2024.07.02 - Olean Sewer Replacement & Levee Restoration.pdf
PDF 6 MB Posted
- Solicitation number
- 2110985
- Issued by
- Cattaraugus County, New York
About this file
This document contains design drawings and specifications for the Olean Sewer Replacement & Levee Restoration project, which is being prepared by McMahon & Mann Consulting Engineering and Geology, P.C. on behalf of the City of Olean Department of Public Works. The project involves the removal and replacement of a damaged 15-inch sanitary sewer pipe buried under a flood protection levee along Olean Creek. It will require excavation of the levee to access the pipe and backfill placement to restore the site after the pipe replacement. The project plan includes details on existing conditions, site access, excavation, final grading, and utility connections. The estimated quantities for various construction activities are provided. The work is to be conducted during the late summer/early fall when creek levels are historically lowest.
The contract opportunity is a single procurement for the levee reconstruction and sewer replacement with no set-asides or sub-contracting goals indicated. The due date for responses is July 11, 2024 at 1:30 PM. No information is provided on identical or substantially similar contracts awarded in the past 5 years. The contract is located in Olean, New York within Cattaraugus County.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 17.docx | DOCX document | |
| BO5.1.pdf | ||
| Complete Project Bid Doc-6.05.24.pdf | ||
| 2024.06.06 - Plans & Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sanitary Sewer Pipe Repair and
Olean Creek Levee Reconstruction
City of Olean – Department of Public Works
Design Drawings
Prepared by
McMahon & Mann Consulting Engineering and Geology, P.C.
PREPARED BY: PREPARED FOR:
City of Olean - Department of Public Works 101 East State Street
Olean, New York 14760
OLEAN FLOOD PROTECTION LEVEE
CONTRACT PLANS
SHEET DESCRIPTION
TITLE PAGE
SUMMARY OF QUANTITIES AND GENERAL NOTES
McMahon & Mann Consulting Engineering and Geology, P.C.
2495 Main Street, Suite 432 Buffalo, NY 14214
(716) 834-8932 www.mmce.net
OLEAN, NEW YORK
INDEX OF PLANS
JUNE 2024
DWG. NO. 23021-007a
EXISTING CONDITIONS PLAN AND EXISTING CONDITIONS CROSS SECTION
SITE ACCESS PLAN
EXCAVATION PLAN, EXCAVATION CROSS SECTION, AND EXCAVATION PROFILE
FINAL GRADING PLAN, FINAL GRADING CROSS SECTION, AND FINAL GRADING PROFILE
FINAL GRADING AND MANHOLE CONNECTION DETAILS
ITEM
NUMBER ITEM DESCRIPTION UNIT ESTIMATED
QUANTITY
ACTUAL
QUANTITY
DIVISION 02 - EXISTING CONDITIONS
022100-4.1 SURVEYING AND RECORD PLANS LUMP SUM 1
024300-4.1 SANITARY BYPASS SYSTEM LUMP SUM
311100-4.1 TOPSOIL REMOVAL CUBIC YARD
312219-4.3 REVEGETATION ACRE
312319-4.1 EXCAVATION DEWATERING LUMP SUM
312323-4.1 SLOPED EXCAVATION
312323-4.2 SOIL TESTING (SLOPED EXCAVATION AND
RELIEF TRENCH EXCAVATION)
312323-4.3 TRENCH EXCAVATION AND DISPOSAL
312323-4.4 FLOWABLE FILL
312323-4.5 SUITABLE FILL - ONSITE
312323-4.6 SUITABLE FILL - OFFSITE
312323-4.7 FIELD DENSITY TESTING (SUITABLE FILL)
312323-4.8 RELIEF TRENCH CONNECTION
312500-4.1 EROSION AND SEDIMENTATION CONTROL
330100-4.1 PIPE PROTECTION
330130-4.1 PIPE VERIFICATION
333000-4.1 REMOVAL AND DISPOSAL OF EXISTING
SANITARY PIPE
333000-4.3 INSTALLATION OF NEW SANITARY PIPE
DIVISION 31 - EARTHWORK
LUMP SUM
LUMP SUM
DIVISION 33 - UTILITIES
LUMP SUM
LUMP SUM
LINEAR FEET
LINEAR FEET
0.31
3,500
3,500
CUBIC YARD
CUBIC YARD
CUBIC YARD
CUBIC YARD
312219-4.2
312219-4.1 TOPSOIL - ONSITE
TOPSOIL - OFFSITE
ACRE
CUBIC YARD
CUBIC YARD
LUMP SUM
LINEAR FEET
0.31
SUMMARY OF QUANTITIES
ABBREVIATIONS FOR CONTRACT PLANS
C.I.P. CAST IRON PIPE
C.M. CORRUGATED METAL
C.M.P. CORRUGATED METAL PIPE
DIA. DIAMETER
DWG. DRAWING
EL. ELEVATION
INV. INVERT
MAX. MAXIMUM
M.H. MANHOLE
MIN. MINIMUM
NO. NUMBER
NYSDEC NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
OSHA OCCUPATIONAL SAFETY AND HEALTH ORGANIZATION
P.V.C. POLYVINYL CHLORIDE
SAN. SANITARY
SDR STANDARD DIMENSION RATIO
STORM. STORMWATER
USACOE UNITED STATES ARMY CORPS OF ENGINEERS
USGS UNITED STATES GEOLOGICAL SURVEY
GENERAL NOTES
1. The project involves the removal and replacement of a damaged sanitary sewer pipe buried under a flood protection levee in the City of Olean. The project will require excavation of the flood protection levee to reach the pipe and backfill placement to restore the site to preconstruction conditions after replacement of the sanitary pipe. The flood protection levee under this project is located on the east side of Olean Creek.
2. The provided Technical Specifications should be used in conjunction with the Contract Plans. The pay item numbers shown on the Contract Plans for specified material and construction activities are in accordance with the Technical Specifications.
3. Subsurface explorations have been completed for this project at the locations indicated on Sheet 3 of the Contract Plans. Boring logs, groundwater monitoring well installation logs, and other subsurface information shall be made available for the inspection of bidders.
4. Unless otherwise noted or approved by the Engineer, construction work is to be accomplished in the sequence as shown on the Contract Plans and as described in the Technical Specifications.
5. The Contractor shall supply a materials list of chemicals to be used or stored on the job site. This shall include material safety data sheets and documentation of worker training.
6. Access for rescue and fire fighting equipment and personnel shall be maintained at all times. The rescue and fire fighting operations shall have right-of-way over all Contractor's operations at all times.
7. The Contractor shall refer to the Technical Specifications for time constraints and construction scheduling.
8. All elevations shown on the Contract Plans are based on NAVD 88.
9. The Contractor shall examine and verify, in the field, all conditions and dimensions. The Contractor shall take all field measurements to ensure proper fit of the finished work, and the contractor shall assume full responsibility for their accuracy. If field conditions and dimensions differ from those shown on the Contract Plans, the Contractor shall use the field conditions and dimensions and make the appropriate changes to those shown on the Contract Plans, as approved by the Engineer. When shop drawings based on field measurements are submitted for approval, the field measurements made shall be indicated on the shop drawings submitted for reference of the reviewer.
10. The Contractor's attention is directed to the fact that, due to the nature of reconstruction projects, the exact extent of reconstruction work cannot always be accurately determined prior to the commencement of work. The Contract Plans and Technical Specifications have been prepared based on field inspection, historical construction drawings, and other information available at the time. Actual field conditions may require modifications to construction details and work quantities. The Contractor shall perform the work in accordance with field conditions.
11. The Contractor will be held responsible for all damage to existing utilities and structures caused by its operations which are not included as part of the intended work. All damage to the existing structures which are not part of the intended work shall be repaired by the Contractor without cost to the Owner, and to the satisfaction of the Engineer and Owner.
12. The Contractor shall conduct its operations to the satisfaction of the Owner to prevent or reduce to a minimum any damage to any waterway from pollution by debris, sediment, or other foreign material, or from the manipulation of equipment and/or materials in or near Olean Creek. The Contractor shall not return directly to a stream, or to a ditch immediately flowing into a stream, any water which has been used for wash purposes or other similar operations which could cause this water to become polluted with sand, silt, cement, oil, or other impurities.
