2025-2 Subtrades.pdf
PDF 2 MB Posted
- Attached to
- Advertisement for Request for Qualification - Best Value JOC -Healthcare General Building
- Solicitation number
- ANE223-ANE2C-6162
- Issued by
- San Bernardino County, California
About this file
This document is a General Prevailing Wage Determination made by California's Director of Industrial Relations under Labor Code provisions for commercial building, highway, heavy construction, and dredging projects across multiple California counties. The determinations cover Alameda County (ALA-2025-2), Alpine County (ALP-2025-2), Amador County (AMA-2025-2), and Butte County (BUT-2025-2), each with an effective date of August 22, 2025, and varying expiration dates through mid-2026. The document establishes mandatory wage rates for numerous craft classifications including bricklayers, electricians, field surveyors, glaziers, marble workers, painters, plasterers, plumbers, roofers, sheet metal workers, terrazzo workers, tile workers, and water well drillers. Each county determination includes specific basic hourly rates, health and welfare benefits, pension contributions, vacation and holiday payments, training allowances, and other employer-paid amounts, along with straight-time and overtime compensation structures for daily, Saturday, and Sunday/holiday work.
Pricing terms are established through collective bargaining agreements and prevailing wage principles, with rates varying by county and craft classification. The document specifies that rates are effective until superseded by new determinations issued by the Director of Industrial Relations and that work performed after expiration dates requires updated rates to be incorporated into contracts. Apprenticeable crafts are identified with notation that current apprentice wage rates are available on the Department of Industrial Relations website. Rates include specific overtime multipliers with variations for different days and hours worked, and certain classifications include premium pay for hazardous work such as employees working at heights exceeding specified thresholds, suspended platforms, or specialized tasks like metalizing and thermal spray work. Contractors must maintain specific staffing ratios for certain trades (such as journeyman-to-tradesman ratios for pipefitters), provide travel and subsistence payments where applicable, and comply with holiday provisions detailed in applicable collective bargaining agreements or California Government Code Section 6700. The determinations note that employer payments may vary under Labor Code sections 1773.1 and 1773.8 but cannot result in total hourly rates below the established prevailing wage.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7,
CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
LOCALITY: ALAMEDA COUNTY
DETERMINATION: ALA-2025-2
CRAFT CLASSIFICATION CRAFT
FOOTNOTE
ISSUE
DATE
EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE
FOOTNOTE
HEALTH
AND
WELFARE
HEALTH
AND
WELFARE
FOOTNOTE
PENSION PENSION
FOOTNOTE
VACATION/
HOLIDAY
VACATION/
HOLIDAY
FOOTNOTE
TRAINING TRAINING
FOOTNOTE
OTHER
PAYMENTS
OTHER
PAYMENTS
FOOTNOTE
HOURS HOURS
FOOTNOTE
STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
FOOTNOTE
SATURDAY
OVERTIME
HOURLY
RATE
SATURDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
#BRICKLAYER,
BLOCKLAYER:
BRICKLAYER,
BLOCKLAYER,
STONEMASON
08/22/2025 04/30/2026** $55.520 A $13.100 $12.770 $3.250 B $0.800 $2.260 C 8.0 D $87.700 $117.090 E $117.090 E $146.470
#BRICKLAYER,
BLOCKLAYER:
POINTER, CLEANER,
CAULKER,
WATERPROOFER
08/22/2025 06/30/2026* $61.910 A $13.100 $15.120 $0.000 F $1.720 $0.430 8.0 D $92.280 $123.240 G $123.240 H $154.190
#BRICK
TENDER 08/22/2025 06/30/2026** $44.090 I $11.100 $14.770 $0.000 F $0.450 $0.550 8.0 $70.960 $93.010 J $93.010 J $115.050
#CARPET,
LINOLEUM, SOFT FLOOR LAYER 08/22/2025 12/31/2025** $60.950 A $11.750 $21.380 $0.000 K $1.100 $0.460 8.0 $95.640 $126.120 L $126.120 L $156.590
#ELECTRICIAN: COMM & SYSTEM
INSTALLER 02/22/2025 11/30/2025** $56.680 M $15.650 $10.000 N $0.000 $1.000 $0.260 O 8.0 $85.570 $114.900 P $114.900 P $144.230
