2024.08.16 - ADDENDUM No. 3.pdf

PDF 96 KB Posted

Attached to
Bid Pack 7 - HVAC upgrades at 6 NE area buildings
Solicitation number
RFP-WCS-240000002862-4
Issued by
Macomb County, Warren City, Michigan

About this file

This document is Addendum No. 3 to the contract documents for Bid Package No. 07 of the Warren Consolidated Schools 2022 Bond Issue, which involves HVAC upgrades at 6 NE area school buildings. The addendum includes revisions to door specifications, lighting fixture types, and hardware for certain doors. The bid due date is 2:00 PM on Thursday, August 22, 2024.

The addendum was issued by Wakely Associates, Inc. on behalf of Warren Consolidated Schools. It clarifies and revises certain aspects of the original contract documents, but the general scope of work remains the same. All bidders are required to review the addendum and include any work reasonably inferred to be part of their scope, even if not specifically detailed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM No. 03

August 16, 2024

Warren Consolidated Schools 2022 Bond Program Page 1 of 2

Bid Package No. 07 (Addendum 3) Project No. 2903

PROJECT: Warren Consolidated Schools

2022 Bond Issue

CLARK PROJECT NO.: 2903

BID PACKAGE NO.: 07

DESCRIPTION: HVAC Upgrades at (6) NE Area Buildings

BID DUE DATE/TIME: 2:00 PM, Thursday August 22, 2024

The following clarifications and/or Changes made to the Contract Documents are hereby made part of the Contract Documents.

The general character of the Work clarified or revised by this Addendum shall be the same as required by the complete set of Contract Documents. All incidentals required in connection with the Work of this Addendum shall be included in the Scope of Work even though not specifically specified.

All bidders shall be held responsible to review the Addendum and to include in its Bid

Proposal all Work reasonably inferred to be included in its Scope of Work.

Acknowledge receipt of this Addendum in the space provided on the Bid Proposal

Form.

Warren Consolidated Schools 2022 Bond Program Page 2 of 2

Bid Package No. 07 (Addendum 3) Project No. 2903

Include (u.n.o):

1. ARCHITECT / ENGINEER DOCUMENTION:

1.1. Addendum No. 3 Write-Ups, Drawings, and Specifications issued by Wakely

Associates, Inc. dated 8/16/24.

END OF SECTION

WAKELY ASSOCIATES, INC. ADDENDUM NO. THREE

ARCHITECTS WARREN CONSOLIDATED SCHOOLS

30500 Van Dyke Avenue Suite 209 2022 BOND PROGRAM VAR PROJ-BP#7 Warren, Michigan 48093 Page 1 of 1 (write up only)

ADDENDUM NO. THREE to the plans and specifications for the WARREN

CONSOLIDATED SCHOOLS, 2022 BOND ISSUE RENOVATIONS, BID PACK #7,

Warren, MI, Architect’s Project No. 232017, dated August 2, 2024

The above plans and specifications are modified, supplemented, or augmented as follows, and this ADDENDUM NO. THREE, is hereby made a part of the contract documents.

No specification sections or drawings are being issued with this Addendum, write up only.

ARCHITECTURAL ITEMS

ITEM NO. A1: Refer to sheet A17.12 (not issued):

1. Revise doors E112A and E113 from FRP with aluminum frame to type ‘F’ 20 minute rated stained wood doors with hardware set number 2. Prep. and paint existing hollow metal frame.

2. Add hardware set No. 26 to door C131A.

ELECTRICAL ITEMS

ITEM NO. E1 Refer to sheet E0.01 (not-issued):

1. Revise luminaire schedule note No. 4. At Carleton only, luminaires L4, L4E, L6 and L6E shall be 8” diameter recessed downlights throughout. All remaining schools included in bid pack No. 7 shall reflect the luminaire schedule and have 6” diameter recessed downlights.

END OF ADDENDUM NO. 03

Cc: Nick Pitrone, Warren Consolidated Schools Ron Zuhorski, Plante Moran Cresa Jade Warner, Clark Construction Company

2024.08.16 - ADDENDUM No. 3 - Write Up
2024.08.16 BP7 Addendum 3 Narrative