13. Visibly turbid discharges from dewatering operations or excavation activities shall not be allowed to enter any waterway. The Contractor shall be responsible for all measures necessary to eliminate the turbidity prior to discharge.
14. Erosion and sedimentation control measures are described on the Contract Plans and in the Technical Specifications (Section 31 25 00 - Erosion and Sedimentation Control). The Contractor shall modify the controls as necessary to accommodate its operations, and obtain approval by the Engineer and Owner prior to implementing any changes.
15. The Contractor shall contact Dig Safely New York in advance of any digging to avoid interruption of service provided by underground utilities. The phone number is 811.
16. Should utilities be encountered during construction which interfere with the work and for which provisions are not provided on the Contract Plans, the Contractor shall immediately notify the Engineer and Owner of their existence and extent of conflict with the work. The Contractor shall make arrangements with the owning agency to modify the site in order to allow the work to progress. Any adjustments to contract quantities as a result of such utility conflicts will be paid for at contract unit prices.
17. Location of utilities, public and/or private, indicated as existing and/or to be constructed as shown on the Contract Plans, are approximate only. Their exact location shall be determined in the field. Additional utility lines, whether abandoned or in service, may exist and it shall be the Contractor's responsibility to conduct its operations and take the necessary precautions to prevent interference with or damage to these or other facilities during the course of construction.
18. In the event the Contractor damages an existing utility service, causing an interruption in said service, it shall immediately commence work to restore service and may not cease its work operation until service is restored. Any damage caused by the Contractor's operations shall be repaired by the Contractor at no cost to the Owner.
19. The Contractor is to be aware that the water level in Olean Creek varies depending on evaporation, rainfall within the watershed, and downstream discharge. The Owner has indicated that the anticipated rise in water level in the creek is delayed several days following a significant precipitation event.
20. Work for this project is to be conducted during late summer/early fall when the water level historically in the creek has been at its lowest levels.
FLOOD EMERGENCY OPERATION PLAN NOTES
1. The Contractor shall monitor the forecasted and actual precipitation within the Olean Creek watershed and the potential effects on the water level in Olean Creek at the construction site. Early preventative action can be critical should a rain event be predicted. Coordination and consultation with the Owner is required during critical periods of construction. Prior to the start of construction, the NYSDEC and USACE shall determine and provide to the Contractor the "action" stage level of the creek that will initiate the flood emergency operation plan.
2. There are two USGS gaging stations located downstream of the project site. The first gaging station is USGS Gage 03010810 "Olean Creek at Olean NY" - this gaging station is located within Olean Creek and is shown to be deactivated. The second gaging station is USGS Gage 03010820 "Allegheny River at Olean NY" - this active gaging station is located along the Allegheny River at the City of Olean wastewater treatment plant.
3. The Contractor will be required to install a temporary staff gage along the bank of Olean Creek to monitor the water level in the creek, Item No. 022100-4.1, prior to the commencement of earthwork. The gage should be placed so that it is visible without obstructions throughout the construction schedule and so that it remains visible at increasing water levels. The gage should have graduated marks at each tenth of a foot of height and it should have additional distinctive marks at each whole foot. The "action" stage level determined for the construction site will be measured with respect to this temporary staff gage. The Contractor shall observe the stage level of the creek at the beginning and end of every day and shall report its observations to the Engineer and Owner.
4. Prior to the commencement of earthwork, the Contractor will be required to coordinate with the Engineer and Owner the criteria for backfill placement and compaction in the event of the "action" stage level of the creek. The criteria should be in general accordance with the Technical Specifications (Earthwork - Section 312323).
5. In the event the floodwaters are predicted to reach an "action" stage level within a 48-hour time span as identified by the NYSDEC and USACE, the Contractor must initiate the closure of the flood protection levee excavation as follows:
a. Stop all work, temporarily cover/cap-off exposed sanitary piping to a sealed condition, and remove any temporary excavation dewatering measures.
b. Backfill the excavation with stockpiled suitable fill material located near the excavation as indicated on Sheet 4 of the Contract Plans. The backfill shall be placed and compacted in general accordance with Note 4 of the Flood Emergency Operation Plan Notes.
d. Provide a 14-foot top width flood protection levee crest and match the existing embankment slopes on both the upstream and downstream sides.
e. Provide erosion and sedimentation control measures on the downstream slopes to prevent soil erosion during the "action" event.
f. When flood waters recede below the "action" stage level, the Contractor can resume work, at their own risk, by re-excavating the work area to the condition it was prior to the "action" event.
6. Contractor to notify the Engineer and Owner immediately upon enactment of flood protection levee excavation closure. A project contact list will be composed upon award of contract so that all involved parties remain informed.
7. The costs associated with the Flood Emergency Operation Plan will be negotiated in the event of the "action" stage level of the creek.
333000-4.2 REMOVAL AND DISPOSAL OF 1949
SANITARY MANHOLE LUMP SUM 1
C
AT
TA
R
AU
G
U S
C O
U N
TY
R
EV
R
EV
R
EV
N
EW
Y O
R K
O
LE
AN
F
LO
O
D P
R O
TE
C
TI
O
N L
EV
EE
SU
M
M
AR
Y O
F Q
U
AN
TI
TI
ES
A
N D
G
EN
ER
AL
N O
TE
S
A.J.N. / T.W.S.
N.T.S.
23021-007b
DESIGNED BY:
JUNE 2024
DWG. NO.
SHEET:
JOB NO.
DATE:
SCALE:
23-021
CHECKED BY:
0REVISION NUMBER -
K.M.M.
K.M.M.DRAWN BY:
N O
TE
U N
AU
TH
O R
IZ
ED
A
LT
ER
AT
IO
N
O R
A D
D
IT
IO
N
TO
A
N Y
SU
R
VE
Y, D R
AW
IN
G , D
ES
IG
N
SP
EC
IF
IC
AT
IO
N , P
LA
N
, O R
R
EP
O R
T
IS
A
VI
O
LA
TI
O
N O
F
SE
C
TI
O N
PR
O
VI
SI
O
N
O F
TH
E
N
EW
Y O
R K
ST
AT
E
ED
U C
AT
IO
N L
AW
M cM ah on
M an n
C on su lti ng E ng in ee rin g an d G eo lo gy , P
.C
M ai n St re et
, S ui te
Bu ffa lo
, N Y
(7
)8
-8 w w w .m m ce
.n et
PLAN LEGEND
EXISTING GROUND CONTOURS
(SEE NOTE 1)
CREST OF FLOOD CONTROL
LEVEE
APPROXIMATE EDGE OF OLEAN
CREEK (DECEMBER 22, 2023)
RELIEF TRENCH LIMITS
(SEE NOTE 3)
BORING LOCATION,
DESIGNATION, AND GROUND
SURFACE ELEVATION
(SEE NOTE 4)
EXISTING CONDITIONS PLAN LEGEND NOTES
1. Base map adapted from survey completed by KHEOPS
Architecture, Engineering & Survey, DPC, dated December 2023.
2. The locations of the underground structures and utilities were adapted from the drawings titled, "Plan and Profile Sanitary Sewer
Reconstruction Boardmanville Outlet Sewer," prepared by City of
Olean, N.Y. Engineering Department, dated August 1949 and
"Olean Flood Protection Project, Unit Two, Allegheny River Olean, NY, Plan & Profile - Olean Creek, STA. 380+00 to STA. 394+00, STA. 578+00 to STA. 579+00," prepared by Knappen Engineering
Co. and Department of the Army Corps of Engineers, dated
December 1951.
3. The limits of the relief trench were adapted from the drawings titled, "Olean Flood Protection Project, Unit Two, Allegheny River
Olean, NY, Plan & Profile - Olean Creek, STA. 380+00 to STA.
394+00, STA. 578+00 to STA. 579+00," prepared by Knappen
Engineering Co. and Department of the Army Corps of Engineers, dated December 1951 and "Olean Flood Protection Project, Unit
Two, Allegheny River Olean, NY, Plan & Profile - Allegheny River, STA. 9+00 to STA. 23+00," prepared by Knappen Engineering Co.
and Department of the Army Corps of Engineers, dated June
1952.
4. Borings and groundwater monitoring wells installed in November
2023 by Earth Dimensions, Inc. Boring and groundwater monitoring well locations and ground surface elevations were adapted from the topographic survey completed by KHEOPS
Architecture, Engineering & Survey, DPC, dated December 2023.