#ELECTRICIAN: COMM & SYSTEM
TECH. 02/22/2025 11/30/2025** $65.180 M $15.650 $10.000 N $0.000 $1.000 $0.260 O 8.0 $94.380 $128.120 P $128.120 P $161.850
#ELECTRICIAN: INSIDE WIREMAN, 08/22/2025 05/31/2026** $76.000 $20.460 $23.970 Q $0.000 F $2.360 $1.450 R 8.0 $126.520 $166.060 S $205.600 $205.600
#ELECTRICIAN: CABLE SPLICER-
WELDER 08/22/2025 05/31/2026** $87.400 $20.460 $23.970 Q $0.000 F $2.360 $1.570 R 8.0 $138.380 $183.850 S $229.320 $229.320
#FIELD
SURVEYOR: CHIEF OF PARTY T 02/22/2025 02/28/2026** $62.050 $13.380 $14.510 U $5.100 V $1.260 $0.280 8.0 $96.580 $127.610 W $127.610 W $158.630
#FIELD
SURVEYOR: CHAINMAN/RODMAN T 02/22/2025 02/28/2026** $52.580 $13.380 $14.510 U $5.100 V $1.260 $0.280 8.0 $87.110 $113.400 W $113.400 W $139.690
#GLAZIER X 08/22/2025 12/31/2025** $59.660 A $11.750 $21.590 Y $0.000 $1.100 $0.550 Z 8.0 $94.650 $124.480 AA $154.310 $154.310
#MARBLE
FINISHER AB 08/22/2025 07/31/2026** $43.140 AC $13.100 $6.780 $0.000 K $0.450 $0.970 8.0 $64.440 $86.010 AD $107.580 $107.580
#MARBLE
MASON AB 08/22/2025 07/31/2026** $64.010 AC $13.100 $16.220 $0.000 K $0.800 $1.330 8.0 $95.460 $127.470 AD $159.470 $159.470
#PAINTER AE 08/22/2025 12/31/2025** $53.330 I $11.750 $15.220 U $0.000 K $1.070 $0.550 8.0 D $81.920 $108.590 AF $108.590 AF $135.250
#PAINTER INDUSTRIAL
PAINTER AG 08/22/2025 12/31/2025** $55.830 I $11.750 $15.220 U $0.000 K $1.070 $0.550 8.0 D $84.420 $112.340 AF $112.340 AF $140.250
#PAINTER BRIDGE PAINTER AH 08/22/2025 12/31/2025** $57.830 I $11.750 $15.220 U $0.000 K $1.070 $0.550 8.0 D $86.420 $115.340 AF $115.340 AF $144.250 #PAINTER: TAPER 08/22/2025 12/31/2025** $67.410 AI $11.750 $21.240 $0.000 K $1.050 $0.780 8.0 $102.230 $135.940 AJ $135.940 AJ $169.640 AK #PLASTERER 08/22/2025 06/30/2026** $54.170 AL $16.040 $19.990 $0.000 F $1.450 $1.440 8.0 $93.090 $116.780 AM $116.780 AN $140.470
#PLASTER
TENDER 08/22/2025 06/30/2026* $44.580 $11.100 $16.670 $5.560 $0.500 $0.500 8.0 $78.910 $101.200 L $101.200 L $123.490
#PLUMBER:
PLUMBER,
PIPEFITTER,
STEAMFITTER
08/22/2025 06/30/2026** $80.500 A $22.750 AO $24.600 AP $0.000 $3.100 $0.350 8.0 $131.300 $175.930 E $175.930 E $220.550
#PLUMBER: UNDERGROUND
UTILITY PIPEFITTER 08/22/2025 06/30/2026* $36.010 $12.400 $3.250 AQ $2.750 AR $0.100 $0.450 8.0 $54.960 $74.340 $74.340 D $93.720
PLUMBER:
UNDERGROUND
UTILITY ASSISTANT
JOURNEYMAN
AS 08/22/2025 06/30/2026* $21.810 $12.400 $3.250 AQ $2.750 AR $0.100 $0.450 8.0 $40.760 $53.040 $53.040 D $65.320
PLUMBER:
UNDERGROUND
UTILITY
TRADESMAN
AT 08/22/2025 06/30/2026* $18.950 $12.400 $0.000 AQ $2.750 AR $0.100 $0.450 8.0 $34.650 $45.500 $45.500 D $56.350
#PLUMBER:
SPRINKLER FITTER
(FIRE PROTECTION
AND FIRE CONTROL
SYSTEMS)
08/22/2025 08/02/2026** $82.440 A $13.850 $24.400 $0.000 F $1.850 $0.400 8.0 $122.940 $164.160 E $164.160 E $205.380
#ROOFER 08/22/2025 07/31/2026** $52.290 $12.250 $11.500 $5.000 $0.650 $0.730 8.0 $82.420 $108.570 L $108.570 AU $134.710
#ROOFER
BITUMASTIC,
ENAMELER, PIPE
WRAPPER, COAL
TAR PITCH BUILD-
UP
08/22/2025 07/31/2026** $54.290 $12.250 $11.500 $5.000 $0.650 $0.730 8.0 $84.420 $111.570 L $111.570 AU $138.710
#ROOFER MASTIC WORKER,
KETTLEMAN 08/22/2025 07/31/2026** $52.540 $12.250 $11.500 $5.000 $0.650 $0.730 8.0 $82.670 $108.940 L $108.940 AU $135.210
#SHEET METAL
WORKER 08/22/2025 06/28/2026* $79.100 I $18.270 AV $34.920 AW $0.000 F $1.740 $1.110 8.0 $135.140 $179.440 AX $179.440 AX $223.740
#SHEET METAL
WORKER
TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS
08/22/2025 06/28/2026* $67.870 I $18.070 AV $32.870 AW $0.000 F $1.740 $1.110 8.0 $121.660 $159.600 AX $159.600 AX $197.530
#SHEET METAL
WORKER
SERVICE MECHANIC
(TOTAL SHEET
METAL CONTRACT
OF $200,000 OR
LESS)
08/22/2025 06/28/2026* $53.000 I $17.070 AV $17.840 AW $0.000 F $1.510 $1.110 8.0 $90.530 $118.460 AY $118.460 AY $146.380
#SHEET METAL
WORKER
SERVICE
TECHNICIAN (TOTAL
SHEET METAL
CONTRACT OF
$200,000 OR LESS)
08/22/2025 06/28/2026* $48.330 I $17.070 AV $11.690 AW $0.000 F $1.510 $1.110 8.0 $79.710 $104.860 AY $104.860 AY $129.990
