2024_OGS_Pipe_to_soil.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Gas Yard Maintenance at SEC & OGS State and local contract opportunity
Solicitation number
PR8458
Issued by
Florida

About this file

The file 2024_OGS_Pipe_to_soil.xlsx is a Request for Proposal (RFP 8458 PR) issued by the Orlando Utilities Commission (OUC) in Florida for comprehensive natural gas yard maintenance services at the Stanton Energy Center and Osceola Generating Station. The contract requires maintenance of above-grade piping, filter separators, regulator valves, condensate drain tanks, and manual valves, with a three-year base term and an optional two-year renewal. Proposals are due by June 3, 2025 at 2:00 PM EST, with a mandatory pre-response conference scheduled for May 15, 2025. Bidders must have at least 5 years of business experience performing similar work, be properly licensed in Florida, and maintain staff capable of responding to emergency calls.

The solicitation includes an 8% Minority/Women Business Enterprises (M/WBE) goal, requiring bidders to specify subcontracted work with M/WBE vendors. No bid or performance bonds are required, and pricing will be submitted on a provided Excel form with unit pricing remaining firm for the initial three-year period. Bidders must provide comprehensive qualifications including current licensing, financial statements, Dun & Bradstreet numbers, OSHA incident rates, worker's compensation modification ratings, and employee screening details. The contract will cover monthly facility maintenance, annual inspections of cathodic protection, atmospheric corrosion, grounding systems, leak surveys, pressure regulator maintenance, and filter separator element replacements. The time and materials pricing structure suggests contract value flexibility based on actual maintenance requirements and service calls.

View the file

Other files for this state and local contract opportunity

Other files attached to Gas Yard Maintenance at SEC & OGS, newest first.
File Type Posted
RFP_PR_8458_-_ADDENDUM_NO_1_.pdf PDF
RFP_PR_8458_-_ADDENDUM_NO_1_.pdf PDF
ATMOSPHECIC_CORROSION_2024.xlsx XLSX spreadsheet
2024_OGS_Pipe_to_soil.xlsx XLSX spreadsheet
ATMOSPHECIC_CORROSION_2024.xlsx XLSX spreadsheet
Attachment_'F'_-_Clarifications_&_Exceptions_Fill_in_Form.xlsx XLSX spreadsheet
Attachment_'F'_-_Clarifications_&_Exceptions_Fill_in_Form.xlsx XLSX spreadsheet
Attachment_'F'_-_Clarifications_&_Exceptions_Fill_in_Form.xlsx XLSX spreadsheet
Attachment_'E'_General_Terms_and_Conditions_for_Goods_and_Services_5-12-23.doc DOC document
Attachment_D-4_-_Unit_1_and_Unit_2_-_Instruction_Book_for_Metering_Station_Filter_Separator.pdf PDF
Attachment_'D-5'_OGS_Drawings.zip ZIP file
Attachment_'E'_General_Terms_and_Conditions_for_Goods_and_Services_5-12-23.doc DOC document
Attachment_'D-5'_OGS_Drawings.zip ZIP file
Attachment_D-3_-Unit_1_and_Unit_2_-_Instruction_Book_Fuel_Gas_Metering_Regulating.pdf PDF
Attachment_D-4_-_Unit_1_and_Unit_2_-_Instruction_Book_for_Metering_Station_Filter_Separator.pdf PDF
Compliance_-_Submittal_Forms.pdf PDF
Attachment_'E'_General_Terms_and_Conditions_for_Goods_and_Services_5-12-23.doc DOC document
Compliance_-_Submittal_Forms.pdf PDF
vfile —
Attachment_'D-5'_OGS_Drawings.zip ZIP file
Attachment_D-3_-Unit_1_and_Unit_2_-_Instruction_Book_Fuel_Gas_Metering_Regulating.pdf PDF
Attachment_D-4_-_Unit_1_and_Unit_2_-_Instruction_Book_for_Metering_Station_Filter_Separator.pdf PDF
Attachment_'D-5'_OGS_Drawings.zip ZIP file
Compliance_-_Submittal_Forms.pdf PDF
Attachment_D-3_-Unit_1_and_Unit_2_-_Instruction_Book_Fuel_Gas_Metering_Regulating.pdf PDF
Attachment_'E'_General_Terms_and_Conditions_for_Goods_and_Services_5-12-23.doc DOC document
Attachment_D-3_-Unit_1_and_Unit_2_-_Instruction_Book_Fuel_Gas_Metering_Regulating.pdf PDF
Attachment_D-4_-_Unit_1_and_Unit_2_-_Instruction_Book_for_Metering_Station_Filter_Separator.pdf PDF
Compliance_-_Submittal_Forms.pdf PDF
Attachment_D-1_-_Drawings_Total.pdf PDF
Attachment_D-1_-_Drawings_Total.pdf PDF
Attachment_D-1_-_Drawings_Total.pdf PDF
Attachment_D-2_-_Heater_Pictures.pdf PDF
Attachment_D-2_-_Heater_Pictures.pdf PDF
Attachment_D-2_-_Heater_Pictures.pdf PDF
Attachment_D-2_-_Heater_Pictures.pdf PDF
Attachment_D-1_-_Drawings_Total.pdf PDF
Attachment_'B-1'_-_Bid_Form_PR8458.xlsx XLSX spreadsheet
RFP_8458_PR_-_Natural_Gas_Yard_Maintenance.pdf PDF
Attachment_'B-1'_-_Bid_Form_PR8458.xlsx XLSX spreadsheet
Attachment_'B-2'_Company_Qualifications_Form_PR8458.docx DOCX document
Attachment_'B-2'_Company_Qualifications_Form_PR8458.docx DOCX document
RFP_8458_PR_-_Natural_Gas_Yard_Maintenance.pdf PDF
Attachment_'B-2'_Company_Qualifications_Form_PR8458.docx DOCX document
RFP_8458_PR_-_Natural_Gas_Yard_Maintenance.pdf PDF
Attachment_'B-2'_Company_Qualifications_Form_PR8458.docx DOCX document
Attachment_'B-1'_-_Bid_Form_PR8458.xlsx XLSX spreadsheet
Attachment_'B-1'_-_Bid_Form_PR8458.xlsx XLSX spreadsheet
RFP_8458_PR_-_Natural_Gas_Yard_Maintenance.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KING -MURRAY OPERATING COMPANY
ANNUAL PIPE TO SOIL SURVEY
Date4/27/24
OGS HOLOPAW
TEST SITE
STATION FOOTAGEP/S ONP/S OFFAC VOLTSDATEDESCRIPTION

0+70 -1.167 -1.034 40 mv 4/27/24 Meter Station Outlet

Rectifier-1.193-107260 mvRectifier
106+00-1.189-1.02280mvRegulator Station Inlet
106+10-1.176-1.01140 mvRegulator Skid Inlet
106+30-1.187-0.95640mvRegulator Skid Outlet

ELECTRICAL ISOLATION FLANGES

PROTECTEDUNPROTECTEDDATE
FGT Take off Flange-1.099-0.4564/27/24
Meter Skid Outlet-1.167-0.432
Regulator Inlet-1.189-0.403
Regulator Oulet1.187-0.398
COMMENTS:CP SYSTEM IS IN GOOD ORDER
A NEW UPDATED RECTIFER WAS INSTALLED AS WELL AS NEW TEST STATIONS.

Technician James McAllister

File details come from the government source that posted it. Updated .