EXISTING SANITARY MANHOLE
TOP OF STREAMBANK
BOTTOM OF STREAMBANK
EXISTING HANDRAIL
STONE LINED ACCESS ROAD
BORING AND GROUNDWATER
MONITORING WELL LOCATION,
DESIGNATION, AND GROUND
SURFACE ELEVATION
(SEE NOTE 4)
EXISTING CONCRETE LIMITS
EXISTING STRUCTURE
EXISTING STORMWATER PIPE
TO REMAIN
EXISTING SANITARY PIPE TO
REMAIN
APPROXIMATE LIMITS OF
OBSERVED SINKHOLE
B-3-23
GS. EL. 1420.7
B-1-23
GS. EL. 1429.9
1949 SANITARY MANHOLE
(SEE NOTE 2)
ABANDONED 15-INCH DIAMETER
SANITARY PIPE (SEE NOTE 2)
REMOVED 24-INCH DIAMETER
CONCRETE DRAIN PIPE (SEE NOTE 2)
EXISTING BRUSH LINE
DAMAGED SANITARY PIPE TO BE
REPLACED
O L E
A N
C R
E E
K
18-INCH DIA.
STORM. PIPE
CONCRETE CULVERT
HEADWALL AND
WINGWALLS
CONCRETE CULVERT
HEADWALL AND
WINGWALLS
STORM. M.H.
CONCRETE CULVERT
HEADWALL AND
WINGWALLS
INV. EL. 1414.41
INV. EL. 1414.21
SAN. M.H. - NO. GV59
RIM EL. 1429.7
DAMAGED 15-INCH
DIA. C.M.P. (TO BE
REPLACED)
CHANNEL INVERT
EL. 1407.19
CHANNEL INVERT
EL. 1407.22 INV. EL. 1408.44
(PIPE UNDERWATER)
SAN. M.H. - NO. N0A1
RIM EL. 1418.1
INV. EL. 1408.32
10-INCH DIA. C.M.P.
24-INCH DIA. STORM. PIPE
INV. EL. 1414.43
APPROXIMATE LIMITS OF
SINKHOLE OBSERVED
ON THE INBOARD SIDE
(FEBRUARY 2023)
INV. EL. 1407.77
INV. EL. 1408.75
SAN. M.H. - SOUTH
RIM EL. 1420.6
TEMPORARY SHED
TO BE REMOVED
BY OWNER
10-INCH DIA. C.M.P
B-2-23
GS. EL. 1430.2
15-INCH DIA. C.M.P.
INV. EL. NOT KNOWN
15-INCH DIA. C.I.P. CONTINUES
BELOW CREEK
3 3 1
15-INCH DIA. C.M.P. EXTENDS
AN ADDITIONAL 228 FEET
NORTH TO SAN. M.H. - NORTH
PREVIOUSLY REMOVED
24-INCH DIA. CONCRETE
DRAIN PIPE
PREVIOUSLY ABANDONED 15-INCH
DIA. SAN. PIPE - CONDITION TO BE
FIELD VERIFIED
B-1-23
GS. EL. 1429.9
B-3-23
GS. EL. 1420.7
APPROXIMATE LIMITS OF
SINKHOLE OBSERVED
ON OUTBOARD SIDE
(DECEMBER 2023)
1949 SAN. M.H. - TO BE DISPOSED
OF IF ENCOUNTERED
RELIEF TRENCH - LOCATION
AND DIMENSIONS TO BE
FIELD VERIFIED
S T
O N
E L
IN
E
D A
C C
E S
S R
O A
D
E L E
V A
T
IO
N
F T
OUTBOARD
SINK HOLE
INBOARD
SINK HOLE TEMPORARY SHED TO
BE REMOVED BY OWNER
CROSS SECTION LEGEND
EXISTING GROUND SURFACE
SAN. MAN. - NO. N0A1
RIM EL. 1418.1
SAN. M.H. - NO. GV59
RIM EL. 1429.7
CHANNEL INV. EL. 1407.19 CHANNEL INV. EL. 1407.22
10-INCH DIA. C.M.P.
INV. EL. 1408.32
15-INCH DIA. C.I.P.
CONTINUES BELOW CREEK
15-INCH DIA. C.M.P.
INV. EL. NOT KNOWN
OLEAN CREEK ON DECEMBER 22, 2023
APPROXIMATE ALIGNMENT OF DAMAGED SANITARY PIPE TO BE REPLACED
OLEAN CREEK (EL. 1412.7)
ON DECEMBER 22, 2023
GROUNDWATER MONITORING WELL SCREEN ZONE (INCLUDING SAND PACK)
N
NUMBER OF HAMMER BLOWS REQUIRED TO ADVANCE A SPLIT SPOON SAMPLER, 24 INCHES, PER ASTM D 1586
WATER LEVEL MEASURED IN GROUNDWATER MONITORING WELL ON MARCH 5, 2024
B-3-23
OFFSET 5.1' NORTH
GS EL.1420.7
<1
N
EL. 1411.2
<2
22.5' (EL. 1398.2)
23.5' (EL. 1397.2)
25.0' (EL. 1395.7)
SANDY SILT
4.5' (EL. 1416.2)
0.6' (EL. 1420.1)
SILTY CLAY
SAND, SILT,
AND CLAY WITH
GRAVEL FILL
SANDY SILT
(TOPSOIL FILL)
28.0' (EL. 1392.7)
END OF BORING
SANDY SILT
SILTY SAND
AND GRAVEL
INV. EL. 1408.44
(PIPE UNDERWATER)
EXISTING GROUND SURFACE
PREVIOUSLY
ABANDONED
15-INCH DIA. SAN.
PIPE (SEE NOTE 1)
1949 SAN. M.H. - CONDITION TO
BE FIELD VERIFIED (SEE NOTE 1)
EXISTING CONDITIONS CROSS SECTION LEGEND NOTES
1. The August 1949 Plan shows that the 1949 Sanitary Manhole was to be removed. However, the December 1951 Plan does not indicate that the 1949 Sanitary Manhole was removed. There is a possibility that the sanitary manhole still remains and is buried under the flood protection levee. The August 1949 Plan and the December 1951
Plan show that the 15-inch diameter, 835 foot long, sanitary pipe that fed into the 1949 Sanitary Manhole (extends into the page to the north) was abandoned and plugged at both ends of the pipe. The August 1949 Plan shows that two corrugated metal square seep rings, approximately 5.5 feet in length and height, were to be installed around the 15-inch diameter corrugated metal pipe, at the 1949 Sanitary Manhole and approximately 15 feet west of the 1949 Sanitary Manhole. It is not clear on the
December 1951 Plan if the seep rings were installed. Locations of these items will be field verified during construction.
2. The June 1952 Plan shows that the relief trench was constructed at the toe of the flood protection levee for a length of approximately 170 feet and was backfilled with graded sand and gravel. The relief trench was installed with an approximate width of 2 feet and extended approximately 0.5 feet into the pervious soil (i.e., sandy silt) for a total depth between 3 and 6 feet. Location and dimension to be field verified during construction.
RELIEF TRENCH -
LOCATION AND DIMENSION
TO BE FIELD VERIFIED
(SEE NOTE 2)
15-INCH DIA. C.M.P.
C.M. SQUARE SEEP RING -
LOCATIONS TO BE FIELD
VERIFIED (SEE NOTE 1)
B-1-23
OFFSET 20.2' NORTH
GS EL.1429.9
0.4' (EL. 1429.5)
13.0' (EL. 1416.9)
14.5' (EL. 1415.4)
18.0' (EL. 1411.9)
29.0' (EL. 1400.9)
32.0' (EL. 1397.9)
38.0' (EL. 1391.9)
SANDY SILT
SAND, SILT, AND
CLAY WITH
GRAVEL FILL
SILTY SAND
AND GRAVEL
SILTY CLAY
SANDY SILT
(TOPSOIL FILL)
40.0' (EL. 1389.9)
END OF BORING
CLAYEY SILT
FILL
SAND, SILT, AND
CLAY
SAND AND
GRAVEL
N
SLUICE GATE ON THE EAST WALL
OF SAN. M.H. - NO. GV59 THAT
CONTROLS FLOW INTO THE M.H.