#SHEET METAL
WORKER
AIR CONDITIONING
SPECIALIST (TOTAL
SHEET METAL
CONTRACT OF
$200,000 OR LESS)
08/22/2025 06/28/2026* $41.670 I $17.070 AV $5.770 AW $0.000 F $1.490 $1.110 8.0 $67.110 $88.780 AX $88.780 AX $110.430
#SHEET METAL
WORKER
AIR CONDITIONING
PRO (TOTAL SHEET
METAL CONTRACT 08/22/2025 06/28/2026* $49.370 I $17.070 AV $12.170 AW $0.000 F $1.490 $1.110 8.0 $81.210 $106.850 AX $106.850 AX $132.470
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
AB
AC
AD
AE
AF
AG
AH
OF $200,000 OR
LESS)
#SHEET METAL
WORKER
METAL DECK &
SIDING 08/22/2025 06/30/2026* $52.950 I $17.650 AQ $23.780 AZ $0.000 F $0.320 BA $0.000 8.0 $94.700 $122.310 AX $122.310 AX $149.910
#TERRAZZO
FINISHER BB 08/22/2025 06/30/2026** $46.600 BC $13.100 $7.220 $0.000 F $0.800 $1.120 8.0 $68.840 $89.480 AX $89.480 AX $110.110
#TERRAZZO
WORKER BB 08/22/2025 06/30/2026** $62.810 BC $13.100 $15.720 $0.000 F $0.800 $1.370 8.0 $93.800 $121.620 AX $121.620 AX $149.440
#TILE
FINISHER 08/22/2025 03/31/2026* $37.780 BD $12.400 $6.270 $1.250 $0.530 $1.600 8.0 D $59.830 $78.720 $78.720 H $97.610
#TILE
FINISHER
RED CIRCLED
FINISHER 08/22/2025 03/31/2026* $43.050 BD $12.400 $7.170 $1.750 $0.530 $1.660 8.0 D $66.560 $88.090 $88.090 H $109.610
#TILE SETTER 08/22/2025 03/31/2026** $58.950 BD $12.400 $9.270 $3.000 $0.800 $2.170 8.0 D $86.590 $116.070 $116.070 H $145.540
WATER WELL
DRILLER: 08/22/2025 06/30/2026** $32.830 $10.010 $4.080 $1.640 BE $0.000 $0.000 8.0 $48.560 $64.980 BF $64.980 BF $64.980 BF
WATER WELL
DRILLER: PUMP INSTALLER 08/22/2025 06/30/2026** $32.830 $10.010 $4.080 $1.640 BE $0.000 $0.000 8.0 $48.560 $64.980 BF $64.980 BF $64.980 BF
WATER WELL
DRILLER: HELPER 08/22/2025 06/30/2026** $28.350 $10.010 $4.080 $1.420 BG $0.000 $0.000 8.0 $43.860 $58.040 BF $58.040 BF $58.040 BF
Go to increase page
FOOTNOTES
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT
DETERMINATION IS ISSUED.
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR
SPECIFIC RATES AT (415) 703-4774.
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY
COUNCIL.
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE
NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
INCLUDED IN BASIC HOURLY RATE.
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
INCLUDES AN AMOUNT EQUAL TO 6% OF THE HOURLY RATE FOR VACATION/WORKING DUES WHICH IS FACTORED INTO OVERTIME RATES.
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT OVERTIME HOURLY RATE.
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
INCLUDES AN AMOUNT (1.05% OF THE BASIC HOURLY RATE) FOR THE CONTRACT ADMINISTRATION FUND, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.
THIS APPLIES TO DAILY OVERTIME RATE FOR THE FIRST SHIFT IN A MULTISHIFT OPERATION AND THE FIRST 2 HOURS OF DAILY OVERTIME FOR NON-SHIFT WORK. ALL OTHER NON-SHIFT WORK IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY RATE.
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
RATE APPLIES TO DAILY OVERTIME HOURS UP TO AND INCLUDING 12 HOURS WORKED IN A WORKDAY OR OTHER OVERTIME HOURS BEYOND 40 HOURS IN A WORKWEEK. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT THERE ARE LESS THAN 40 HOURS WORKED MONDAY THROUGH FRIDAY, THEN THE BALANCE OF HOURS WORKED UP TO AND INCLUDING 40 HOURS FOR THE WORKWEEK, OR UP TO 8 HOURS FOR THE WORKDAY, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $2.00 PER HOUR ABOVE THE BASIC WAGE RATE
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
file:///OPRL/2025-2/PWD/Increases/Subtrades/ALA-Pre.html
AI
AJ
AK
AL
AM
AN
AO
AP
AQ
AR
AS
AT
AU
AV
AW
AX
AY
AZ
BA
BB
BC
BD
BE
BF
BG
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE
NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME.EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
INCLUDES AN AMOUNT OF $0.75 FOR HEALTH REIMBURSEMENT ACCOUNT WHICH IS FACTORED INTO OVERTIME. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
INCLUDES AN AMOUNT OF $8.00 FOR 401A SUPPLEMENTAL PENSION WHICH IS FACTORED INTO OVERTIME. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL
PREVAILING RATE OF PER DIEM WAGES.
