This document is a set of Questions and Responses related to a federal contract opportunity for the Upgrade of the Hydro-Generators Brakes Control System. The key details are:

The contract opportunity is solicitation number 20245201002, issued by the International Boundary and Water Commission, U.S. Section (IBWC) as a 100% Small Business Set-Aside. The North American Industry Classification System (NAICS) code is 335314 Relay and Industrial Control Manufacturing. The requirement is for upgrading the hydro-generator brakes control system, including the programmable logic controller (PLC), annunciator system, and related field devices. The questions cover topics such as cable routing, PLC specifications, brake system details, licensure requirements, and project execution considerations. Quotes are due by April 17, 2024 at 2:00 PM MDT, and the government will award a contract to the lowest price technically acceptable, responsible offeror.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE ID: 20245201002 Upgrade of the Hydro-Generators Brakes Control System Questions and Responses

1. Do we know the distance between the Brake Control Enclosure and the Control Room? Is there an existing raceway/cable tray that can be utilized for new control cables?

Yes, there is a route and cable tray to run the communication cable, plus the max distance between the Generators Brakes and Control Room 250 FT.

2. Are there 3 spare digital inputs available on any of the SEL Axion 2244-2 digital inputs modules?

Yes, there is enough inputs digital and analogs in the PLC for the annunciator system.

3. Are there any spare slots on the SEL Axion Backplane?

Yes, there are few open slots.

4. What is the operating pressure of the brake system?

100 PSI.

5. How do they handle creep detection for the turbines?

The PLC from the governor send a digital signal (Alarm) to the Annunciator after 10 minutes if the

Generator doesn’t stop. This signal is already prewired all the way to the control room, but sometimes the PLC send the wrong signal and we believe the creep sensor needs to be recalibrated or replaced.

6. As we prepare our bid, we are seeking clarification regarding the license requirements. Specifically, we would like to know whether it is permissible for a subcontractor to hold the Texas Engineering Practice

Act and Rules Concerning the Practice of Engineering and Professional Engineering Licensure, or if it is mandatory for the prime contractor to possess this license.

A PE is required for this project. Please focus more on previous experience performing projects with

Hydo Generators.

7. What type of PLC are you using (manufacture-reference) version of the control system?

Our current Annunciator systems has Schweitzer SEL-2244-2 PLC module, but our current brake system do not use anything close to Schweitzer Relay everything is pretty much manual. PLC will work fine to prevent the Generator runs with the Brake system ON. field devices such that the system could benefit from a SIL-3 safety PLC and this will be an upgrade for current system, also we need to send the signal to current Annunciator System.

8. How is the drive sequence depending on the type of stop?

Everything is manual

9. Condition of the machines (do they require replacement, refurbishment)?

Replacement Upgrade current brake system

10. Is the whole operation of the plant controlled with one PLC, and is it required to make the breaker control system independent?

NOTICE ID: 20245201002 Upgrade of the Hydro-Generators Brakes Control System Questions and Responses

The brake control system should work in conjunction with Generator Control System to avoid start the generator with the brake system on and dagame the brake pads for the unit

11. How much asbestos could we find in the execution of the project?

They may be some asbestos in the electrical wires and brake pads and you may contemplate this issue with your quote.

12. We would like to know what kind of HMI (touch screen, buttons on cabinet)?

We don’t have specific Brand but size we would like to install 16-18 inches touchscreen type.

13 We might have some kind of reference to the solenoid operated air brake valve 125Vol dc (Size pipe , Pressure, flow rate)?

Please submit it with your proposal and we Will review the technical proposal

14. Regarding the format to apply for the quote, could you provide us with information on the necessary documents?

Submit your quote on the CLIN Structure document and a proposal that provides information on your design, project schedule, and any other documents mentioned in the PWS.