APPROXIMATE ALIGNMENT OF SANITARY PIPE TO REMAIN
APPROXIMATE ALIGNMENT OF SANITARY CHANNEL TO REMAIN
CHANNEL
EXISTING SINKHOLE NOTES
1. The inboard and outboard sinkholes were temporarily remediated in March 2024. Procedures included excavating the previously placed sand, placing flowable fill into the void until it was filled, and placing a cover and erosion protection above the flowable fill. The flowable fill that was placed into the sinkholes appeared to remain within the void that was visible from the ground surface; there was no evidence that it flowed into and underground void network.
SCALE: 1" = 20'
0 10' 20'20'
C A
T T
A R
A U
G U
S C
O U
N T
Y
R E
V
R E
V
R E
V
N E
W Y
O R
K
O L E
A N
F L O
O D
P R
O T
E C
T
IO
N L
E V
E E
E X
IS
T
IN
G
C O
N D
IT
IO
N S
P L A
N A
N D
E X
IS
T
IN
G
C O
N D
IT
IO
N S
C R
O S
S S
E C
T
IO
N
A.J.N. / T.W.S.
AS SHOWN
23021-003
DESIGNED BY:
JUNE 2024
DWG. NO.
SHEET:
JOB NO.
DATE:
SCALE:
23-021
CHECKED BY:
0REVISION NUMBER -
K.M.M.
K.M.M.DRAWN BY:
N O
T E
U N
A U
T H
O R
IZ
E
D A
L T
E R
A T
IO
N
O R
A D
D
IT
IO
N
T O
A N
Y S
U R
V E
Y
D R
A W
IN
G
D
E S
IG
N
S P
E C
IF
IC
A T
IO
N
P
L A
N
O R
R E
P O
R T
I S
A
V
IO
L A
T
IO
N O
F S
E C
T
IO
N
P
R O
V
IS
IO
N
O F
T H
E N
E W
Y O
R K
S T
A T
E E
D U
C A
T
IO
N L
A W
M cM ah on
M an n
C o n s u lt in g E n g in e e ri n g a n d G e o lo g y P
.C
M a in
S tr e e t, S u it e
B u ff a lo N
Y
(7
-8 w w w .m m c e
.n e t
SCALE: 1" = 20'
EXISTING CONDITIONS PLAN
SCALE: 1" = 10'
EXISTING CONDITIONS CROSS SECTION
3 3
SCALE: 1" = 10'
0 5' 10'10'
J u ly
A d d e d E x is ti n g S in k h o le
N o te
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
LEGEND
DAMAGED SANITARY PIPE TO BE REPLACED
LEGEND NOTE
1. Base map adapted from Google Earth imagery, acquired on March 11, 2024.
SITE ACCESS PATH
SANITARY PIPE TO REMAIN
STORMWATER PIPE TO REMAIN
SANITARY BYPASS SYSTEM< <
POTENTIAL MATERIAL STOCKPILE AREA
POTENTIAL STAGING AREA
OLE
AN C
REEK
NO
RT
H
UN
IO
N
ST
RE
ET
E
XT
EN
SI
O
N
SAN. M.H. - NO. GV59
RIM EL. 1429.7
SAN. M.H. - NO. N0A1
SAN. M.H. - NORTH
RIM. EL. 1422.44
SAN. M.H. - SOUTH
RIM EL. 1420.6
STORM. M.H.
INV. EL. 1408.75
INV. EL. 1407.77
INV. EL. 1408.32
INV. EL. NOT KNOWN
INV. EL. 1408.13
INV. EL. 1407.22
INV. EL. 1407.19
POTENTIAL MATERIAL
STOCKPILE AREA
(SEE SITE ACCESS NOTES)
POTENTIAL STAGING AREA
(SEE SITE ACCESS NOTES)
SANITARY BYPASS SYSTEM,
ITEM NO. 024300-4.1
SANITARY BYPASS SYSTEM,
ITEM NO. 024300-4.1
INV. EL. 1408.00
1949 SAN. M.H. (NOT KNOWN
IF STRUCTURE REMAINS)
INV. EL. 1408.44
SITE ACCESS NOTES
1. The Contractor shall confine its activities to the work areas shown and shall limit its travel to and from the work site to the access path shown. The access path crosses private property that the Owner has negotiated use of. The private property owners access and needs must not be restricted by construction activities.
2. The Contractor shall be responsible for the maintenance of the site access road to the staging, work, or stockpile areas in accordance with the Contract Plans and Technical Specifications.
3. Stockpiled material shall be located within the designated staging or stockpile areas shown and as directed by the Owner. The stockpiled material shall be placed in accordance with the Technical Specifications.
4. It is the responsibility of the Contractor to grade and prepare the staging area as necessary for storing its equipment and materials.
SANITARY BYPASS SYSTEM CONSTRUCTION SEQUENCE NOTES
1. Prior to the commencement of earthwork, the Contractor shall install all pumps and pipes necessary to maintain the sanitary flow to Sanitary Manhole - No. GV59, Item No. 024300-4.1. This shall include pumping directly from Sanitary Manhole - North and Sanitary Manhole - South to Sanitary Manhole - No. GV59, bypassing Sanitary Manhole - No. N0A1.
2. Sanitary pipes exiting the Sanitary Manhole - North and Sanitary Manhole - South which flow to Sanitary Manhole - No. N0A1 shall be temporarily plugged to prevent downstream flow.
3. The sluice gate located on the inlet to Sanitary Manhole - No. GV59 shall be closed. This gate shall remain closed while the bypass pipes are discharging into the manhole.
4. Earthwork shall commence after the pumps and pipes have been installed, critical gates have been closed, critical pipes have been plugged, and sanitary flow has been directed away from Sanitary Manhole - No. N0A1.
5. The sanitary bypass will be operated as needed during the duration of construction until the new sanitary piping is installed and inspected to the satisfaction of the Engineer and Owner.
6. Remove all temporary piping, pumps, plugs, and restore Sanitary Manhole - North and Sanitary Manhole - South to original condition upon completion of construction work.
SCALE: 1" = 100'
0 50' 100'100'
C
AT
TA
R
AU
G
U S
C O
U N
TY
R
EV
R
EV
R
EV
N
EW
Y O
R K
O
LE
AN
F
LO
O
D P
R O
TE
C
TI
O
N L
EV
EE
SI
TE
A C
C
ES
S
PL
AN
A.J.N. / T.W.S.
1" = 100'
23021-005
DESIGNED BY:
JUNE 2024
DWG. NO.
SHEET:
JOB NO.
DATE:
SCALE:
23-021
CHECKED BY:
0REVISION NUMBER -
K.M.M.
K.M.M.DRAWN BY:
N O
TE
U N
AU
TH
O R
IZ
ED
A
LT
ER
AT
IO
N
O R
A D
D
IT
IO
N
TO
A
N Y
SU
R
VE
Y, D R
AW
IN
G , D
ES
IG
N
SP
EC
IF
IC
AT
IO
N , P
LA
N
, O R
R
EP
O R
T
IS
A
VI
O
LA
TI
O
N O
F
SE
C
TI
O N
PR
O
VI
SI
O
N
O F
TH
E
N
EW
Y O
R K
ST
AT
E
ED
U C
AT
IO
N L
AW
M cM ah on
M an n
C on su lti ng E ng in ee rin g an d G eo lo gy , P
.C
M ai n St re et
, S ui te
Bu ffa lo
, N Y
(7
)8
-8 w w w .m m ce
.n et
SCALE: 1" = 100'
SITE ACCESS PLAN
(SEE NOTE 1)
APPROXIMATE EDGE OF
OLEAN CREEK
(DECEMBER 22, 2023)
EXISTING BRUSH LINE
NOTE
1. Base map adapted from survey completed by
KHEOPS Architecture, Engineering & Survey, DPC, dated December 2023.
EXISTING SANITARY MANHOLE
TOP OF STREAMBANK
BOTTOM OF STREAMBANK
EXISTING HANDRAIL
STONE LINED ACCESS ROAD
EXISTING CONCRETE LIMITS
EXISTING STORMWATER PIPE
TO REMAIN
EXISTING SANITARY PIPE TO
REMAIN
SLOPED EXCAVATION GRADES
1949 SANITARY MANHOLE
ABANDONED 15-INCH
DIAMETER SANITARY PIPE
RELIEF TRENCH LIMITS
DAMAGED SANITARY PIPE
TO BE REPLACED
LIMITS OF TRENCH
EXCAVATION
O L E
A N
C R
E E
K
5 5
5 5
5 5
SAN. M.H. - SOUTH
10-INCH DIA. C.M.P.
15-INCH DIA. C.M.P.
STORM. M.H.
SAN. M.H. - NO. GV59
(TO REMAIN AND BE PROTECTED)
TRENCH EXCAVATION AND DISPOSAL,
ITEM NO. 312323-4.3,
- SEE SECTIONS
5 5
2.5H:1V
.5
H :1
V
10H:1V
SAN. M.H. - NO. N0A1 (TO REMAIN AND BE PROTECTED)
REMOVAL AND
DISPOSAL OF 1949
SANITARY MANHOLE,
ITEM NO. 333000-4.2
LOCATE RELIEF TRENCH
DURING SLOPED EXCAVATION
5 5
50H:1V
ABANDONED 15-INCH
DIA. SAN. PIPE TO BE
EVALUATED ONCE
EXPOSED
LIMITS OF TOPSOIL REMOVAL,
ITEM NO. 311100-4.1
REMOVAL AND DISPOSAL OF EXISTING
SANITARY PIPE, ITEM NO. 333000-4.1
5 5
PIPE PROTECTION,
ITEM NO. 330100-4.1
PIPE PROTECTION,
ITEM NO. 330100-4.1
PIPE PROTECTION,
ITEM NO. 330100-4.1
18-INCH DIA.
STORM. PIPE
15-INCH DIA. C.I.P.
(TO REMAIN AND
BE PROTECTED)
CHANNEL INVERT
EL. 1407.19
CHANNEL INVERT
EL. 1407.22
INV. EL. 1408.44
INV. EL. 1408.32
INV. EL. NOT KNOWN
S T
O N
E L
IN
E
D A
C C
E S
S R
O A
D
.5
H :1
V
E L E
V A
T
IO
N
F T
0.5' (MIN.)
SAN. M.H. - NO. N0A1
RIM EL. 1418.1
SAN. M.H. - NO. GV59
RIM EL. 1429.7
CHANNEL INV. EL. 1407.22
10-INCH DIA.
C.M.P. TO REMAIN
15-INCH DIA. C.I.P.
TO REMAIN
15-INCH DIA.
C.M.P. TO REMAIN
OLEAN CREEK (EL. 1412.7)
ON DECEMBER 22, 2023
INV. EL. 1408.44
APPROXIMATE
EXCAVATION EL. 1406.76
TO BE FIELD VERIFIED
APPROXIMATE
EXCAVATION EL. 1407.93
TO BE FIELD VERIFIED
EXCAVATION EL. 1410.00 EXCAVATION EL. 1411.00
EXISTING GROUND SURFACE
LIMIT OF TRENCH EXCAVATION AND DISPOSAL,
ITEM NO. 312323-4.3
REMOVAL AND
DISPOSAL OF 1949
SANITARY MANHOLE,
ITEM NO. 333000-4.2
LOCATE RELIEF TRENCH DURING
SLOPED EXCAVATION
C.M. SQUARE SEEP RINGS TO BE
DISPOSED OF IF ENCOUNTERED
SLOPED EXCAVATION,
ITEM NO. 312323-4.1
REMOVAL AND DISPOSAL
OF EXISTING SANITARY
PIPE, ITEM NO. 333000-4.1
SAN. M.H. - NO. GV59
SLUICE GATE TO REMAIN
ABANDONED 15-INCH DIA.
SAN. PIPE TO BE EVALUATED
ONCE EXPOSED
0.5' (MIN.)
PIPE REMOVAL FROM
MANHOLE - SEE DETAIL 3
5 7
CHANNEL INV. EL. 1407.19
PIPE REMOVAL FROM
MANHOLE - SEE DETAIL 3
5 7
E L
E V
A T
IO
N
F
T
2.5' (MIN.)
EXISTING GROUND SURFACE
SLOPED EXCAVATION,
ITEM NO. 312323-4.1
EL. VARIES
EL. VARIESTRENCH EXCAVATION AND DISPOSAL,
ITEM NO. 312323-4.3
REMOVAL AND DISPOSAL OF
EXISTING SANITARY PIPE,
ITEM NO. 333000-4.1
2.5
2.5
EXCAVATION CONSTRUCTION SEQUENCE NOTES
1. Prior to the start of construction, pipe protection shall be installed over the 18-inch diameter stormwater pipe within the limits shown, Item No. 330100-4.1. The pipe protection shall be sized for the expected soil cover and construction loads so as to limit additional stresses and deflections of the pipe and be approved by the Engineer and Owner.
2. Next, the Contractor shall establish all horizontal and vertical control points necessary to accurately complete the work and establish data to create record plans, Item No. 022100-4.1. The top and bottom elevations of each material type and excavation grade shall be measured with sufficient accuracy to establish quantities for payment.
3. After, the Contractor shall install sedimentation and erosion control measures upgradient of the planned excavation, Item
No. 312500-4.1. The Contractor shall also survey the approximate limits of the relief trench to help verify during excavation, Item No. 022100-4.1.
4. Once the erosion and sedimentation control measures are in place, the Contractor shall begin earthwork operations by removing topsoil within the limits shown, Item No. 311100-4.1. Topsoil shall be stockpiled onsite in the designated areas shown on Sheet 4 of the Contract Plans. Sedimentation and erosion control measures shall be installed downgradient of the stockpiled material, Item No. 312500-4.1.
5. Following topsoil removal, the Contractor shall excavate to the sloped excavation grades shown, Item No. 312323-4.1.
During the sloped excavation, the Contractor shall install pipe protection over the alignment of the two sanitary pipes
(15-inch diameter pipe and 10-inch diameter pipe) located within the sloped excavation to the limits shown, Item No.
330100-4.1.The pipe protection shall be sized for the expected soil cover and construction loads so as to limit additional stresses and deflections of the pipe and be approved by the Engineer and Owner. The 15-inch diameter sanitary pipe that discharges from Sanitary Manhole - North to Sanitary Manhole - No. N0A1 will be located at the toe of the access ramp into the sloped excavation and will need to account for larger loads from construction equipment and vehicles.
6. As the sloped excavation progresses, the Contractor shall implement excavation dewatering techniques as needed, Item
No. 312319-4.1.
7. Soil excavated from the sloped excavation shall be stockpiled onsite in the designated areas shown on Sheet 4 of the
Contract Plans, Item No. 312323-4.1. Sedimentation and erosion control measures shall be installed downgradient of the stockpiled material, Item No. 312500-4.1.
8. The Contractor shall collect a minimum of three representative soil samples from the stockpiled sloped excavation material and test them in accordance with the Technical Specifications, Item No. 312323-4.2.
9. If the relief trench is encountered during the sloped excavation, the Contractor shall collect a minimum of three representative soil samples from the relief trench material. The soil samples shall be tested in accordance with the
Technical Specifications, Item No. 312323-4.2.
10. Following sloped excavation, the Contractor shall excavate to the trench excavation grades shown, Item No. 312323-4.3.
12. As the trench excavation progresses, the Contractor shall implement excavation dewatering techniques as needed, Item
No. 312319-4.1.
13. Soil excavated from the trench excavation should be classified as contaminated soil and disposed of in accordance with
Section 31 20 00 - Removal and Disposal of Contaminated Materials of the Technical Specifications, Item No. 312323-4.3.
14. During trench excavation, if the 1949 Sanitary Manhole is encountered, the manhole should be classified as contaminated material and disposed of in accordance with Section 31 20 00 - Removal and Disposal of Contaminated Materials of the
Technical Specifications, Item No. 333000-4.2.
15. The existing sanitary pipe will be exposed during trench excavation. The pipe should be classified as contaminated material and disposed of in accordance with Section 31 20 00 - Removal and Disposal of Contaminated Materials of the
Technical Specifications, Item No. 333000-4.1.
16. The existing sanitary pipe is installed into each manhole as shown in the details on Sheet 7 of the Contract Plans. Actual conditions may vary once the pipe is exposed, changes to removal or additional work required shall be discussed with the
Engineer and Owner.
17.The abandoned 15-inch diameter sanitary pipe that connects into the 1949 Sanitary Manhole shall be evaluated by the
Owner and Engineer after trench excavation is complete and the pipe has been exposed. Depending on the condition of the pipe, additional remediation/removal measures may be required.
18. The Owner and Engineer contact information is as follows:
Todd Swackhamer, P.E., Design Engineer - (716) 834-8932
Brad Camp, Olean DPW Water & Sewer Superintendent - (716) 376-5659
SCALE: 1" = 20'
0 10' 20'20'
C A
T T
A R
A U
G U
S C
O U
N T
Y
R E
V
R E
V
R E
V
N E
W Y
O R
K
O L E
A N
F L O
O D
P R
O T
E C
T
IO
N L
E V
E E
E X
C A
V A
T
IO
N P
L A
N E
X C
A V
A T
IO
N
C R
O S
S S
E C
T
IO
N A
N D
E X
C A
V A
T
IO
N P
R O
F
IL
E
A.J.N. / T.W.S.
AS SHOWN
23021-004
DESIGNED BY:
JUNE 2024
DWG. NO.
SHEET:
JOB NO.
DATE:
SCALE:
23-021
CHECKED BY:
0REVISION NUMBER -
K.M.M.
K.M.M.DRAWN BY:
N O
T E
U N
A U
T H
O R
IZ
E
D A
L T
E R
A T
IO
N
O R
A D
D
IT
IO
N
T O
A N
Y S
U R
V E
Y
D R
A W
IN
G
D
E S
IG
N
S P
E C
IF
IC
A T
IO
N
P
L A
N
O R
R E
P O
R T
I S
A
V
IO
L A
T
IO
N O
F S
E C
T
IO
N
P
R O
V
IS
IO
N
O F
T H
E N
E W
Y O
R K
S T
A T
E E
D U
C A
T
IO
N L
A W
M cM ah on
M an n
C o n s u lt in g E n g in e e ri n g a n d G e o lo g y P
.C
M a in S tr e e t, S u it e
B u ff a lo N
Y
(7
-8 w w w
.m m c e
.n e t
SCALE: 1" = 20'
EXCAVATION PLAN
SCALE: 1" = 10'
EXCAVATION CROSS SECTION
5 5
SCALE: 1" = 10'
0 5' 10'10'
SCALE: 1" = 10'
EXCAVATION PROFILE
5 5
SCALE: 1" = 10'
0 5' 10'10'
J u ly
A d d e d s id e s lo p e a n g le a n d N o te
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
(SEE NOTE 1)
APPROXIMATE EDGE OF OLEAN
CREEK (DECEMBER 22, 2023)
1949 ABANDONED UNDERGROUND
SANITARY UTILITY
NOTE:
1. Base map adapted from survey completed by KHEOPS
Architecture, Engineering & Survey, DPC, dated December
2023.
SANITARY MANHOLE
TOP OF STREAMBANK
BOTTOM OF STREAMBANK
EXISTING HANDRAIL
STONE LINED ACCESS ROAD
EXISTING CONCRETE LIMITS
UNDERGROUND
STORMWATER UTILITY
EXISTING UNDERGROUND
SANITARY UTILITY
CONCEPTUAL FINAL GRADE
CONTOURS
PROPOSED UNDERGROUND
SANITARY UTILITY
EXISTING BRUSH LINE
EXISTING RELIEF TRENCH LIMITS
RELIEF TRENCH CONNECTION
LIMITS
O L E
A N
C R
E E
K
6 6
6 6
6 6
SANITARY M.H. - SOUTH
10-INCH DIA. C.M.P.
15-INCH DIA. C.M.P.
15-INCH DIA. C.I.P.
STORM. M.H.
18-INCH DIA.
STORM. PIPE
GRADE TO MATCH
EXISTING CONTOURS
INSTALLATION OF NEW SANITARY PIPE,
ITEM NO. 333000-4.3
(15-INCH DIA. SDR 35 PVC PIPE)
ABANDONED 15-INCH
DIA. SAN. PIPE
RELIEF TRENCH CONNECTION,
ITEM NO. 312323-4.8,
- SEE DETAIL
6 6
RELIEF TRENCH
GRADE TO MATCH
EXISTING CONTOURS
LIMITS OF TOPSOIL PLACEMENT,
ITEM NO. 312219-4.1 (ONSITE)
AND ITEM NO. 312219-4.2
(OFFSITE), AND REVEGETATION,
ITEM NO. 312219-4.3
SAN. M.H. - NO N0A1
SAN. M.H. - NO. GV59
6 7
S T
O N
E L
IN
E
D A
C C
E S
S R
O A
D
E L
E V
A T
IO
N
F
T
1435SAN. M.H. - NO. GV59
RIM EL. 1429.7
CHANNEL INV. EL. 1407.22
10-INCH DIA. C.M.P.
15-INCH DIA. C.I.P.
15-INCH DIA. C.M.P.
INSTALLATION OF
NEW SANITARY PIPE,
ITEM NO. 333000-4.3
(15-INCH DIA. SDR 35
PVC PIPE)
OLEAN CREEK (EL. 1412.7)
ON DECEMBER 22, 2023
INV. EL. 1408.44
FINAL GRADE EXISTING GROUND SURFACE
RELIEF TRENCH CONNECTION,
ITEM NO. 312323-4.8,
- SEE DETAIL
SAN. M.H. - NO. N0A1
RIM EL. 1418.1
KEYED SLOPE
CONNECTION
- SEE DETAIL
6-INCH TOPSOIL,
TOPSOIL - ONSITE, ITEM NO. 312219-4.1
TOPSOIL - OFFSITE, ITEM NO. 312219-4.2
REVEGETATION, ITEM NO. 312219-4.3
CONSISTS OF FERTILIZER, GRASS
SEED, MULCH, AND BINDER
KEYED SLOPE
CONNECTION
- SEE DETAIL
6 7
6 7
PIPE REPLACEMENT INTO
MANHOLE - SEE DETAIL 4
6 7
PIPE REPLACEMENT INTO
MANHOLE - SEE DETAIL
6 7
CHANNEL INV. EL. 1407.19
ABANDONED 15-INCH
DIA. SAN. PIPE
FLOWABLE FILL,
ITEM NO. 312323-4.4
SAN. M.H. - NO.
GV59 SLUICE GATE
6 7
0.5' (MIN.)
20.0'
SUITABLE FILL - ONSITE, ITEM NO. 312323-4.5
SUITABLE FILL - OFFSITE, ITEM NO. 312323-4.6
FILTER COLLAR
- SEE DETAIL
6 7
E L E
V A
T
IO
N
F T
2.5' (MIN.)
EXISTING GROUND SURFACE
TRENCH EXCAVATION LIMIT
FINAL GRADE
SUITABLE FILL - ONSITE,
ITEM NO. 312323-4.5 /
SUITABLE FILL - OFFSITE,
ITEM NO. 312323-4.6
REVEGETATION, ITEM NO. 312219-4.3
CONSISTS OF FERTILIZER, GRASS
SEED, MULCH, AND BINDER
6-INCH TOPSOIL,
TOPSOIL - ONSITE, ITEM NO. 312219-4.1
TOPSOIL - OFFSITE, ITEM NO. 312219-4.2
INSTALLATION OF
NEW SANITARY PIPE,
ITEM NO. 333000-4.3
(15-INCH DIA. SDR 35
PVC PIPE)
FLOWABLE FILL,
ITEM NO. 312323-4.4
KEYED SLOPE
CONNECTION
- SEE DETAIL
KEYED SLOPE
CONNECTION
- SEE DETAIL
2.5
2.5
EXISTING
(FILL/SANDY SILT/SAND
AND GRAVEL)
EXISTING
(FILL/SANDY SILT/SAND
AND GRAVEL)
6 7
6 7
0.5' (MIN.)
FINAL GRADING CONSTRUCTION SEQUENCE NOTES
1. Upon completion of the trench excavation and subsequent material disposal, the Contractor shall prepare the subgrade within the excavation prior to placement of flowable fill in accordance with Section 31 23 23 -
Earthwork of the Technical Specifications.
2. After subgrade acceptance, the Contractor shall install the new sanitary pipe (15-inch diameter SDR 35 PVC pipe), Item No. 333000-4.3, in accordance with Section 33 30 00 - Sanitary Utility Piping and Structures of the
Technical Specifications and the sections and details shown on Sheets 6 and 7 of the Contract Plans. The proposed pipe invert elevations for the new sanitary pipe shown, shall be field verified after exposing and removing existing pipe.
3. Install the new sanitary pipe as shown in the details on Sheet 7 so as to create a water tight connection. The pipe connection and seal to Sanitary Manhole - No. GV59 shall in no way damage operation of the existing sluice gate.
4. Following the installation of the new sanitary pipe, the Contractor shall start placement of the flowable fill within the trench excavation around the new sanitary pipe to the grades shown, Item No. 312323-4.4, in accordance with Section 31 23 23 - Earthwork of the Technical Specifications. Flowable fill shall be placed in lifts and sections to maintain the proposed alignment of the new sanitary pipe.
5. Upon completion of placement of the flowable fill, the Contractor shall prepare the subgrade within the sloped excavation limits prior to placement of the suitable fill in accordance with Section 31 23 23 - Earthwork of the
Technical Specifications.
6. After acceptance of the subgrade, the Contractor shall start placement and compaction of the suitable fill
(from onsite stockpile, Item No. 312323-4.5 and as needed from offsite source, Item No. 312323-4.6) within the sloped excavation to the grades shown in accordance with Section 31 23 23 - Earthwork of the Technical
Specifications. The compacted suitable fill shall be keyed into the excavation slopes as shown on Sheets 6 and 7 of the Contract Plans.
7. The Contractor shall obtain the services of a third party testing firm to complete the in-place field density tests, Item No. 312323-4.7. The Field Technician shall measure the in-place dry density and in-place moisture content at the minimum requirements provided in Section 31 23 23 - Earthwork of the Technical
Specifications.
8. If the limits of the relief trench are encountered during sloped excavation, the relief trench should be restored, Item No. 312323-4.8. The relief trench should be restored to the approximate limits and dimensions surveyed during the sloped excavation, as follows:
a. Following placement of the suitable fill, excavate to approximate limits surveyed during the sloped excavation.
b. The Contractor shall prepare the subgrade within the relief trench excavation prior to placement of concrete sand as specified in the Section 31 23 23 - Earthwork of the Technical Specifications.
c. Then the Contractor shall place the concrete sand in accordance with Section 31 23 23 - Earthwork of the
Technical Specifications.
9. Following placement of the suitable fill and relief trench connection, topsoil shall be placed to a minimum compacted depth of 6 inches within the limits indicated. Topsoil from either onsite stockpile, Item No.
312219-4.1, or if needed offsite source, Item No. 312219-4.2, shall be placed. The topsoil shall be placed in accordance with Section 31 22 19 - Revegetation of the Technical Specifications.
10. After placement of topsoil, the Contractor shall perform revegetation, Item No. 312219-4.3. This shall include soil preparation and fertilizing, seeding and mulching, and maintenance. Revegetation shall be performed in accordance with the guidelines and requirements provided in Section 31 22 19 - Revegetation of the
Technical Specifications. The Contractor shall be responsible for satisfactory establishment and growth of a permanent stand of vegetation for a period of one year following the final seeding as judged by the Owner.
During this period, the Contractor shall be responsible for the maintenance of vegetation.
11. After the completion of construction and before sanitary flow is directed to Sanitary Manhole - No. N0A1, the
Contractor shall inspect the new pipe, Item No. 330130-4.1. The pipe inspection shall be in accordance with
Section 33 01 30 - Pipe Verification of the Technical Specifications. Following approval of the pipe inspection, the Contractor shall remove the sanitary bypass system and direct the sanitary flow into Sanitary Manhole -
No. N0A1 where the flow can then travel to Sanitary Manhole - No. GV59.
12. Upon completion of the work, all equipment and materials shall be removed from the staging area, shown on
Sheet 4 of the Contract Plans, and the area shall be returned to preconstruction condition to the satisfaction of the Owner. All incidental areas disturbed by the Contractor are to be returned to their original condition or better by the Contractor upon completion of the project.
13. All excess material and debris shall be removed from the site as specified in the Technical Specifications.
SCALE: 1" = 20'
0 10' 20'20'
C A
T T
A R
A U
G U
S C
O U
N T
Y
R E
V
R E
V
R E
V
N E
W Y
O R
K
O L E
A N
F L O
O D
P R
O T
E C
T
IO
N L
E V
E E
F
IN
A L G
R A
D
IN
G P
L A
N F
IN
A
L G
R A
D
IN
G C
R O
S S
S E
C T
IO
N
A
N D
F
IN
A L G
R A
D
IN
G P
R O
F
IL
E
A.J.N. / T.W.S.
AS SHOWN
23021-006a
DESIGNED BY:
JUNE 2024
DWG. NO.
SHEET:
JOB NO.
DATE:
SCALE:
23-021
CHECKED BY:
0REVISION NUMBER -
K.M.M.
K.M.M.DRAWN BY:
N O
T E
U N
A U
T H
O R
IZ
E
D A
L T
E R
A T
IO
N
O R
A D
D
IT
IO
N
T O
A N
Y S
U R
V E
Y
D R
A W
IN
G
D
E S
IG
N
S P
E C
IF
IC
A T
IO
N
P
L A
N
O R
R E
P O
R T
I S
A
V
IO
L A
T
IO
N O
F S
E C
T
IO
N
P
R O
V
IS
IO
N
O F
T H
E N
E W
Y O
R K
S T
A T
E E
D U
C A
T
IO
N L
A W
M cM ah on
M an n
C o n s u lt in g E n g in e e ri n g a n d G e o lo g y P
.C
M a in
S tr e e t, S u it e
B u ff a lo N
Y
(7
-8 w w w .m m c e
.n e t
SCALE: 1" = 20'
FINAL GRADING PLAN
SCALE: 1" = 10'
FINAL GRADING CROSS SECTION
6 6
SCALE: 1" = 10'
0 5' 10'10'
SCALE: 1" = 10'
FINAL GRADING PROFILE
6 6
SCALE: 1" = 10'
0 5' 10'10'
J u ly
A d d e d F ilt e r C o lla r
AutoCAD SHX Text S
AutoCAD SHX Text S
~2'
DEPTH OF
RELIEF
TRENCH
VARIES
(~3-6')
RELIEF TRENCH CONNECTION NOTES
1. The historical construction drawings show that the relief trench was installed with an approximate width of 2 feet and extended approximately
0.5 feet into the pervious soil (i.e., sandy silt) for a total depth between 3 and 6 feet.
2. If the limits of the relief trench are encountered during sloped excavation, the relief trench should be restored, Item No. 312323-4.8. The relief trench should be restored to the approximate limits and dimensions surveyed during the sloped excavation, as follows:
a. Following placement of the suitable fill, excavate to approximate limits surveyed during the sloped excavation.
b. The Contractor shall prepare the subgrade within the relief trench excavation prior to placement of concrete sand as specified in the
Section 31 23 23 - Earthwork of the Technical Specifications.
c. Then the Contractor shall place the concrete sand in accordance with Section 31 23 23 - Earthwork of the Technical Specifications.
REVEGETATION, ITEM NO. 312219-4.3
CONSISTS OF FERTILIZER, GRASS
SEED, MULCH, AND BINDER
6-INCH TOPSOIL,
TOPSOIL - ONSITE, ITEM NO. 312219-4.1
TOPSOIL - OFFSITE, ITEM NO. 312219-4.2
RELIEF TRENCH CONNECTION,
ITEM NO. 312323-4.8,
RELIEF TRENCH EXCAVATION
AND CONCRETE SAND
PLACEMENT
SUITABLE FILL - ONSITE,
ITEM NO. 312323-4.5 /
SUITABLE FILL - OFFSITE,
ITEM NO. 312323-4.6
EXISTING
(FILL/SANDY SILT/SAND
AND GRAVEL)
20"
8"
12"
6"
6"
12"
18"
4"
3"
MAX.
EXISTING CONCRETE STRUCTURE
(SAN. M.H. - NO. GV59)
SAN. M.H. - NO. GV59
REMOVE EXISTING CONCRETE
AROUND AND BEYOND EXISTING
PIPE TO ALLOW FOR NEW PIPE
CONNECTION
SLUICE GATE OPERATOR
DO NOT EXCEED 3" OF
CONCRETE REMOVAL IN ANY
DIRECTION WITHOUT APPROVAL
FROM THE ENGINEER OR OWNER
SLUICE GATE FLUSH TO CONCRETE -
SEE PHOTO DETAIL BELOW
TRENCH EXCAVATION AND DISPOSAL LIMIT,
ITEM NO. 312323-4.3
REMOVAL AND DISPOSAL OF EXISTING
SANITARY PIPE, ITEM NO. 333000-4.1
84 FEET OF
EXISTING PIPE
(NOT SHOWN)
3"
MAX.
3"
MAX.
DO NOT EXCEED 3" OF
CONCRETE REMOVAL IN ANY
DIRECTION WITHOUT APPROVAL
FROM THE ENGINEER OR OWNER
EXISTING BRICK/CONCRETE STRUCTURE
(SAN. M.H. - NO. N0A1) -
SEE PHOTO DETAIL BELOW
SAN. M.H. - NO. N0A1
REMOVE EXISTING
BRICK/CONCRETE AROUND AND
BEYOND EXISTING PIPE TO
ALLOW FOR NEW PIPE
CONNECTION
EXISTING CONCRETE STRUCTURE
(SAN. M.H. - NO. GV59)
SAN. M.H. - NO. GV59
SLUICE GATE OPERATOR
SLUICE GATE FLUSH
TO CONCRETE
INSTALLATION OF NEW SANITARY PIPE,
ITEM NO. 333000-4.3
CONSISTS OF NEW SANITARY PIPE
(15-INCH DIA. SDR 35 PVC PIPE),
WATER STOP GROUTING RING, AND
HYDRAULIC CEMENT GROUT
84 FEET OF
NEW PIPE
(NOT SHOWN)
EXISTING BRICK/CONCRETE
STRUCTURE
(SAN. M.H. - NO. N0A1)
SAN. M.H. - NO. N0A1
TRENCH EXCAVATION AND DISPOSAL LIMIT,
ITEM NO. 312323-4.3
WATER STOP GROUTING RING
SIZED TO FIT TIGHTLY TO PIPE
AND BE EMBEDDED INTO GROUT
FILL VOID AREAS WITH
HYDRAULIC CEMENT GROUT
WATER STOP GROUTING RING
SIZED TO FIT TIGHTLY TO PIPE
AND BE EMBEDDED INTO GROUT
FILL VOID AREAS WITH
HYDRAULIC CEMENT GROUT
EXTEND NEW PIPE TO
CONCRETE REMOVAL DEPTH
FLOWABLE FILL
NEW PIPE
SUITABLE FILL
EXISTING NATIVE
FOUNDATION SOIL
FILTER COLLAR
3.0'
3.0'
1.5'
1.5'
NEW PIPE
FILTER COLLAR - CONCRETE
SAND ITEM NO. 312323-4.8
SUITABLE FILL
EXISTING NATIVE
FOUNDATION SOIL
SLOPE FOR SAFETY
& STABILITY
5.5'
SCALE: 1" = 2'
RELIEF TRENCH CONNECTION DETAIL
6 7
C A
T T
A R
A U
G U
S C
O U
N T
Y
R E
V
R E
V
R E
V
N E
W Y
O R
K
O L
E A
N F
L O
O D
P R
O T
E C
T
IO
N L
E V
E E
F
IN
A L
G R
A D
IN
G
A N
D M
A N
H O
L E
C O
N N
E C
T
IO
N D
E T
A
IL
S
A.J.N. / T.W.S.
AS SHOWN
23021-006b
DESIGNED BY:
JUNE 2024
DWG. NO.
SHEET:
JOB NO.
DATE:
SCALE:
23-021
CHECKED BY:
0REVISION NUMBER -
K.M.M.
K.M.M.DRAWN BY:
N O
T E
U N
A U
T H
O R
IZ
E
D A
L T
E R
A T
IO
N
O R
A D
D
IT
IO
N
T O
A N
Y S
U R
V E
Y
D R
A W
IN
G
D
E S
IG
N
S P
E C
IF
IC
A T
IO
N
P
L A
N
O R
R E
P O
R T
I S
A
V
IO
L A
T
IO
N O
F S
E C
T
IO
N
P
R O
V
IS
IO
N
O F
T H
E N
E W
Y O
R K
S T
A T
E E
D U
C A
T
IO
N L
A W
M cM ah on
M an n
C o n s u lt in g E n g in e e ri n g a n d G e o lo g y P
.C
M a in
S tr e e t, S u it e
B u ff a lo N
Y
(7
-8 w w w .m m c e
.n e t
SCALE: 1" = 1'
KEYED SLOPE CONNECTION DETAIL
6 7
SCALE: 1" = 2'
PIPE REMOVAL FROM MANHOLE DETAIL
5 7
SCALE: 1" = 2'
PIPE REPLACEMENT INTO MANHOLE DETAIL
6 7
SCALE: 1" = 2'
FILTER COLLAR DETAIL
6 7
SCALE: 1" = 2'
FILTER COLLAR SECTION
7 7
J u ly
A d d e d F ilt e r
C o lla r
D e ta il a n d S e c ti o n
Project Specifications
Prepared by
McMahon & Mann Consulting Engineering and Geology, P.C.
SECTION 02 21 00 SURVEYING AND RECORD PLANS
Olean Flood Protection Levee Page 02 21 00 - 1
SECTION 02 21 00
SURVEYING AND RECORD PLANS
PART 1 – GENERAL
1.1. SCOPE
A. This work shall consist of all necessary surveying required to construct all elements of the project as shown on the Contract Plans or as directed by the Engineer in accordance with the specifications.
B. Work shall include but not be limited to stakeout, layout, and elevations for the limit of disturbance, new sanitary piping, and remaining sanitary utility structures by qualified personnel acceptable to the Engineer and Owner and the installation of a temporary staff gage.
1.2. RELATED SECTIONS
A. Earthwork – Section 31 23 23
B. Sanitary Utility Piping and Structures – Section 33 30 00
1.3. REFERENCE STANDARDS
A. New York State Department of Transportation (NYSDOT) Standard Specifications Section 625 – Survey Operations.
1.4. SUBMITTALS
A. Submittals shall be prepared and reviewed at least two weeks prior to the start of construction.
B. Submit qualifications for the surveying firm and the qualified personnel indicating a minimum of three years of experience with construction layout and record plan development.
C. Submit plan for construction survey control including survey equipment and location of baselines for control of work. Equipment shall conform to the latest NYSDOT Standard Specifications Section 625-2.
D. Submit plan for installation of temporary staff gage including equipment and location of gage.
PART 2 – MATERIALS
None
Olean Flood Protection Levee Page 02 21 00 - 2
PART 3 – EXECUTION
3.1. TEMPORARY STAFF GAGE
A. Prior to the commencement of earthwork, the Contractor shall install a temporary staff gage along the bank of Olean Creek to monitor the water level in the creek. The gage should be placed so that it is visible without obstructions throughout the construction schedule and so that it remains visible at increase water levels. The gage should have graduated marks at each tenth of a foot of height and it should have additional distinctive marks at each whole foot. The “action” stage level determined for the construction site will be measured with respect to this temporary staff gage and will be provided to the Contractor prior to the start of construction. The Contractor shall observe the stage level of the creek at the beginning and end of every day and shall report its observations to the Engineer and Owner.
3.2. GENERAL
A. Work shall conform to the latest NYSDOT Standard Specifications Section 625-3.
B. Survey measurements are required to be accurate to within 0.12 inches (0.01 feet) in horizontal location and within 0.12 inches (0.01 feet) in elevation.
C. Prior to commencement of earthwork, the Contractor shall establish all necessary baselines, and horizontal and vertical control points, necessary to accurately complete the construction.
D. Existing grades shall be verified within the construction limits shown on the Contract
Plans, with information provided to the Engineer for review and issuance of proposed grades.
E. Approximate limits of the relief trench, as shown on the Contract Plans, shall be surveyed prior to sloped excavation to help verify during excavation if the relief trench is present. If the relief trench is encountered during sloped excavation, the Contractor shall survey the actual limits of the relief trench and reconstruct the relief trench in the existing location and to the existing dimensions.
F. As-built points, sufficient to define surfaces for measurements and payment, shall be taken at all surfaces, including: the ground surface following the completion of…