The document is a 2022 King-Murray Operating Company Annual Pipe to Soil Survey report for the OGS Holopaw Test Site, conducted on 4/27/24. The survey documents electrical measurements and cathodic protection (CP) system assessments for various pipeline station locations, including meter and regulator stations. Measurements were taken at multiple points along the pipeline, recording pipe-to-soil potential readings and voltage measurements at different station locations such as meter station outlet rectifier, regulator station inlet, and various skid inlets and outlets.

The survey report indicates that the CP system is in good order, with a new updated rectifier and new test stations installed. The technician, James McAllister, noted electrical isolation flange measurements and provided overall system status. The document includes detailed voltage readings at specific pipeline points, with measurements ranging from -0.398 to -1.189 volts, and demonstrates a comprehensive assessment of the pipeline's electrical integrity and corrosion protection infrastructure.

View the file

Other files for this state and local contract opportunity

Other files attached to Gas Yard Maintenance at SEC & OGS, newest first.
File Type Posted
RFP_PR_8458_-_ADDENDUM_NO_1_.pdf PDF
2024_OGS_Pipe_to_soil.xlsx XLSX spreadsheet
RFP_PR_8458_-_ADDENDUM_NO_1_.pdf PDF
ATMOSPHECIC_CORROSION_2024.xlsx XLSX spreadsheet
ATMOSPHECIC_CORROSION_2024.xlsx XLSX spreadsheet
Attachment_'F'_-_Clarifications_&_Exceptions_Fill_in_Form.xlsx XLSX spreadsheet
Attachment_'F'_-_Clarifications_&_Exceptions_Fill_in_Form.xlsx XLSX spreadsheet
Attachment_'F'_-_Clarifications_&_Exceptions_Fill_in_Form.xlsx XLSX spreadsheet
Attachment_'E'_General_Terms_and_Conditions_for_Goods_and_Services_5-12-23.doc DOC document
Attachment_D-4_-_Unit_1_and_Unit_2_-_Instruction_Book_for_Metering_Station_Filter_Separator.pdf PDF
Attachment_'D-5'_OGS_Drawings.zip ZIP file
Attachment_'E'_General_Terms_and_Conditions_for_Goods_and_Services_5-12-23.doc DOC document
Compliance_-_Submittal_Forms.pdf PDF
Attachment_D-3_-Unit_1_and_Unit_2_-_Instruction_Book_Fuel_Gas_Metering_Regulating.pdf PDF
Attachment_'E'_General_Terms_and_Conditions_for_Goods_and_Services_5-12-23.doc DOC document
Attachment_D-3_-Unit_1_and_Unit_2_-_Instruction_Book_Fuel_Gas_Metering_Regulating.pdf PDF
Attachment_D-4_-_Unit_1_and_Unit_2_-_Instruction_Book_for_Metering_Station_Filter_Separator.pdf PDF
Compliance_-_Submittal_Forms.pdf PDF
Attachment_'D-5'_OGS_Drawings.zip ZIP file
Attachment_D-3_-Unit_1_and_Unit_2_-_Instruction_Book_Fuel_Gas_Metering_Regulating.pdf PDF
Attachment_D-4_-_Unit_1_and_Unit_2_-_Instruction_Book_for_Metering_Station_Filter_Separator.pdf PDF
Compliance_-_Submittal_Forms.pdf PDF
Attachment_'E'_General_Terms_and_Conditions_for_Goods_and_Services_5-12-23.doc DOC document
Compliance_-_Submittal_Forms.pdf PDF
vfile —
Attachment_'D-5'_OGS_Drawings.zip ZIP file
Attachment_D-3_-Unit_1_and_Unit_2_-_Instruction_Book_Fuel_Gas_Metering_Regulating.pdf PDF
Attachment_D-4_-_Unit_1_and_Unit_2_-_Instruction_Book_for_Metering_Station_Filter_Separator.pdf PDF
Attachment_'D-5'_OGS_Drawings.zip ZIP file
Attachment_D-1_-_Drawings_Total.pdf PDF
Attachment_D-1_-_Drawings_Total.pdf PDF
Attachment_D-2_-_Heater_Pictures.pdf PDF
Attachment_D-2_-_Heater_Pictures.pdf PDF
Attachment_D-2_-_Heater_Pictures.pdf PDF
Attachment_D-1_-_Drawings_Total.pdf PDF
Attachment_D-1_-_Drawings_Total.pdf PDF
Attachment_D-2_-_Heater_Pictures.pdf PDF
Attachment_'B-1'_-_Bid_Form_PR8458.xlsx XLSX spreadsheet
RFP_8458_PR_-_Natural_Gas_Yard_Maintenance.pdf PDF
Attachment_'B-1'_-_Bid_Form_PR8458.xlsx XLSX spreadsheet
Attachment_'B-1'_-_Bid_Form_PR8458.xlsx XLSX spreadsheet
RFP_8458_PR_-_Natural_Gas_Yard_Maintenance.pdf PDF
Attachment_'B-2'_Company_Qualifications_Form_PR8458.docx DOCX document
Attachment_'B-2'_Company_Qualifications_Form_PR8458.docx DOCX document
RFP_8458_PR_-_Natural_Gas_Yard_Maintenance.pdf PDF
Attachment_'B-2'_Company_Qualifications_Form_PR8458.docx DOCX document
RFP_8458_PR_-_Natural_Gas_Yard_Maintenance.pdf PDF
Attachment_'B-2'_Company_Qualifications_Form_PR8458.docx DOCX document
Attachment_'B-1'_-_Bid_Form_PR8458.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KING -MURRAY OPERATING COMPANY
ANNUAL PIPE TO SOIL SURVEY
Date4/27/24
OGS HOLOPAW
TEST SITE
STATION FOOTAGEP/S ONP/S OFFAC VOLTSDATEDESCRIPTION

0+70 -1.167 -1.034 40 mv 4/27/24 Meter Station Outlet

Rectifier-1.193-107260 mvRectifier
106+00-1.189-1.02280mvRegulator Station Inlet
106+10-1.176-1.01140 mvRegulator Skid Inlet
106+30-1.187-0.95640mvRegulator Skid Outlet

ELECTRICAL ISOLATION FLANGES

PROTECTEDUNPROTECTEDDATE
FGT Take off Flange-1.099-0.4564/27/24
Meter Skid Outlet-1.167-0.432
Regulator Inlet-1.189-0.403
Regulator Oulet1.187-0.398
COMMENTS:CP SYSTEM IS IN GOOD ORDER
A NEW UPDATED RECTIFER WAS INSTALLED AS WELL AS NEW TEST STATIONS.

Technician James McAllister