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
APPLIES TO THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT CONDITIONS OVER WHICH THE INDIVIDUAL EMPLOYER HAS NO CONTROL (I.E., ADVERSE WEATHER, PROJECT DELAYS, LOGISTICAL PROBLEMS, GENERAL CONTRACTOR OR OWNER REQUIREMENTS, ETC.) ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK PREVENT EMPLOYEES FROM WORKING, THEN WORK IS TO BE PERFORMED ON SATURDAY, WHEN AVAILABLE, AT STRAIGHT TIME RATES.
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES. INCLUDES AN AMOUNT FOR HEALTH & WELFARE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
INCLUDES $0.05 FOR SCHOLAR FUND.
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
$2.27 AFTER 2 YEARS OF EMPLOYMENT.
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
$1.96 AFTER 2 YEARS OF EMPLOYMENT.
RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF
THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.
TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.
Return to main page file:///OPRL/2025-2/PWD/Determinations/Subtrades/jrnylist.html
CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
LOCALITY: ALPINE COUNTY
DETERMINATION: ALP-2025-2
CRAFT CLASSIFICATION CRAFT
FOOTNOTE
ISSUE
DATE
EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE
FOOTNOTE
HEALTH
AND
WELFARE
HEALTH
AND
WELFARE
FOOTNOTE
PENSION PENSION
FOOTNOTE
VACATION/
HOLIDAY
VACATION/
HOLIDAY
FOOTNOTE
TRAINING TRAINING
FOOTNOTE
OTHER
PAYMENTS
OTHER
PAYMENTS
FOOTNOTE
HOURS HOURS
FOOTNOTE
STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
FOOTNOTE
SATURDAY
OVERTIME
HOURLY
RATE
SATURDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
#BRICKLAYER,
BLOCKLAYER:
BRICKLAYER,
BLOCKLAYER,
STONEMASON
08/22/2025 04/30/2026** $51.780 A $13.100 $11.620 $2.750 B $0.800 $2.200 C 8.0 D $82.250 $109.520 E $109.520 E $136.780
#BRICKLAYER,
BLOCKLAYER:
POINTER, CLEANER,
CAULKER,
WATERPROOFER
08/22/2025 06/30/2026* $55.630 A $13.100 $13.370 $0.000 F $1.640 $0.430 8.0 D $84.170 $111.990 G $111.990 H $139.800
#BRICK
TENDER 08/22/2025 06/30/2026** $42.500 I $11.100 $14.350 $0.000 F $0.450 $0.550 8.0 $68.950 $90.200 J $90.200 J $111.450
#CARPET,
LINOLEUM,
RESILIENT TILE
LAYER 08/22/2025 12/31/2025** $50.390 A $11.750 $15.310 $0.000 K $0.880 $0.340 8.0 $78.670 $103.870 L $103.870 L $129.060 M
#ELECTRICIAN: COMM & SYSTEM
INSTALLER 02/22/2024 02/28/2025* $36.600 $15.000 $6.850 N $0.000 $1.000 $1.110 O 8.0 $61.840 $80.780 P $80.780 P $99.720
#ELECTRICIAN: COMM & SYSTEM
TECH. 02/22/2024 02/28/2025* $42.090 $15.000 $6.850 N $0.000 $1.000 $1.110 O 8.0 $67.520 $89.300 P $89.300 P $111.080
#ELECTRICIAN: INSIDE WIREMAN 08/22/2025 01/31/2026** $52.700 $14.060 $13.250 N $0.000 F $1.890 $7.900 Q 8.0 $92.220 $119.780 $119.780 $147.340 #ELECTRICIAN: CABLE SPLICER 08/22/2025 01/31/2026** $57.970 $14.060 $13.250 N $0.000 F $1.890 $7.900 Q 8.0 $97.740 $128.060 $128.060 $158.380
FIELD
SURVEYOR:
CHIEF OF PARTY
(018.167-010) R 02/22/2025 03/31/2025* $16.500 & $1.150 $1.250 $1.520 $0.000 $0.000 8.0 $20.420 $28.670 $28.670 $36.920
FIELD
SURVEYOR:
INSTRUMENTMAN
(018.167-034) R 02/22/2025 03/31/2025* $16.500 & $1.150 $1.250 $1.490 $0.000 $0.000 8.0 $20.390 $28.640 $28.640 $36.890
FIELD
SURVEYOR:
CHAINMAN/RODMAN
(869.567-010) R 02/22/2025 03/31/2025* $16.500 & $1.150 $1.250 $1.460 $0.000 $0.000 8.0 $20.360 $28.610 $28.610 $36.860
#GLAZIER S 08/22/2025 12/31/2025** $46.690 A $11.750 $23.170 T $0.000 $1.140 $0.550 U 8.0 $83.300 $106.650 V $129.990 $129.990
#MARBLE
FINISHER W 08/22/2025 07/31/2026** $43.140 X $13.100 $6.780 $0.000 K $0.450 $0.970 8.0 $64.440 $86.010 Y $107.580 $107.580
#MARBLE
MASON W 08/22/2025 07/31/2026** $64.010 X $13.100 $16.220 $0.000 K $0.800 $1.330 8.0 $95.460 $127.470 Y $159.470 $159.470
#PAINTER Z 08/22/2025 12/31/2025** $43.400 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 D $66.730 $88.430 AB $88.430 AB $110.130
#PAINTER INDUSTRIAL
PAINTER AC 08/22/2025 12/31/2025** $45.900 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 D $69.230 $92.180 AB $92.180 AB $115.130
#PAINTER BRIDGE PAINTER AD 08/22/2025 12/31/2025** $47.900 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 D $71.230 $95.180 AB $95.180 AB $119.130 #PAINTER: TAPER 08/22/2025 12/31/2025** $63.280 AE $11.750 $19.840 $0.000 K $1.050 $0.740 8.0 $96.660 $128.300 AF $128.300 AF $159.940 AG #PLASTERER 08/22/2025 06/30/2026** $52.170 AH $16.040 $19.990 $0.000 F $1.450 $1.440 8.0 $91.090 $113.780 AI $113.780 AJ $136.470
#PLASTER
TENDER 08/22/2025 06/30/2026* $42.420 $11.100 $16.130 $4.330 $0.520 $0.630 AK 8.0 $75.130 $96.340 L $96.340 L $117.550
#PLUMBER:
PLUMBER,
STEAMFITTER,
REFRIGERATION
FITTER (HVAC)
AL 08/22/2025 12/31/2025** $56.600 $13.280 $23.360 $0.000 F $1.500 $2.520 8.0 $97.260 $125.560 E $125.560 E $153.860
PLUMBER: PIPE TRADESMAN AL 08/22/2025 12/31/2025* $22.640 $10.760 $1.000 $0.000 F $0.000 $0.710 8.0 $35.110 $46.430 E $46.430 E $57.750
#PLUMBER: PLUMBER,
PIPEFITTER AM 08/22/2025 07/31/2026** $58.390 $9.120 $11.290 AN $0.000 F $1.870 $0.150 AO 8.0 D $80.820 $110.020 $110.020 $139.210
PLUMBER: PLUMBER,
PIPEFITTER HELPER AM 08/22/2025 07/31/2026** $23.960 $8.820 $0.000 AN $0.000 F $0.100 $0.000 8.0 D $32.880 $44.860 $44.860 $56.840
#PLUMBER: LIGHT COMMERCIAL
PLUMBER AM 08/22/2025 07/31/2026* $46.220 $9.120 $10.200 AN $0.000 F $1.870 $0.150 AO 8.0 D $67.560 $90.670 $90.670 $113.780
PLUMBER: LIGHT COMMERCIAL
PLUMBER - HELPER AM 08/22/2025 07/31/2026** $23.960 $8.820 $0.000 AN $0.000 F $0.100 $0.000 8.0 D $32.880 $44.860 $44.860 $56.840
#PLUMBER: UNDERGROUND
UTILITY PIPEFITTER 08/22/2025 06/30/2026* $36.010 $12.400 $3.250 AN $2.750 AP $0.100 $0.450 8.0 $54.960 $74.340 $74.340 D $93.720
PLUMBER:
UNDERGROUND
UTILITY ASSISTANT
JOURNEYMAN
AQ 08/22/2025 06/30/2026* $21.810 $12.400 $3.250 AN $2.750 AP $0.100 $0.450 8.0 $40.760 $53.040 $53.040 D $65.320
PLUMBER:
UNDERGROUND
UTILITY
TRADESMAN
AR 08/22/2025 06/30/2026* $18.950 $12.400 $0.000 AN $2.750 AP $0.100 $0.450 8.0 $34.650 $45.500 $45.500 D $56.350
#PLUMBER:
FIRE SPRINKLER
FITTER
(PROTECTION AND
CONTROL
SYSTEMS,
OVERHEAD AND
UNDERGROUND)
02/22/2025 03/31/2025* $48.650 $12.400 $15.620 AS $0.000 $0.540 $0.250 8.0 $77.460 $101.790 $101.790 $126.110
#ROOFER 08/22/2025 01/31/2026** $46.250 $12.250 $10.000 $5.000 $0.740 $0.290 8.0 $74.530 $97.660 L $97.660 AT $120.780
#ROOFER
BITUMASTIC,
ENAMELER, COAL
TAR, PITCH AND
MASTIC WORKER
08/22/2025 01/31/2026** $48.250 $12.250 $10.000 $5.000 $0.740 $0.290 8.0 $76.530 $100.660 L $100.660 AT $124.780
#SHEET METAL
WORKER
METAL DECK &
SIDING 08/22/2025 06/30/2026* $52.950 I $17.650 AN $23.780 AU $0.000 F $0.320 AV $0.000 8.0 $94.700 $122.310 AW $122.310 AW $149.910
#SHEET METAL
WORKER 08/22/2025 06/30/2026** $51.020 A $18.190 $25.480 AX $0.000 F $1.680 AV $1.000 AY 8.0 $97.370 $125.380 AW $125.380 AW $153.390
#TERRAZZO
FINISHER AZ 08/22/2025 06/30/2026** $46.600 BA $13.100 $7.220 $0.000 F $0.800 $1.120 8.0 $68.840 $89.480 AW $89.480 AW $110.110
#TERRAZZO
WORKER AZ 08/22/2025 06/30/2026** $62.810 BA $13.100 $15.720 $0.000 F $0.800 $1.370 8.0 $93.800 $121.620 AW $121.620 AW $149.440
#TILE
FINISHER 08/22/2025 03/31/2026* $35.190 BB $12.400 $6.210 $1.000 $0.500 $1.570 8.0 D $56.870 $74.470 $74.470 H $92.060
#TILE
FINISHER
RED CIRCLED
FINISHER 08/22/2025 03/31/2026* $39.750 BB $12.400 $7.050 $1.300 $0.500 $1.630 8.0 D $62.630 $82.510 $82.510 H $102.380
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
AB
AC
AD
AE
AF
AG
AH
AI
AJ
AK
AL
AM
AN
#TILE SETTER 08/22/2025 03/31/2026** $54.700 BB $12.400 $9.020 $2.750 $0.750 $2.120 8.0 D $81.740 $109.090 $109.090 H $136.440
WATER WELL
DRILLER: 08/22/2025 06/30/2026** $32.830 $10.010 $4.080 $1.640 BC $0.000 $0.000 8.0 $48.560 $64.980 BD $64.980 BD $64.980 BD
WATER WELL
DRILLER: PUMP INSTALLER 08/22/2025 06/30/2026** $32.830 $10.010 $4.080 $1.640 BC $0.000 $0.000 8.0 $48.560 $64.980 BD $64.980 BD $64.980 BD
WATER WELL
DRILLER: HELPER 08/22/2025 06/30/2026** $28.350 $10.010 $4.080 $1.420 BE $0.000 $0.000 8.0 $43.860 $58.040 BD $58.040 BD $58.040 BD
Go to increase page
FOOTNOTES
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT
DETERMINATION IS ISSUED.
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR
SPECIFIC RATES AT (415) 703-4774.
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY
COUNCIL.
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE
NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
INCLUDED IN BASIC HOURLY RATE.
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT OVERTIME HOURLY RATE.
IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES WORKING ON COMMERCIAL PROJECTS SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES A SWINGING AND/OR PLATFORM SUSPENSION SYSTEM. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180
FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
RATE APPLIES TO FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY, FIRST 12 HOURS WORKED ON SATURDAYS AND ALL HOURS WORKED ON DESIGNATED DAYS OFF. ALL OTHER OVERTIME IS PAID AT SUNDAY/HOLIDAY RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE
NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME.EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
INCLUDES AN AMOUNT FOR INDUSTRY STABILIZATION FUND.
PORTION OF COUNTY LYING OUTSIDE THE TAHOE BASIN WATERSHED.
PORTION OF COUNTY LYING IN THE TAHOE BASIN AREA.
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL file:///OPRL/2025-2/PWD/Increases/Subtrades/ALP-Pre.html
AO
AP
AQ
AR
AS
AT
AU
AV
AW
AX
AY
AZ
BA
BB
BC
BD
BE
PREVAILING RATE OF PER DIEM WAGES.
AMOUNT IS FOR CONTRACT ADMINISTRATION
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
RATE APPLIES TO FIRST 12 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORKWEEK MAY BE WORKED AT STRAIGHT-TIME IF THE JOB IS SHUT DOWN FOR 1 OR MORE DAYS DURING THE NORMAL WORKWEEK DUE
TO ADVERSE WEATHER CONDITIONS.
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
INCLUDES $0.05 FOR SCHOLAR FUND.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
INCLUDES AMOUNTS FOR INDUSTRY FUND AND LABOR MANAGEMENT.
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
$2.27 AFTER 2 YEARS OF EMPLOYMENT.
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
$1.96 AFTER 2 YEARS OF EMPLOYMENT.
RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF
THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.
TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.
CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
LOCALITY: AMADOR COUNTY
DETERMINATION: AMA-2025-2
CRAFT CLASSIFICATION CRAFT
FOOTNOTE
ISSUE
DATE
EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE
FOOTNOTE
HEALTH
AND
WELFARE
HEALTH
AND
WELFARE
FOOTNOTE
PENSION PENSION
FOOTNOTE
VACATION/
HOLIDAY
VACATION/
HOLIDAY
FOOTNOTE
TRAINING TRAINING
FOOTNOTE
OTHER
PAYMENTS
OTHER
PAYMENTS
FOOTNOTE
HOURS HOURS
FOOTNOTE
STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
FOOTNOTE
SATURDAY
OVERTIME
HOURLY
RATE
SATURDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
#BRICKLAYER,
BLOCKLAYER:
BRICKLAYER,
BLOCKLAYER,
STONEMASON
08/22/2025 04/30/2026** $51.780 A $13.100 $11.620 $2.750 B $0.800 $2.200 C 8.0 D $82.250 $109.520 E $109.520 E $136.780
#BRICKLAYER,
BLOCKLAYER:
POINTER, CLEANER,
CAULKER,
WATERPROOFER
08/22/2025 06/30/2026* $55.630 A $13.100 $13.370 $0.000 F $1.640 $0.430 8.0 D $84.170 $111.990 G $111.990 H $139.800
#BRICK
TENDER 08/22/2025 06/30/2026** $42.500 I $11.100 $14.350 $0.000 F $0.450 $0.550 8.0 $68.950 $90.200 J $90.200 J $111.450
#CARPET,
LINOLEUM,
RESILIENT TILE
LAYER 08/22/2025 12/31/2025** $50.390 A $11.750 $15.310 $0.000 K $0.880 $0.340 8.0 $78.670 $103.870 L $103.870 L $129.060 M
#ELECTRICIAN: COMM & SYSTEM
INSTALLER 02/22/2024 02/28/2025* $36.600 $15.000 $6.850 N $0.000 $1.000 $1.110 O 8.0 $61.840 $80.780 P $80.780 P $99.720
#ELECTRICIAN: COMM & SYSTEM
TECH. 02/22/2024 02/28/2025* $42.090 $15.000 $6.850 N $0.000 $1.000 $1.110 O 8.0 $67.520 $89.300 P $89.300 P $111.080
#ELECTRICIAN: INSIDE WIREMAN 08/22/2025 01/31/2026** $52.700 $14.060 $13.250 N $0.000 F $1.890 $7.900 Q 8.0 $92.220 $119.780 $119.780 $147.340 #ELECTRICIAN: CABLE SPLICER 08/22/2025 01/31/2026** $57.970 $14.060 $13.250 N $0.000 F $1.890 $7.900 Q 8.0 $97.740 $128.060 $128.060 $158.380
FIELD
SURVEYOR:
CHIEF OF PARTY
(018.167-010) R 02/22/2025 03/31/2025* $16.500 & $1.150 $1.250 $1.520 $0.000 $0.000 8.0 $20.420 $28.670 $28.670 $36.920
FIELD
SURVEYOR:
INSTRUMENTMAN
(018.167-034) R 02/22/2025 03/31/2025* $16.500 & $1.150 $1.250 $1.490 $0.000 $0.000 8.0 $20.390 $28.640 $28.640 $36.890
FIELD
SURVEYOR:
CHAINMAN/RODMAN
(869.567-010) R 02/22/2025 03/31/2025* $16.500 & $1.150 $1.250 $1.460 $0.000 $0.000 8.0 $20.360 $28.610 $28.610 $36.860
#GLAZIER S 08/22/2025 12/31/2025** $46.690 A $11.750 $23.170 T $0.000 $1.140 $0.550 U 8.0 $83.300 $106.650 V $129.990 $129.990
#MARBLE
FINISHER W 08/22/2025 07/31/2026** $43.140 X $13.100 $6.780 $0.000 K $0.450 $0.970 8.0 $64.440 $86.010 Y $107.580 $107.580
#MARBLE
MASON W 08/22/2025 07/31/2026** $64.010 X $13.100 $16.220 $0.000 K $0.800 $1.330 8.0 $95.460 $127.470 Y $159.470 $159.470
#PAINTER Z 08/22/2025 12/31/2025** $43.400 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 D $66.730 $88.430 AB $88.430 AB $110.130
#PAINTER INDUSTRIAL
PAINTER AC 08/22/2025 12/31/2025** $45.900 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 D $69.230 $92.180 AB $92.180 AB $115.130
#PAINTER BRIDGE PAINTER AD 08/22/2025 12/31/2025** $47.900 I $11.750 $10.050 AA $0.000 K $1.000 $0.530 8.0 D $71.230 $95.180 AB $95.180 AB $119.130 #PAINTER: TAPER 08/22/2025 12/31/2025** $63.280 AE $11.750 $19.840 $0.000 K $1.050 $0.740 8.0 $96.660 $128.300 AF $128.300 AF $159.940 AG #PLASTERER 08/22/2025 06/30/2026** $52.170 AH $16.040 $19.990 $0.000 F $1.450 $1.440 8.0 $91.090 $113.780 AI $113.780 AJ $136.470
#PLASTER
TENDER 08/22/2025 06/30/2026* $42.420 $11.100 $16.130 $4.330 $0.520 $0.630 AK 8.0 $75.130 $96.340 L $96.340 L $117.550
#PLUMBER:
PLUMBER,
STEAMFITTER,
REFRIGERATION
FITTER (HVAC)
AL 08/22/2025 12/31/2025** $56.600 $13.280 $23.360 $0.000 F $1.500 $2.520 8.0 $97.260 $125.560 E $125.560 E $153.860
PLUMBER: PIPE TRADESMAN AL 08/22/2025 12/31/2025* $22.640 $10.760 $1.000 $0.000 F $0.000 $0.710 8.0 $35.110 $46.430 E $46.430 E $57.750
#PLUMBER: UNDERGROUND
UTILITY PIPEFITTER 08/22/2025 06/30/2026* $36.010 $12.400 $3.250 AM $2.750 AN $0.100 $0.450 8.0 $54.960 $74.340 $74.340 D $93.720
PLUMBER:
UNDERGROUND
UTILITY ASSISTANT
JOURNEYMAN
AO 08/22/2025 06/30/2026* $21.810 $12.400 $3.250 AM $2.750 AN $0.100 $0.450 8.0 $40.760 $53.040 $53.040 D $65.320
PLUMBER:
UNDERGROUND
UTILITY
TRADESMAN
AP 08/22/2025 06/30/2026* $18.950 $12.400 $0.000 AM $2.750 AN $0.100 $0.450 8.0 $34.650 $45.500 $45.500 D $56.350
#PLUMBER: PLUMBER,
STEAMFITTER AQ 08/22/2025 06/30/2026** $67.370 A $12.900 $15.400 AM $0.000 F $1.350 $0.700 8.0 $97.720 $131.410 E $131.410 AR $165.090
#PLUMBER:
PLUMBER (FOR
TOTAL PLUMBING
JOBS $150,000 OR
UNDER)
AQ 08/22/2025 06/30/2026* $55.580 A $10.770 $11.550 $0.000 F $1.350 $0.700 8.0 $79.950 $107.740 E $107.740 AS $135.530
#PLUMBER:
FIRE SPRINKLER
FITTER
(PROTECTION AND
CONTROL
SYSTEMS,
OVERHEAD AND
UNDERGROUND)
02/22/2025 03/31/2025* $48.650 $12.400 $15.620 AT $0.000 $0.540 $0.250 8.0 $77.460 $101.790 $101.790 $126.110
#ROOFER 08/22/2025 01/31/2026** $46.250 $12.250 $10.000 $5.000 $0.740 $0.290 8.0 $74.530 $97.660 L $97.660 AU $120.780
#ROOFER
BITUMASTIC,
ENAMELER, COAL
TAR, PITCH AND
MASTIC WORKER
08/22/2025 01/31/2026** $48.250 $12.250 $10.000 $5.000 $0.740 $0.290 8.0 $76.530 $100.660 L $100.660 AU $124.780
#SHEET METAL
WORKER 08/22/2025 06/30/2026* $55.060 A $17.020 $28.120 AV $0.000 F $1.560 $0.870 8.0 $102.630 $132.490 E $132.490 E $162.340
#SHEET METAL
WORKER
(HVAC)
METAL DECK &
SIDING 02/22/2002 03/31/2002* $30.160 AW $0.000 $0.000 $0.000 $10.500 AX $0.000 8.0 $40.660 $55.740 $55.740 $55.740
#TERRAZZO
FINISHER AY 08/22/2025 06/30/2026** $46.600 AZ $13.100 $7.220 $0.000 F $0.800 $1.120 8.0 $68.840 $89.480 BA $89.480 BA $110.110
#TERRAZZO
WORKER AY 08/22/2025 06/30/2026** $62.810 AZ $13.100 $15.720 $0.000 F $0.800 $1.370 8.0 $93.800 $121.620 BA $121.620 BA $149.440
#TILE
FINISHER 08/22/2025 03/31/2026* $35.190 BB $12.400 $6.210 $1.000 $0.500 $1.570 8.0 D $56.870 $74.470 $74.470 H $92.060
#TILE
FINISHER
RED CIRCLED
FINISHER 08/22/2025 03/31/2026* $39.750 BB $12.400 $7.050 $1.300 $0.500 $1.630 8.0 D $62.630 $82.510 $82.510 H $102.380
#TILE SETTER 08/22/2025 03/31/2026** $54.700 BB $12.400 $9.020 $2.750 $0.750 $2.120 8.0 D $81.740 $109.090 $109.090 H $136.440
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
AB
AC
AD
AE
AF
AG
AH
AI
AJ
AK
AL
AM
AN
WATER WELL
DRILLER: 08/22/2025 06/30/2026** $32.830 $10.010 $4.080 $1.640 BC $0.000 $0.000 8.0 $48.560 $64.980 BD $64.980 BD $64.980 BD
WATER WELL
DRILLER: PUMP INSTALLER 08/22/2025 06/30/2026** $32.830 $10.010 $4.080 $1.640 BC $0.000 $0.000 8.0 $48.560 $64.980 BD $64.980 BD $64.980 BD
WATER WELL
DRILLER: HELPER 08/22/2025 06/30/2026** $28.350 $10.010 $4.080 $1.420 BE $0.000 $0.000 8.0 $43.860 $58.040 BD $58.040 BD $58.040 BD
Go to increase page
FOOTNOTES
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT
DETERMINATION IS ISSUED.
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR
SPECIFIC RATES AT (415) 703-4774.
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY
COUNCIL.
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE
NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
INCLUDED IN BASIC HOURLY RATE.
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT OVERTIME HOURLY RATE.
IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES WORKING ON COMMERCIAL PROJECTS SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES A SWINGING AND/OR PLATFORM SUSPENSION SYSTEM. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180
FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
RATE APPLIES TO FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY, FIRST 12 HOURS WORKED ON SATURDAYS AND ALL HOURS WORKED ON DESIGNATED DAYS OFF. ALL OTHER OVERTIME IS PAID AT SUNDAY/HOLIDAY RATE.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
RATE APPLIES TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .