08/22/2025 01/31/2026** $69.250 $14.060 $13.250 M $0.000 B $1.890 $7.900 Q 8.0 $109.540 $145.760 R $145.760 R $181.980 P

#ELECTRICIAN: CABLE SPLICER,

2ND SHIFT 08/22/2025 01/31/2026** $68.000 $14.060 $13.250 M $0.000 B $1.890 $7.900 Q 8.0 $108.230 $143.800 R $143.800 R $179.360 P

#ELECTRICIAN: CABLE SPLICER,

3RD SHIFT 08/22/2025 01/31/2026** $76.170 $14.060 $13.250 M $0.000 B $1.890 $7.900 Q 8.0 $116.770 $156.600 R $156.600 R $196.430 P

#GLAZIER GLAZIER

(SPECIAL SHIFT) S 08/22/2025 12/31/2025** $51.360 A $11.750 $23.170 T $0.000 $1.140 $0.550 U 7.5 V $87.970 $139.330 $139.330 $139.330

#MARBLE

FINISHER

MARBLE

FINISHER (2ND

SHIFT)

W 08/22/2025 07/31/2026** $48.140 X $13.100 $6.780 $0.000 K $0.450 $0.970 8.0 $69.440 $93.510 Y $117.580 $117.580

#MARBLE

MASON

MARBLE MASON

(2ND SHIFT) W 08/22/2025 07/31/2026** $70.010 X $13.100 $16.220 $0.000 K $0.800 $1.330 8.0 $101.460 $136.470 Y $171.470 $171.470

#PAINTER PAINTER

(SPECIAL SHIFT) Z 08/22/2025 12/31/2025** $52.090 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 C $75.420 $101.470 AB $101.470 AB $127.510

#PAINTER

INDUSTRIAL

PAINTER

(SPECIAL SHIFT)

AC 08/22/2025 12/31/2025** $55.090 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 C $78.420 $105.970 AB $105.970 AB $133.510

#PAINTER BRIDGE PAINTER

(SPECIAL SHIFT) AD 08/22/2025 12/31/2025** $57.490 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 C $80.820 $109.570 AB $109.570 AB $138.310

#PAINTER: TAPER (SPECIAL

SHIFT) 08/22/2025 12/31/2025** $75.940 AE $11.750 $19.840 $0.000 K $1.050 $0.740 8.0 $109.320 $147.290 AF $147.290 AF $185.260 AG

#PLASTERER PLASTERER: 2ND

SHIFT 08/22/2025 06/30/2026** $53.170 AH $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AI $92.090 $114.780 AJ $114.780 AK $137.470

#PLASTERER PLASTERER: 3RD

SHIFT 08/22/2025 06/30/2026** $54.170 AH $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AI $93.090 $115.780 AJ $115.780 AK $138.470

#SHEET METAL

WORKER

SHEET METAL

WORKER (2ND

SHIFT)

08/22/2025 06/30/2026** $56.120 A $18.190 $25.480 AL $0.000 B $1.680 AM $1.000 AN 7.5 V $102.470 $133.030 AO $133.030 AO $163.590

#SHEET METAL

WORKER

SHEET METAL

WORKER (THIRD

SHIFT)

08/22/2025 06/30/2026** $58.670 A $18.190 $25.480 AL $0.000 B $1.680 AM $1.000 AN 7.0 AP $105.020 $136.860 AO $136.860 AO $168.690

#TERRAZZO

FINISHER

TERRAZZO

FINISHER, 2ND

SHIFT

AQ 08/22/2025 06/30/2026** $51.600 AR $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AO $96.980 AO $120.110

#TERRAZZO

FINISHER

TERRAZZO

FINISHER, 3RD

SHIFT

AQ 08/22/2025 06/30/2026** $51.600 AR $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AO $96.980 AO $120.110

TERRAZZO

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

X

Y

Z

AA

AB

AC

AD

AE

AF

AG

AH

AI

AJ

#TERRAZZO

WORKER WORKER, 2ND

SHIFT

AQ 08/22/2025 06/30/2026** $70.810 AR $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AO $133.620 AO $165.440

#TERRAZZO

WORKER

TERRAZZO

WORKER, 3RD

SHIFT

AQ 08/22/2025 06/30/2026** $70.810 AR $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AO $133.620 AO $165.440

#TILE

FINISHER

TILE FINISHER,

2ND SHIFT 08/22/2025 03/31/2026* $40.190 AS $12.400 $6.210 $1.000 $0.500 $1.570 8.0 C $61.870 $79.470 $79.470 E $97.060

#TILE

FINISHER

TILE FINISHER -

RED CIRCLED

FINISHER, 2ND

SHIFT

08/22/2025 03/31/2026* $44.750 AS $12.400 $7.050 $1.300 $0.500 $1.630 8.0 C $67.630 $87.510 $87.510 E $107.380

#TILE SETTER TILE SETTER,

2ND SHIFT 08/22/2025 03/31/2026** $60.700 AS $12.400 $9.020 $2.750 $0.750 $2.120 8.0 C $87.740 $115.090 $115.090 E $142.440

Go to increase page

FOOTNOTES

EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT

DETERMINATION IS ISSUED.

THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR

SPECIFIC RATES AT (415) 703-4774.

INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.

THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.

INCLUDED IN STRAIGHT-TIME HOURLY RATE.

SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.

RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.

VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER

INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY

COUNCIL.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.

RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE

NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.

INCLUDED IN BASIC HOURLY RATE.

DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.

IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.

IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT OVERTIME HOURLY RATE.

DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.

IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.

DISREGARD THIS RATE. USE THE DAILY OVERTIME NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.

CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE

INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.

INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE

8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE

EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.

INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.

RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES WORKING ON COMMERCIAL PROJECTS SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES A SWINGING AND/OR PLATFORM SUSPENSION SYSTEM. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180

FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.

RATE APPLIES TO FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY, FIRST 12 HOURS WORKED ON SATURDAYS AND ALL HOURS WORKED ON DESIGNATED DAYS OFF. ALL OTHER OVERTIME IS PAID AT SUNDAY/HOLIDAY RATE.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF

RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE

NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.

INCLUDES AMOUNTS WITHHELD FOR DUES CHECK OFF, VACATION, AND SHIFT PREMIUM WHICH ARE NOT FACTORED INTO OVERTIME. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.

8 HOURS PAY FOR 7 HOURS WORKED AT STRAIGHT-TIME BASIC HOURLY RATE.

RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

file:///OPRL/2025-2/PWD/Increases/Subtrades/Shift/Shift-ALP-Pre.html

AK

AL

AM

AN

AO

AP

AQ

AR

AS

RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER

INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

INCLUDES $0.05 FOR SCHOLAR FUND.

INCLUDES AMOUNTS FOR INDUSTRY FUND AND LABOR MANAGEMENT.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

8 HOURS PAY FOR 7 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE.

THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).

INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.

INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES AN AMOUNT OF PREMIUM RATE PER HOUR ABOVE THE REGULAR STRAIGHT-TIME RATE, WHICH IS NOT FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING

UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE

OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT

(415) 703-4774.

7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING

PROJECTS

LOCALITY: AMADOR COUNTY

DETERMINATION: AMA-2025-2

CRAFT CLASSIFICATION CRAFT

FOOTNOTE

ISSUE

DATE

EXPIRATION

DATE

BASIC

HOURLY

RATE

BASIC

HOURLY

RATE

FOOTNOTE

HEALTH

AND

WELFARE

HEALTH

AND

WELFARE

FOOTNOTE

PENSION PENSION

FOOTNOTE

VACATION/

HOLIDAY

VACATION/

HOLIDAY

FOOTNOTE

TRAINING TRAINING

FOOTNOTE

OTHER

PAYMENTS

OTHER

PAYMENTS

FOOTNOTE

HOURS HOURS

FOOTNOTE

STRAIGHT-

TIME

TOTAL

HOURLY

RATE

DAILY

OVERTIME

HOURLY

RATE

DAILY

OVERTIME

HOURLY

RATE

FOOTNOTE

SATURDAY

OVERTIME

HOURLY

RATE

SATURDAY

OVERTIME

HOURLY

RATE

FOOTNOTE

SUNDAY

AND

HOLIDAY

OVERTIME

HOURLY

RATE

SUNDAY

AND

HOLIDAY

OVERTIME

HOURLY

RATE

FOOTNOTE

#BRICKLAYER,

BLOCKLAYER,

POINTER,

CLEANER,

CAULKER,

WATERPROOFER

(2ND SHIFT)

08/22/2025 06/30/2026* $63.970 A $13.100 $13.370 $0.000 B $1.640 $0.430 8.0 C $92.510 $124.500 D $124.500 E $156.480

#BRICKLAYER,

BLOCKLAYER,

POINTER,

CLEANER,

CAULKER,

WATERPROOFER

(3RD SHIFT)

08/22/2025 06/30/2026* $66.760 A $13.100 $13.370 $0.000 B $1.640 $0.430 8.0 C $95.300 $128.680 D $128.680 E $162.060

#BRICKLAYER,

BLOCKLAYER:

BRICKLAYER,

BLOCKLAYER,

STONEMASON

(2ND SHIFT)

08/22/2025 04/30/2026** $57.230 A $13.100 $11.620 $2.750 F $0.800 $2.200 G 8.0 C $87.700 $117.690 H $117.690 H $147.680

#BRICKLAYER,

BLOCKLAYER:

BRICKLAYER,

BLOCKLAYER,

STONEMASON

(3RD SHIFT)

08/22/2025 04/30/2026** $59.960 A $13.100 $11.620 $2.750 F $0.800 $2.200 G 8.0 C $90.430 $121.790 H $121.790 H $153.140

#BRICK

TENDER

BRICK TENDER

(SPECIAL SINGLE

SHIFT)

08/22/2025 06/30/2026** $45.500 I $11.100 $14.350 $0.000 B $0.450 $0.550 8.0 $71.950 $94.700 J $94.700 J $117.450

#CARPET,

LINOLEUM,

RESILIENT TILE

LAYER (2ND

SHIFT)

08/22/2025 12/31/2025** $61.910 A $11.750 $15.310 $0.000 K $0.880 $0.340 8.0 $90.190 $152.100 $152.100 $152.100 L

#ELECTRICIAN:

COMM & SYSTEM

INSTALLER,

SECOND SHIFT

02/22/2024 02/28/2025* $42.930 $15.000 $6.850 M $0.000 $1.000 $1.110 N 8.0 $68.390 $90.600 O $90.600 O $112.820 P

#ELECTRICIAN:

COMM & SYSTEM

INSTALLER,

THIRD SHIFT

02/22/2024 02/28/2025* $48.090 $15.000 $6.850 M $0.000 $1.000 $1.110 N 8.0 $73.730 $98.620 O $98.620 O $123.510 P

#ELECTRICIAN:

COMM & SYSTEM

TECH., SECOND

SHIFT

02/22/2024 02/28/2025* $49.370 $15.000 $6.850 M $0.000 $1.000 $1.110 N 8.0 $75.060 $100.610 O $100.610 O $126.160 P

#ELECTRICIAN:

COMM & SYSTEM

TECH., THIRD

SHIFT

02/22/2024 02/28/2025* $55.310 $15.000 $6.850 M $0.000 $1.000 $1.110 N 8.0 $81.210 $109.830 O $109.830 O $138.460 P

#ELECTRICIAN:

INSIDE

WIREMAN, 2ND

SHIFT

08/22/2025 01/31/2026** $61.820 $14.060 $13.250 M $0.000 B $1.890 $7.900 Q 8.0 $101.760 $134.100 R $134.100 R $166.430 P

#ELECTRICIAN:

INSIDE

WIREMAN, 3RD

SHIFT

08/22/2025 01/31/2026** $69.250 $14.060 $13.250 M $0.000 B $1.890 $7.900 Q 8.0 $109.540 $145.760 R $145.760 R $181.980 P

#ELECTRICIAN: CABLE SPLICER,

2ND SHIFT 08/22/2025 01/31/2026** $68.000 $14.060 $13.250 M $0.000 B $1.890 $7.900 Q 8.0 $108.230 $143.800 R $143.800 R $179.360 P

#ELECTRICIAN: CABLE SPLICER,

3RD SHIFT 08/22/2025 01/31/2026** $76.170 $14.060 $13.250 M $0.000 B $1.890 $7.900 Q 8.0 $116.770 $156.600 R $156.600 R $196.430 P

#GLAZIER GLAZIER

(SPECIAL SHIFT) S 08/22/2025 12/31/2025** $51.360 A $11.750 $23.170 T $0.000 $1.140 $0.550 U 7.5 V $87.970 $139.330 $139.330 $139.330

#MARBLE

FINISHER

MARBLE

FINISHER (2ND

SHIFT)

W 08/22/2025 07/31/2026** $48.140 X $13.100 $6.780 $0.000 K $0.450 $0.970 8.0 $69.440 $93.510 Y $117.580 $117.580

#MARBLE

MASON

MARBLE MASON

(2ND SHIFT) W 08/22/2025 07/31/2026** $70.010 X $13.100 $16.220 $0.000 K $0.800 $1.330 8.0 $101.460 $136.470 Y $171.470 $171.470

#PAINTER PAINTER

(SPECIAL SHIFT) Z 08/22/2025 12/31/2025** $52.090 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 C $75.420 $101.470 AB $101.470 AB $127.510

#PAINTER

INDUSTRIAL

PAINTER

(SPECIAL SHIFT)

AC 08/22/2025 12/31/2025** $55.090 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 C $78.420 $105.970 AB $105.970 AB $133.510

#PAINTER BRIDGE PAINTER

(SPECIAL SHIFT) AD 08/22/2025 12/31/2025** $57.490 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 C $80.820 $109.570 AB $109.570 AB $138.310

#PAINTER: TAPER (SPECIAL

SHIFT) 08/22/2025 12/31/2025** $75.940 AE $11.750 $19.840 $0.000 K $1.050 $0.740 8.0 $109.320 $147.290 AF $147.290 AF $185.260 AG

#PLASTERER PLASTERER: 2ND

SHIFT 08/22/2025 06/30/2026** $53.170 AH $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AI $92.090 $114.780 AJ $114.780 AK $137.470

#PLASTERER PLASTERER: 3RD

SHIFT 08/22/2025 06/30/2026** $54.170 AH $16.040 $19.990 $0.000 B $1.450 $1.440 7.0 AI $93.090 $115.780 AJ $115.780 AK $138.470

#PLUMBER:

PLUMBER,

STEAMFITTER

(2ND AND 3RD

SHIFT)

AL 08/22/2025 06/30/2026** $77.480 A $12.900 $15.400 AM $0.000 B $1.350 $0.700 8.0 $107.830 $146.570 H $146.570 AN $185.300

#PLUMBER:

PLUMBER (FOR

TOTAL

PLUMBING JOBS

$150,000 OR

UNDER) (2ND

AND 3RD SHIFT)

AL 08/22/2025 06/30/2026* $63.920 A $10.770 $11.550 $0.000 B $1.350 $0.700 8.0 $88.290 $120.250 H $120.250 AO $152.210

#SHEET METAL

WORKER

SHEET METAL

WORKER (2ND

SHIFT)

08/22/2025 06/30/2026* $60.570 A $17.020 $28.120 AP $0.000 B $1.560 $0.870 7.5 AQ $108.140 $140.760 H $140.760 H $173.360

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

X

Y

Z

AA

AB

AC

AD

#SHEET METAL

WORKER

SHEET METAL

WORKER (3RD

SHIFT)

08/22/2025 06/30/2026* $63.320 A $17.020 $28.120 AP $0.000 B $1.560 $0.870 7.0 AR $110.890 $144.880 H $144.880 H $178.860

#SHEET METAL

WORKER

SHEET METAL

WORKER

(SPECIAL SHIFT)

08/22/2025 06/30/2026* $61.670 A $17.020 $28.120 AP $0.000 B $1.560 $0.870 8.0 $109.240 $142.410 H $142.410 H $175.560

#TERRAZZO

FINISHER

TERRAZZO

FINISHER, 2ND

SHIFT

AS 08/22/2025 06/30/2026** $51.600 AT $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AU $96.980 AU $120.110

#TERRAZZO

FINISHER

TERRAZZO

FINISHER, 3RD

SHIFT

AS 08/22/2025 06/30/2026** $51.600 AT $13.100 $7.220 $0.000 B $0.800 $1.120 8.0 $73.840 $96.980 AU $96.980 AU $120.110

#TERRAZZO

WORKER

TERRAZZO

WORKER, 2ND

SHIFT

AS 08/22/2025 06/30/2026** $70.810 AT $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AU $133.620 AU $165.440

#TERRAZZO

WORKER

TERRAZZO

WORKER, 3RD

SHIFT

AS 08/22/2025 06/30/2026** $70.810 AT $13.100 $15.720 $0.000 B $0.800 $1.370 8.0 $101.800 $133.620 AU $133.620 AU $165.440

#TILE

FINISHER

TILE FINISHER,

2ND SHIFT 08/22/2025 03/31/2026* $40.190 AV $12.400 $6.210 $1.000 $0.500 $1.570 8.0 C $61.870 $79.470 $79.470 E $97.060

#TILE

FINISHER

TILE FINISHER -

RED CIRCLED

FINISHER, 2ND

SHIFT

08/22/2025 03/31/2026* $44.750 AV $12.400 $7.050 $1.300 $0.500 $1.630 8.0 C $67.630 $87.510 $87.510 E $107.380

#TILE SETTER TILE SETTER,

2ND SHIFT 08/22/2025 03/31/2026** $60.700 AV $12.400 $9.020 $2.750 $0.750 $2.120 8.0 C $87.740 $115.090 $115.090 E $142.440

Go to increase page

FOOTNOTES

EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT

DETERMINATION IS ISSUED.

THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR

SPECIFIC RATES AT (415) 703-4774.

INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.

THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.

INCLUDED IN STRAIGHT-TIME HOURLY RATE.

SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.

RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.

VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER

INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY

COUNCIL.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.

RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE

NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.

INCLUDED IN BASIC HOURLY RATE.

DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.

IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.

IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT OVERTIME HOURLY RATE.

DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.

IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.

DISREGARD THIS RATE. USE THE DAILY OVERTIME NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.

CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE

INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.

INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE

8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE

EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.

INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.

RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES WORKING ON COMMERCIAL PROJECTS SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES A SWINGING AND/OR PLATFORM SUSPENSION SYSTEM. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180

FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.

RATE APPLIES TO FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY, FIRST 12 HOURS WORKED ON SATURDAYS AND ALL HOURS WORKED ON DESIGNATED DAYS OFF. ALL OTHER OVERTIME IS PAID AT SUNDAY/HOLIDAY RATE.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

file:///OPRL/2025-2/PWD/Increases/Subtrades/Shift/Shift-AMA-Pre.html

AE

AF

AG

AH

AI

AJ

AK

AL

AM

AN

AO

AP

AQ

AR

AS

AT

AU

AV

INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF

RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE

NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.

INCLUDES AMOUNTS WITHHELD FOR DUES CHECK OFF, VACATION, AND SHIFT PREMIUM WHICH ARE NOT FACTORED INTO OVERTIME. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.

8 HOURS PAY FOR 7 HOURS WORKED AT STRAIGHT-TIME BASIC HOURLY RATE.

RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .