2024_OGS_Pipe_to_soil.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Gas Yard Maintenance at SEC & OGS State and local contract opportunity
- Solicitation number
- PR8458
- Issued by
- Florida
About this file
The file 2024_OGS_Pipe_to_soil.xlsx is a Request for Proposal (RFP 8458 PR) issued by the Orlando Utilities Commission (OUC) in Florida for comprehensive natural gas yard maintenance services at the Stanton Energy Center and Osceola Generating Station. The contract requires maintenance of above-grade piping, filter separators, regulator valves, condensate drain tanks, and manual valves, with a three-year base term and an optional two-year renewal. Proposals are due by June 3, 2025 at 2:00 PM EST, with a mandatory pre-response conference scheduled for May 15, 2025. Bidders must have at least 5 years of business experience performing similar work, be properly licensed in Florida, and maintain staff capable of responding to emergency calls.
The solicitation includes an 8% Minority/Women Business Enterprises (M/WBE) goal, requiring bidders to specify subcontracted work with M/WBE vendors. No bid or performance bonds are required, and pricing will be submitted on a provided Excel form with unit pricing remaining firm for the initial three-year period. Bidders must provide comprehensive qualifications including current licensing, financial statements, Dun & Bradstreet numbers, OSHA incident rates, worker's compensation modification ratings, and employee screening details. The contract will cover monthly facility maintenance, annual inspections of cathodic protection, atmospheric corrosion, grounding systems, leak surveys, pressure regulator maintenance, and filter separator element replacements. The time and materials pricing structure suggests contract value flexibility based on actual maintenance requirements and service calls.
View the file
Other files for this state and local contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| KING -MURRAY OPERATING COMPANY | ||||||
| ANNUAL PIPE TO SOIL SURVEY | ||||||
| Date | 4/27/24 | |||||
| OGS HOLOPAW | ||||||
| TEST SITE | ||||||
| STATION FOOTAGE | P/S ON | P/S OFF | AC VOLTS | DATE | DESCRIPTION |
0+70 -1.167 -1.034 40 mv 4/27/24 Meter Station Outlet
| Rectifier | -1.193 | -1072 | 60 mv | Rectifier |
| 106+00 | -1.189 | -1.022 | 80mv | Regulator Station Inlet |
| 106+10 | -1.176 | -1.011 | 40 mv | Regulator Skid Inlet |
| 106+30 | -1.187 | -0.956 | 40mv | Regulator Skid Outlet |
ELECTRICAL ISOLATION FLANGES
| PROTECTED | UNPROTECTED | DATE | |
| FGT Take off Flange | -1.099 | -0.456 | 4/27/24 |
| Meter Skid Outlet | -1.167 | -0.432 | |
| Regulator Inlet | -1.189 | -0.403 | |
| Regulator Oulet | 1.187 | -0.398 |
| COMMENTS: | CP SYSTEM IS IN GOOD ORDER |
| A NEW UPDATED RECTIFER WAS INSTALLED AS WELL AS NEW TEST STATIONS. |
Technician James McAllister
File details come from the government source that posted it. Updated .